3702-NEP: Disaster Resilience of Schools Project and Title

Total Page:16

File Type:pdf, Size:1020Kb

3702-NEP: Disaster Resilience of Schools Project and Title Invitation for Bids Date: 25 February 2021 Loan No. 3702-NEP: Disaster Resilience of Schools Project and Title: Contract No. DRSP/076/77-Retro-07 and Title: Retrofitting of 18 School Buildings in Ramechhap and Dolakha Districts Deadline for Submission of 26 March 2021, 12:00 hours Nepal Standard Time (NST) Bids: 1. The Government of Nepal has received a financing from the Asian Development Bank (ADB) toward the cost of Disaster Resilience of Schools Project (DRSP). Part of this financing will be used for payments under the contracts named above. Bidding is open to bidders from eligible source countries of ADB. 2. The Central Level Project Implementation Unit (Education), National Reconstruction Authority (NRA) (the “Employer”) invites sealed bids from eligible bidders or joint ventures for the Retrofitting of 18 School Buildings in Ramechhap and Dolakha Districts. Retrofitting period is of 18 months. 3. Only eligible bidders with the following key qualifications should participate in the bidding: Key Qualification Description of works Minimum Construction Lot to be bid as SINGLE PACKAGE Average Annual contracts of similar S.N. Identification (Retrofitting of following school Construction size and nature in (ID) No. building complex) Turnover (Last last five (5) years three (3) years). and Key Activities Ramechhap • Himganga SS, Sanghutar, Sanghutar RM-01 Contracts of similar • Kusheswor SS, Bethan, size and nature Sunapati RM-04 At least one (1) • Rudraksheswor SS, Muhgitar, contract that has Manthali Municipality-7 been successfully DRSP/076/77- • Kalika Devi SS, Deurali, or substantially Ramechhap Municipality-2 1 Retro-07 NPR528.20 completed where • Kantheshwor SS, Tokarpur, Million Doramba RM-03 the bidder’s participation • Shatalingeshwor SS, Bhadaure, Sunapati RM-01 exceeds: • Shivalingeshwor SS, Tamchet, NPR190.50 Million. Doramba RM-04 • Shree Buddha Bhawani SS, Makadum, Khadadevi RM-06 Key Activities • Surke Deurali SS,Daduwa, Retrofitting works of Doramba RM-01 building where the • Shree Manthali SS, Manthali value of the Bidder’s participation exceeds Dolakha NPR. 38.10 Million • Hanumanteswor SS, Kabre, Baiteswor Municipality-04 • Narayani SS, Bhirkot, Tamakoshi RM-01 • Sitapaila SS, Japhe, Tamakoshi RM-03 • Devi SS, Bosch, Bhimeshwor Municipality-08 • Jana Jyoti SS, Gairimudi, Putalikath, Baiteshwor RM-02 • Kalika SS, Hanwa,Tamakoshi RM-07 • Pashupati Kanya Mandir SS, Charikot, Bhimeshwar Municipality • Satyeshwor SS,Pawati, Melung RM-01 4. Open competitive bidding (OCB) with national advertising will be conducted in accordance with ADB’s Single-Stage: Two-Envelope bidding procedure and is open to all bidders from eligible countries as described in the Bidding Document. 5. To obtain further information and inspect the bidding documents, bidders should contact: Project Director Central Level Project Implementation Unit (Education) 4th Floor Shanta Plaza, Gyaneshwor, Kathmandu Telephone: +977-1-4420106, Fax: +977-1-4420521 Electronic mail address: [email protected] Website: www.moepiu.gov.np or may download the bidding document visiting PPMO e-GP system www.bolpatra.gov.np/egp. 6. To purchase the bidding documents in English eligible bidders should: • Write to address above requesting the above-mentioned bidding documents on or before 25 March 2021 during office hours (except on holidays) from Sunday to Thursday, 10:00 hrs to 17:00 hrs and on Friday from 10:00 hrs to 15:00 hrs. • Pay a non-refundable fee of NPR 20,000 towards the cost of the Bidding Document. Bidders who choose to submit their bid electronically may purchase the hard copy of the bidding documents as mentioned above or may download the bidding documents for e- submission from PPMO’s e-GP system www.bolpatra.gov.np/egp. The local currency should be deposited in the account as given below. Name of the Bank: Rastriya Banijya Bank, Thamel, Kathmandu Name of Office: Central Level Project Implementation Unit (Education) Office Code no.: 392003502 Revenue Account no.: 1000200010000 Revenue Code.: 14229 7. Pre-bid meeting shall be held at the address above on 12 March 2021 at 11:00 hours. 8. Deliver your bid: • to the address in Para. 5 above or electronically through PPMO’s e-GP system www.bolpatra.gov.np/egp • on or before the deadline: 26 March 2021, 12:00 hours Nepal Standard Time (NST) • together with the bid security as described in the bidding documents. Technical bids will be opened immediately in the presence of Bidders’ representatives who choose to attend, whereas the Financial Bids shall remain sealed and unopened and shall be placed locked. The Financial Bids of only Technically Responsible and Qualified Bidders shall be opened after Technical Bid Evaluation, whereas, the Financial Bids of those Bidders whose Technical Bids are not responsive and qualified shall be returned unopened after the contract is awarded. .
Recommended publications
  • Ramechhap HRRP General Coordination Meeting,11Th Dec 2018
    HRRP District Coordination Meeting Minutes Meeting Purpose: HRRP General Coordination Meeting Meeting Date: 11/12/2018 (11th Dec 2018) Meeting Time: 11am – 2pm Meeting Location: Devkota Chowk, Manthali DTO Meeting Hall, Ramechhap Meeting Facilitator: Prakash Bishwakarma Minutes Taken By: Prakash Bishwakarma / Javeed Mohamad Summary of Total: 16 Female:1 Male: 15 participants: Discussion: (Items/Knowledge Shared) GMaLi/HRRP Ramechhap General coordination meeting was chaired by Mr. Krishna lal Piya – GMALI Office Chief, Ramechhap and chief guest was Mr. Shanti prasad Paudel Provincial member of parliament province 3. Agenda: ➢ Welcome/Introduction ➢ Follow up of previous month’s meeting discussion and parking lot ➢ POs update – please share your update packs (PPT) so that can be shared in the meeting minute ➢ AOB Discussion ➢ Welcome and Introduction: Mr. Prakash Bishwakarma- District Coordinator- HRRP welcomed all the participants participated in the General coordination meeting and had a round of the introduction with each other. He also shared the objective and agenda of the General coordination meeting to be discussed in the meeting. ➢ HRRP updates: Mr. Prakash Bishwakarma- District coordinator have a presentation on What HRRP is doing and What HRRP is? Housing Recovery and Reconstruction Platform (HRRP) is working in Nepal to support Government of Nepal (NRA, MOUD/DUDBC, MOFALD) in coordination, Strategic planning, facilitating cooperation with the national and international organizations, the private sector, and public associations involve in recovery and reconstruction after Earthquake in Nepal. In the following ways HRRP Work. -General Coordination -Technical Coordination -Information Management o Collecting 5w data o Manage Training Database o Generate Maps ➢ Partners Update In Ramechhap District there are 6 partner’s organization are actively working in the district based on the reporting to GMALI/HRRP.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Map of Dolakha District Show Ing Proposed Vdcs for Survey
    Annex 3.6 Annex 3.6 Map of Dolakha district showing proposed VDCs for survey Source: NARMA Inception Report A - 53 Annex 3.7 Annex 3.7 Summary of Periodic District Development Plans Outlay Districts Period Vision Objectives Priorities (Rs in 'ooo) Kavrepalanchok 2000/01- Protection of natural Qualitative change in social condition (i) Development of physical 7,021,441 2006/07 resources, health, of people in general and backward class infrastructure; education; (ii) Children education, agriculture (children, women, Dalit, neglected and and women; (iii) Agriculture; (iv) and tourism down trodden) and remote area people Natural heritage; (v) Health services; development in particular; Increase in agricultural (vi) Institutional development and and industrial production; Tourism and development management; (vii) infrastructure development; Proper Tourism; (viii) Industrial management and utilization of natural development; (ix) Development of resources. backward class and region; (x) Sports and culture Sindhuli Mahottari Ramechhap 2000/01 – Sustainable social, Integrated development in (i) Physical infrastructure (road, 2,131,888 2006/07 economic and socio-economic aspects; Overall electricity, communication), sustainable development of district by mobilizing alternative energy, residence and town development (Able, local resources; Development of human development, industry, mining and Prosperous and resources and information system; tourism; (ii) Education, culture and Civilized Capacity enhancement of local bodies sports; (III) Drinking
    [Show full text]
  • Provincial Summary Report Province 3 GOVERNMENT of NEPAL
    National Economic Census 2018 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 Provincial Summary Report Provincial National Planning Commission Province 3 Province Central Bureau of Statistics Kathmandu, Nepal August 2019 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 National Planning Commission Central Bureau of Statistics Kathmandu, Nepal August 2019 Published by: Central Bureau of Statistics Address: Ramshahpath, Thapathali, Kathmandu, Nepal. Phone: +977-1-4100524, 4245947 Fax: +977-1-4227720 P.O. Box No: 11031 E-mail: [email protected] ISBN: 978-9937-0-6360-9 Contents Page Map of Administrative Area in Nepal by Province and District……………….………1 Figures at a Glance......…………………………………….............................................3 Number of Establishments and Persons Engaged by Province and District....................5 Brief Outline of National Economic Census 2018 (NEC2018) of Nepal........................7 Concepts and Definitions of NEC2018...........................................................................11 Map of Administrative Area in Province 3 by District and Municipality…...................17 Table 1. Number of Establishments and Persons Engaged by Sex and Local Unit……19 Table 2. Number of Establishments by Size of Persons Engaged and Local Unit….….27 Table 3. Number of Establishments by Section of Industrial Classification and Local Unit………………………………………………………………...34 Table 4. Number of Person Engaged by Section of Industrial Classification and Local Unit………………………………………………………………...48 Table 5. Number of Establishments and Person Engaged by Whether Registered or not at any Ministries or Agencies and Local Unit……………..………..…62 Table 6. Number of establishments by Working Hours per Day and Local Unit……...69 Table 7. Number of Establishments by Year of Starting the Business and Local Unit………………………………………………………………...77 Table 8.
    [Show full text]
  • Three Years of Reconstruction Special You Can Obtain the Previous Editions of ‘Rebuilding Nepal’ from NRA Office at Singha Durbar
    Three years of reconstruction special You can obtain the previous editions of ‘Rebuilding Nepal’ from NRA office at Singha Durbar. Cover: Jagat Bahadur Khatri and Chitra Kumari Khatri of Singati, Dolakha. Khatri is the first beneficiary to sign and receive the government’s private housing reconstruction grant. Photo: Chandra Shekhar Karki THREE YEARS OF RECONSTRUCTION NRA Chief Executive Officer of the National Reconstruction Authority Sushil Gyewali addressing a press meet to mark the completion of the NRA’s three years of establishment on December 25, 2018. 77% in private housing, 80% in schools and 95% progress in public buildings The National Reconstruction Author- with 742,135 beneficiaries, out of which in the rebuilding of health institutions, 95 ity (NRA) has publicized the progress 337,319 have completed rebuilding their percent in government buildings, 54 per- made in the post-earthquake reconstruc- houses while 233,343 houses are currently cent in security sector buildings and 68 tion and rehabilitation during three years under construction. percent in the cultural heritage sites. of its establishment and also unveiled the Similarly, 80 percent progress has been “We are on the right track to complete plans for the next two years of its tenure made in the reconstruction of the educa- the reconstruction of private housing during a press conference organized in tional institutions. As per the available within this fiscal year,” said Sushil Gyewa- Kathmandu on December 25. data, 55 percent of the schools have al- li, Chief Executive Officer of the NRA. The NRA has informed that there has ready been reconstructed while 25 percent “As many structures are currently under been 77 percent progress in the recon- of them are currently under construction.
    [Show full text]
  • TSLC PMT Result
    Page 62 of 132 Rank Token No SLC/SEE Reg No Name District Palika WardNo Father Mother Village PMTScore Gender TSLC 1 42060 7574O15075 SOBHA BOHARA BOHARA Darchula Rithachaupata 3 HARI SINGH BOHARA BIMA BOHARA AMKUR 890.1 Female 2 39231 7569013048 Sanju Singh Bajura Gotree 9 Gyanendra Singh Jansara Singh Manikanda 902.7 Male 3 40574 7559004049 LOGAJAN BHANDARI Humla ShreeNagar 1 Hari Bhandari Amani Bhandari Bhandari gau 907 Male 4 40374 6560016016 DHANRAJ TAMATA Mugu Dhainakot 8 Bali Tamata Puni kala Tamata Dalitbada 908.2 Male 5 36515 7569004014 BHUVAN BAHADUR BK Bajura Martadi 3 Karna bahadur bk Dhauli lawar Chaurata 908.5 Male 6 43877 6960005019 NANDA SINGH B K Mugu Kotdanda 9 Jaya bahadur tiruwa Muga tiruwa Luee kotdanda mugu 910.4 Male 7 40945 7535076072 Saroj raut kurmi Rautahat GarudaBairiya 7 biswanath raut pramila devi pipariya dostiya 911.3 Male 8 42712 7569023079 NISHA BUDHa Bajura Sappata 6 GAN BAHADUR BUDHA AABHARI BUDHA CHUDARI 911.4 Female 9 35970 7260012119 RAMU TAMATATA Mugu Seri 5 Padam Bahadur Tamata Manamata Tamata Bamkanda 912.6 Female 10 36673 7375025003 Akbar Od Baitadi Pancheswor 3 Ganesh ram od Kalawati od Kalauti 915.4 Male 11 40529 7335011133 PRAMOD KUMAR PANDIT Rautahat Dharhari 5 MISHRI PANDIT URMILA DEVI 915.8 Male 12 42683 7525055002 BIMALA RAI Nuwakot Madanpur 4 Man Bahadur Rai Gauri Maya Rai Ghodghad 915.9 Female 13 42758 7525055016 SABIN AALE MAGAR Nuwakot Madanpur 4 Raj Kumar Aale Magqar Devi Aale Magar Ghodghad 915.9 Male 14 42459 7217094014 SOBHA DHAKAL Dolakha GhangSukathokar 2 Bishnu Prasad Dhakal
    [Show full text]
  • (Sector) Project: Charikot Water Supply and Sanitation Subproject
    Land Acquisition, Involuntary Resettlement and Indigenous Peoples Due Diligence Report Document stage: Draft for consultation Project number: 35173-015 July 2018 NEP: Urban Water Supply and Sanitation (Sector) Project - Charikot Water Supply and Sanitation Subproject) Package No. W-01 Prepared by the Ministry of Water Supply, Government of Nepal for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 2 July 2018) Currency unit - Nepalese rupee (NRe) $1.00 = NRs109.821 NRe1.00 = $0.009 ABBREVIATIONS ADB - Asian Development Bank DMA - district metered area DWSS - Department of Water Supply and Sewerage PMO - project management office RDSMC - regional design supervision and management consultant RVT - reservoir tank TDF - Town Development Fund UWSSP - Urban Water Supply and Sanitation (Sector) Project VDC - Village Development Committee WSS - water supply and sanitation WTP - water treatment plant WUSC - Water Users and Sanitation Committee WEIGHTS AND MEASURES m3 – cubic meter km – kilometer lps – liter per second msl – mean sea level mm – millimeter m2 – square meter NOTE In this report, "$" refers to United States dollars. This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Earthquake Housing Reconstruction Project (EHRP)
    Government of Nepal National Reconstruction Authority District Level Project Implementation Unit (DLPIU) Grant Management and Local Infrastructure (GMaLI) Manthali, Ramechhap Earthquake Housing Reconstruction Project (EHRP) Environmental and Social Safeguard Work Completion Report of Parthala-Surke-Gadi Gaon Drinking Water Supply Scheme, Doramba Rural Municipality-01, Dadhuwa Prepared by: Submitted to: District Level Project Implementation Unit Central Level Project Implementation Unit GMaLI, Manthali, Ramechhap Jwagal, Lalitpur ESMP Approval Date: 2076/01/16 July, 2019 Table of Contents 1. Sub-project background ...................................................................................................... 1 2. Relevancy of sub-project selection ..................................................................................... 1 3. Sub-project activities .......................................................................................................... 2 4. Original condition of sub-project ....................................................................................... 2 5. Intervention/activities carried out ....................................................................................... 2 6. Total cost incurred .............................................................................................................. 3 7. Photographs ........................................................................................................................ 3 8. Sub-project implementation modality and
    [Show full text]
  • Ttamak Koshi 3 Hyd Droel Ectric C Pro Oject
    TAMAKOSHI 3 HYDROELECTRIC PROJECT EXECUTIVE SUMMARY - VOLUME XI Document for Disclosure Final Report – November 30, 2009 SWECO Norge AS Lysaker, P O Box 400 Oslo, NORWAY Telephone +47 67 12 80 00 www.sweco.no Abbreviations and Acronyms ACBP Awareness and Capacity Building Plan ADB Asian Development Bank CF Community Forest CFUG Community Forest User Group CITES Convention of International Trade in Endangered Species CSR Corporate Social Responsibility DFO District Forest Office DOED Department of Electricity Development EHSP Environment, Health and Safety Plan EIA Environmental Impact Assessment EMP Environmental Management Plan EMU Environmental Management Unit EPA Environmental Protection Agency EPR Environmental Protection Rules GLOF Glacial Lake Outburst Floods GON Government of Nepal GRU Grievance Redressal Unit GW Giga-watt GWh Giga-watt per hour HEP Hydroelectric Project HH/hh Household ICAMDP Immediate Catchment Area Management and Development Plan IFC International Financial Corporation IUCN International Union for the Conservation of Nature LSEP Livelihood Support and Enhancement Program m asl meters above sea level MOE Ministry of Energy MoEn Ministry of Environment MoWR Ministry of Water Resources MT Million Tons MW Mega Watt NEA National Electricity Authority PAF Project Affected Families PAP Project Affected Persons PCDP Public Consultation and Disclosure Plan PS Performance Standards RAP Resettlement Action Plan RRP Resettlement and Rehabilitation Plan SBA Safeguard Buffer Area SchEMS School of Environmental Management and Sustainable Development SEMD Social and Environmental Management Division SNP SN Power SPAF Severely Project Affected Families SPS Safeguard Policy Statement TA3HEP Tamakoshi 3 Hydroelectric Project TOR Terms of Reference VDC Village Development Committee WBG World Bank Group WHO World Health Organization Table of Content Page nos 1 Project Proponent and Organization Responsible for Preparing the EIA Report .........................................................
    [Show full text]
  • Nepal: Disaster Resilience of Schools Project
    Social Safeguards Due Diligence Report Project Number: 51190-001 February 2020 Nepal: Disaster Resilience of Schools Project Construction of Schools in Ramechhap District (Reconstruction Phase II) Prepared by Central Level Project Implementation Unit (Education) of National Reconstruction Authority for the Asian Development Bank. This Social Safeguards Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS ABBREVIATIONS ..................................................................................................................... III I. INTRODUCTION ............................................................................................................ 1 II. APPROACH AND METHODOLOGY IN DUE DILIGENCE ............................................ 2 III. SCOPE OF LIKELY IMPACTS OF THE PROJECTS ..................................................... 3 A. INVOLUNTARY RESETTLEMENT ...................................................................................................................... 3 B. INDIGENOUS PEOPLES...................................................................................................................................
    [Show full text]
  • Annual Report
    ANNUAL REPORT National Trust for Nature Conservation ANNUAL REPORT 2018 © NTNC 2018 (FY 2017/18) Published by: National Trust for Nature Conservation (NTNC) Khumaltar, Lalitpur, Nepal PO Box 3712, Kathmandu, Nepal Tel: +977-1-5526571, 5526573, Fax: +977-1-5526570 E-mail: [email protected], URL: www.ntnc.org.np Photo credits: ACAP, BCC, BCP, Central Zoo, MCAP, SCP, GCAP Cover Photo: Chitwan © Sagar Giri Back cover photo: Ghorepani © Nicolas Cegalerba & Joanna Szwemberg Perhaps in recent memory, nature has never been under so much stress. Human being’s modern advancement are unfortunately taking a heavy toll on nature. Exponential population growth, aggravating poverty, expanding industrialization and unwarranted interference with nature’s indivisible elements – species, ecosystems and climate has put today’s global society out of harmony with nature. Nature as we know it is all giving, yet hardly immune from overexploitation. Therefore, sustenance and conservation of nature in delivering our developmental needs must be at the center of today’s aspiration for prosperity. Thence, increased commitment for sustainability and a collective action to secure our material progress in harmony with nature is imperative. In the midst of surmounting environmental problems both globally and locally, the National Trust for Nature Conservation continues to move forward to do its best in balancing the needs of people to that of nature’s sustainability. With a sense of concern FOREWORD and responsiveness from all spheres of society, we believe that a harmonious relationship between people and nature is attainable. Being guided in our mission to secure biodiversity for posterity, we understand the irreplaceable value that natural systems bring to life, and what it would mean if these are not secured.
    [Show full text]
  • Ramechhap (As of 10 May 2017) HRRP
    District Profile - Ramechhap (as of 10 May 2017) HRRP This district profile outlines the current activities by partner organisations (POs) in post-earthquake recovery and reconstruction. It is based on 4W and secondary data collected from POs on their recent activities pertaining to housing sector. Further, it captures a wide range of planned, ongoing and completed activities within the HRRP framework. For additional information, please refer to the HRRP dashboard. FACTS AND FIGURES Population: 202,6461 45 VDCs and 2 municipalities Damage Status - Private Structures Type of housing walls Ramechhap National Mud-bonded bricks/stone 95% 41% Cement-bonded bricks/stone 3% 29% Damage Grade (3-5) 49,345 Other 2% 30% Damage Grade (1-2) 9,267 % of households who own 95% 85% Total 58,6122 their housing unit (Census 2011)1 NEWS & UPDATES 1. 50 days mason training to generate 350 skilled masons from 6 former VDC’s of Umakunda gaupalika has been started by Helvetas. In the meantime the training sessions are halted and will resume smoothly after local election. 2. Election campaigns are in full fledge in the district and no such incidents are reported yet. Government officials allocated to conduct election has left district headquarter for their respective polling station from today (10th May 2017). All support staff from NRA has also been deployed in various polling stations of the district. © GWT PARTNERS SUMMARY AND HIGHLIGHTS3 Partner Organisation Implementing Partner(s) ACTED ECARDS 373 2,980 GOAL CDS SHORT TRAINING HCI YSP 4,429 HELVETAS SODEC-N,BDCC,ANS,CMES,TRACE,MTSDI,SBPK
    [Show full text]