Environmental Clearance Report of Rameshbhai Karshanbhai Bariya Page 1
Total Page:16
File Type:pdf, Size:1020Kb
Shree Rameshbhai Karshanbhai Bariya Survey No. 123/1/1 p 1, 123/1/1 p 2 Vill. Khijadiya, Tal. Mendarda, Dis. Junagadh Mo. 9427278946 To. State Level Expert Appraisal Committee, Paryavaran Bhavan, Sector-10/A, Gandhinagar. Sub: Application for Environmental Clearance for the Black trap of mine Shree Rameshbhai Karshanbhai Bariya Admeasuring 4.85.62 Hectors Survey No.123/1/1 p 1, 123/1/1 p 2, Vill. Khijadiya,Tal. Mendarda, Dis.Junagadh Respected Sir, We propose to start the operation of the Black trap of mine in above mentioned location. As per the moEF circular dated 18/05/2012. We require to obtain the prior environmental clearance. We herewith apply (in From-1) for environmental clearance with and other supporting documents. We request your good selves to kindly consider our case in earliest Committee meeting and grant us the recommendation/Environmental Clearance. Thanking You, Sincerely Yours, For, Shree Rameshbhai Karshanbhai Bariya (LEASE OWNER) Environmental Clearance Report Of Rameshbhai Karshanbhai Bariya Page 1 FORMATE OF CHECKLIST FOR FIRST PRESENTATION BEFORE THE SEAC, GUJARAT Sr. Particulars Details No. 1. About the Proposal a. Name of Lease Holder Shree Rameshbhai Karshanbhai Bariya b. Location Address Survey No. 123/1/1 p 1, 123/1/1 p 2, Vill. Khijadiya,Tal. Mendarda, Dis.Junagadh. c. Name of mineral to mine Black Trap d. End use of Mineral For Road and Building construction Work e. Man power & No. of working 10 no. of man power will be involved days No. of working days will be 280 Days. 2. About the Lease Area a. Lease Area 4.85.62 hactor b. Lease Period 10 years c. Co ordinates (Latitude & 21°05’."N Latitude & 70°20'."E Longitude) d. Ownership of Lease area (Govt. Government land Land, Private Land, etc.) e. Satellite Image of the project Satellite Image of the area is attached showing 1 Km & 5 Km radial area. f. Present Land use of Lease Area. Presently land use as a black trap excavation. g. Rate of mining (MT/Annum) 60000 MT per Annum h. Total reserve of mineral & life of Mineral reserves-1200000 tones mine. Life of mine 20 years 3. Environment setting: a. Whether project involves forest No Forest land involved land? If Yes, status of application for diversion of forest land. b. Aerial Distance of the lease area from nearest: (1)National Park/Wildlife Sanctuary Gir Wildlife Sanctuary Biosphere reserve Biosphere Reserve exists within the core & Buffer Zone (2) Reserve Forest/ Protected Forest Gir National Park – 5 km (3) Water Bodies Madhuvanti River – 4 Km in Direction (4) Human Habitation Village Khijadiya exists at a distance of 1.5 Km. (5) Nearest Railway Line Malia Railway station 17 Km. (6) Nearest Road Gujarat State Highway 100 is 2.85 Km (7) Notified/Protected Archaeological Not Applicable Environmental Clearance Report Of Rameshbhai Karshanbhai Bariya Page 2 Sites (8) Social Infrastructure Viz. Social Infrastructure like school,hospital,historic cultural/religious school,hospital,historic cultural/religious places,defence establishment etc. places at Mendarda 5 Km c. Hydrology indicating water No surface water body exists in the core zone bodies & ground water depth & Ground water Depth 42 meter & good quality. quality. d. Wind rose Predominant wind direction SW diagram/Predominates wind Wind Speed – Max 12 Km/Hr & Min 04 Km/hr direction & wind Speed e. Existing dust & Noise level After operation start reported Existing dust level. Average Noise level around site 52 dB f. Endemic and endangered species No Endemic &endangered species of flora & for flora and fauna, if any in the fauna found in the core Zone. area 4. About the mining Activities: a. Requirement of power supply and No required electricity power at the mine site. water supply and its source About 3.00 KLD water is required for the purpose of drinking, dust suppression & green belt development & water will be made available nearest farmer well. b. Method of mining (Manual/Semi Open cast Semi mechanized method of mining. mechanized/mechanized) c. Details of method of working with Semi mechanized open cast method of phasing of actives (Sequence of excavation. The soil cover had removed by use mining operations). Height and of a JCB. The Production is black trap. First width of benches and side slope Blasting by such explosive after than drilling machine cutting stone block. black stone size is not measurable but than cutting and handling tractor and trolley and reach out stone crusher unit. Proper method is mining mention Pre feasibility report. d. Likely impact of mining activities. Dust & Noise will be generated e. Details of drilling, Blasting, Jack hammer Drilling and other drilling explosives. machine use for operation, Blasting is done by short delay action detonators so reduce ground vibration, explosive use as slurry. We have done blasting by professional blasting person so required any handling explosive at site. f. Storage of explosive and safety We have done blasting by professional blasting Environmental Clearance Report Of Rameshbhai Karshanbhai Bariya Page 3 measures at the time blasting. person so required any handling explosive at site. g. Section plan map showing We have showing section plan at presentation overburden (Average) time. h. Details of over barding (OB) Over Burden was used for natural fencing removal And Stacking around excavation area in lease. I. Plan for managing storm water, Yes, Garland drain will be provided around Details of garland drains to be working pit. provided j. Plan for managing dust ,noise ,slit Proper Plantation within and around and other pollution during mining working area. activities Regular water sprinkling to suppress dust Avoid unnecessary & idle running of machine &make its optimum use. Regular maintenance of machineries, vehicles etc and use PPE k. Mode of transportation of mineral Transportation of Black trap is being done and transportation route with the help of tractor from working faces to stone crushing unit. The area is well connected with Tehsil & District headquarter & other cities. l. Mode for control of fugitive Regular water sprinkling will be done at the emission during transportation haulage road to suppress dust. m. Provision of First aid kit, use of First aid kit will be provided at the mine site. PPEs and other measures Protective equipment like goggles, helmet, face proposed for safety of workers: shield, hand gloves, safety belt, and barricade tape will be provided to the workers. All the precautionary measures, safety rules, regulations and procedures will be followed. 5. About the post mine plans: a. Plan for green belt development We have attached environmental management ,area of green belt , no &type of plan. Proper plantation on mined out benches. species to be planted and Proper plantation of saplings, suitable for the budgetary for the same region will be carried out in consultation with forest department. b. Layout Plan showing demarcation Yes, attached with form1 of green belt: c. Mine closure plan: demolition of Implementation of progressive mine closure structure, removal of Deleterious plan includes development of green belt within material and restoration lease area, along boundary as well backfilled /reclamation of land: mine out area. d. Plan for post mining Reclamation works in way of convert artificial use/reclamation/fencing of pits. reservoir will be done. Environmental Clearance Report Of Rameshbhai Karshanbhai Bariya Page 4 e. Plan for periodic monitoring of Yes, Periodic monitoring of Environmental Environmental quality and quality will be done as per the CPCB norms. management: 6. Environment Management Plan a. A details EMP including the Yes, Detailed EMP will be prepared which Protection and mitigation includes protection and mitigation measures measures for impact on Human for impact on Human health & Environment. health & Environment as well as detailed monitoring plan and environmental management cell proposed for implementation and monitoring of EMP 7. About the social obligations: a. Mitigation measure to reduce No, Hazardous substance will be used. hazardous conditions and hardship to local inhabitants. b. Concerns of local inhabitants like: Project will provide employment opportunity health ,water, employment, to the local people .we will arrange the resettlement/rehabilitation, etc. medical check-up camps for mine workers & proposed effected villager. No R/R plan is applicable. c. Specific activities proposed to be Development activities like hand pump for carried out under the corporate drinking water; maintenance of road, common social Responsibility addressing toilet will be taken up. the concerns of local inhabitants Total fund for Socio Economic development is along with budgetary. about 2 % total income. Date: / /2015 Signature and Stamp of Place: Junagadh Mining and Geological Department Environmental Clearance Report Of Rameshbhai Karshanbhai Bariya Page 5 APPENDIX –I (See paragraph -6) FORM 1 • Basic Information Name of the project : Shree Rameshbhai Karshanbhai Bariya Project Location: Survey no. 123/1/1 p 1, 123/1/1 p 2, Vill. Khijadiya, Tal. Mendarda, Dis.Junagadh. Size of the Project: 4.85.62 Hectore. Expected cost of the project: 30 Lakhs Contact Information: Shree Rameshbhai Karshanbhai Bariya At. Khijadiya, Tal. Mendarda, Dis. Junagadh Mo. No. 9427278946 Screening Category: “B” • Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, Temporary change in land/lease area land cover or topography including increase will occur due to mining. Lease area Yes in intensity of land use (with respect to local might not go slightly deeper than land use plan) earlier due to.