Spaulding Turnpike Improvements NHS-027-1(37), 11238

Total Page:16

File Type:pdf, Size:1020Kb

Spaulding Turnpike Improvements NHS-027-1(37), 11238 Final Environmental Impact Statement Volume 1 Spaulding Turnpike Improvements NHS-027-1(37), 11238 Newington to Dover, New Hampshire Prepared for: New Hampshire Department of Transportation and Federal Highway Administration Prepared by: /Vanasse Hangen Brustlin, Inc. Bedford, New Hampshire December 2007 Newington-Dover Final Environmental Impact Statement New Hampshire Table of Contents Volume 1 -- Text Executive Summary .......................................................................................................................... ES-1 A. Project Description/Purpose and Need................................................................ ES-1 A.1 Study Area Description ........................................................................ ES-1 A.2 Purpose and Need .............................................................................. ES-2 B. Description of Selected Alternative...................................................................... ES-4 C. Project History.................................................................................................... ES-10 D. Alternatives Considered..................................................................................... ES-11 E. Summary of Beneficial and Adverse Effects of Selected Alternative................. ES-12 E.1 Adverse Effects.................................................................................. ES-12 E.2 Beneficial Effects................................................................................ ES-17 F. Issues and Areas of Controversy....................................................................... ES-19 G. Other Governmental Actions.............................................................................. ES-22 H. Major Unresolved Issues ................................................................................... ES-22 I. Federal and State Actions Required for the Implementation of Proposed Action................................................................................................................. ES-22 1.0 Introduction....................................................................................................................... 1-1 1.1 General Overview ...................................................................................................1-1 1.2 Project Setting and Overview..................................................................................1-5 1.3 General Description of Project Area .......................................................................1-7 1.3.1 Study Area..............................................................................................1-7 1.3.2 Existing Roadway System.......................................................................1-8 1.3.3 Traffic Operations....................................................................................1-9 1.3.4 Future Travel Demand ..........................................................................1-10 1.4 Purpose and Need................................................................................................1-12 1.4.1 Purpose.................................................................................................1-12 1.4.2 Need......................................................................................................1-12 2.0 Alternatives ....................................................................................................................... 2-1 2.1 Introduction .............................................................................................................2-1 2.2 Project Scoping.......................................................................................................2-2 2.3 General Description of Alternatives ........................................................................2-2 2.3.1 No-Build ..................................................................................................2-2 2.3.2 Transportation System Management (TSM) Improvements ...................2-3 2.3.3 Travel Demand Management (TDM) Strategies ....................................2-3 2.3.4 Mode Alternatives...................................................................................2-4 2.3.5 Turnpike Widening/Interchange Improvements ......................................2-5 2.3.6 Combination of Alternatives ....................................................................2-6 2.4 Alternatives Considered..........................................................................................2-6 2.4.1 No-Build ..................................................................................................2-6 i Table of Contents Newington-Dover Final Environmental Impact Statement New Hampshire 2.4.2 Transportation System Management......................................................2-7 2.4.3 Travel Demand Management................................................................2-11 2.4.3.1 Employer-based Measures...................................................2-11 2.4.3.2 Transportation Management Associations............................2-11 2.4.3.3 Other Measures.....................................................................2-13 2.4.4 Mode Alternatives.................................................................................2-13 2.4.4.1 High Occupancy Vehicle (HOV) Lanes .................................2-15 2.4.4.2 Rail ........................................................................................2-20 2.4.4.3 Bus ........................................................................................2-31 2.4.4.4 Park-and-Ride Facilities ........................................................2-35 2.4.5 Ridership Projection Methodologies for Alternative Modes...................2-38 2.4.5.1 Rail and Bus Ridership Methodology ....................................2-39 2.4.5.2 High Occupancy Vehicle Utilization Methodology.................2-41 2.4.5.3 Travel Demand Management Methodology ..........................2-43 2.4.6 Alternative Modes Ridership and Utilization Projections.......................2-44 2.4.6.1 Rail ........................................................................................2-46 2.4.6.2 Bus ........................................................................................2-48 2.4.6.3 High Occupancy Vehicle Lanes ............................................2-49 2.4.6.4 Travel Demand Management................................................2-51 2.4.6.5 Combined Alternatives..........................................................2-52 2.4.6.6 Sensitivity Analyses...............................................................2-53 2.4.7 Summary of Mode Alternatives and Traffic Operations ........................2-57 2.4.7.1 Rail Alternatives....................................................................2-57 2.4.7.2 Bus Alternatives ....................................................................2-61 2.4.7.3 Rail and Bus Cost Summary .................................................2-61 2.4.8 Development of Build Alternatives ........................................................2-61 2.4.8.1 Highway and Bridge Segments.............................................2-64 2.4.8.2 Newington Segment..............................................................2-64 2.4.8.3 Dover Segment.....................................................................2-75 2.4.8.4 Bridge Segment.....................................................................2-79 2.5 Initial Screening of Alternatives.............................................................................2-82 2.5.1 Public Review of Alternatives................................................................2-82 2.5.1.1 FHWA and NHDOT Oversight...............................................2-83 2.5.1.2 Federal and State Resource Agencies..................................2-83 2.5.1.3 Advisory Task Force..............................................................2-84 2.5.1.4 Public Informational Meetings ...............................................2-85 2.5.2 Environmental Constraints....................................................................2-85 2.5.3 Highway Widening and Interchange Improvements Evaluation............2-86 2.5.4 Bridge Alternatives Evaluation ..............................................................2-88 2.5.5 Lane Requirements and Mode Option Evaluation ................................2-90 2.5.5.1 Eight-lane vs. Six-lane Options .............................................2-90 2.5.5.2 Mode Options........................................................................2-94 2.5.6 Identification of a Reasonable Range of Alternatives ...........................2-95 2.6 Project Costs.........................................................................................................2-97 ii Table of Contents Newington-Dover Final Environmental Impact Statement New Hampshire 2.7 Selected Alternative..............................................................................................2-98 2.7.1 Description of and Rationale for Selected Alternative...........................2-98 2.7.2 Environmental Summary of Selected Alternative................................2-107 3.0 Affected Environment........................................................................................................ 3-1 3.1 Introduction .............................................................................................................3-1 3.2 Transportation.........................................................................................................3-1
Recommended publications
  • Community Guide
    ROCHESTERNH.ORG GREATER ROCHESTER CHAMBER OF COMMERCE 2016 • 1 It’s about People. 7HFKQRORJ\ 7UXVW frisbiehospital.com People are the foundation of what health that promotes faster healing, better health, care is about. People like you who are and higher quality of life. looking for the best care possible—and It’s this approach that has allowed us to people like the professionals at Frisbie develop trust with our patients, and to Memorial Hospital who are dedicated to become top-rated nationally for our quality providing it. of care and services. :HXVHWKHODWHVWWHFKQRORJ\WRKHOSÀQG VROXWLRQVWKDWEHQHÀWSDWLHQWV7HFKQRORJ\ 11 Whitehall Road, Rochester, NH 03867 | Phone (603) 332-5211 2 • 2016 GREATER ROCHESTER CHAMBER OF COMMERCE ROCHESTERNH.ORG contents Editor: 4 A Message from the Chamber Greater Rochester Chamber of Commerce 5 City of Rochester Welcome 6 New Hampshire Economic Development Photography Compliments of: 7 New Hampshire & Rochester Facts Cornerstone VNA Frisbie Memorial Hospital 8 Rochester – Ideal Destination, Convenient Location Great Bay Community College 10 Rochester History Greater Rochester Chamber of Commerce Revolution Taproom & Grill 11 Arts, Culture & Entertainment Rochester Economic Development 13 Rochester Business & Industry Rochester Fire Department A Growing & Diverse Economy Rochester Historical Society Rochester Main Street 14 Rochester Growth & Development Rochester Opera House Business & Industrial Parks Rochester Police Department 15 Rochester Commercial Districts Produced by: 16 Helpful Information Rochester
    [Show full text]
  • Phase II Highway Corridor Strategy Descriptions Technical
    ENTRAL ORK OUNTY ONNECTIONS TUDY CENTRAL YORK COUNTY CONNECTIONS STUDY PHASE II HIGHWAY CORRIDOR STRATEGY DESCRIPTIONS PHASE II TECHNICAL MEMORANDUM SEPTEMBER 2011 Prepared for: Maine Department Maine Turnpike Authority of Transportation Prepared by: In association with: Morris Communications • Kevin Hooper Associates T.Y. Lin • Planning Decisions • Facet Decision Systems Dr. Charles Colgan, University of Southern Maine • Evan Richert Normandeau Associates • Preservation Company This document is formatted for two-sided printing. Document II-4 ENTRAL ORK OUNTY ONNECTIONS TUDY CENTRAL YORK COUNTY CONNECTIONS STUDY 1 INTRODUCTION This document summarizes the potential highway corridor improvements – called strategies – that are being tested and evaluated for Phase II of the Central York County Connections Study (CYCCS). Phase II Highway Strategies are a starting point in the development and consideration of candidate improvements for the study; they are not recommendations, nor are they the only strategies that will be studied. Phase II strategies are conceptual in nature, and not yet detailed, specific proposals. Strategies considered later in the study during Phase III, as well as those ultimately recommended by the study, may differ considerably from the initial strategies currently under evaluation in Phase II. Specific aspects of these initially proposed strategies may be dropped, carried forward or combined in different ways, depending on the results of the analyses conducted during Phase II. The study is guided by a Purpose and Need Statement, which articulates that the study is to identify transportation and related land use strategies that enhance economic development opportunities and preserve and improve the regional transportation system. Additional information on the study, including the full Purpose and Need Statement, is available at the project website: www.connectingyorkcounty.org.
    [Show full text]
  • Toll Roads in the United States: History and Current Policy
    TOLL FACILITIES IN THE UNITED STATES Bridges - Roads - Tunnels - Ferries August 2009 Publication No: FHWA-PL-09-00021 Internet: http://www.fhwa.dot.gov/ohim/tollpage.htm Toll Roads in the United States: History and Current Policy History The early settlers who came to America found a land of dense wilderness, interlaced with creeks, rivers, and streams. Within this wilderness was an extensive network of trails, many of which were created by the migration of the buffalo and used by the Native American Indians as hunting and trading routes. These primitive trails were at first crooked and narrow. Over time, the trails were widened, straightened and improved by settlers for use by horse and wagons. These became some of the first roads in the new land. After the American Revolution, the National Government began to realize the importance of westward expansion and trade in the development of the new Nation. As a result, an era of road building began. This period was marked by the development of turnpike companies, our earliest toll roads in the United States. In 1792, the first turnpike was chartered and became known as the Philadelphia and Lancaster Turnpike in Pennsylvania. It was the first road in America covered with a layer of crushed stone. The boom in turnpike construction began, resulting in the incorporation of more than 50 turnpike companies in Connecticut, 67 in New York, and others in Massachusetts and around the country. A notable turnpike, the Boston-Newburyport Turnpike, was 32 miles long and cost approximately $12,500 per mile to construct. As the Nation grew, so did the need for improved roads.
    [Show full text]
  • Mass Transit
    Gear boxes and couplings Heavy-duty braking systems Subway cars, commuter cars or trolley cars. Rockwell Our wedge, cam, disc or spring brakes, actuated by air has the capability to supply the type of gear box or or hydraulic pressure, will stop most any vehicle you coupling you specify. Or, we can custom design "special start. Add our Skid-Trol® wheel anti-lock system and drives" for unique vehicle applications. you have a single source for most all heavy-duty stopping requirements. line From Concept to Reality That's what cities like San Francisco, Boston, New York, Chicago and Washington, the Dallas/Fort Worth and Seattle/Tacoma airports, Disney World, the Toronto Zoo and others have done. We can put our 50 years' mass transit experience, the resources of the world's largest independent Automotive Technical Center, and a broad line of components for rail cars, buses and guideway vehicles to work for you, too. Contact Mass Transit Sales, Automotive Operations, Rockwell International, 2135 W. Maple Road, Troy, MI 48084. Rail trucks The broadest line of axles We make complete rail trucks or components for The mass transit industry uses our steering, driving locomotives, freight cars, subway cars, and commuter and trailer axles — single and tandem — in a variety of cars. Or if you have a special rail vehicle in mind, we'll configurations for highway and guideway vehicles. Plus help you make it go. custom design axles for virtually every mass transpor- tation application. Rockwell International ...where science gets down to business ALMEX Passenger self service. This is one wayof looking at it.
    [Show full text]
  • New Hampshire
    DOVER NEW HAMPSHIRE City of Opportunity A Message from Dover Economic reetings, Development and City Planning G & Community Development On behalf of the city of Dover, NH, I thank you for considering our great community. Dover was established in 1623 and has a rich history of industry, education and Dover, New Hampshire: Unique, Cooperative, culture which rivals any community in the State or region. Proactive. That’s how we see our city. Dover has worked hard to build a business-friendly, proactive government Dover is a great place to live, work and play. From our his- infrastructure, where departments cooperate to assist toric downtown to our rich cultural events, Dover is a place existing businesses, and relocating companies, so that where people want to settle down and raise their families. both fulfill their potential. Great schools, family friendly events and close proximity One example of this cooperation, is the close to the State University hub add to the appeal of Dover. working relationship between the Dover Business & Industrial Development Authority and the City of Dover Our proximity to major highways, deep water ports, and Planning and Community Development Department. regional airports adds to the draw of an already vibrant Both entities work together with our clients from start to community. Dover is within a one hour drive of major finish. This integration ensures that permitting, engineer- cities, the Atlantic Ocean, the White Mountains and a ing, plan acceptance, variance consideration, and zoning number of prime hiking and ski resorts. approvals happen in a transparent and expeditious man- ner. There is a keen awareness that common sense and Dover offers an educated workforce, a technologically flexibility within the rules are needed to make projects advanced infrastructure and a proactive Planning Board work.
    [Show full text]
  • Thruway Authority Toll Adjustment Proposal December 19, 2019
    12/19/2019 Thruway Authority Toll Adjustment Proposal December 19, 2019 Thruway’s Current State 570 miles or 2,840 lanes miles 266.4 million transactions = $736.5 million in toll revenues E-ZPass customers 77% system-wide GMMCB E-ZPass customers 86.7% Overall 16% - Out-of-state accounts 20.5% - E-ZPass commuters 1 12/19/2019 Fiscal Discipline Tolls have not increased since 2010 How ? Balanced budgets Avg. 1.2% annual growth since 2010 Thruway Stabilization Fund = $2 billion Commitment to Safety & Reliability Decade of reinvestment in the system Replaced/rehabilitated 116 bridges Resurfaced 2,000 lanes miles of highway Advanced $6.6 billion capital program Replaced/added $141 million in vehicles and equipment 2 12/19/2019 Thruway of the Future Cashless Tolling Gov. Mario M. Cuomo Bridge System-wide in 2020 (GMMCB) Cashless Tolling Benefits Safer travel Reduced congestion Lowered emissions 3 12/19/2019 The Time is Now… Both spans of GMMCB open to traffic System-wide cashless tolling conversion by the end of 2020 Additional revenues will: Allow the Thruway Authority to responsibly meet capital needs Support outstanding debt Continue to provide reliable service to its patrons What They Said 4 12/19/2019 Proposal Components GMMCB Commuter Discount Plan (40% Discount) New Westchester and Rockland Resident Discount Plan for the GMMCB – Tolls remain flat through 2022 NY E-ZPass Customers Continue to Save Money (Base Rate) Non-NY E-ZPass Rate (15% above the NY E-ZPass Rate) Tolls By Mail Rate (30% > NY E-ZPass) $2 Surcharge on the Tolls by Mail Bill Commercial rates remain below nearby crossings Proposed Toll Schedule Gov.
    [Show full text]
  • Updated Project Area Form (2018)
    New Hampshire Division of Historical Resources Page 1 of 27 mapping information updated 6/2015 AREA FORM AREA NAME: SPAULDING TURNPIKE: NEWINGTON-DOVER PROJECT AREA, NWN-DOV (UPDATE SEPTEMBER 2018) 1. Type of Area Form 9. Inventory numbers in this area: DOV0090, a. Town-wide: DOV0091, DOV0092, DOV0150, b. Historic District: DOV0093, DOV0158, NWN0162, NWN c. Project Area: 0163, NWN0168, NWN-SP/ (NWN0159 and NWN0161 demolished) 2. Name of area: Spaulding Turnpike: Newington-Dover Project Area 10. Setting: Area within physical and visual proximity to the General Sullivan Bridge 3. Location: Bloody Point and Trickey’s (DOV0158) over Little Bay, including light Cove (Newington); Dover Point (Dover) industrial development along the Spaulding Turnpike, recreation areas along the bay, 4. City or town: Newington and Dover short residential streets, and sparsely- developed rural roads 5. County: Rockingham (Newington) and Strafford (Dover) 11. Acreage: 275 acres 6. USGS quadrangle name(s): Portsmouth 12. Preparer(s): Nicole Benjamin-Ma 7. Dataset: SP Feet, NAD83 13. Organization: VHB 8. SP Feet: (see #15, Location map, below) 14. Date(s) of field survey: August and September 2018 15. Location map Project Area APE New Hampshire Division of Historical Resources Page 2 of 27 last update 6.2015, map info and Word 2010 format AREA FORM AREA NAME: SPAULDING TURNPIKE: NEWINGTON-DOVER PROJECT AREA, NWN-DOV (UPDATE SEPTEMBER 2018) 16. Sketch map (Please see attached map set) New Hampshire Division of Historical Resources Page 3 of 27 last update 6.2015, map info and Word 2010 format AREA FORM AREA NAME: SPAULDING TURNPIKE: NEWINGTON-DOVER PROJECT AREA, NWN-DOV (UPDATE SEPTEMBER 2018) 17.
    [Show full text]
  • Th E V O Lvo G Ro U P 2 0
    THE VOLVO GROUP ANNUAL REPORT 2012 The V olvo olvo G roup 2012 TOGETHER WE MOVE THE WORLD www.volvogroup.com A Global Group 2 CEO comment TOGETHER WE MOVE THE OperatiNG coNteXT 4 Future transport needs StrategY 8 Strategic approach BUsiNess model 22 Product offering WORLD 28 World-class services 30 A high-performing organization Without the products and services of the Volvo 32 Industrial structure Group the societies where many of us live 34 Production 35 Responsible sourcing would not function. Like lifeblood, our trucks, GroUP PerformaNce buses, engines and construction equipment are 36 Global strength involved in many of the functions that most of 38 Development by continent − Europe us rely on every day. 40 Focus new Volvo FH 42 Development by continent − North America For instance, one in seven meals eaten in 44 Development by continent − South America Europe reaches the consumers thanks to trucks 46 Focus Peru 48 Development by continent − Asia from the Volvo Group rolling on the roads of the 50 Focus Dongfeng continent. Buses are the most common type of 52 Focus Africa public transportation in the world, helping many Board of Directors’ report people to reach work, school, vacations, friends 56 Significant events and family. If all the Volvo buses in the world were 58 Trucks to start at the same time, they would transport 60 Buses more than 10 million people. Our construction 62 Construction equipment 64 Volvo Penta machines are used when building roads, houses, 66 Volvo Financial Services hospitals, airports, railroads, factories, offices, 68 Financial management shopping centers and recreational facilities.
    [Show full text]
  • Vehicle Registration Category and Body Type Examples
    Vehicle Registration Category and Body Type Examples Registration Category Description Body Type Body Type Comments Ambulance Heavy Ambulance GVM over 4.5 tonnes Ambulance GVM up to and including 4.5 tonnes Bus GVM up to and including 4.5 tonnes Minibus GVM up to and including 4.5 tonnes Panel Van GVM up to and including 4.5 tonnes Wagon GVM up to and including 4.5 tonnes Articulated Truck Dual Purpose Truck GVM over 4.5 tonnes Prime Mover GVM over 4.5 tonnes Truck Cab'N'Chassis GVM over 4.5 tonnes Bus Minibus GVM from 4.01 tonnes up to & including 4.5 tonnes Stretch Limousine GVM from 4.01 tonnes up to & including 4.5 tonnes Wagon GVM from 4.01 tonnes up to & including 4.5 tonnes Articulated Bus GVM over 4.5 tonnes Bus GVM over 4.5 tonnes Truck Bus GVM over 4.5 tonnes Campervan/Motorhome Campervan GVM from 4.01 tonnes up to & including 4.5 tonnes Minibus GVM from 4.01 tonnes up to & including 4.5 tonnes Bus GVM over 4.5 tonnes Truk Based Motorhome GVM over 4.5 tonnes Conditional Registration Artc Water Trk E/D Restricted to 1-3 area zones Backhoe Loader Restricted to 1-3 area zones Bale Wagon Restricted to 1-3 area zones Bike Off Road Restricted to 1-3 area zones Break Pusher Restricted to 1-3 area zones Bunker Rake Restricted to 1-3 area zones Cane Plant Loader Restricted to 1-3 area zones Cane Planter Track Restricted to 1-3 area zones Chip Spreader Wheel Restricted to 1-3 area zones Compactor L/Fil Soil Restricted to 1-3 area zones Dozer Crawler/Loader Restricted to 1-3 area zones Drill\Driv Rig Track Restricted to 1-3 area zones
    [Show full text]
  • Site Directions
    SITE DIRECTIONS Aircraft Club (CT): 200 Clement Road East Hartford, CT - Take Rt 495 North to Rt 90 (Mass Pike) West to Rt. 84 West. Follow 84 West to exit 58 (Silver Lane). Take a left off the ramp and then left at the first light onto Silver Lane (across from Pratt and Whitney's front gate). Take the first left onto Clement. Go to the end and take a right. The Aircraft Club is on the right. The Aggie: see below - Norfolk Agricultural Regional High School Amherst Middle School (NH): 14 Cross Road - Amherst, NH. - From Nashua:Take exit 8 from the Everett Turnpike. Follow to traffic light at T intersection by Ground Round take a right onto Rt101A west. Follow Rt101A west through many traffic lights. Keep an eye out for Wendy's on the Right and MacDonalds on the left. Keep right at this point. After passing the MacDonalds look for Post Road Plaza on your left. Take a right onto Boston Post Road at the light by Post Road Plaza. The road splits almost immediately. Bear right, staying on Boston Post Rd. The road splits again, bear left. The church should be immediately on your left. About 2 miles you will pass the Homestead Market on your right. The next right is Cross Rd and is marked with a very small Middle School sign. Take that right. Take 2nd left into Amherst Middle School parking lot. AIC - American International College (MA): 1000 State Street Springfield, MA - FROM THE EAST OR WEST: Massachusetts Turnpike (I-90) to Exit 6 (Springfield).
    [Show full text]
  • 2010 Turnpike Financial Report
    STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION TURNPIKE SYSTEM COMPREHENSIVE ANNUAL FINANCIAL REPORT FOR THE FISCAL YEAR ENDED JUNE 30, 2010 Front Cover: New open road tolling lanes completed June 2010 at the Hampton Toll Plaza. STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION COMPREHENSIVE ANNUAL FINANCIAL REPORT For the Fiscal Year Ended June 30, 2010 Prepared by the Division of Finance Leonard L. Russell, CPA, Director of Financial Reporting Walker Nielsen, Administrator III Margaret S. Blacker, Business Administrator, Turnpike System Mary Ellen Emmerling, CPA, CCM, Financial Analyst Elizabeth A. Yanco, Accountant IV This document and related information can be accessed at http://webster.state.nh.us/dot/media/publications.htm (i) New Hampshire Turnpike System Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2010 Table of Contents Page Introductory Section (Unaudited)…....……………………………………. 1 Turnpike System Map………………………………………….………… 2 Commissioner’s Letter………….……………………………………….. 3-6 Organizational Listing………………………………………………….… 7 Letter of Transmittal……………………………………………………… 8-9 Financial Section…………………………………………………………….. 11 Independent Auditors’ Report…………………………………………… 13-14 Management’s Discussion and Analysis………………………………… 15-19 Basic Financial Statements ……………………………………………… 20 Statement of Net Assets…………………………………….………... 21 Statement of Revenues, Expenses, and Changes in Net Assets……... 22 Statement of Cash Flows……...……………...……………….……... 23 Notes – Table of Contents……………………………………………..... 25 Notes to the Financial
    [Show full text]
  • Spaulding Turnpike Improvements NHS-027-1(37), 11238
    Final Environmental Impact Statement Executive Summary Spaulding Turnpike Improvements NHS-027-1(37), 11238 Newington to Dover, New Hampshire Prepared for: New Hampshire Department of Transportation and Federal Highway Administration Prepared by: /Vanasse Hangen Brustlin, Inc. Bedford, New Hampshire December 2007 Newington-Dover Final Environmental Impact Statement New Hampshire Executive Summary A. Project Description/Purpose and Need A.1 Study Area Description The section of Spaulding Turnpike (NH 16) under study is approximately 3.5 miles long, extending from just north of Exit 1 in Newington to just south of the Dover Toll Plaza, including the Little Bay Bridges. Most of this section of the Turnpike is a limited access (fully controlled) facility and consists of two (2) through lanes in each direction separated by a median of varying width. The study area includes five interchange areas (Exits 2, 3, 4, 5 and 6) to accommodate access and turning movements in a relatively short section of the Turnpike. The Turnpike is part of the National Highway System and is functionally classified as a principal arterial connecting the Seacoast Region with Concord, the Lakes Region and the White Mountains. Poor traffic flow conditions can be attributed to two separate factors: physical infrastructure deficiencies and high traffic volumes. Physical deficiencies along the Turnpike include substandard curvature along interchange ramps, inadequate acceleration and deceleration lanes at interchanges, inadequate weave distances between the interchange ramps, and substandard shoulder widths on the Little Bay Bridges. These factors, combined with high traffic volumes, often result in reduced travel speeds, constrained maneuverability, and congestion during the peak hour conditions, as well as the increased potential for crashes and its negative effect on safety.
    [Show full text]