Priority River Basins Flood Risk Management Project

Total Page:16

File Type:pdf, Size:1020Kb

Priority River Basins Flood Risk Management Project Report and Recommendation of the President to the Board of Directors Project Number: 52195-001 September 2020 Proposed Loan, Grant, and Technical Assistance Grant Nepal: Priority River Basins Flood Risk Management Project Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval, ADB will disclose the document to the public in accordance with ADB's Access to Information Policy. CURRENCY EQUIVALENTS (as of 11 August 2020) Currency unit – Nepalese rupee/s (NRe/NRs) NRe1.00 = $0.00834 $1.00 = NRs119.90000 ABBREVIATIONS ADB – Asian Development Bank CBDRM – community-based disaster risk management COVID-19 – coronavirus disease DHM – Department of Hydrology and Meteorology DWRI – Department of Water Resources and Irrigation EIRR – economic internal rate of return EMP – environmental management plan FFEWS – flood forecasting and early warning system GESI-AP – Gender Equality and Social Inclusion Action Plan ha – hectare IED – Independent Evaluation Department IEE – initial environmental examination MEWRI – Ministry of Energy, Water Resources and Irrigation O&M – operation and maintenance PAM – project administration manual PIC – project implementation consultant PMU – project management unit TA – technical assistance NOTES (i) The fiscal year (FY) of the Government of Nepal and its agencies ends on 15 July. “FY” before the calendar year denotes the year in which the fiscal year ends, e.g., FY2020 ends on 15 July 2020. (ii) In this report, “$” refers to United States dollars. Vice-President Shixin Chen, Operations 1 Director General Kenichi Yokoyama, South Asia Department (SARD) Director Mio Oka, Environment, Natural Resources and Agriculture Division (SAER), SARD Team leader Suzanne Marsh, Water Resources Specialist, SAER, SARD Team members Mikael Andersson; Financial Management Specialist, Portfolio, Results, and Quality Control Unit, SARD Angelique Dawn A. Badelles, Associate Safeguards Officer (Resettlement), Office of the Director General, SARD Arnaud Cauchois, Principal Water Resources Specialist, SAER, SARDa Katrina L. Magpatoc, Operations Assistant, SAER, SARD Rachel F. Mendinueto, Associate Project Analyst, SAER, SARD Soma Misra, Procurement Specialist, Procurement Division 1, Procurement, Portfolio, and Financial Management Department Roshan Ouseph, Senior Counsel, Office of the General Counsel Deepak Singh, Senior Environment Officer, Nepal Resident Mission (NRM), SARD Suman Subba, Senior Social Development Officer (Gender), NRM, SARD Peer reviewer Geoffrey Wilson, Senior Water Resources Specialist, Water Sector Group, Sustainable Development and Climate Change Department a Outposted to the India Resident Mission. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page PROJECT AT A GLANCE MAP I. THE PROPOSAL 1 II. THE PROJECT 1 A. Rationale 1 B. Project Description 3 C. Value Added by ADB 4 D. Summary Cost Estimates and Financing Plan 4 E. Implementation Arrangements 6 III. ATTACHED TECHNICAL ASSISTANCE 7 IV. DUE DILIGENCE 7 A. Technical 7 B. Economic and Financial Viability 8 C. Sustainability 9 D. Governance 9 E. Poverty, Social, and Gender 10 F. Safeguards 10 G. Summary of Risk Assessment and Risk Management Plan 11 V. ASSURANCES 12 VI. RECOMMENDATION 12 APPENDIXES 1. Design and Monitoring Framework 13 2. List of Linked Documents 16 Project Classification Information Status: Complete PROJECT AT A GLANCE 1. Basic Data Project Number: 52195-001 Project Name Priority River Basins Flood Risk Management Department/Division SARD/SAER Project Country Nepal Executing Agency Ministry of Energy, Water Borrower Government of Nepal Resources and Irrigation Country Economic https://www.adb.org/Documents/LinkedDocs/ Indicators ?id=52195-001-CEI Portfolio at a Glance https://www.adb.org/Documents/LinkedDocs/ ?id=52195-001-PortAtaGlance 2. Sector Subsector(s) ADB Financing ($ million) Agriculture, natural Rural flood protection 40.00 resources and rural Rural water policy, institutional and capacity development 10.00 development Total 50.00 3. Operational Priorities Climate Change Information Addressing remaining poverty and reducing inequalities GHG reductions (tons per annum) 0 Accelerating progress in gender equality Climate Change impact on the High Tackling climate change, building climate and disaster resilience, and Project enhancing environmental sustainability Promoting rural development and food security ADB Financing Strengthening governance and institutional capacity Adaptation ($ million) 7.00 Mitigation ($ million) 0.00 Cofinancing Adaptation ($ million) 0.00 Mitigation ($ million) 0.00 Sustainable Development Goals Gender Equity and Mainstreaming SDG 1.5 Effective gender mainstreaming (EGM) SDG 2.4 SDG 5.5 Poverty Targeting SDG 13.a General Intervention on Poverty 4. Risk Categorization: Low . 5. Safeguard Categorization Environment: B Involuntary Resettlement: C Indigenous Peoples: B . 6. Financing Modality and Sources Amount ($ million) ADB 50.00 Sovereign Project grant: Asian Development Fund 10.00 Sovereign Project (Concessional Loan): Ordinary capital resources 40.00 Cofinancing 0.00 None 0.00 Counterpart 13.00 Government 13.00 Total 63.00 Note: An attached technical assistance will be financed on a grant basis by the Technical Assistance Special Fund (TASF-6) in the amount of $500,000; Water Financing Partnership Facility-NET TF in the amount of $750,000. Currency of ADB Financing: US Dollar, Nepalese Rupee Source: Asian Development Bank This document must only be generated in eOps. 25032020123619031705 Generated Date: 04-Sep-2020 18:14:51 PM NEPAL PRIORITY RIVER BASINS FLOOD RISK MANAGEMENT PROJECT SimikotSimikot DarchulaDarchula Kimri ChainpurChainpur BaitadiBaitadi Kolti GamgadhiGamgadhi Patan DadeldhuraDadeldhura MMartadiartadi Silgarhi JumlaJumla Bhatkanda DipayalDipayal MangalsenMangalsen ManmaManma DDunaiunai Banbasa BBheemdattheemdatt GGodawariodawari DDailekhailekh JomsomJomsom JajarkotJajarkot Babiyachour ChameChame DhangadhiDhangadhi MusikotMusikot BBirendranagarirendranagar BeniBeni SalyanSalyan Sittalpat PPokharaokhara DDhunchehunche LiwangLiwang BaglungBaglung BesisaharBesisahar GulariyaGulariya Kohalpur KKusmausma Tulsipur PPyuthanyuthan GGorkhaorkha BidurBidur TamghasTamghas SyangjaSyangja ChautaraChautara SandhikharkaSandhikharka DamauliDamauli NepalganjNepalganj GGhorahihorahi Waling Mugling Kakani Barhabise Lamahi DhadingbesiDhadingbesi Kathmandu CCharikotharikot MOHANA KHUTIYA TansenTansen Thankot BBhaktapurhaktapur Jiri BButwalutwal BBharatpurharatpur Dakshinkali Meghauli LLalitpuralitpur SalleriSalleri TaulihawaTaulihawa KKhandbarihandbari TTaplejungaplejung WEST RAPTI Bhairahawa PParasiarasi Baruwa Bhimphedi BhojpurBhojpur HHetaudaetauda RamecchapRamecchap Krishnanagar DDikteliktel Lohathar Bhimeshwar OkhaldhungaOkhaldhunga PhidimPhidim Lumbini SindhulimadiSindhulimadi Basantpur TerhanthumTerhanthum Pathlaiya DhankutaDhankuta IlamIlam BirgunjBirgunj Dhalkebar N EAST RAPTI KKalaiyaalaiya MMalangawaalangawa GGaighataighat DharanDharan Kakarbhitta GGauraur JJanakpuranakpur Maikhola Lahan Itahari SirahaSiraha ChandragadhiChandragadhi 0 20 40 60 80 100 RajbirajRajbiraj BBiratnagariratnagar JaleswarJaleswar Rangeli Kilometers LAKHANDEI Priority Basin BAKRAHA MAWA RATUWA River National Capital Provincial Capital District Headquarters Town/Market Center National Highway 194311 19NEP ABV 19NEP 194311 Feeder/District Road This map was produced by the cartography unit of the Asian Development Bank. District Boundary The boundaries, colors, denominations, and any other information shown on this Provincial Boundary map do not imply, on the part of the Asian Development Bank, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries, Boundaries areInternational not necessarily Boundary authoritative. colors, denominations, or information. I. THE PROPOSAL 1. I submit for your approval the following report and recommendation on a proposed loan and a proposed grant to Nepal for the Priority River Basins Flood Risk Management Project. The report also describes proposed technical assistance (TA) for the Implementation Support for the Priority River Basin Flood Risk Management Project, and if the Board approves the proposed loan and grant, I, acting under the authority delegated to me by the Board, approve the TA.1 2. The project will improve the resilience of communities to flooding in six river basins (para. 9) in the Terai region (Map).2 It is in line with Nepal’s National Water Plan, 2002–2027 to reduce social and economic losses from water-induced disasters through blending structural and nonstructural measures.3 The project will protect agricultural land and households in priority areas from a 1-in-50-year return period flood by constructing flood embankments, spurs, and outlet structures. The local response to flooding will be strengthened through the installation of flood forecasting and early warning systems (FFEWS) and community-based disaster risk management (CBDRM). II. THE PROJECT A. Rationale 3. Strategic context. Nepal’s comparatively low level of development in South Asia and complex geography render the country vulnerable to climate change impacts and prone to natural hazards.4 During the monsoon season (June–September), Nepal
Recommended publications
  • Map of Dolakha District Show Ing Proposed Vdcs for Survey
    Annex 3.6 Annex 3.6 Map of Dolakha district showing proposed VDCs for survey Source: NARMA Inception Report A - 53 Annex 3.7 Annex 3.7 Summary of Periodic District Development Plans Outlay Districts Period Vision Objectives Priorities (Rs in 'ooo) Kavrepalanchok 2000/01- Protection of natural Qualitative change in social condition (i) Development of physical 7,021,441 2006/07 resources, health, of people in general and backward class infrastructure; education; (ii) Children education, agriculture (children, women, Dalit, neglected and and women; (iii) Agriculture; (iv) and tourism down trodden) and remote area people Natural heritage; (v) Health services; development in particular; Increase in agricultural (vi) Institutional development and and industrial production; Tourism and development management; (vii) infrastructure development; Proper Tourism; (viii) Industrial management and utilization of natural development; (ix) Development of resources. backward class and region; (x) Sports and culture Sindhuli Mahottari Ramechhap 2000/01 – Sustainable social, Integrated development in (i) Physical infrastructure (road, 2,131,888 2006/07 economic and socio-economic aspects; Overall electricity, communication), sustainable development of district by mobilizing alternative energy, residence and town development (Able, local resources; Development of human development, industry, mining and Prosperous and resources and information system; tourism; (ii) Education, culture and Civilized Capacity enhancement of local bodies sports; (III) Drinking
    [Show full text]
  • Three Years of Reconstruction Special You Can Obtain the Previous Editions of ‘Rebuilding Nepal’ from NRA Office at Singha Durbar
    Three years of reconstruction special You can obtain the previous editions of ‘Rebuilding Nepal’ from NRA office at Singha Durbar. Cover: Jagat Bahadur Khatri and Chitra Kumari Khatri of Singati, Dolakha. Khatri is the first beneficiary to sign and receive the government’s private housing reconstruction grant. Photo: Chandra Shekhar Karki THREE YEARS OF RECONSTRUCTION NRA Chief Executive Officer of the National Reconstruction Authority Sushil Gyewali addressing a press meet to mark the completion of the NRA’s three years of establishment on December 25, 2018. 77% in private housing, 80% in schools and 95% progress in public buildings The National Reconstruction Author- with 742,135 beneficiaries, out of which in the rebuilding of health institutions, 95 ity (NRA) has publicized the progress 337,319 have completed rebuilding their percent in government buildings, 54 per- made in the post-earthquake reconstruc- houses while 233,343 houses are currently cent in security sector buildings and 68 tion and rehabilitation during three years under construction. percent in the cultural heritage sites. of its establishment and also unveiled the Similarly, 80 percent progress has been “We are on the right track to complete plans for the next two years of its tenure made in the reconstruction of the educa- the reconstruction of private housing during a press conference organized in tional institutions. As per the available within this fiscal year,” said Sushil Gyewa- Kathmandu on December 25. data, 55 percent of the schools have al- li, Chief Executive Officer of the NRA. The NRA has informed that there has ready been reconstructed while 25 percent “As many structures are currently under been 77 percent progress in the recon- of them are currently under construction.
    [Show full text]
  • (Sector) Project: Charikot Water Supply and Sanitation Subproject
    Land Acquisition, Involuntary Resettlement and Indigenous Peoples Due Diligence Report Document stage: Draft for consultation Project number: 35173-015 July 2018 NEP: Urban Water Supply and Sanitation (Sector) Project - Charikot Water Supply and Sanitation Subproject) Package No. W-01 Prepared by the Ministry of Water Supply, Government of Nepal for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 2 July 2018) Currency unit - Nepalese rupee (NRe) $1.00 = NRs109.821 NRe1.00 = $0.009 ABBREVIATIONS ADB - Asian Development Bank DMA - district metered area DWSS - Department of Water Supply and Sewerage PMO - project management office RDSMC - regional design supervision and management consultant RVT - reservoir tank TDF - Town Development Fund UWSSP - Urban Water Supply and Sanitation (Sector) Project VDC - Village Development Committee WSS - water supply and sanitation WTP - water treatment plant WUSC - Water Users and Sanitation Committee WEIGHTS AND MEASURES m3 – cubic meter km – kilometer lps – liter per second msl – mean sea level mm – millimeter m2 – square meter NOTE In this report, "$" refers to United States dollars. This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Ttamak Koshi 3 Hyd Droel Ectric C Pro Oject
    TAMAKOSHI 3 HYDROELECTRIC PROJECT EXECUTIVE SUMMARY - VOLUME XI Document for Disclosure Final Report – November 30, 2009 SWECO Norge AS Lysaker, P O Box 400 Oslo, NORWAY Telephone +47 67 12 80 00 www.sweco.no Abbreviations and Acronyms ACBP Awareness and Capacity Building Plan ADB Asian Development Bank CF Community Forest CFUG Community Forest User Group CITES Convention of International Trade in Endangered Species CSR Corporate Social Responsibility DFO District Forest Office DOED Department of Electricity Development EHSP Environment, Health and Safety Plan EIA Environmental Impact Assessment EMP Environmental Management Plan EMU Environmental Management Unit EPA Environmental Protection Agency EPR Environmental Protection Rules GLOF Glacial Lake Outburst Floods GON Government of Nepal GRU Grievance Redressal Unit GW Giga-watt GWh Giga-watt per hour HEP Hydroelectric Project HH/hh Household ICAMDP Immediate Catchment Area Management and Development Plan IFC International Financial Corporation IUCN International Union for the Conservation of Nature LSEP Livelihood Support and Enhancement Program m asl meters above sea level MOE Ministry of Energy MoEn Ministry of Environment MoWR Ministry of Water Resources MT Million Tons MW Mega Watt NEA National Electricity Authority PAF Project Affected Families PAP Project Affected Persons PCDP Public Consultation and Disclosure Plan PS Performance Standards RAP Resettlement Action Plan RRP Resettlement and Rehabilitation Plan SBA Safeguard Buffer Area SchEMS School of Environmental Management and Sustainable Development SEMD Social and Environmental Management Division SNP SN Power SPAF Severely Project Affected Families SPS Safeguard Policy Statement TA3HEP Tamakoshi 3 Hydroelectric Project TOR Terms of Reference VDC Village Development Committee WBG World Bank Group WHO World Health Organization Table of Content Page nos 1 Project Proponent and Organization Responsible for Preparing the EIA Report .........................................................
    [Show full text]
  • Annual Report
    ANNUAL REPORT National Trust for Nature Conservation ANNUAL REPORT 2018 © NTNC 2018 (FY 2017/18) Published by: National Trust for Nature Conservation (NTNC) Khumaltar, Lalitpur, Nepal PO Box 3712, Kathmandu, Nepal Tel: +977-1-5526571, 5526573, Fax: +977-1-5526570 E-mail: [email protected], URL: www.ntnc.org.np Photo credits: ACAP, BCC, BCP, Central Zoo, MCAP, SCP, GCAP Cover Photo: Chitwan © Sagar Giri Back cover photo: Ghorepani © Nicolas Cegalerba & Joanna Szwemberg Perhaps in recent memory, nature has never been under so much stress. Human being’s modern advancement are unfortunately taking a heavy toll on nature. Exponential population growth, aggravating poverty, expanding industrialization and unwarranted interference with nature’s indivisible elements – species, ecosystems and climate has put today’s global society out of harmony with nature. Nature as we know it is all giving, yet hardly immune from overexploitation. Therefore, sustenance and conservation of nature in delivering our developmental needs must be at the center of today’s aspiration for prosperity. Thence, increased commitment for sustainability and a collective action to secure our material progress in harmony with nature is imperative. In the midst of surmounting environmental problems both globally and locally, the National Trust for Nature Conservation continues to move forward to do its best in balancing the needs of people to that of nature’s sustainability. With a sense of concern FOREWORD and responsiveness from all spheres of society, we believe that a harmonious relationship between people and nature is attainable. Being guided in our mission to secure biodiversity for posterity, we understand the irreplaceable value that natural systems bring to life, and what it would mean if these are not secured.
    [Show full text]
  • Community Resilience Capacity
    COMMUNITY RESILIENCE CAPACITY A STUDY ON NEPAL’S 2015 EARTHQUAKES AND AFTERMATH Central Department of Anthropology Tribhuvan University Kirtipur, Kathmandu, Nepal COMMUNITY RESILIENCE CAPACITY B A STUDY ON NEPAL’S 2015 EARTHQUAKES AND AFTERMATH COMMUNITY RESILIENCE CAPACITY A STUDY ON NEPAL’S 2015 EARTHQUAKES AND AFTERMATH Mukta S. Tamang In collaboration with Dhanendra V. Shakya, Meeta S. Pradhan, Yogendra B. Gurung, Balkrishna Mabuhang SOSIN Research Team PROJECT COORDINATOR Dr. Dambar Chemjong RESEARCH DIRECTOR Dr. Mukta S. Tamang TEAM LEADERS Dr. Yogendra B Gurung Dr. Binod Pokharel Dr. Meeta S. Pradhan Dr. Mukta S. Tamang TEAM MEMBERS Dr. Dhanendra V. Shakya Dr. Meeta S. Pradhan Dr. Yogendra B. Gurung Mr. Balkrishna Mabuhang Mr. Mohan Khajum ADVISORS/REVIEWERS Dr. Manju Thapa Tuladhar Mr. Prakash Gnyawali I COMMUNITY RESILIENCE CAPACITY A Study on Nepal’s 2015 Earthquakes and Aftermath Copyright @ 2020 Central Department of Anthropology Tribhuvan University This study is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of the authors and do not necessarily reflect the views of USAID or the United States Government or Tribhuvan University. Published by Central Department of Anthropology (CDA) Tribhuvan University (TU), Kirtipur, Kathmandu, Nepal Tel: + 977- 01-4334832 Email: [email protected] Website: www.anthropologytu.edu.np First Published: October 2020 300 Copies Cataloguing in Publication Data Tamang, Mukta S. Community resilience capacity: a study on Nepal’s 2015 earthquakes and aftermath/ Mukta S.Tamang …[ et al. ] Kirtipur : Central Department of Anthropology, Tribhuvan University, 2020.
    [Show full text]
  • Virgin Route Awakening!
    Tsho Rolpa Trail Virgin route awakening! Tsho Rolpa Lake, 4558 m.a.s.l. Contact in Beding village: Gaurishankar Conservation Area Office, Singati Tel. +977 49 421493 Gaurishankar Rural Municipality Tel. +977 49 691349 Photographs: © DRILP team Illustration/design: kiirtistudio April 2019 Tsho Rolpa Trail Starting from Chhetchhet – a small settlement along the Tamakoshi River in Rolwaling valley of Dolakha district – around 2.5 hours trek takes you to the village of Simigaun. From Simigaun, a moderate climb through a dense forest takes you further to the villages of Surmuche, Kyalje, Shikari and Dongang. All those tranquil settlements maintain clean, authentic lodges. The forest lightens up after the village of Dongang. As you enter an enticing high-altitude trail along the foot of Mt. Gaurishankar, you walk a good amount to reach the Beding village that hosts a stunning Buddhist monastery. From Beding you ascent further to reach Naagaun and from there you walk some more to claim your reward, a breathtaking Tsho Rolpa Lake. Why Tsho Rolpa Getting There Trek along the foothills of the towering and ever By public bus: Kathmandu to Lamabagar (two buses present Gaurishankar (7134m), Kang Nachugo daily), get off the bus at Chhetchhet. (6735m) and Dragnag Ri (6801m) mountains. By car / motorbike: Kathmandu - Dhulikhel - Khurkot Experience virgin forests; enjoy and embrace the - Manthali - Charikot (visit Dolakha and Bhimeshwar overwhelming scents of the ever flowering and Temple) - Singati - Jagat - Gongar - Chhetchhet. evolving flora and fauna. Walk along the pounding Rolwaling river with its millions of different settings. Take a shower in Return / Alternative Options* the waterfalls of the tributary rivers.
    [Show full text]
  • Section 3 Zoning
    Section 3 Zoning Section 3: Zoning Table of Contents 1. OBJECTIVE .................................................................................................................................... 1 2. TRIALS AND ERRORS OF ZONING EXERCISE CONDUCTED UNDER SRCAMP ............. 1 3. FIRST ZONING EXERCISE .......................................................................................................... 1 4. THIRD ZONING EXERCISE ........................................................................................................ 9 4.1 Methods Applied for the Third Zoning .................................................................................. 11 4.2 Zoning of Agriculture Lands .................................................................................................. 12 4.3 Zoning for the Identification of Potential Production Pockets ............................................... 23 5. COMMERCIALIZATION POTENTIALS ALONG THE DIFFERENT ROUTES WITHIN THE STUDY AREA ...................................................................................................................................... 35 i The Project for the Master Plan Study on High Value Agriculture Extension and Promotion in Sindhuli Road Corridor in Nepal Data Book 1. Objective Agro-ecological condition of the study area is quite diverse and productive use of agricultural lands requires adoption of strategies compatible with their intricate topography and slope. Selection of high value commodities for promotion of agricultural commercialization
    [Show full text]
  • Government of Nepal
    Invitation for Bids Notice No.: 05/073/074 (First Publication Date: 2073-12-10 (23th March 2017)) Government of Nepal, Ministry of Physical Infrastructure and Transport, Department of Roads, Division Road Office, Charikot invites sealed bids from registered eligible Contractors having qualification as mentioned in the bidding document for the following contracts as mentioned below: Estimated Price of Bid Security S.No Amount Bidding Contract No. Name of Road /Bridge Description of work Amount Remarks . Without VAT Document (NRs) (NRs) (NRs) Jalbari-Khahare- DROCHT/3371234/ Jogidanda Gramin 1 Upgrading of road 23000 1000 073/74-154 Sadak, 845,653.87 Sindhupalchowk Barhabise -Saheli- DROCHT/3371234/ Andherikhola- Stone soling, 2 073/74-155 23000 1000 Bhairabkunda Sadak, Gabion works 847,371.53 Sindhupalchowk Barhabise Thotanari DROCHT/3371234/ Ratamata Earthwork (Hard 845,770.00 3 073/74-156 Chulthidamar Ghode 23000 1000 Rock Cutting) Ompark, Sindhupalchowk DROCHT/3371234/ Baruwa Yangri Sadak, 1,693,627.29 4 073/74-157 Upgrading of Road 45000 1000 Sindhupalchowk Barhabise -Dhuskun- DROCHT/3371234/ Piskar-Kharidhunga 422,978.44 5 073/74-158 Gabion works 12000 1000 Sadak, Sindhupalchowk DROCHT/3371234/ Bahunepati- Dhusini- 6 073/74-159 Aapchaur Kulchowk Upgrading of road 1,692,529.92 45000 1000 Sadak Sipaghat-Bhimtar- DROCHT/3371234/ Sipapokhari- 1,691,614.76 7 073/74-160 Badegaun-Nawalpur 45000 1000 Upgrading of road sadak, Sindhupalchowk Dhade-Baramche- DROCHT/3371234/ 1,694,695.38 8 Pangtang-Golu Sadak, 45000 1000 073/74-161 Upgrading
    [Show full text]
  • 3702-NEP: Disaster Resilience of Schools Project and Title
    Invitation for Bids Date: 25 February 2021 Loan No. 3702-NEP: Disaster Resilience of Schools Project and Title: Contract No. DRSP/076/77-Retro-07 and Title: Retrofitting of 18 School Buildings in Ramechhap and Dolakha Districts Deadline for Submission of 26 March 2021, 12:00 hours Nepal Standard Time (NST) Bids: 1. The Government of Nepal has received a financing from the Asian Development Bank (ADB) toward the cost of Disaster Resilience of Schools Project (DRSP). Part of this financing will be used for payments under the contracts named above. Bidding is open to bidders from eligible source countries of ADB. 2. The Central Level Project Implementation Unit (Education), National Reconstruction Authority (NRA) (the “Employer”) invites sealed bids from eligible bidders or joint ventures for the Retrofitting of 18 School Buildings in Ramechhap and Dolakha Districts. Retrofitting period is of 18 months. 3. Only eligible bidders with the following key qualifications should participate in the bidding: Key Qualification Description of works Minimum Construction Lot to be bid as SINGLE PACKAGE Average Annual contracts of similar S.N. Identification (Retrofitting of following school Construction size and nature in (ID) No. building complex) Turnover (Last last five (5) years three (3) years). and Key Activities Ramechhap • Himganga SS, Sanghutar, Sanghutar RM-01 Contracts of similar • Kusheswor SS, Bethan, size and nature Sunapati RM-04 At least one (1) • Rudraksheswor SS, Muhgitar, contract that has Manthali Municipality-7 been successfully DRSP/076/77- • Kalika Devi SS, Deurali, or substantially Ramechhap Municipality-2 1 Retro-07 NPR528.20 completed where • Kantheshwor SS, Tokarpur, Million Doramba RM-03 the bidder’s participation • Shatalingeshwor SS, Bhadaure, Sunapati RM-01 exceeds: • Shivalingeshwor SS, Tamchet, NPR190.50 Million.
    [Show full text]
  • Environmental Compliance Monitoring Report Nepal: Earthquake
    Environmental Compliance Monitoring Report Semi-Annual Report No. 2 Loan Number: 3260 NEP January - June, 2017 Nepal: Earthquake Emergency Assistance Project Prepared by the Government of Nepal for the Asian Development Bank. This environmental Compliance Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental Compliance Monitoring Report January-June, 2017 Environmental Compliance Monitoring Report January-June, 2017 Semi-Annual Report No. 2 Nepal: Earthquake Emergency Assistance Project Project No. 49512-001 Loan Number: 3260 NEP Prepared by Earthquake Emergency Assistance Project (EEAP) for Government of Nepal and Asian Development Bank Earthquake Emergency Assistance Project 1 Environmental Compliance Monitoring Report January-June, 2017 This environmental compliance monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • World Bank Document
    Nepal Electricity Authority Public Disclosure Authorized Social Impact Assessment of Khimti- Dhalkebar 220 kV Transmission Line Project Final Report Public Disclosure Authorized Submitted to: Khimti- Dhalkebar 220 kV Transmission Line Project Darbar Marga, Kathmandu Public Disclosure Authorized Submitted by: Environment and Social Studies Department Adwait Marga, Kathmandu Public Disclosure Authorized and will cross Ramechap, Sindhuli and Mahottari districts and finally reaches the Dhalkebar substation of Dhanusha district. For the purpose of the SIA study, the study area is defined as the project area consisting of the right of way, substation area as well as the area that will be impacted due to the construction and operation of the project. The proposed project will cover 16 VDCs and one Municipality of the five districts. The right of way of the proposed project will be 15 meter each side from the centerline and approximately 12.5.m x 12.5-m area will be required for tower foundation. In most of the areas span of the tower will be 350 meter and in total 230 towers will be constructed in 73- km alignment. The number of angle points is 53 and tower is steel lattice structure, self supported type. The project component also includes extension of two 132 kV line bays, one each at Khimti and Dhalkebar existing substations. The estimated cost for the proposed project is 22 million US$ which will be jointly funded by World Bank, HMG/N and NEA. In order to carry out the project works the entire stretch of the line route will be segmented into two work sections and will be controlled from two ends.
    [Show full text]