Enel Green Power Commissions the 15 Mw Nou Biniatria Solar Photovoltaic Plant in Mallorca

Total Page:16

File Type:pdf, Size:1020Kb

Enel Green Power Commissions the 15 Mw Nou Biniatria Solar Photovoltaic Plant in Mallorca News Media Spain T +34 971 461 808 www.endesa.com ENEL GREEN POWER COMMISSIONS THE 15 MW NOU BINIATRIA SOLAR PHOTOVOLTAIC PLANT IN MALLORCA ● The Nou Biniatria is the second solar photovoltaic plant that Enel Green Power has commissioned on the island of Mallorca and represents a milestone in the energy transformation of the Alcúdia power plant Palma, May 14th 2021 – Enel Green Power España (EGPE), has commissioned the new Nou Biniatria solar photovoltaic plant in the town of Alcúdia in Mallorca. This facility has an installed capacity of 14.96 MW and an expected output of approximately 24.84 GWh per year. The construction of Nou Biniatria, Enel Green Power's second solar photovoltaic plant in Mallorca, entailed an investment of around 14 million euros. This facility is located in the town of Alcúdia, close to the Es Murterar thermal power plant, where Enel Green Power is working intensively to decarbonize the area. José Bogas, Chief Executive Officer of Endesa stated: "At the Alcúdia plant in Mallorca we are looking at developing up to 73 megawatts of solar capacity in the area of the plant. The project is yet another confirmation of our commitment towards strengthening the renewable generation mix in Spain and helping the country towards its renewable energy targets.” The photovoltaic plant consists of 38,880 photovoltaic panels. As part of the construction process, EGPE has installed two transformer stations and a private substation, in addition to a 1.7 km underground transmission line, which runs along existing roads to the Sant Martí substation. Enel Green Power's renewables projects in the Balearic Islands Aside from the Nou Biniatria and Sa Caseta solar photovoltaic farms, Enel Green Power expects to start building a further five solar photovoltaic plants - Son Orlandis, Son Juny, Son Reus, Can Balança and Can na - when the necessary administrative approval has been secured. Thanks to an investment of approximately 60 million euros, Enel Green Power's additional 59.64 MW in the Balearic Islands will generate 114 GWh per year, resulting in annual savings of 75,000 tons of CO2 emissions. Enel Green Power currently manages more than 7,794 MW of renewable capacity installed in Spain, including: 4,745 MW of hydraulic power; 2,422 MW of wind power, 624 MW of solar power, and 3 MW from other renewable sources. News Media Endesa - Balearic Islands tel: 971461808 [email protected] Enel Green Power, within the Enel Group, develops and operates renewable energy plants worldwide and is present in Europe, the Americas, Asia, Africa and Oceania. A world leader in clean energy, with a total capacity of around 49 GW and a generation mix that includes wind, solar, geothermal, and hydroelectric power, Enel Green Power is at the forefront of integrating innovative technologies into renewable energy plants. News Media Endesa - Balearic Islands tel: 971461808 [email protected] .
Recommended publications
  • Enel Green Power Group Annual Report
    2009 Enel Green Power Annual Report INDEX REPORT ON OPERATIONS .............................................................................. 3 Structure of the Enel Green Power Group in 2009 ............................................. 4 Corporate boards ......................................................................................... 5 Summary of results ...................................................................................... 6 Significant events in 2009 ............................................................................. 9 The contribution of renewable energy to sustainability ..................................... 14 Value creation for sustainable development...............................................................14 Economic and market context ...................................................................... 15 Regulatory and rate issues......................................................................................19 Overview of the Group’s operations and economic and financial performance ...... 29 Definition of performance indicators .........................................................................29 Main changes in the scope of consolidation ...............................................................30 Group performance................................................................................................31 Analysis of the Group's financial position...................................................................34 Results by geographical area.......................................................................
    [Show full text]
  • Solar Energy Toward a Sustainable Growth
    Solar Energy Toward a sustainable growth Marco Raganella Head of Technical Support Solar Activities Business Development Enel Green Power S.p.A. Seminario Internacional Solar Antofagasta – Chile 6th October 2009 Agenda • Renewables geographies and technologies • Growth of Solar Energy and key drivers • Enel Green Power experience Dec 2008 1 Renewable energies: strong fundamentals in all geographies Estimates of renewables installed capacity, 2008-2020 Europe 1,030 GW max North America 620 GW min TOTAL WORLD 390 GW 550 GW max 3,020 GW min max 230 GW 330 GW 2008 2020 1,820 GW min 1,150 GW 2008 2020 2008 2020 Latin America Africa Asia 1,000 GW max 600 GW min 330 GW max 350 GW min 110 GW max 150 GW 200 GW min 70 GW min 30 GW 2008 2020 2008 2020 2008 2020 UpUp toto 1,9001,900 GWGW ofof renewablerenewable capacitycapacity additionsadditions Source: Enel estimates based/WEO 2008/GWEC 2008 (2008); WEO 2008 Reference Scenario (2020 min); Industry reports/McKinsey (2020 max) Dec 2008 2 Renewable energies: strong fundamentals in all technologies Global installed Global installed Technology base base Δ capacity CAGR Technological maturity 2008 2020 2% Very high (large hydro) Hydro 960 GW 1,280 GW +320 GW 8% Very high (small hydro) Biomass 50 GW 470 GW +420 GW 20% Very high Geothermal 10 GW 30 GW +20 GW 10% High High (on-shore) Wind 120 GW 800 GW +680 GW 17% Low (off-shore) Medium (c-SI) Solar Low (Thin Film) PV Solar 10 GW 440 GW +430 GW 37% Concentrated Low solar power TOTAL 1,150 GW 3,020 GW+1,870 GW 8% AllAll technologiestechnologies havehave
    [Show full text]
  • Financial Statement 2013 of Enel Green Power S.P.A
    Annual Report 2013 Annual Report2013 Annual Report 2013 Contents Report on operations Consolidated financial statements Enel Green Power | 6 Consolidated Income Statement | 110 The Group structure | 7 Statement of Consolidated Comprehensive Income | 111 Enel Green Power in the world | 8 Consolidated Balance Sheet | 112 Corporate boards and Powers | 10 Statement of Changes in Consolidated Shareholders’ Equity | 113 Letter to the shareholders and other stakeholders | 12 Consolidated Statement of Cash Flows | 114 Summary of results | 16 Notes to the financial statements | 115 Significant events in 2013 | 25 Reference scenario | 33 Economic and energy conditions in 2013 | 35 Corporate governance | 187 Electricity markets | 39 How we operate | 57 Overview of the Group’s performance and financial position | 73 Declaration of the Chief Executive Officer and the Performance and financial position by segment | 90 officer responsible for the preparation of corporate > Italy and Europe | 91 financial reports | 188 > Iberia and Latin America | 95 > North America | 98 Main risks and uncertainties | 101 Annexes Outlook | 102 Regulations governing non-EU subsidiaries | 103 Subsidiaries, associates and other significant equity investments of the Enel Green Power Group at December 31, 2013 | 192 Regulations governing subsidiaries subject to the management and coordination of other companies | 104 Related parties | 105 Reconciliation of shareholders’ equity and net income of Enel Green Reports Power SpA and the corresponding consolidated figures | 107 Report of the Independent Auditors | 210 3 Report on operations Enel Green Power Enel Green Power, founded in December 2008, is the Enel Group company entirely devoted to the development and management of the Group’s renewables generation operations around the world, with a presence in Europe and the Americas.
    [Show full text]
  • Combining Renewable Energy Technologies - with a Geothermal Focus
    Proceedings of the 4th African Rift Geothermal Conference Nairobi, Kenya, 21-23 November 2012 Combining Renewable Energy Technologies - With a Geothermal Focus Marietta Sander International Geothermal Association, c/o University of Applied Sciences, Lennershofstr. 140, 44801 Bochum, Germany [email protected] Keywords: Hybrid geothermal, combining renewable 2. AHUACHAPÁN POWER PLANT, EL SALVADOR energy technology, REN Alliance The geothermal energy production in El Salvador dates back to 1975, with the first 30 MW unit in Ahuachapán. In ABSTRACT El Salvador geothermal energy has been one of the main Combining renewable energy technologies using their sources of electricity, supplying the country with up to 41% of the national electricity demand. In 1981 for example specific characteristics and assets can lead to a more Ahuachapán was the first geothermal field in El Salvador to efficient and increased power generation. Geothermal be developed for commercial electricity generation. Besides energy being a baseload power source in particular, can two 30 MW single-flash units a third double-flash unit enhance the use of other renewables which depend on the came online in 1981, bringing the total capacity to 95 MW. availability of wind, sun or hydro resources. Additionally, it Ahuachapán was the first geothermal field in El Salvador to can significantly enhance the reliability of a renewable be developed for commercial electricity generation (Guidos energy future. and Burgos 2012). In 2007, LaGeo, the national electricity provider initiated a Three hybrid systems are introduced and their technical thermosolar R&D project at its geothermal plant details shown: Ahuachapán aimed at enhancing the output power of the geothermal facility.
    [Show full text]
  • EGP Lily PV+Battery
    Media Relations PRESS T +39 06 8305 5699 RELEASE [email protected] enelgreenpower.com ENEL GREEN POWER STARTS CONSTRUCTION OF ITS FIRST RENEWABLES + STORAGE PROJECT IN NORTH AMERICA • Enel Green Power has started construction of the Lily solar + storage project in Texas, its first utility-scale solar + storage project in North America • The Lily solar + storage project comprises a 146 MWac photovoltaic (PV) facility paired with a 50 MWac battery and is expected to be operational by summer 2021 • In addition, the company plans to install 1 GW of battery storage capacity for future utility-scale installation across the company’s renewable portfolio in the United States through 2022 Rome, Boston, July 21 st , 2020 – Enel Green Power started construction of the Lily solar + storage project, its first hybrid project in North America that integrates a renewable energy plant with utility-scale battery storage. By pairing the two technologies, Enel can store energy generated by the renewable plants to be delivered when needed, such as to help smooth the supply of electricity to the grid or during periods of high electricity demand. In addition to the Lily solar + storage project, Enel plans to install approximately 1 GW of battery storage capacity across its new and existing wind and solar projects in the United States over the next two years. “This substantial commitment to deploy battery storage capacity underscores Enel’s leadership in constructing innovative hybrid projects that will drive the ongoing decarbonization of the power sector in the United States and around the world ,” said Antonio Cammisecra , CEO of Enel Green Power.
    [Show full text]
  • What the Build Was Like
    Press Office T +34 954 417 311 [email protected] endesa.com ENDESA CONNECTS TO THE GRID A NEW PHOTOVOLTAIC PLANT OF AROUND 50 MW IN BADAJOZ • Endesa has invested 35 million euros in the construction of the Augusto solar plant, creating more than 300 jobs and carrying out training courses on renewable issues • During construction, advanced technologies were employed and numerous conservation actions that will benefit the whole Extremadura region were carried out Badajoz, December 22nd, 2020 – Endesa, through its renewable energy company Enel Green Power España (EGPE), has completed the construction of the Augusto photovoltaic plant located in the municipality of Badajoz, Extremadura. This 49.91 MW photovoltaic plant, in which Endesa invested 35 million euros, was built in record time, in compliance with the strictest health and safety measures, even in the most difficult moments of the global Covid-19 outbreak. For the construction of the plant, which is expected to produce around 100.45 GWh a year, equivalent to the combined annual energy consumption of towns like Merida and Almendralejo, more than 300 people have been employed, 70% of them from Extremadura. Rigorous safety protocols were implemented, in light of the ongoing pandemic and in line with the indications provided by health authorities, with the aim to ensure the necessary protection of the workers involved in the construction as well as to the communities where the plant is being installed. Augusto features 127,980 bifacial photovoltaic panels of 390 watts peak power. The bifacial nature of these panels ensures greater use of solar energy, making them more efficient than conventional panels.
    [Show full text]
  • Financial Statement 2012 of Enel Green Power S.P.A
    Annual Report 2012 Annual Report 2012 Contents Report on operations Consolidated financial statements The Enel Green Power structure | 7 Consolidated Income Statement | 90 Corporate boards | 8 Statement of Consolidated Comprehensive Income | 91 Letter to the shareholders and other stakeholders | 10 Consolidated Balance Sheet | 92 Summary of results | 12 Statement of Changes in Consolidated Shareholders’ Equity | 93 Significant events in 2012 | 17 Consolidated Statement of Cash Flows | 94 The contribution of renewable energy to sustainability | 24 Notes to the financial statements | 95 Reference scenario | 28 > Enel Green Power and the financial markets | 28 Economic and energy conditions in 2012 | 30 Corporate governance > Economic developments | 30 > Developments in the main market indicators | 31 Corporate governance and ownership > International commodity prices | 32 structures report | 162 Electricity markets | 33 Overview of the Group’s performance and financial position | 52 Declaration of the Chief Executive Officer Performance and financial position by segment | 62 and the officer responsible for the preparation > Italy and Europe | 64 of corporate financial reports > Iberia and Latin America | 66 > North America | 68 Declaration of the Chief Executive Officer > Retail | 69 and the officer responsible for the preparation Main risks and uncertainties | 71 of corporate financial reports | 202 Outlook | 73 Innovation | 74 Human resources and organization | 77 Annexes Regulations governing non-EU subsidiaries | 83 Regulations governing
    [Show full text]
  • Enel Green Power Starts the Construction of Three Solar Photovoltaic Plants in Extremadura, Between Mérida and Almendralejo
    News Media Spain Tel +34 954 417 311 [email protected] endesa.com ENEL GREEN POWER STARTS THE CONSTRUCTION OF THREE SOLAR PHOTOVOLTAIC PLANTS IN EXTREMADURA, BETWEEN MÉRIDA AND ALMENDRALEJO ● The new solar photovoltaic plants involve an investment of around 96 million euros and will have installed capacity of around 50 MW Mérida/Almendralejo, May 21th 2021 – Enel Green Power España (EGPE) starts the construction of the Veracruz, Puerta Palmas and El Doblón solar photovoltaic plants between Mérida and Almendralejo. The construction project, which is expected for completion this year, will entail an investment of around 96 million euros. Enel Green Power will employ around 900 people from the local area for the construction of these plants, in keeping with the Shared Value Creation plan that the company's renewable energy subsidiary, Enel Green Power Spain, applies in the construction of all its plants. The Veracruz, Puerta Palmas, and El Doblón plants will each have installed capacity of around 50MW thanks to bifacial photovoltaic panels, which are more efficient as they generate power by exposing both sides of the cells to sunlight. These panels, which will be installed using state-of-the-art technology, will come into operation in December 2021. Enel Green Power España is focusing on Extremadura as it one of the regions of the country with the most hours of sunshine. The company uses the Sustainable Construction Site model, which includes several actions that help to minimize environmental impacts for all new renewable plant projects: installing solar photovoltaic panels to meet part of the energy requirements during construction, the installation of storage tanks and rainwater collection systems for water conservation.
    [Show full text]
  • Enel Green Power Begins Construction of Four Photovoltaic Plants in Andalusia and Extremadura with an Investment of 125 Million Euros
    Press Office T +34 954 417 311 [email protected] endesa.com ENEL GREEN POWER BEGINS CONSTRUCTION OF FOUR PHOTOVOLTAIC PLANTS IN ANDALUSIA AND EXTREMADURA WITH AN INVESTMENT OF 125 MILLION EUROS ● The development works of the four plants will create 1,200 jobs ● The four facilities will have a combined power of more than 180 MW and are expected to be operational in the last quarter of the year Madrid, 28 February 2021 – Enel Green Power España (EGPE), has started the construction of four solar power plants in Andalusia and Extremadura this week that will involve a joint investment of 125 million euros. The works will employ about 1,200 people during peak activity, mostly local labour, one of the measures of EGPE's Shared Value Creation plan in the construction of all its plants. The three facilities, which will have about 445,000 panels, will have a combined power of more than 180 MW. Three of the plants started this week are located in Extremadura: Apicio, Beturia and Nertóbriga. These are three of the five photovoltaic plants that the company will build between the Extremaduran municipalities of Fregenal de la Sierra and Bodonal. The three plants, which will be operational by December 2021, will have a power of about 50 MW each and will employ around 900 people during the construction phase. In total, 274,904 bifacial photovoltaic panels will be installed, which are more efficient in allowing not only solar radiation to be captured through the upper panels, but also the reflection on the ground is also exploited thanks to the infrastructure's bifaciality.
    [Show full text]
  • Enel Green Power North America in Kansas Enel Green Power North America, Inc
    Buffalo Dunes Wind Farm Enel Green Power North America in Kansas Enel Green Power North America, Inc. (EGP) is a leading owner and operator of renewable energy projects that currently has the largest wind capacity of any wind operator in the state of Kansas. In Kansas, EGP operates five wind power plants, including the 400 MW Cimarron Bend – the largest in its global portfolio and recently announced the start of operations of one additional wind project, Diamond Vista. Combined, EGP’s projects in Kansas represent 1,400 MW of renewable energy capacity, over $2.1 billion in total investment and the creation of around 70 quality full-time jobs in the state. EGP is invested in Kansas and committed to the long-term sustainability of the communities where it operates, supporting critical initiatives including, $8.5 million in funding to support research, preservation and combating invasive species within the Tall Grass prairie habitat and approximately $300,000 to local education and scholarship programs. In Kansas, among its six wind projects, Enel Green Power: Has a total of six Has more than Created approximately Created around Produces enough Avoids more than wind projects that 30% of the 1,700 construction jobs 70 full-time, wind energy to 4.3 million tons required a total company’s total at peak of construction permanent jobs power more than of CO2 annually investment of over wind capacity 500,000 U.S. $2.1 billion located in Kansas households 2019 | Enel Green Power North America, Inc. EGP in Kansas Topeka Operating Wind Project Smoky Hills I & ll Diamond Vista Smoky Hills Wind Farm Ellsworth and Lincoln Counties Buffalo Dunes Start of Operations Phase I: 2008 Start of Operations Phase II: 2009 Cimarron Bend l & ll Caney River Total Managed Capacity: 250 MW PPA: Sunflower Electric Power Corporation, Midwest Energy Inc., Kansas City Board of Public Utilities and the cities of Independence and Springfield, Missouri.
    [Show full text]
  • ENEL CHILE ANNUAL REPORT 2019 “Year 2020 Will Have New Challenges for the Company, That We Will Enthusiastically Tackle, with Responsibility and Transparency”
    Santiago Stock Exchange ENELCHILE New York Stock Exchange ENIC Enel Chile S.A. was initially incorporated as Enersis Chile S.A., on March 1, 2016. On October 18, of the same year, the company changed its name to Enel Chile S.A. As of December 31, 2019, the company´s total subscribed, and paid capital amounted to Ch$ 3,882,103,470 represented by 69,166,557,220 shares. These shares are traded on the Santiago Stock Exchange and, as American Depositary Shares (ADS) on the New York Stock Exchange. The Company’s business is to exploit, develop, operate, generate, distribute, transform and/or sell energy, in any form and nature, directly or through other companies. Total assets as of December 31, 2019, amounted to ThCh$ 7,857,988,164. Enel Chile controls and manages a group of companies that operate in the Chilean electricity market. In 2019, net income attributable to the controlling sharehold- er reached ThCh$ 296,153,605 and operating income was ThCh$ 526,054,835. At year-end 2019, a total 2,148 people were directly employed by its subsidiaries in Chile. ENEL CHILE ANNUAL REPORT 2019 “Year 2020 will have new challenges for the Company, that we will enthusiastically tackle, with responsibility and transparency” 2 Letter from the Chairman Dear shareholders, been able to grasp entirely. As a country, we have a new challenge and I hope that everyone- politicians, executives, I hereby present to you the Annual Report and Financial businessmen, social leaders, and citizens- will have the Statements of Enel Chile for the year 2019.
    [Show full text]
  • EGP Azure Sky Solar
    Media Relations PRESS T +39 06 8305 5699 RELEASE [email protected] enelgreenpower.com ENEL GREEN POWER STARTS CONSTRUCTION OF ITS SECOND SOLAR + STORAGE PROJECT IN NORTH AMERICA, WORKS WITH THE HOME DEPOT TO DRIVE CONTINUED ADOPTION OF RENEWABLE ENERGY • The Azure Sky solar + storage project in Texas is Enel Green Power’s second utility-scale solar + storage project in North America after the Lily solar + storage project was announced in July • The Azure Sky solar + storage project comprises a 284 MW 1 photovoltaic (PV) facility paired with an 81 MW battery and is expected to be operational by summer 2021 • Enel Green Power North America has signed a power purchase agreement (PPA) with The Home Depot for a 75 MW portion of the project Rome, Boston, October 13 th , 2020 – Enel, through its US renewable subsidiary Enel Green Power North America, started construction of the 284 MW 1 Azure Sky solar + storage project, its second hybrid project in North America that integrates a renewable energy plant with utility-scale battery storage. The project is another milestone in the company’s commitment, announced in July , to invest in renewables- plus-storage hybrids in the United States. The Home Depot will procure the electricity generated from a 75 MW portion of the Azure Sky solar project through a power purchase agreement (PPA). “Enel Green Power is serious about storage in North America. Coming just a few months after our announcement of the Lily project, Azure Sky’s groundbreaking is yet another step forward toward a sustainable future with flexible, hybrid plants that will generate renewable power while further stabilizing power grids ,” said Salvatore Bernabei , newly-appointed CEO of Enel Green Power and Head of Enel’s Global Power Generation business line.
    [Show full text]