8. ESSB EIA Chap 1-Introduction

Total Page:16

File Type:pdf, Size:1020Kb

8. ESSB EIA Chap 1-Introduction EIA for the Proposed Development of 55MW Gas Fired Power Project No: P18006 Plant and New Plant Components at the Integrated Iron and Steel Mill, Teluk Kalung Industrial Estate, Kemaman, Revision: 0 Terengganu for Eastern Steel Sdn. Bhd. Date: October 2019 CHAPTER 1 INTRODUCTION 1.1 TITLE OF PROJECT This Environmental Impact Assessment (EIA) report is titled: “Proposed Development of 55MW Gas Fired Power Plant and New Plant Components at the Integrated Iron and Steel Mill, Teluk Kalung Industrial Estate, Kemaman, Terengganu for Eastern Steel Sdn. Bhd.” This Environmental Impact Assessment (EIA) study is carried out for proposed development of Power Plant and New Plant Components that will be develop in the existing Integrated Iron and Steel Mill (IISM) operated by Eastern Steel Sdn Bhd located in Teluk Kalong Industrial Estate, Kemaman, Terengganu. An EIA study is deemed required based on the following: a. Compliance with EIA Approval Conditions No 11 b. DOE’s reply letter dated 19 October 2018 [ref. no: AS(PN)/37/101/000/118 Jilid 4()]. c. Compliance with EIA Order 2015 under prescribed activities. In order to address the current operation and proposed new components, the EIA study will address the cumulative impacts from current Phase 1 operations and with the proposed plant components, as well as the Production Office, Worker Quarter and Administrative Building. Hereinafter, it shall be referred to as “the Project” in this report. 1.2 PROJECT BACKGROUND Eastern Steel Sdn. Bhd. (hereinafter referred to as “Eastern Steel” or “Project Proponent”) is the owner and operator of an Integrated Iron and Steel Mill (IISM) on Lot 6293, 6294, 60129, 60130 and 60131 within the Teluk Kalung Industrial Estate (TKIE) in Kemaman, Terengganu. The overall IISM based on its conception planning is to be developed in 2 main phases – Phase 1 and Future Phase. Phase 1 is planned for maximum production capacity of 1.57 mil MT/year of iron and steel products, while the Future Phase will have an overall production capacity of 5 mil MT/year for iron and steel products, including the downstream steel products such as coils, wire, plates and others. The components that has been developed under Phase 1 in 2012 and currently in operation are: Page 1-1 EIA for the Proposed Development of 55MW Gas Fired Power Project No: P18006 Plant and New Plant Components at the Integrated Iron and Steel Mill, Teluk Kalung Industrial Estate, Kemaman, Revision: 0 Terengganu for Eastern Steel Sdn. Bhd. Date: October 2019 • Sinter Plant, • Blast Furnace, • Steel Converter, • Ladle Furnace, • Continuous Caster (Slab), • Continuous Caster (Round/ Rectangular), • Oxygen Plant, and • Raw Material Storage Yard. Details of IISM components for Phase 1 and Future Phase in Table 1-1. In terms of physical development, the Phase 1 was developed on land area of about 358 ac. while the remaining 850 ac. of land is designated for Future Phase. The overall IISM occupies total land area of approximately 1,208 ac. In this EIA study, Eastern Steel is proposing to complete the Phase 1 development components as follows: • 55 MW Gas Fired Power Plant utilising waste gas (Blast Furnace Gas and Converter Gas), • Slag Metal Recovery Plant (cooling and physical separation only), • Continuous Caster (Billet) (or known as “Billet Plant”), and • Coking Plant All the above components will be constructed within the existing IISM area. To support the operation and management of IISM, a new Production Office, Worker Quarter and Administrative Building are proposed to be developed within the IISM land area. Table 1-1 Status of IISM Development Phase 1 Future No. Component Maximum Remarks Size Unit Phase Capacity 4.45 mil Phase 1 1. Sinter Plant 2.3 mil MT/year 100 m2 2 MT/year In operation 3 600 m 2.98 mil Phase 1 2. Blast Furnace 1.57 mil MT/year 1 1080 m3 MT/year In operation 3.43 mil Phase 1 3. Steel Converter 1.57 mil MT/year 60 t 2 MT/year In operation 3.43 mil Phase 1 4. Ladle Furnace 1.57 mil MT/year 65 t 2 MT/year In operation Continuous Caster 1.685 mil Phase 1 5. (Slab) MT/year In operation Continuous Caster 1.5 mil MT/year - 2 1.685 mil Phase 1 6. (Round/ MT/year In operation Rectangular) Page 1-2 EIA for the Proposed Development of 55MW Gas Fired Power Project No: P18006 Plant and New Plant Components at the Integrated Iron and Steel Mill, Teluk Kalung Industrial Estate, Kemaman, Revision: 0 Terengganu for Eastern Steel Sdn. Bhd. Date: October 2019 Phase 1 Future No. Component Maximum Remarks Size Unit Phase Capacity Raw Material 350,000 3.22 mil Phase 1 7. 2.28 mil MT/year 1 Storage Yard m2 MT/year In operation Wastewater 1.095 mil 8. 0.73 mil m3/year - 1 Future Treatment Plant 1 m3/year 10,000 180 mil 240 mil m3/year Phase 1 9. Oxygen Plant m3/hr 2 m3/year (liq. O2) In operation per unit X 5 unit Lime 0.198 mil 0.702 mil 10. Manufacturing - 1 Future MT/year MT/year Plant 5 m3 0.75 mil 11. Pellet Plant 0.25 mil MT/year Roasting 1 Future MT/year Furnace 8 x 18 In progress holes 2.2 mil 12. Coking Plant 0.8 mil MT/year - of Coke MT/year construction Oven 3.0 mil 13. Hot Rolling Mill - - - Future MT/year 0.8 mil 14. Cold Rolling Mill - - - Future MT/year 0.2 mil 15. Galvanising Plant - - - Future MT/year 0.1 mil 16. Pre-Painting Plant - - - Future MT/year 1.0 mil 17. Plate Mill - - - Future MT/year 0.75 mil 18. Section Mill - - - Future MT/year 1.0 mil 19. Bar Mill - - - Future MT/year 0.5 mil 20. Wire Rod Mill - - - Future MT/year Seamless Pipe 0.5 mil 21. - - - Future Mill MT/year Acid Regeneration 24003 22. - - - Future Plant m3/year Wastewater 18.25 mil 23. - - - Future Treatment Plant 2 m3/year 24. Conveyor System Convey raw material from Kemaman Port to the Mill Future This Environmental Impact Assessment (EIA) is prepared to present the identification and assessment of key environmental issues arising from the proposed Project and the issues of concern to be assessed during its implementation. In general, EIA will assess impacts Page 1-3 EIA for the Proposed Development of 55MW Gas Fired Power Project No: P18006 Plant and New Plant Components at the Integrated Iron and Steel Mill, Teluk Kalung Industrial Estate, Kemaman, Revision: 0 Terengganu for Eastern Steel Sdn. Bhd. Date: October 2019 arising from the proposed Project as well as cumulative impacts from operation of Project and existing plants. 1.3 PROJECT LOCATION The Proposed Project will be developed within the existing plant located on Lot 6294 and partially of Lot 60129 and Lot 60131 in the Teluk Kalung Industrial Estate, Kemaman, Terengganu as shown in Figure 1-1. The entire IISM is located at Lot 6293, 6294, 60129, 60130 and 60131 within Teluk Kalung Industrial Estate (TKIE). Location plan of the IISM plant within TKIE is shown in Figure 1-2. Total overall IISM facility occupies approximately 1,208 ac. of land. Phase 1 of the development covers an area of 358 ac. Whilst the remaining 850 ac. Of land is designated for Future Phases. The Global Positioning System (GPS) coordinates for Eastern Steel plant boundaries are listed in Table 1-2. Table 1-2 Project Boundaries Coordinate No Latitude Longitude 1 N40 16’ 54.24” E1030 26’ 2.63” 2 N40 16’ 58.35” E1030 25’ 34.84” 3 N40 16’ 58.35” E1030 25’ 11.83” 4 N40 17’ 15.03” E1030 25’ 11.88” 5 N40 17’ 15.03” E1030 25’ 0.80” 6 N40 17’ 24.5” E1030 25’ 02.3” 7 N40 17’ 32.3” E1030 25’ 11.2” 8 N40 17’ 46.8” E1030 25’ 10.0” 9 N40 17’ 47.8” E1030 25’ 01.2” 10 N40 18’ 20.4” E1030 25’ 01.2” 11 N40 18’ 32.5” E1030 25’ 26.9” 12 N40 18’ 32.5” E1030 26’ 16.8” 13 N40 17’ 50.6” E1030 26’ 16.8” 14 N40 17’ 35.6” E1030 26’ 09.8” 15 N40 17’ 26.38” E1030 26’ 05.65” 16 N40 17’ 11.22” E1030 26’ 03.74” Source: Eastern Steel, 2019 The TKIE is accessible by using the Federal Route 3, the main coastal road link and later Federal Route 145 (Jalan Kemaman-Dungun) connecting Kijal to Dungun. It also can be access via the Teluk Kalung Bypass Road. The industrial estate is also supported by the Kemaman Port which facilitates the import of raw materials and export of products. Page 1-4 EIA for the Proposed Development of 55MW Gas Fired Power Project No: P18006 Plant and New Plant Components at the Integrated Iron and Steel Mill, Teluk Kalung Industrial Estate, Kemaman, Revision: 0 Terengganu for Eastern Steel Sdn. Bhd. Date: October 2019 LOCATION PLAN New Worker Quarter & Administrative Building ESSB LAND New 55MW Gas Fired Power Plant Coking Plant KEY PLAN (Approved Component) New Production Office Relocation New Billet Plant LEGEND: New Slag Metal Project Site Recovery Plant New Components Source: Eastern Steel, 2019; MPK,2019 Figure 1-1 Layout of Proposed Project at Integrated Iron and Steel Mill (IISM) Page 1-5 EIA for the Proposed Development of 55MW Gas Fired Power Project No: P18006 Plant and New Plant Components at the Integrated Iron and Steel Mill, Teluk Kalung Industrial Estate, Kemaman, Revision: 0 Terengganu for Eastern Steel Sdn. Bhd. Date: October 2019 Source(s): Google Map, 2019, & Eastern Steel, 2019 LEGEND: Eastern Steel Sdn.
Recommended publications
  • Senarai Nama Kontraktor Perkhidmatan Pembersihan Awam Dalam Kawasan Majlis Perbandaran Kemaman Bagi Tahun 2019/2021 Bil Nama K
    SENARAI NAMA KONTRAKTOR PERKHIDMATAN PEMBERSIHAN AWAM DALAM KAWASAN MAJLIS PERBANDARAN KEMAMAN BAGI TAHUN 2019/2021 BIL NAMA TARIKH KAWASAN PKA YANG MENJAGA KONTRAKTOR LANTIKAN 1 MPK/T/P/2018/1 Perkhidmatan pemungutan dan pembuangan sampah di Zon A1 Kawasan Pusat Nasrul Syamim bin Nazri 1/1/2019 Bandar Cukai dan sekitarnya 0199454889 KALONG ILHAM – ENTERPRISE 31/12/2021 1081-2, Teluk Kalong 24000 Kemaman. No. Tel: 019 983 5667 2 MPK/T/P/2018/2 Perkhidmatan pemungutan dan pembuangan sampah di Zon A2 Kawasan 1/1/2019 Industri Jakar dan sekitarnya Adnan bin Abu Bakar DYROX ENTERPRISE – 013 920 6893 K-543-1, Tingkat 1, 31/12/2021 Jalan Sulaimani, 24000 Kemaman. No. Tel: 019 915 2402 BIL NAMA TARIKH KAWASAN PKA YANG MENJAGA KONTRAKTOR LANTIKAN 3 MPK/T/P/2018/3 Perkhidmatan pemungutan dan pembuangan sampah di Zon A3 Kawasan Shahrul Badry bin Ab 1/1/2019 Taman Cukai Utama Fasa 1 & 4/Nirwana/Jalan Pengkalan Pandan/Jalan Jamil AINNUR BERKAT – Bukit Mentok dan sekitarnya 0111 6927 445 ENTERPRISE 31/12/2021 964, Kg Bukit Mentok 24000 Kemaman. No. Tel: 013 931 9764 4 MPK/T/P/2018/4 Perkhidmatan pemungutan dan pembuangan sampah di Zon A4 Kawasan Jalan Wan Izrul Hafiz bin Wan 1/1/2019 Air Putih/Kg Gong Pauh dan sekitarnya Mohd Suhaimi MM TECH – 018 900 1962 ENGINEERING & 31/12/2021 SERVICES PT 8808 & 8809, Bandar Baru Bukit Mentok, 24000 Kemaman. No. Tel: 019 985 7288 5 MPK/T/P/2018/5 Perkhidmatan pemungutan dan pembuangan sampah di Zon B1 Kawasan Kuala Mohd Hafifi bin Zakaria 1/1/2019 Kemaman/Kg Geliga dan sekitarnya 013 929 7360 DINAR SUASA SDN – BHD 31/12/2021 K-543, Tingkat 1, Jalan Sulaimani, 24000 Kemaman.
    [Show full text]
  • Jabatan Kerja Raya Negeri Terengganu
    JABATAN KERJA RAYA NEGERI TERENGGANU SENARAI PROJEK DALAM PEMBINAAN PERUNTUKKAN : PERSEKUTUAN DAERAH : MARANG KOS(RM) BIL TAJUK PROJEK JANGKA SIAP JUTA PEMBINAAN BILIK KEBAL DAN LAIN-LAIN KERJA BERKAITAN 1 0.41 NOV 2008 DI SMK. SEBERANG MARANG, MARANG, TERENGGANU Projek Membina Jalan Dari Rawai Ke Binjai Rendah, Marang, 2 8.55 NOV 2009 Terengganu PEMBINAAN SATU (1) BLOK BENGKEL MENSERVIS 3 AUTOMOBIL (MA)SERTA KERJA-KERJA BERKAITAN DI SMK. 0.88 AUG 2008 MERCHANG, MARANG, TERENGGANU PEMBINAAN BANGUNAN SEKOLAH TEMBAHAN (6BD) DAN 4 LAIN-LAIN KERJA BERKAITAN DI SK. PULAU KERENGGA, 3.38 MEI 2009 MARANG, TERENGGANU PEMBINAAN ASRAMA (HARIAN BIASA)DEWAN 5 MAKAN,KUARTERS WARDEN DAN LAIN-LAIN KERJA 6.10 MAC 2009 BERKAITAN DI SMK.BUKIT SAWA,MARANG,TERENGGANU. PEMBINAAN ASRAMA (HARIAN BIASA) DEWAN 6 MAKAN,KUARTERS WARDEN DAN LAIN-LAIN KERJA 4.39 MAC 2009 BERKAITAN DI SK.MERCHANG,MARANG,TERENGGANU. PEMBINAAN ASRAMA (HARIAN BIASA) DEWAN MAKAN,KUARTERS WARDEN DAN LAIN-LAIN KERJA 7 4.67 MAC 2009 BERKAITAN DI SK. PENGKALAN BERANGAN,MARANG,TERENGGANU PEMBINAAN SATU (1) BLOK BENGKEL AKUAKULTUR DAN SATU (1) BLOK BENGKEL HAIWAN REKREASI SERTA KERJA- 8 1.39 NOV 2008 KERJA BERKAITAN DI SMK WAKAF TAPAI, MARANG, TERENGGANU PEMBINAAN ASRAMA (HARIAN BIASA)DEWAN 9 MAKAN,KUARTERS WARDEN DAN LAIN-LAIN KERJA 4.47 FEB 2009 BERKAITAN DI SMK.MERCHANG, MARANG, TERENGGANU PEMBINAAN SEBUAH BANGUNAN KLINIK DESA JENIS 2G 10 DAN LAIN-LAIN KERJA BERKAITAN DI KG. RHU MUDA, 0.80 SEPT 2008 MARANG, TERENGGANU 11 SK JERONG, MARANG, TERENGGANU 7.01 JUN 2009 PEMBINAAN KUARTERS KAKITANGAN PERSEKUTUAN JKR DI 12 1.50 JUN 2008 MARANG, TERENGGANU NAIKTARAF JALAN PERSEKUTUAN LALUAN 3, KM 11- 13 18,JALAN KUALA TERENGGANU- 41.03 JAN 2009 KUANTAN,MARANG,TERENGGANU JUMLAH 84.58 JABATAN KERJA RAYA NEGERI TERENGGANU SENARAI PROJEK DALAM PEMBINAAN PERUNTUKKAN : NEGERI DAERAH : MARANG KOS(RM) BIL TAJUK PROJEK JANGKA SIAP JUTA PEMBINAAN SEBUAH MASJID DAN LAIN-LAIN KERJA YANG 1 2.98 ARPIL 2009 BERKAITAN DI KG.
    [Show full text]
  • Laporan Ketua Audit Negara Pengurusan Aktiviti Jabatan/Agensi Negeri
    LKAN TAHUN 2018 SIRI 3 PENGURUSAN AKTIVITI JABATAN/AGENSI NEGERI LAPORAN KETUA AUDIT NEGARA PENGURUSAN AKTIVITI JABATAN/AGENSI NEGERI TERENGGANU TAHUN 2018 SIRI 3 Jabatan Audit Negara Aras 1-9, Blok F2 & F3, Kompleks F Lebuh Perdana Timur, Presint 1 Pusat Pentadbiran Kerajaan Persekutuan 62000 Putrajaya, Malaysia www.audit.gov.my JABATAN AUDIT NEGARA TERENGGANU MALAYSIA LAPORAN KETUA AUDIT NEGARA PENGURUSAN AKTIVITI JABATAN/AGENSI NEGERI NEGERI TERENGGANU TAHUN 2018 SIRI 3 Jabatan Audit Negara Malaysia WJD013337 T.Page Terengganu.indd 1 18/06/2020 5:03 PM WJD013337 T.Page Terengganu.indd 2 18/06/2020 5:03 PM KANDUNGAN WJD013337 T.Page Terengganu.indd 1 18/06/2020 5:03 PM KANDUNGAN MUKA SURAT PENDAHULUAN vii AKTIVITI JABATAN/AGENSI PEJABAT SETIAUSAHA KERAJAAN NEGERI (BAHAGIAN PERUMAHAN)/PERBADANAN MEMAJUKAN IKTISAD NEGERI TERENGGANU 1 - 3 1. Pengurusan Rumah Mampu Milik dan Rumah Pangsa Mampu Milik Negeri Terengganu PEJABAT TANAH SETIU PEJABAT TANAH MARANG PEJABAT TANAH KEMAMAN 2 - 3 PEJABAT TANAH BESUT 2. Pengurusan Lesen Menduduki Sementara PENUTUP 3 - 3 AKRONIM 4 - 3 Laporan Ketua Audit Negara Negeri Terengganu Tahun 2018 Siri 3 iii Kandungan WJD013337 T.Page Terengganu.indd 2 18/06/2020 5:03 PM KANDUNGAN MUKA SURAT PENDAHULUAN vii AKTIVITI JABATAN/AGENSI PEJABAT SETIAUSAHA KERAJAAN NEGERI (BAHAGIAN PERUMAHAN)/PERBADANAN MEMAJUKAN IKTISAD NEGERI TERENGGANU 1 - 3 1. Pengurusan Rumah Mampu Milik dan Rumah Pangsa Mampu Milik Negeri Terengganu PEJABAT TANAH SETIU PEJABAT TANAH MARANG PEJABAT TANAH KEMAMAN 2 - 3 PEJABAT TANAH BESUT 2. Pengurusan Lesen Menduduki Sementara PENUTUP 3 - 3 AKRONIM 4 - 3 Laporan Ketua Audit Negara Negeri Terengganu Tahun 2018 Siri 3 iii Laporan Ketua Audit Negara Negeri Terengganu Tahun 2018 Siri 3 iii Kandungan Kandungan WJD013337 T.Page Terengganu.indd 3 18/06/2020 5:03 PM WJD013337 T.Page Terengganu.indd 4 18/06/2020 5:03 PM PENDAHULUAN WJD013337 T.Page Terengganu.indd 5 18/06/2020 5:03 PM PENDAHULUAN 1.
    [Show full text]
  • Malaysia Industrial Park Directory.Pdf
    MALAYSIA INDUSTRIAL PARK DIRECTORY CONTENT 01 FOREWORD 01 › Minister of International Trade & Industry (MITI) › Chief Executive Officer of Malaysian Investment Development Authority (MIDA) › President, Federation of Malaysian Manufacturers (FMM) › Chairman, FMM Infrastructure & Industrial Park Management Committee 02 ABOUT MIDA 05 03 ABOUT FMM 11 04 ADVERTISEMENT 15 05 MAP OF MALAYSIA 39 06 LISTING OF INDUSTRIAL PARKS › NORTHERN REGION Kedah & Perlis 41 Penang 45 Perak 51 › CENTRAL REGION Selangor 56 Negeri Sembilan 63 › SOUTHERN REGION Melaka 69 Johor 73 › EAST COAST REGION Kelantan 82 Terengganu 86 Pahang 92 › EAST MALAYSIA Sarawak 97 Sabah 101 PUBLISHED BY PRINTED BY Federation of Malaysian Manufacturers (7907-X) Legasi Press Sdn Bhd Wisma FMM, No 3, Persiaran Dagang, No 17A, (First Floor), Jalan Helang Sawah, PJU 9 Bandar Sri Damansara, 52200 Kuala Lumpur Taman Kepong Baru, Kepong, 52100 Kuala Lumpur T 03-62867200 F 03-62741266/7288 No part of this publication may be reproduced in any form E [email protected] without prior permission from Federation of Malaysian Manufacturers. All rights reserved. All information and data www.fmm.org.my provided in this book are accurate as at time of printing MALAYSIA INDUSTRIAL PARK DIRECTORY FOREWORD MINISTER OF INTERNATIONAL TRADE & INDUSTRY (MITI) One of the key ingredients needed is the availability of well-planned and well-managed industrial parks with Congratulations to the Malaysian Investment eco-friendly features. Thus, it is of paramount importance Development Authority (MIDA) and the for park developers and relevant authorities to work Federation of Malaysian Manufacturers together in developing the next generation of industrial (FMM) for the successful organisation of areas to cater for the whole value chain of the respective the Industrial Park Forum nationwide last industry, from upstream to downstream.
    [Show full text]
  • Data Utama Negeri I
    Main Data Terengganu Main Data Data Utama Negeri i kandungan contents DATA UTAMA NEGERI 21. Penduduk Mengikut Jantina, Isi Rumah dan Tempat Kediaman 2017 01 Main Data Terengganu Population by Sex, Household & Living Quarters 2017 23. 2. Keluasan, Bilangan JKKK, Guna Tanah & Penduduk Mengikut Daerah 2017 Penduduk Mengikut Kumpulan Umur 2017 Population by Age Group 2017 Area, Number of JKKK, Landused and Population by District 2017 24. 3. Keluasan Mengikut Daerah Penduduk Mengikut Kumpulan Etnik 2017 Population by Ethnic 2017 Area by District Main Data Terengganu Main Data 26. 5. Keluasan Tanah Mengikut Mukim 2017 Kadar Pertumbuhan Penduduk Purata Tahunan Average Annual Population Growth Rate Land Area by Mukim 2017 28. Taburan Peratus Penduduk, Keluasan dan Kepadatan Mengikut Daerah 12. Bilangan Kampung Mengikut JKKK Daerah 2017 Percentage Distribution of Population Area And Density by District Number of Village by District JKKK 2017 30. Penduduk Mengikut Strata 13. Gunatanah Mengikut Daerah 2017 Population by Stratum Landused by District 2017 14. Gunatanah Negeri 2017 Landused by State 2017 SUMBER 03 Resources 34. Sumber PENDUDUK 02 Population Resources 16. Data Penduduk Mengikut Negeri Population Data by State GUNATENAGA 04 Manpower Data Utama Negeri 18. Kadar Pertumbuhan Penduduk Purata Tahunan Mengikut Negeri Average Annual Growth Rate by State 36. Penglibatan Tenaga Buruh 19. Anggaran Penduduk Mengikut Daerah Labour Force Participation Estimated Population by District 37. Taburan Gunatenaga Mengikut Industri Manpower Distribution by Industry KELUARAN DALAM NEGERI KASAR 05 Gross Domestic Product 42 Keluaran Dalam Negeri Kasar (KKDNK) Mengikut Sektor (Harga Malar 2010) Gross Domestic Product (GDP) by Sector (Constant Prices 2010) ii kandungan contens PERINDUSTRIAN TERNAKAN 06 Industry 09 Livestock 48.
    [Show full text]
  • List of Industrial Partners
    LIST OF INDUSTRIAL PARTNERS BIL COMPANY NAME ADDRESS STATE TEL. NO FAX. NO 1 3M MALAYSIA SDN BHD BANGUNAN 3M, PERSIARAN TROPICANA, 47410 PETALING SELANGOR 03-78062888 03-780662902 JAYA 2 4U-TECH CORPORATION SDN BHD 28A JLN PEKAKA 8/3 KOTA DAMANSARA 47810 PETALING SELANGOR 03-61405258 03-61560265 JAYA 3 A FARMOSA RESORT HOTEL SDN JLN KEMUS SIMPANG EMPAT 78000 ALOR GAJAH MELAKA 06-5528388 06-5528107 BHD 4 A PLUS MANUFACTURING LOT 15803, JALAN SIBU, TAMAN TUNKU,98000 MIRI, SARAWAK 0085-611139 0085-611039 (SARAWAK) SDN BHD SARAWAK 5 A PLUS MANUFACTURING SDN BHD 194-B, JALAN TUDM, KAMPUNG BARU SUBANG,40150 SHAH SELANGOR 03-78469397 03-78469404 ALAM 6 A RASHID ENTERPRISE 1763-3 SRI PUNGGOR ALAI 75460 MELAKA 012-6383410 06-2615410 7 A S KOMASU BATTERY 8, JALAN UTARA DUAKAW PERUSAHAAN MERGONG, JALAN KEDAH 04-7338942 04-7337651 TECHNOLOGY SDN BHD LENCONG BARAT, 05150 ALOR SETAR KEDAH 8 A&H ELECTRIC SDN BHD 39-M JLN SBC 1 TMN SRI BATU CAVES 68100 BATU CAVES SELANGOR 03-61887300 03-61899300 9 A&T ELECTRICAL ENGINEERING SDN 29 JLN SELAT SELATAN 14 PORTLAND INDUSTRIAL PARK SELANGOR 03-31670281 03-31670284 BHD PANDAMARAN 42000 PORT KELANG 10 A. & H. MEYER SDN. BHD. NO: 3, JALAN ASTAKA U8/84 SECTION U8, BUKIT JELUTONG SELANGOR 03-78457277 03-78452155 SHAH ALAM 40150 11 A.M OFFICE GROUP INDUSTRIES LOT PT 2333, KAMPUNG BARU SG. BULOH SUNGAI BULOH SELANGOR 03-61577336 03-61569089 SDN BHD 47000 12 A.P.A.I. ENGINEERING SDN BHD NO 53 PERSIARAN VENICE SUTERA 1 DESA MANJUNG RAYA PERAK 05-6885986 05-6888275 32200 LUMUT 13 A1 Niaga Sdn Bhd NO.
    [Show full text]
  • Data Asas 2015.Pdf
    1 DATA UTAMA NEGERI Main Data Terengganu 11 PENDUDUK Population 23 SUMBER Resources 24 GUNATENAGA Manpower 29 KELUARAN DALAM NEGERI KASAR Gross Domestic Product 34 PERINDUSTRIAN Industry 43 PENGELUARAN Production 46 PERTANIAN / PERHUTANAN Agriculture / Forestry 50 TERNAKAN Livestock 55 PERIKANAN Fisheries 61 TARAF HIDUP Quality of Life 64 KESIHATAN Healthy 70 PENDIDIKAN Education 81 PELANCONGAN Tourism 87 PENGANGKUTAN / INFRASTRUKTUR Transport / Infrastructure 100 PERUMAHAN Housing 103 KEMUDAHAN SOSIAL Social Amenities 106 KEBAJIKAN & MAKLUMAT SOSIAL Welfare & Social Information 120 PUSAT PERTUMBUHAN / JARAK PERJALANAN Growth / Road Distance Bismillahirrahmanirrahim. Assalamualaikum Warahmatullahi Wabarakatuh Terlebih dahulu saya merafak kesyukuran ke hadrat ilahi, kerana dengan limpah kurnia dan izinNya dapat diterbitkan Buku Data Asas Negeri Terengganu 2015. Penerbitan ini merupakan inisiatif berterusan Unit Perancang Ekonomi Negeri Terengganu dalam menyalurkan maklumat prestasi serta perkembangan sosio-ekonomi di Negeri Terengganu. Seiring dengan agenda transformasi negeri, data asas ini bertindak sebagai rujukan asas utama dalam merangka perancangan pembangunan sosio-ekonomi, pentadbiran dan penggubalan dasar negeri. Sekalung tahniah dan setinggi penghargaan kepada Jabatan/Agensi Kerajaan Negeri dan Persekutuan serta semua pihak yang terlibat atas komitmen dan inisiatif yang disumbangkan dalam menjayakan penerbitan buku ini. Dengan pendekatan lebih mesra pengguna, buku ini telah diubahsuai dalam bentuk yang lebih mudah alih. Bagi penyebaran maklumat dengan lebih meluas, mudah dicapai dan digunakan, Buku Data Asas ini boleh diakses melalui laman sesawang rasmi Unit Perancang Ekonomi Negeri Terengganu di http://upen.terengganu.gov.my/ Saya yakin dengan penerbitan buku ini akan memberi kebaikan dan meningkatkan usaha bersama ke arah membangunkan sosioekonomi Negeri Terengganu agar seiring dengan perkembangan nasional dan global. Sekian, terima kasih Y. Bhg Dato’ Haji A.
    [Show full text]
  • (Viii) EQR 2017
    CHAPTER 3 : GROUNDWATER QUALITY Kualiti Air Marin dan Pulau-Pulau Marine and Island Marine Water Quality environment quality report 71 BAB 4: KUALITI AIR MARIN DAN PULAU-PULAU KUALITI AIR MARIN DAN PULAU-PULAU MARINE AND ISLAND MARINE WATER QUALITY PENGAWASAN KUALITI AIR MARIN MARINE WATER QUALITY MONITORING Jabatan Alam Sekitar (JAS) menjalankan The Department of Environment (DOE) has been pengawasan kualiti air marin bermula pada tahun monitoring the marine water quality since 1978 in 1978 di Semenanjung Malaysia dan 1985 bagi Sabah Peninsular Malaysia and 1985 in Sabah and Sarawak dan Sarawak dengan tujuan untuk mengenalpasti with the objectives to establish the marine water status kualiti air marin dan menentukan tahap quality status and to determine the pollution level pencemaran daripada punca-punca di daratan dan from land-based and the sea based sources. These juga di laut. Punca-punca pencemaran ini boleh sources may pose threats to the marine resources menimbulkan ancaman kepada sumber kehidupan and can disrupt the stability and diversity of the marin dan menganggu kestabilan dan kepelbagaian marine ecosystem. ekosistem marin. Pada tahun 2017, sebanyak 188 stesen pantai, 88 In 2017, a total of 188 coastal, 88 estuary and 95 stesen kuala dan 95 stesen pulau telah dipantau. island stations were monitored. 752 samples from Sebanyak 752 sampel di kawasan pantai, 352 di coastal, 352 samples from estuary and 380 samples kuala dan 380 di pulau telah diambil untuk dianalisis from island were collected for analysis and reported dan hasilnya dilaporkan berdasarkan Indeks Kualiti based on the Marine Water Quality Index (MWQI). Air Marin (IKAM).
    [Show full text]
  • Table of Contents
    TABLE OF CONTENTS ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CLINICAL WASTE TREATMENT PLANT AT TELUK KALONG INDUSTRIAL ESTATE, KEMAMAN, TERENGGANU FOR RADICARE (M) SDN BHD TOC ACKNOWLEDGEMENT Radicare (M) Sdn Bhd and Chemsain Konsultant Sdn Bhd would like to extend appreciation to the following agencies, companies, community leaders and member of public for contributing to the preparation of this Environmental Impact Assessment (EIA) Report: . Department of Environment, Putrajaya . Department of Environment (DOE) Negeri Terengganu . Jabatan Perancangan Bandar dan Desa Negeri Terengganu . Jabatan Pengairan dan Saliran Negeri Terengganu . Majlis Perbandaran Kemaman . Pejabat Daerah Kemaman . Pejabat Penghulu Mukim Teluk Kalong . Pejabat Penyelaras Dun Kijal Kemaman . All people who rendered their assistance in the study Chemsain Konsultant Sdn Bhd Page | TOC-i Revision No. : 0 CK/EV703/7024/18 Date : August 2019 ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CLINICAL WASTE TREATMENT PLANT AT TELUK KALONG INDUSTRIAL ESTATE, KEMAMAN, TERENGGANU FOR RADICARE (M) SDN BHD TOC Table of Contents Acknowledgement List of Contents List of Appendices List of Tables List of Figures List of Plates List of Abbreviations List of Units Executive Summary Ringkasan Eksekutif CHAPTER 1: INTRODUCTION 1.1 INTRODUCTION ......................................................................................................................... C1-1 1.2 PROJECT TITLE AND PROJECT LOCATION ...........................................................................
    [Show full text]
  • High Grade Iron Ore Concentrate Producer in Malaysia
    HIGH GRADE IRON ORE CONCENTRATE PRODUCER IN MALAYSIA FORTRESS MINERALS LIMITED (Company Registration Number: 201732608K) (Incorporated in the Republic of Singapore on 13 November 2017) Placement in respect of 75,000,000 Placement Shares at S$0.20 for each Placement Share (including 51,250,000 Cornerstone Shares), payable in full on application OFFER DOCUMENT DATED 19 MARCH 2019 arising therefrom and you will have no claim against us or the Sponsor, Issue Manager and (Registered by the Singapore Exchange Securities Trading Limited (the “SGX-ST”), acting as Placement Agent (as defined herein), if the admission and listing do not proceed. The dealing agent on behalf of the Monetary Authority of Singapore (the “Authority”) on 19 March 2019). in and quotation of the Shares will be in Singapore dollars. This document is important. Before making any investment in the securities being Companies listed on Catalist may carry higher investment risk when compared with larger or offered, you should consider the information provided in this Offer Document more established companies listed on the Main Board of the SGX-ST. In particular, companies carefully and consider whether you understand what is described in this Offer may list on Catalist without a track record of profitability and there is no assurance that there will be a liquid market in the shares or units of shares traded on Catalist. You should be Document. You should also consider whether an investment in the securities aware of the risks of investing in such companies and should make the decision to invest being offered is suitable for you, taking into account your investment objectives only after careful consideration and, if appropriate, consultation with your professional and risk appetite.
    [Show full text]
  • Property Market Report 2013 TERENGGANU 12 TERENGGANU DARUL IMAN
    LAPORAN PASARAN HARTA Property Market Report 2013 TERENGGANU 12 TERENGGANU DARUL IMAN Jadual 12.1 Bilangan dan Peratus Pindah Milik Mengikut Lingkungan Harga Bagi Subsektor Harta Utama Table Number and Percentage of Transactions by Price Range for the Principal Property Sub-Sectors 12.2 Peratus Perubahan Bilangan Pindah Milik bagi Subsektor Harta Utama Percentage Change in Number of Transactions for the Principal Property Sub-Sectors 12.3 Nilai Pindah Milik Mengikut Lingkungan Harga bagi Subsektor Harta Utama Value of Transactions by Price Range for the Principal Property Sub-Sectors 12.4 Peratus Perubahan Nilai Pindah Milik bagi Subsektor Harta Utama Percentage Change in Value of Transactions for the Principal Property Sub-Sectors 12.5 Pecahan Bilangan Pindah Milik Harta Kediaman Mengikut Jenis dan Daerah Breakdown of Number of Residential Property Transactions According to Type and District 12.6 Pecahan Nilai Pindah Milik Harta Kediaman Mengikut Jenis dan Daerah Breakdown of Value of Residential Property Transactions According to Type and District 12.7 Pecahan Bilangan Pindah Milik Harta Perniagaan Mengikut Jenis dan Daerah Breakdown of Number of Commercial Property Transactions According to Type and District 12.8 Pecahan Nilai Pindah Milik Harta Perniagaan Mengikut Jenis dan Daerah Breakdown of Value of Commercial Property Transactions According to Type and District 12.9 Pecahan Bilangan Pindah Milik Harta Industri Mengikut Jenis dan Daerah Breakdown of Number of Industrial Property Transactions According to Type and District 12.10
    [Show full text]
  • Executive Summary
    EXECUTIVE SUMMARY OPTIMISTIC ORGANIC Sdn. Bhd. (OOSB) is currently operating a 30 000 tn/yr Maleic Anhydride (MA) production facility in the Teluk Kalong Industrial Estate (TKIE) in Kemaman, Terengganu. The following EIA and QRA reports related to OOSB MA complex have been done and submitted to DOE: I. Environmental Impact Assessment (EIA) for the Proposed TLC Industries (M) Sdn. Bhd. Maleic Anhydride Plant in Kemaman, Terengganu, Malaysia,1995. II. Preliminary Risk Assessment for the Proposed TLC Industries (M) Sdn. Bhd. Maleic Anhydride Plant in Kemaman, Terengganu, Malaysia,1995. III. Supplementary EIA Report for Incinerator for the Proposed TLC Industries (M) Sdn. Bhd. Maleic Anhydride Plant in Kemaman, Terengganu, Malaysia,1995. Over the years of operation, demand for these products is more than it was originally foreseen. In order to meet this demand, OOSB are planning to upgrade the plant capacity of existing plant at additional 33% to 40 000 tn/yr. This will involve installation of additional equipment and revamping of existing equipment. .All new equipment will be constructed within the current plant boundary. PROJECT TITLE The title of this report is Environmental Impact Assessment (EIA) for the Proposed Maleic Anhydride Plant Expansion in KawasanPerindustrianTeluk Kalong, Kemaman, Terengganu. STATEMENT OF NEED The proposed facility expansion is toincrease the production of Maleic Anhydride (MA) to meet the increasing worldwide demand for this important petrochemical product which is used in coatings, adhesives, resins, paints, plasticisers, insecticides and food chemical worldwide. Page Exe - 1 EIA for the Proposed Maleic Anhydride Plant Expansion in Teluk Kalong Industrial Estate, Kemaman,Terengganu Executive Summary PROJECT INITIATOR AND CONSULTANTS The project initiator for the proposed project is Optimistic Organic Sdn.
    [Show full text]