<<

Federal Register / Vol. 83, No. 214 / Monday, November 5, 2018 / Notices 55401

including a description of the likely notwithstanding any other provisions of Authority: 44 U.S.C. 3507(a)(1)(D). respondents, proposed frequency of law, no person shall generally be subject Michel Smyth, response, and estimated total burden to penalty for failing to comply with a Departmental Clearance Officer. may be obtained free of charge from the collection of information that does not RegInfo.gov website at http://www. display a valid Control Number. See 5 [FR Doc. 2018–24153 Filed 11–2–18; 8:45 am] reginfo.gov/public/do/PRAViewICR?ref_ CFR 1320.5(a) and 1320.6. The DOL BILLING CODE 4510–26–P nbr=201801-1218-004 or by contacting obtains OMB approval for this Michel Smyth by telephone at 202–693– information collection under Control DEPARTMENT OF LABOR 4129, TTY 202–693–8064, (these are not Number 1218–0110. The DOL notes that toll-free numbers) or sending an email existing information collection Office of Workers’ Compensation _ _ to DOL PRA [email protected]. requirements submitted to the OMB Programs Submit comments about this request receive a month-to-month extension by mail to the U.S. Department of Labor- while they undergo review. New Energy Employees Occupational OASAM, Office of the Chief Information requirements would only take effect Illness Compensation Program Act of Officer, Attn: Departmental Information upon OMB approval. For additional 2000, as Amended Compliance Management Program, substantive information about this ICR, Room N1301, 200 Constitution Avenue see the related notice published in the AGENCY: Office of Workers’ NW, Washington, DC 20210; or by Federal Register on March 30, 2018 (83 Compensation Programs, Labor email: [email protected]. FR 13792). Department. FOR FURTHER INFORMATION CONTACT: Interested parties are encouraged to ACTION: Notice of revision of listing of Michel Smyth by telephone at 202–693– send comments to the address shown in covered Department of Energy facilities. 4129, TTY 202–693–8064, (these are not ADDRESSES the section within thirty (30) SUMMARY: The Office of Workers’ toll-free numbers) or sending an email days of publication of this notice in the _ _ Compensation Programs (OWCP) is to DOL PRA [email protected]. Federal Register. In order to help ensure publishing a list of Department of SUPPLEMENTARY INFORMATION: This ICR appropriate consideration, comments Energy (DOE) facilities covered under seeks approval under the PRA for should mention OMB Control Number the Energy Employees Occupational revisions to the Occupational Safety and 1218–0110. The OMB is particularly Illness Compensation Program Act of Health Onsite Consultation Agreements interested in comments that: 2000, as amended (EEOICPA). information collection. The OSHA • Evaluate whether the proposed DATES: This notice revises and Onsite Consultation Service Program collection of information is necessary republishes the listing of DOE facilities offers free and confidential advice to for the proper performance of the that was last published by OWCP on small and medium-sized businesses in functions of the agency, including January 20, 2015 (80 FR 2735) to all States across the country, with whether the information will have include additional determinations made priority given to high-hazard worksites. practical utility; on this subject through November 5, The requirements specified in the • Evaluate the accuracy of the 2018. Onsite Consultation regulations for agency’s estimate of the burden of the ADDRESSES: OWCP welcomes comments cooperative agreements, 29 CFR part proposed collection of information, regarding this list. Individuals who wish 1908, are necessary to ensure uniform including the validity of the to suggest changes to this list may delivery of onsite consultation services methodology and assumptions used; nationwide. The regulatory procedures • provide information to OWCP at the Enhance the quality, utility, and following address: U.S. Department of specify the activities carried out by State clarity of the information to be Onsite Consultation Programs funded by Labor, Office of Workers’ Compensation collected; and Programs, Division of Energy Employees the Federal government, as well as the • responsibilities of employers who Minimize the burden of the Occupational Illness Compensation, receive onsite consultation services. collection of information on those who Room C–3321, 200 Constitution Avenue This information collection has been are to respond, including through the NW, Washington, DC 20210. You may classified as a revision, because the use of appropriate automated, also suggest changes to this list by email OSHA is making minor edits to the electronic, mechanical, or other at [email protected]. You should Safety and Health Program Assessment technological collection techniques or include ‘‘DOE facilities list’’ in the Worksheet, Form OSHA–33, that reflect other forms of information technology, subject line of any email containing new terminology and revised e.g., permitting electronic submission of comments on this list. requirements associated with the responses. FOR FURTHER INFORMATION CONTACT: revised 2012 OSHA Hazard Agency: DOL–OSHA. Rachel P. Leiton, Director, Division of Communication Standard, 29 CFR Title of Collection: Occupational Energy Employees Occupational Illness 1910.1200. Occupational Safety and Safety and Health Onsite Consultation Compensation, Office of Workers’ Health Act of 1970 sections 7(c)(1) and Agreements. Compensation Programs, U.S. 21(c) authorize this information OMB Control Number: 1218–0110. Department of Labor, Room C–3321, 200 collection. See 29 U.S.C. 656(c)(1) and Affected Public: State, Local, and Constitution Avenue NW, Washington, 670(c). Tribal Governments. DC 20210. Telephone: 202–693–0081 This information collection is subject (this is not a toll-free number). Total Estimated Number of to the PRA. A Federal agency generally Respondents: 22,767. SUPPLEMENTARY INFORMATION: cannot conduct or sponsor a collection of information, and the public is Total Estimated Number of I. Background generally not required to respond to an Responses: 94,225. The Energy Employees Occupational information collection, unless it is Total Estimated Annual Time Burden: Illness Compensation Program Act of approved by the OMB under the PRA 214,750 hours. 2000, as amended (42 U.S.C. 7384 et and displays a currently valid OMB Total Estimated Annual Other Costs seq.), was originally enacted on October Control Number. In addition, Burden: $0. 30, 2000, and the primary responsibility

VerDate Sep<11>2014 18:38 Nov 02, 2018 Jkt 247001 PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1 55402 Federal Register / Vol. 83, No. 214 / Monday, November 5, 2018 / Notices

for administering EEOICPA was has made a number of determinations in with the most current listing of DOE assigned to the Department of Labor connection with claims filed under facilities in order to assist potential (DOL) by Executive Order 13179 (65 FR EEOICPA. Those determinations are claimants and their families. OWCP is 77487). In section 2(c)(vii) of that briefly described in this Supplementary continuing its efforts in this area as it Executive Order, DOE was directed to Information and are memorialized in the adjudicates claims filed under publish a list in the Federal Register of two updated lists of DOE facilities EEOICPA, and further revisions of these Atomic Weapons Employer (AWE) published by OWCP today. lists should be expected. Although DOE facilities, DOE facilities, and facilities Specifically, the Director of OWCP maintains a website (https:// owned and operated by a has determined that the Enewetak ehss.energy.gov/Search/Facility/ Vendor (as those terms are defined in RADLAB, located on Enewetak Atoll findfacility.aspx) that provides sections 7384l(5), 7384l(12) and and now within the Republic of the information on AWE facilities, 7384l(6) of EEOICPA, respectively). Marshall Islands, meets the definition of Beryllium Vendor facilities and DOE Pursuant to this direction, DOE a Department of Energy facility for the facilities to the public, the information published a list of these three types of purposes of claims filed under EEOICPA on that website regarding DOE facilities facilities covered under EEOICPA on because a predecessor agency of DOE should not be relied upon as it may not January 17, 2001 (66 FR 4003), and entered into a contract with an entity to be up to date, nor is it binding on subsequently revised and republished provide radiological support during the OWCP’s adjudication of claims filed the entire list on June 11, 2001 (66 FR remediation of the Pacific Proving under EEOICPA. Instead, OWCP is 31218), December 27, 2002 (67 FR Ground by the Defense Department. In solely authorized to give the public 79068), July 21, 2003 (68 FR 43095) and addition, OWCP’s research has led the notice of the Director’s determinations August 23, 2004 (69 FR 51825). In Director to clarify or otherwise modify regarding DOE facilities. subsequent notices published on the designation of two other work sites III. Introduction to the Lists November 30, 2005 (70 FR 71815), June that have appeared in OWCP’s prior 28, 2007 (72 FR 35448), April 9, 2009 published lists. The first of these The five complete lists previously (74 FR 16191), August 3, 2010 (75 FR appears in List 1 published below as the published by DOE included all three 45608), May 26, 2011 (76 FR 30695), Dayton Project, and the Director has types of work sites described in February 6, 2012 (77 FR 5781), February modified the designation for this Executive Order 13179, i.e., AWE 11, 2013 (78 FR 9678), July 16, 2015 (80 multiple-location work site so it facilities, Beryllium Vendor facilities, FR 42094) and February 17, 2016 (81 FR includes another location in Dayton, and DOE facilities. On the other hand, 8060), DOE further revised the August Ohio known as floors 4, 5 and 6 of the the lists published on June 23, 2009, 23, 2004 list by removing a total of 21 Warehouse located at 601 East Third November 24, 2010, March 6, 2012, AWE facilities, and formally designating Street because OWCP’s research shows April 8, 2013, January 20, 2015 and one additional AWE facility, without that the DOE contractor for the Dayton again today by OWCP only include republishing the list in its entirety. Project also performed work under a work sites that meet the definition of a Following the amendments to contract with a predecessor agency of Department of Energy facility, because EEOICPA that were enacted as subtitle DOE at that additional location. This the authority to designate both AWE E of Title XXXI of the Ronald W. Reagan expansion does not have any effect on facilities and Beryllium Vendor National Defense Authorization Act for the other locations associated with the facilities has been granted to DOE. Fiscal Year 2005, Public Law 108–375, Dayton Project, or on the covered time However, since some work sites can 118 Stat. 1811, 2178 (October 28, 2004), period for the Dayton Project. The meet the definition of more than just OWCP promulgated final regulations Director has also clarified the one type of covered work site during governing its expanded responsibilities designation of a second work site, either the same or differing time under EEOICPA on December 29, 2006 which previously appeared in List 1 as periods, simply presenting one list of (71 FR 78520). One of those regulations, the Stanford Linear Accelerator Center, DOE facilities (without also 20 CFR 30.5(x)(2), indicates that OWCP Stanford University in Palo Alto, differentiating among them in some has adopted the list of DOE facilities California. This work site now appears easily understood fashion) could lead that was published by DOE on August as the SLAC National Accelerator the reader to wrongly conclude that a 23, 2004, and notes that OWCP ‘‘will Laboratory in Menlo Park, California in listed work site has always been a DOE periodically update this list as it deems this publication. This clarification does facility when, in fact, it only had that appropriate in its sole discretion by not have any effect on the status of the status during a brief period. To lessen publishing a revised list of covered work site in question, and is only the potential for this type of [DOE] facilities in the Federal Register.’’ intended to more precisely identify that misunderstanding, OWCP has decided In making these updates, § 30.5(x)(1) facility and its location. And finally, to continue its practice of presenting specifies that the Director of OWCP is OWCP has moved one work site that two separate lists of DOE facilities. solely responsible for determining if a appeared in previous publications in The first list consists exclusively of particular work site under consideration List 2 to List 1 in this publication. The work sites that have only been DOE meets the statutory definition of a Middlesex Municipal Landfill in facilities for purposes of coverage under Department of Energy facility. This sole Middlesex, New Jersey now appears in EEOICPA, and the second list consists responsibility is derived from the grant the list of work sites that have only been of work sites that have also been at least of primary authority to DOL to DOE facilities following DOE’s decision one other type of covered work site in administer the EEOICPA claims process to remove that work site’s status as an addition to a DOE facility. To see what contained in section 2(a)(i) of Executive AWE facility in its July 16, 2015 Federal other types of covered work sites the Order 13179. Register notice. This move from List 2 DOE facilities appearing in the second to List 1 does not have any effect on the list are or have been, readers can refer II. Purpose status of the work site as a Department to the Federal Register notices Since OWCP last published a notice of Energy facility for remediation published by DOE on August 23, 2004 listing all DOE facilities covered under purposes in 1984 and 1986. (69 FR 51825), November 30, 2005 (70 EEOICPA in the January 20, 2015 By updating the two lists found FR 71815), June 28, 2007 (72 FR 35448), Federal Register, the Director of OWCP below, OWCP is presenting the public April 9, 2009 (74 FR 16191), August 3,

VerDate Sep<11>2014 18:38 Nov 02, 2018 Jkt 247001 PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1 Federal Register / Vol. 83, No. 214 / Monday, November 5, 2018 / Notices 55403

2010 (75 FR 45608), May 26, 2011 (76 work site could have been performed. continuing, and it expects that the date FR 30695), February 6, 2012 (77 FR These date ranges, however, often do ranges included in this notice will 5781), February 11, 2013 (78 FR 9678), not reflect the exact day and month that change with the publication of future July 16, 2015 (80 FR 42094) and a work site either acquired or lost its notices. February 17, 2016 (81 FR 8060). Since status as a DOE facility, and are not DOE facilities appearing on the lists covered time periods for a particular considered binding on OWCP in its that have undergone environmental DOE facility are statutorily limited to adjudication of individual claims under periods during which ‘‘operations’’ are EEOICPA. Rather, they are presented in remediation at the direction of or or were performed by or on behalf of this notice for the sole purpose of directly by DOE are identified by the DOE (or its predecessor agencies) at that informing the public of the current following symbol—†—after the date DOE facility, and when DOE (or its results of OWCP’s research into the range during which such environmental predecessor agencies) either had a operational histories of these work sites, remediation occurred. During those proprietary interest in the facility or had some of which extend back to the periods, only the work of employees of entered into a particular type of contract establishment of the Manhattan DOE contractors who actually with an entity regarding the facility, the Engineer District of the U.S. Army Corps performed the remediation is ‘‘covered lists below include date ranges during of Engineers on August 13, 1942. work’’ under EEOICPA. which covered employment at each OWCP’s efforts in this area are

LIST 1—WORK SITES THAT ARE/WERE DOE FACILITIES EXCLUSIVELY

Facility name Location Dates

Alaska DOE Facilities

Amchitka Island Nuclear Explosion Site ...... Amchitka Island ...... 1965–9/30/1973; 5/25/2001–10/13/ 2001.† Project Chariot Site ...... Cape Thompson ...... 1962; 1993.†

California DOE Facilities

Area IV of the Santa Susanna Field Laboratory ...... Ventura County ...... 1955–1988; 1988–Present.† Canoga Complex ...... Los Angeles County ...... 1955–1960. De Soto Complex ...... Los Angeles County ...... 1959–1995; 1998.† Downey Facility ...... Los Angeles County ...... 1948–1955. High Energy Rate Forging (HERF) Facility ...... Oxnard ...... 1984–6/30/1997. Laboratory for Energy-Related Health Research, University of Cali- Davis ...... 1958–1989; 1991–Present.† fornia (Davis). Laboratory of Biomedical and Environmental Sciences, University of Los Angeles ...... 1947–Present. California (Los Angeles). Laboratory of Radiobiology and Environmental Health, University of San Francisco ...... 1951–1999. California (San Francisco). Lawrence Berkeley National Laboratory ...... Berkeley ...... 8/13/1942–Present. Lawrence Livermore National Laboratory ...... Livermore ...... 1950–Present. Sandia National Laboratories, Salton Sea Test Base ...... Imperial County ...... 1946–1961. Sandia National Laboratories-Livermore ...... Livermore ...... 1956–Present. SLAC National Accelerator Laboratory ...... Menlo Park ...... 1962–Present.

Colorado DOE Facilities

Grand Junction Facilities ...... Grand Junction ...... 8/1/1943–10/30/2001; 11/1/2001– Present.† Project Rio Blanco Nuclear Explosion Site ...... Rifle ...... 1973–1976. Project Rulison Nuclear Explosion Site ...... Grand Valley ...... 1969–1971; 1972–1978.† Rocky Flats Plant ...... Golden ...... 1951–2006.

Florida DOE Facilities

Pinellas Plant ...... Clearwater ...... 1957–1997; 1999†; 2008–2009.†

Hawaii DOE Facilities

Kauai Test Facility, U.S. Navy Pacific Missile Range ...... Kauai ...... 1962–Present. Idaho DOE Facilities

Argonne National Laboratory-West ...... Scoville ...... 1949–2005. Idaho National Laboratory ...... Scoville ...... 1949–Present.

Illinois DOE Facilities

Argonne National Laboratory-East ...... Argonne ...... 1946–Present. Fermi National Accelerator Laboratory ...... Batavia ...... 1967–Present.

Indiana DOE Facilities

Dana Heavy Water Plant ...... Dana ...... 1943–5/31/1957.

VerDate Sep<11>2014 18:38 Nov 02, 2018 Jkt 247001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1 55404 Federal Register / Vol. 83, No. 214 / Monday, November 5, 2018 / Notices

LIST 1—WORK SITES THAT ARE/WERE DOE FACILITIES EXCLUSIVELY—Continued

Facility name Location Dates

Iowa DOE Facilities

Ames Laboratory, Iowa State University ...... Ames ...... 8/13/1942–Present. Iowa Ordnance Plant (Line 1 and Associated Activities) ...... Burlington ...... 1947–1974.

Kentucky DOE Facilities

Paducah Gaseous Diffusion Plant ...... Paducah ...... 1951–7/28/98; 7/29/98–10/20/14†; 10/21/14–Present.

Massachusetts DOE Facilities

Winchester Engineering and Analytical Center ...... Winchester ...... 1952–1961.

Michigan DOE Facilities

Adrian Facility ...... Adrian ...... 5/25/54–1962; 1995.†

Minnesota DOE Facilities

Elk River Reactor ...... Elk River ...... 1962–1968.

Mississippi DOE Facilities

Salmon Nuclear Explosion Site ...... Hattiesburg ...... 1964–6/29/1972.

Missouri DOE Facilities

Kansas City Plant ...... Kansas City ...... 11/5/1948–Present. Mallinckrodt Chemical Co., Destrehan Street Facility ...... St. Louis ...... 8/13/1942–1962; 1995.† St. Louis Airport Storage Site (SLAPS) ...... St. Louis ...... 1/3/1947–1973; 1984–1998. Weldon Spring Plant ...... Weldon Spring ...... 1955–1966; 10/1/1985–2002†. Weldon Spring Quarry ...... Weldon Spring ...... 1958–1966; 1967–10/31/2002.† Weldon Spring Raffinate Pits ...... Weldon Spring ...... 1955–1966; 1967–2002.†

Nebraska DOE Facilities

Hallam Sodium Graphite Reactor ...... Hallam ...... 1960–1971.

Nevada DOE Facilities

Nevada Site Office ...... North Las Vegas ...... 3/6/1962–Present. Nevada Test Site ...... Mercury ...... 195–Present. Project Faultless Nuclear Explosion Site ...... Central Nevada Test Site ...... 1967–1974. Project Shoal Nuclear Explosion Site ...... Fallon ...... 1962–1/31/1964. Tonopah Test Range ...... Tonopah ...... 1956–Present. Yucca Mountain Site Characterization Project ...... Yucca Mountain ...... 1987–Present.

New Jersey DOE Facilities

Middlesex Municipal Landfill ...... Middlesex ...... 1984†; 1986.† Middlesex Sampling Plant ...... Middlesex ...... 1943–1967; 1980–1982†; 4/1/ 1986–8/30/1986.† New Brunswick Laboratory ...... New Brunswick ...... 1948–1977. Princeton Plasma Physics Laboratory, James Forrestal Campus of Princeton ...... 1951–Present. Princeton University.

New Mexico DOE Facilities

Albuquerque Operations Office ...... Albuquerque ...... 8/13/1942–Present. Chupadera Mesa ...... White Sands Missile Range ...... 1945. Hangar 481, Kirtland AFB ...... Albuquerque ...... 3/1/1984–2/29/1996. Kirtland Operations Office, Kirtland AFB ...... Albuquerque ...... 1964–Present. Los Alamos Medical Center ...... Los Alamos ...... 1952–1963. Los Alamos National Laboratory ...... Los Alamos ...... 8/13/1942–Present. Lovelace Respiratory Research Institute, Kirtland AFB ...... Albuquerque ...... 1960–6/20/2013. Project Gasbuggy Nuclear Explosion Site ...... Farmington ...... 2/11/1967–1973; 1978; 1992– Present.† Project Gnome Nuclear Explosion Site ...... Carlsbad ...... 7/1/1960–6/30/1962. Sandia National Laboratories ...... Albuquerque ...... 1945–Present. South Albuquerque Works ...... Albuquerque ...... 1951–1967. Nuclear Explosion Site, Alamogordo Bombing and Gunnery White Sands Missile Range ...... 1945; 1952†; 1967.† Range.

VerDate Sep<11>2014 18:38 Nov 02, 2018 Jkt 247001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1 Federal Register / Vol. 83, No. 214 / Monday, November 5, 2018 / Notices 55405

LIST 1—WORK SITES THAT ARE/WERE DOE FACILITIES EXCLUSIVELY—Continued

Facility name Location Dates

Waste Isolation Pilot Plant ...... Carlsbad ...... 3/26/1999–Present.

New York DOE Facilities

Brookhaven National Laboratory ...... Upton ...... 1947–Present. Electro Metallurgical Co...... Niagara Falls ...... 8/13/1942–1953. Environmental Measurements Laboratory ...... New York ...... 1946–2003. Haist Property ...... Tonawanda ...... 6/25/1943–1948. Lake Ontario Ordnance Works ...... Niagara County ...... 1944–1997. Linde Ceramics Plant (Buildings 30, 31, 37 and 38 only) ...... Tonawanda ...... 11/16/1942–1953; 1988–1992†; 1996.† Peek Street Facility (Knolls Atomic Power Laboratory) ...... Schenectady ...... 1947–1954. Sacandaga Facility ...... Glenville ...... 1947–1953. SAM Laboratories, Columbia University ...... New York ...... 8/13/1942–1947. Separations Process Research Unit (Knolls Atomic Power Laboratory) Schenectady ...... 1950–1965; 2007–2011.† University of Rochester Atomic Energy Project ...... Rochester ...... 1943–1986.

Ohio DOE Facilities

Dayton Project (Units I, III, IV and floors 4, 5 and 6 of the Warehouse Dayton and Oakwood ...... 7/14/1943–1950. only). Extrusion Plant (Reactive Metals Inc.) ...... Ashtabula ...... 1962–11/1/2006. Feed Materials Production Center (FMPC) ...... Fernald ...... 1951–Present. Mound Plant ...... Miamisburg ...... 1947–Present. Piqua Organic Moderated Reactor ...... Piqua ...... 1963–2/28/69. Portsmouth Gaseous Diffusion Plant ...... Piketon ...... 1952–7/28/98; 7/29/98–Present.†

Oregon DOE Facilities

Albany Metallurgical Research Center, U.S. Bureau of Mines ...... Albany ...... 1987–1993†; 1995–Present.

Pennsylvania DOE Facilities

Shippingport Atomic Power Plant ...... Shippingport ...... 1984–1995.† Puerto Rico DOE Facilities

BONUS Reactor Plant ...... Punta Higuera ...... 1964–1968. Puerto Rico Nuclear Center ...... Mayaguez ...... 1957–1976; 1987.†

South Carolina DOE Facilities

Savannah River Site ...... Aiken ...... 1950–Present.

Tennessee DOE Facilities

Clarksville Modification Center, Ft. Campbell ...... Clarksville ...... 1949–1967. (CEW) ...... Oak Ridge ...... 1943–1949. Oak Ridge Gaseous Diffusion Plant (K–25) ...... Oak Ridge ...... 1943–1987; 1988–Present.† Oak Ridge Hospital ...... Oak Ridge ...... 1943–1959. Oak Ridge Institute for Science Education ...... Oak Ridge ...... 1946–Present. Oak Ridge National Laboratory (X–10) ...... Oak Ridge ...... 1943–Present. Office of Scientific and Technical Information (OSTI) ...... Oak Ridge ...... 1957–Present. S–50 Oak Ridge Thermal Diffusion Plant ...... Oak Ridge ...... 1944–1951. Y–12 Plant ...... Oak Ridge ...... 8/13/1942–Present.

Texas DOE Facilities

Medina Modification Center ...... San Antonio ...... 1958–1966. Pantex Plant ...... Amarillo ...... 1951–Present.

Virginia DOE Facilities

Thomas Jefferson National Accelerator Facility ...... Newport News ...... 1994–Present.

Washington DOE Facilities

Hanford Engineer Works ...... Richland ...... 8/13/1942–Present. Pacific Northwest National Laboratory ...... Richland ...... 2005–Present.

West Virginia DOE Facilities

Reduction Pilot Plant ...... Huntington ...... 1951–1963; 11/27/1978–5/18/ 1979.†

VerDate Sep<11>2014 18:38 Nov 02, 2018 Jkt 247001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1 55406 Federal Register / Vol. 83, No. 214 / Monday, November 5, 2018 / Notices

LIST 1—WORK SITES THAT ARE/WERE DOE FACILITIES EXCLUSIVELY—Continued

Facility name Location Dates

Wisconsin DOE Facilities

LaCrosse Boiling Water Reactor ...... LaCrosse ...... 1967–1969.

Territorial DOE Facilities

Enewetak RADLAB ...... Enewetak Atoll (now part of the 2/16/1977–9/30/1979. Republic of the Marshall Is- lands). Pacific Proving Ground ...... Bikini and Enewetak Atolls (now 1946–1962. part of the Republic of the Mar- shall Islands), Johnston Island and Christmas Island.

LIST 2—WORK SITES THAT ARE/WERE DOE FACILITIES (FOR THE YEARS IDENTIFIED IN THE LAST COLUMN ONLY) AND ALSO ANOTHER TYPE OF EEOICPA-COVERED FACILITY

Facility name Location Dates

Arizona DOE Facilities

Ore Buying Station at Globe ...... Globe ...... 7/1/1955–1957. Mill in Monument Valley ...... Monument Valley ...... 5/1/1989–2/28/1990 †; 9/1/1992–5/ 31/1994.† Uranium Mill in Tuba City ...... Tuba City ...... 1/1/1985–2/28/1986 †; 1/1/1988–4/ 30/1990.†

California DOE Facilities

General Atomics (Torrey Pines Mesa and Sorrento West) ...... La Jolla ...... 1996–1999.† Vallecitos ...... Pleasanton ...... 1998–6/7/2010.†

Colorado DOE Facilities

Climax Uranium Mill in Grand Junction ...... Grand Junction ...... 12/1/1988–8/31/1994.† Green Sludge Plant in Uravan ...... Uravan ...... 1943–1945. New Uranium Mill in Rifle ...... Rifle ...... 9/1/1988–9/30/1989 †; 4/1/1992– 10/31/1996.† Old Uranium Mill in Rifle ...... Rifle ...... 9/1/1988–9/30/1989 †; 4/1/1992– 10/31/1996.† Uranium Mill in Durango ...... Durango ...... 1948–1953; 10/1/1986–5/31/ 1991.† Uranium Mill in Gunnison ...... Gunnison ...... 9/1/1991–12/31/1995.† Uranium Mill in Maybell ...... Maybell ...... 5/1/1995–9/30/1998.† Uranium Mill in Naturita ...... Naturita ...... 5/1/1994–11/30/1994 †; 6/1/1996– 9/30/1998.† Uranium Mill No. 1 in Slick Rock (East) ...... Slick Rock ...... 1995–1996.† Uranium Mill No. 2 in Slick Rock (West) ...... Slick Rock ...... 1995–1996.†

Connecticut DOE Facilities

Connecticut Aircraft Nuclear Engine Laboratory (CANEL) ...... Middletown ...... 1958–7/8/1966. Seymour Specialty Wire ...... Seymour ...... 1992–1993.†

Idaho DOE Facilities

Uranium Mill in Lowman ...... Lowman ...... 1992 †; 1994–Present.

Illinois DOE Facilities

General Steel Industries (South Plant) ...... Granite City ...... 1993.† , University of Chicago (Eckhart Hall, Jones Chicago ...... 1982–1984†; 1987.† Laboratory and Ryerson Hall only). National Guard Armory (Washington Park Armory) ...... Chicago ...... 1987.†

Massachusetts DOE Facilities

Chapman Valve Manufacturing Co...... Indian Orchard ...... 1995.† Hood Building ...... Cambridge ...... 1946–1963. Ventron Corporation ...... Beverly ...... 1986 †; 9/1/1995–3/30/1997.†

VerDate Sep<11>2014 18:38 Nov 02, 2018 Jkt 247001 PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1 Federal Register / Vol. 83, No. 214 / Monday, November 5, 2018 / Notices 55407

LIST 2—WORK SITES THAT ARE/WERE DOE FACILITIES (FOR THE YEARS IDENTIFIED IN THE LAST COLUMN ONLY) AND ALSO ANOTHER TYPE OF EEOICPA-COVERED FACILITY—Continued

Facility name Location Dates

Missouri DOE Facilities

Latty Avenue Properties ...... Hazelwood ...... 1984–1986.†

New Jersey DOE Facilities

Du Pont Deepwater Works ...... Deepwater ...... 1996.† Kellex/Pierpont ...... Jersey City ...... 1979–1980.† Rare Earths/W.R. Grace ...... Wayne ...... 1985–1987.†

New Mexico DOE Facilities

Ore Buying Station at Grants ...... Grants ...... 7/1/1956–1958. Ore Buying Station at Shiprock ...... Shiprock ...... 7/1/1952–1/31/1954. Uranium Mill in Ambrosia Lake ...... Ambrosia Lake ...... 7/1/1987–4/30/1989 †; 10/1/1992– 7/31/1995.† Uranium Mill in Shiprock ...... Shiprock ...... 10/1/1984–11/30/1986.†

New York DOE Facilities

Baker and Williams Warehouses (Pier 38) ...... New York ...... 1991–1993.† Colonie Interim Storage Site (National Lead Co.) ...... Colonie ...... 1984–1998.† West Valley Demonstration Project ...... West Valley ...... 1980–Present.

Ohio DOE Facilities

Alba Craft ...... Oxford ...... 1994–1995.† Associated Aircraft Tool and Manufacturing Co...... Fairfield ...... 1994–1995.† B & T Metals ...... Columbus ...... 1996.† Baker Brothers ...... Toledo ...... 1995.† Battelle Laboratories-King Avenue ...... Columbus ...... 1986–2000.† Battelle Laboratories-West Jefferson ...... Columbus ...... 1986–Present.† Beryllium Production Plant (Brush Luckey Plant) ...... Luckey ...... 1949–1961; 1992–Present.† General Electric Co. (Ohio) ...... Cincinnati/Evendale ...... 1961–6/30/1970. Herring-Hall Marvin Safe Co...... Hamilton ...... 1994–1995.†

Oregon DOE Facilities

Uranium Mill and Disposal Cell in Lakeview ...... Lakeview ...... 1986–1989.†

Pennsylvania DOE Facilities

Aliquippa Forge ...... Aliquippa ...... 1988 †; 1993–1994.† C.H. Schnorr & Company ...... Springdale ...... 1994.† Vitro Manufacturing (Canonsburg) ...... Canonsburg ...... 1983–1985 †; 1996.†

South Dakota DOE Facilities

Ore Buying Station at Edgemont ...... Edgemont ...... 11/1/1952–7/12/1956.

Texas DOE Facilities

Uranium Mill in Falls City ...... Falls City ...... 1/1/1992–6/30/1994.†

Utah DOE Facilities

Ore Buying Station at Marysvale ...... Marysvale ...... 3/1/1950–1957. Ore Buying Station at Moab ...... Moab ...... 5/1/1954–1960. Ore Buying Station at White Canyon ...... White Canyon ...... 10/1/1954–1957. Uranium Mill in Mexican Hat ...... Mexican Hat ...... 7/1/1987 –10/31/1987†; 9/1/1992– 2/28/1995.† Uranium Mill in Moab (Atlas Site) ...... Moab ...... 2001–Present. Uranium Mill in Monticello ...... Monticello ...... 1948–6/30/2000.

Wyoming DOE Facilities

Ore Buying Station at Crooks Gap ...... Crooks Gap ...... 12/1/1956–7/31/1957. Ore Buying Station at Riverton ...... Riverton ...... 3/1/1955–1957. Uranium Mill in Converse County (Spook Site) ...... Converse County ...... 4/1/1989–9/30/1989.† Uranium Mill in Riverton ...... Riverton ...... 5/1/1988–9/30/1990.† † Denotes a period of environmental remediation.

VerDate Sep<11>2014 18:38 Nov 02, 2018 Jkt 247001 PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1 55408 Federal Register / Vol. 83, No. 214 / Monday, November 5, 2018 / Notices

Signed at Washington, DC, on October 30, https://foia-advisory-committee- Authority: 5 U.S.C. 4314(c)(4). 2018. meeting.eventbrite.com. We will also Dated: October 31, 2018. Julia K. Hearthway, live-stream the meeting on the National By Direction of the Board, Director, Office of Workers’ Compensation Archives’ YouTube channel at https:// Programs. www.youtube.com/user/ Farah Z. Qureshi, [FR Doc. 2018–24202 Filed 11–2–18; 8:45 am] usnationalarchives, and include a Associate Executive Secretary. BILLING CODE 4510–CR–P captioning option. To request additional [FR Doc. 2018–24133 Filed 11–2–18; 8:45 am] accommodations (e.g., a transcript), BILLING CODE 7545–01–P email foia-advisory-committee@ NATIONAL ARCHIVES AND RECORDS nara.gov or call 202–741–5770. ADMINISTRATION Members of the media who wish to NATIONAL SCIENCE FOUNDATION register, those who are unable to register Office of Government Information online, and those who require special Notice of Permit Modification Received Services accommodations, should contact Under the Antarctic Conservation Act of 1978 [NARA–2019–006] Kirsten Mitchell (contact information listed above). AGENCY: National Science Foundation. Freedom of Information Act (FOIA) Miranda J. Andreacchio, ACTION: Notice of permit modification Advisory Committee; Meeting Committee Management Officer. request received and permit issued. AGENCY: National Archives and Records [FR Doc. 2018–24088 Filed 11–2–18; 8:45 am] SUMMARY: The National Science Administration (NARA). BILLING CODE 7515–01–P Foundation (NSF) is required to publish ACTION: Notice of Federal Advisory a notice of requests to modify permits Committee Meeting. issued to conduct activities regulated NATIONAL LABOR RELATIONS and permits issued under the Antarctic SUMMARY: We are announcing an BOARD Conservation Act of 1978. NSF has upcoming Freedom of Information Act published regulations under the (FOIA) Advisory Committee meeting, in Notice of Appointments of Individuals Antarctic Conservation Act in the Code accordance with the Federal Advisory To Serve as Members of Performance of Federal Regulations. This is the Committee Act and the second United Review Boards required notice of a requested permit States Open Government National modification and permit issued. Action Plan. AGENCY: National Labor Relations FOR FURTHER INFORMATION CONTACT: DATES: The meeting will be on Board. Nature McGinn, ACA Permit Officer, November 29, 2018, from 10 a.m. to 1 ACTION: The National Labor Relations Office of Polar Programs, National p.m. EDT. You must register by 5 p.m. Board is issuing this notice that the Science Foundation, 2415 Eisenhower EDT on November 27, 2018, to attend. individuals whose names and position Location: National Archives and titles appear below have been appointed Avenue, Alexandria, VA 22314; 703– Records Administration (NARA), 700 to serve as members of performance 292–8224; email: [email protected]. Pennsylvania Avenue NW, William G. review boards in the National Labor SUPPLEMENTARY INFORMATION: The McGowan Theater, Washington, DC Relations Board for the rating year National Science Foundation (NSF), as 20408. beginning October 1, 2017 and ending directed by the Antarctic Conservation September 30, 2018. Act of 1978 (Pub. L. 95–541, 45 CFR FOR FURTHER INFORMATION CONTACT: 670), as amended by the Antarctic Kirsten Mitchell, Designated Federal Name and Title Science, Tourism and Conservation Act Officer for this committee, by mail at of 1996, has developed regulations for National Archives and Records Elizabeth Tursell—Associate to the the establishment of a permit system for Administration; Office of Government General Counsel, Division of various activities in Antarctica and Information Services, 8601 Adelphi Operations Management designation of certain animals and Road—OGIS, College Park, MD 20740– Linda Dreeben—Deputy Associate certain geographic areas a requiring 6001, by telephone at 202–741–5770, or General Counsel, Division of special protection. by email at foia-advisory-committee@ Enforcement Litigation NSF issued a permit (ACA 2018–024) nara.gov. John Kyle—Deputy General Counsel, to Joseph A. Covi on December 15, 2017. SUPPLEMENTARY INFORMATION: Office of the General Counsel The issued permit allows the permit Agenda and meeting materials: This Christine Lucy—Associate Board holder to enter Antarctic Specially is the second meeting of the third Counsel, Office of the Chairman Protected Areas (ASPAs). The permit committee term. We will review the Jayme Sophir—(Alternate)—Associate holder and agents are permitted to enter work of the committee’s three General Counsel, Division of Advice ASPA 125, Fildes Peninsula; ASPA 132, subcommittees, working on records Mark Arbesfeld—(Alternate)—Director, Potter Peninsula; ASPA 150, Ardley management, FOIA vision, and time/ Office of Appeals Island, Maxwell Bay; and ASPA 171 volume. We have posted the meeting Lara Zick—Deputy Chief Counsel to Narebski Point, Barton Peninsula for the materials online at https:// Member Emanuel purposes of collecting small sediment www.archives.gov/ogis/foia-advisory- Rachel Lennie—(Alternate)—Deputy samples from freshwater lakes and committee/2018-2020-term/meetings. Chief Counsel to Kaplan ephemeral ponds. The permit holder Procedures: The meeting is open to FOR FURTHER INFORMATION CONTACT: and agents are required to adhere to the the public. Due to building access Roxanne Rothschild, Acting Executive management plans for each of the restrictions, you must register through Secretary, National Labor Relations ASPAs that they enter. The permit is set Eventbrite in advance if you wish to Board, 1015 Half Street SE, Washington, to expire on March 1, 2019. attend. You will also go through DC 20570, (202) 273–2917 (this is not a Now the permit holder proposes a security screening when you enter the toll-free number), 1–866–315–6572 permit modification to extend the building. To register, use this link: (TTY/TDD). expiration date to March 15, 2019. The

VerDate Sep<11>2014 18:38 Nov 02, 2018 Jkt 247001 PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1