BRECK FARM, DELIVERY STATEMENT

1 Who are Scott Properties? Scott Properties is a family-run, self-funded Strategic Land Promoter within the M Scott Property Group. Our vision as a company is to be the most trusted and respected Promoter to Landowners, Local Authorities and Communities in East Anglia and the South East of .

We lead multi-disciplinary teams to unlock planning solutions, tackling complex challenges and enabling Council Officers and Members to deliver tangible outputs against policy aspirations. Wherever we work, our focus is on delivering new developments which complement and enhance the existing communities; we aim to achieve this through comprehensive stakeholder engagement, public consultation and a hands-on approach.

Consultant Team Air Quality Assessment: Mayer Brown Arboricultural and Biodiversity: Geosphere Environmental Archaeological and Heritage Assessment: Archaeological Solutions Design: Brown & Co Flood Risk Assessment: Cannon Consulting Engineers Geo-Environmental Desktop Study: Geosphere Environmental Ground Investigation Surveys: Geosphere Environmental Habitat Surveys: Geosphere Environmental Landscape Visual Impact Assessment: Lockhart Garratt Noise Assessment: Mayer Brown Planning Consultant: Bidwells Topographical Survey: BB Surveys Ltd Transport Assessment & Travel Plan: Cannon Consulting Engineers Utilities Consultant: Triconnex

2 SECTION ONE INTRODUCTION Contents

Section one. Introduction 5 3.1.1 Design 24 1.1 Preface 6 3.1.2 Community aspirations 25

1.1.1 Purpose of the report 6 3.1.3 Density 26

1.2 Site context 8 3.1.4 Masterplan 27 1.2.1 Location 8

1.2.1 Topography 9 Section four. Delivery 29 4.1 Delivery & phasing 30 Section two. Technical analysis 11 4.1.1 Phasing 30

2.1 Environmental 12 4.1.2 Developers 31 2.1.1 Surveys & reports 12

2.2 Utilities 14 Section five. Summary 33 2.2.1 Searches 14 5.1 Delivery statement 34 5.1.1 Summary 34 2.3 Connectivity 16 2.3.1 Pedestrian, cycle & vehicular 16

2.3.2 Detailed access points 18

2.4 Local community 20 2.4.1 Community aspirations 20

2.5 Market requirements 21 2.5.1 Demographics 21

Section three. Design framework 23 3.1 Framework 24

3 4 SECTION ONE INTRODUCTION SECTION ONE.

INTRODUCTION 1.1 Preface 1.1.1 Purpose of the report

Purpose of the report The purpose of this document is to provide a clear guide to the delivery of the Site identified within the Greater Local Plan Draft Site Allocations – Preferred Sites as GNLP0337 Land between Fir Covert Road and Reepham Road, Taverham (the Site). The Site has a draft allocation ‘likely to accommodate at least 1,400 homes, 33% of which will be affordable, associated public open space, new primary school and local medical centre’. All the information within this document is underpinned by technical evidence.

North

6 SECTION ONE INTRODUCTION Existing photo of Marriott’s Way

7 1.2 Site context 1.2.1 Location

The site M Scott Properties Ltd are promoting Land at Breck Farm, Taverham on behalf of the landowner through the Greater Norwich Local Plan.

Breck Farm is formed of land between Fir Covert Road and Reepham Road, and extends to c. 78Ha (c. 193 acres). The site is bound by the Northway to the north, which alongside Fir Covert Road and Reepham Road, provides a strong defensible boundary. This location is highly sustainable whilst impacting on a limited number of existing properties. Marriott’s Way travels north-south Broadland Northway through the centre of the site, with additional footpaths

creating sustainable connections to key facilities. Reepham Road

In order to assess the ability of the site to deliver the objectives of the policy and to enable the preperation of a Marriott’s Way robust masterplan, a substantial amount of technical work has been undertaken. This is covered in more detail in the following sections.

Fir Covert Road

Fakenham Road

Breck Farm Lane

North

8 SECTION ONE INTRODUCTION 1.2 Site context 1.2.2 Topography

Northern edge of site with adjacent ‘bund’ and farm access route View south along Marriott’s Way leading towards Norwich Existing access point off Broadland Northway

Eastern boundary of site with adjacent Greenway Existing access route along Breck Farm Lane Adjacent housing along Broom Close screened by established treebelt

9 10 SECTION TWO TECHNICAL ANALYSIS SECTION TWO.

TECHNICAL ANALYSIS 2.1 Environmental 2.1.1 Surveys & Reports

Scott Properties have undergone extensive surveys to Ground conditions are consistent throughout the site, Protected Species - Great Crested Newt Survey ensure the Site is suitable for development, and will have with no concentration of contaminants above guidance Complete for phase 1, additional eDNA samples taken the minimum amount of impact on the environment and threshold values, no methane generation or significant gas with negative results, with no further work required. Great its surroundings. flows detected and no remediation required for chemical Crested Newts are not anticipated on future phases. contamination. Across the Site, Scott Properties will aim to achieve Protected Species - Bat Foraging Survey a bio-diversity net gain to enhance the environment Surface Water Drainage Strategy Complete for phase 1, with recommendations to retain and improve the quality of life for the local community The majority of the site is within Flood Zone 1 and not existing boundary habitat allowing for commuting by providing high quality areas of public open space, identified by the Environment Agency as being in an and foraging, with opportunites to enhance the area enhanced boundary landscaping and native planting area at risk of surface water flooding. Site investigations further by inclusion of native plant species beneficial to throughout. complete, with a surface water drainage strategy bats, and incorporating bat bricks and boxes within the in progress. Current recommendations include a development. Comparable results are anticipated on Topography combination of soakaways and attenuation basins future phases. Complete with no significant site level issues. creating a Sustainable Urban Drainage system, with no significant issues. Drainage strategy for the initial Protected Species - Reptile Survey Phase 1 Desk Study phase of development will include private soakaways Complete for phase 1, site investigations over 6 weeks Complete, report indicates potential sources of in rear gardens, and crated systems under public green show no reptiles present, with no remediation or contamination to include Made Ground associated with infrastructure areas for the highways network. mitigation work required. Biological enhancements to hardstanding tracks, recommendation of standard Phase increase suitability with plantating of Tussock grass species 2 Site Investigation works. Arboricultural Survey and log piles could be incorporated into the detailed Complete, with any impact minimised through sensitive design. Comparable results are anticipated on future Phase 2 Site Investigation design, mitigation and enhancement if required. Standard phases. Initial Site investigations complete for phase 1, including; planning recommendations of Tree Retention Plan, Tree » windowless sampling boreholes Protection Plan, Arboricultural Impact Assessment and Protected Species - Wintering & Breeding Surveys » ground gas moitoring wells Arboricultural Method Statement to be completed during Complete for phase 1, with recommendations to retain » soil infiltration testing each proposed phase of development. existing boundary habitats to minimise the impacts of » machine excavated trial pits breeding and wintering birds. Enhancement opportunities » dynamic probe tests Preliminary Ecology Appraisal include areas of green infrastructure to be planted with » hand dug trial pit and soil logging Complete, with standard recommendations of Protected scattered scrub and rough grassland, residential planting » sampling and in situ strength testing Species surveys. to include native species, and a variety of bird boxes to be

12 SECTION TWO TECHNICAL ANALYSIS installed throughout the development.Comparable results strategy. Enhancement to the landscape buffer alongside are anticipated on future phases. the Broadland Northway has been designed, mitigating any excess noise produced by vehicular movement, Heritage Statement providing noise levels suitable for residential amenity. Complete, the Site does not fall within any Conservation Existing treebelts bounding the remaining site create Area and there are no Listed Buildings, Scheduled Ancient good natural barriers. A technical note providing Monuments or other heritage assets within or adjacent to additional recommendations has been produced, the Site. The Heritage Statement concludes there will be including property orientation and boundary spacing. negligible impact of heritage assets. Further detailed appraisals will be required for each proposed phase of development. Archaeological Statement Complete, request for brief of further works required Preliminary Air Quality Appraisal submitted to the Community and Environmental The results of the preliminary modelling demonstrates Services at County Council. No significant issues that concentrations for all locations and distances Ecology & environmental areas anticipated. assessed are substantially below national health-based objectives, with ‘no air quality grounds for refusal’. Further Habitat Regulations Assessment detailed appraisals required for each proposed phase of Complete, the assessment concludes that having regard to development. the proposed development and the mitigation measures, it is unlikely that there will be significant negative impacts Norfolk Minerals & Waste to International Sites. Ground conditions across the site are consistent, comprising of topsoil overlying superficial deposits Environmental Assessment of Sheringham Cliff Formation (sand and gravel). All The Site does not contain or adjoin any designated Ramsar suitable topsoil and mineral material excavated during sites or Sites of Special Scientific Interest, and is outside of construction will aim to be reused on site. the relevant impact zones for the local wildlife sites. Summary Preliminary Acoustic Appraisal Following the completion of these surveys, an Complete, the Site is considered suitable for residential Opportunities & Constraints Plan has been produced to development subject to effective noise mitigation identify the suitable places for the proposed land uses. Site integration North

13 2.2 Utilities 2.2.1 Searches

Scott Properties is working in conjunction with TriConnex, Electricity Policy 2 - Sustainable communities a multi utility planning and delivery company, to ensure Onsite connection points and capacity secured through The policy will require developments to meet a variety of the local utility infrastructure has the capacity to manage UK Power Networks. Site wide strategy complete, with requirements to ensure the design of the development the increase in demand. two onsite HV overhead cable diversions and three sub is of high quality, contributes to inclusive communities, stations required. promotes low carbon development and helps to address Mains Water climate change. Connection point available at Fir Covert Road, there will be Gas no network reinforcement charge passed to the developer Connection point at Kingswood Avenue secured Water Efficiency if reinforcement works are required. through Cadent. A Connected System Exit Point (CSEP) All residential development on the Site will meet the quotation from Cadent confirms non-chargeable network Building Regulations part G (amended 2016) water Foul Sewerage reinforcement is required to obtain capacity for the entire efficiency higher optional standard. All non-residential will A site wide strategy is being prepared, with current site. meet the BREEAM ‘Very Good’ water efficiency standard, recommendations of pumping stations and gravity fed or any equivalent successor. pipework, with no significant issues to be anticipated. Broadband Connection point available at Broom Close with capacity Connection point to the existing network available and Energy Efficiency for initial phase. suitable for fibre to the property (FTTP). The development will look to achieve a 20% reduction against Building Regulations part L (amended 2016) Surface Water Summary through a combination of a ‘fabric first’ approach and the A surface water drainage strategy is in progress, with The technical searches show that there are no significant inclusion of sustainable energy sources. current recommendations including a combination of utility constraints that will affect the delivery of the Site at soakaways and attenuation basins creating a Sustainable this time. Urban Drainage system, with no significant issues. Drainage strategy for the initial phase of development will include private soakaways in rear gardens, and crated systems under public green infrastructure areas for the highways network. Connection point available at Broom Close with capacity for initial phase if required.

14 SECTION TWO TECHNICAL ANALYSIS The technical design analysis that has been carried out for both the local and site context identifies the primary considerations which determine the proposal for the site.

The primary technical constraints are illustrated and described below:

» Existing farm tracks to be retained leading from the north and north-eastern boundaries to the centre of the site (inclusive of Breck Farm Lane from the south); » Utilities (underground and overground) required to be diverted to release inherent potential of site; » Sensitive approach to inclusion, enhancement and protection of mature trees and associated RPA’s; and » Existing private ownership within central location of site to be retained and sensitively addressed within design proposal.

Key

Site boundary

Existing farm tracks

Acoustic ‘bund’ / cycleway

Overhead powerlines

BT overground services

Underground utility cables

Trees / RPA’s North

Variant land ownership

15 2.3 Connectivity 2.3.1 Pedestrian, cycle and vehicular

The Site is strategically located along a variety of primary routes made up of vehicular, pedestrian, cycle and public transport corridors providing clear and well-defined routes to central Norwich and the Norfolk Coast.

Pedestrian & Cycle The site is well served by strategic pedestrian and cycle routes set at both local and regional scales. Desirable connections can be made north-south along Marriott’s Way, Breck Farm Lane and Fir Covert Road leading to naturalistic countryside and river walks. East-west connections along the Broadland Northway dedicated cycleway allowing for accessible routes towards Cromer and defined woodland trails. Additional connections are available via Felsham Way, Ganners Hill and Kingswood Avenue, providing access to the existing communities and facilities. Marriott’s Way ties the Site within a central focus and allows pedestrians and cyclist’s unprecedented ease of movement to Aylesham and central Norwich, forming part of the wider national cycle route from to Harwich. Key

Site boundary

Marriott’s Way

Broadland Northway cycle

Pedestrian and cycle routes

Public rights of way North Thorpe Marriott Greenway (PROW)

16 SECTION TWO TECHNICAL ANALYSIS Public Transport The Site is well linked in relation to public transport bus routes, with the 29/x29 routes offering direct services between Fakenham to the north-west and Norwich to the south-east within 30 minutes, creating a desirable location for both commuters and retirement living. Bus stops for each of the two identified bus routes are located within easy reach of the site, with no more than a 10-15-minute walk to either. First Eastern Counties bus service have shown interest in providing a bus route that travels through the development along the central link road, thus creating a greater sustainable development, with the aspiration of offering all residents a bus stop within a 5-minute walk. Contextual Setting Map Local Public Transport

Vehicular Movement The Site is well connected by a variety of hierarchic based routes from the Broadland Northway to Fakenham Road, Reepham Road to Fir Covert Road, all of which offering desirable routes to Norwich (south-east), Cromer (north- east) and King’s Lynn (west) within reasonable journey times. By utilising the Broadland Northway, residents will be able to access Norwich International Airport in under a 10-minute drive with relative ease.

Site Pedestrian & Cycle Movement Local Vehicular Routes North

17 2.3 Connectivity 2.3.2 Detailed access points

Scott Properties has been working in conjunction with a Fir Covert Road The Central Link Road specialists in transport & infrastructure design to ensure Detailed designs demonstrate a 36m roundabout A detailed plan of the central road linking Fir Covert Road the local road infrastructure has the capacity to manage incorporating the entrance to the Site and Taverham to Reepham Road has been designed, incorporating a the increase in demand. Garden Centre, suitable to manage the increase in 6.5m wide road suitable for a bus route, 3m verges either vehicular movement, also providing footpath and side, with two 3m combined cycle and footways. The link Suitable access points to the Site have been identified cycle connections to Taverham Garden Centre, and the road will connect the key facilities of the development, along Fir Covert Road and Reepham Road, with detailed granted planning permission for the retail and leisure including Marriott’s Way, Primary School and Local Centre, designs produced. An emergency access point is available development. The design has been agreed in principle to provide easy access capable of serving the entirety of at the Broadland Northway – Fir Covert Road Roundabout. with Norfolk Highways, and a Stage One Safety Audit has the development.

0

0 .

0 4 5.5

.06

40

40. Pond 00 been completed. 2.0 3.0

50

39.

40.00

3 9 .5 0

N 9.93 The extent of the highway improvements are either 3 ROAD REALIGNED

50 WITH 2m FOOTWAY ON 39. under Norfolk County Council ownership or under a legal WESTERN SIDE OF FIR 3.0 39.50 Fence P/W

83

9.

COVERT ROAD 3

39. 50

Grass Field agreement with Scott Properties. 39.50

3

39.8

39.50

50 9. STNBBS15 3 39.00 .80 Grass Field

39

GARDEN CENTRE 39.00 39.00

.79 ENTRANCE FEATURE 39

4

0

0 0. .05

4 .0

40

40 .90 0 39.7 .0 39 9 39 39.79 40.45 39.65 .14 Asphalt 40.54 40

Grass

WALL (SEE INSET A) 39.61 nce P/W e

Gate F

39.90

39.58 39.69

40.04 Grass

5 TP

39.61 39.9

Fence C/L 39.56 Fence C/L

39.99

.85

39

.84 39.75 Shrubs 39

4

7 3 9. 9.73 3 40.08 Grass 40.00 39.74 39.5 G 82 . 0 39.73 40.55 39 .61

G 40 s 39 39.72 .50 Asphalt 9.84 0.50 39.75 3 4 Gras

39.75 6 8 0

.76 0. Fence C/L 39.54 3 4 39.9 39

1 39.9 40 nage Channel

0.0 .00 4 39.85

Drai

MH 39.84 Fence C/L PROPOSED ACCESS ROAD 39.95 39.70

39.86 SP

.01 57 . 40 39.92 39.71

39 39.79 39.87 39.70

SP 39.74 ac 7 39.61 T 39.7 3 Fence C/L 9.77 Grass .50 39.70 38 Grass 39.79 6.5m INCLUDING 3m VERGE, 39.97 39.79 82 .65 38.50 40.00 39. 39.94 39 39 .53 39.94 .83 5 0 39.95 .8 8 4 39 0 9. 88 39.82 3 .

39

39.85

9.84

3

0

0

39.72 0.

4 6 lt 0 0. 3.0m CYCLEWAY BOTH SIDES 4 .50

39

Aspha 39.88

39.89

81 . 39.81 39 .69 39 38.50 Grass

39.88 39.83 Grass Field Asphalt 39. 39.68 85 .81 39 39.83

39.81 39.77 ainage Channel 6 r

39 39.7 D Shrubs .89 39. ADDITIONAL 5 39.90 8 4 9 0.

4 .64 39.87 39.94 39.95 39 4 .80 39.7 39 00

SP 50 39. Grass 39 39.7 39.74

9.

72 8 40 . 39.50 .9 3

39 0

0 . 3 00 0. 39.65 4

39

.84 39.71 SURFACING 39.70 SP

39.84 19 .

39.71 Fence C/L 40

60 Grass . 39 Tactile 39.70 4 6 8 5 39.99 7 9. 39.68 9. 3 9.8 3 3 39.75

81 39.76 10

G 0. 39. 84 . 4 39.67 G 39.81 39.66 G 39 39.72

5 Fence C/L 39.75 8

P/L 9. 39.75 3

ce

6 8

7 0

9. 0. Fen 3 4 Fence P/W 38.00

Asphalt

53 .

39 39.82 Grass Field .50

50 0 40 39.89 1 0 8 5 6 . 40. 9. 8

9. 3 40 3

3 .00

39.80 Grass

39.93 39.69

0.00 4

Grass 39.73 EXISTING ENTRANCE 39.82

Grass

9

7

9.

3 Shrubs 39.80

39.86 TO GARDEN CENTRE - 40.07

age Channel

rain

.95 D 97 39.68 38.00 . 39

39

39.65

9.93

3

5

39.70 40.6

MOVED SOUTH Grass

39.65

39.80

2

8 39.70 39.

L / Fence C/L

0 37.50 9 37.50 9. TP 3 nce P PROPOSED

Fe 39.50

Asphalt G 39.71 Grass Field 39.73

39.71 .50

39

39.85 39.7 9.91 .46 2 G 3 39.93 39 39.71

39.86

39.77 39.94 39.71

.87

39 9.95 3 ROUNDABOUT

39.92 37.50

.66 Grass

.47 39 .00

40

40

3 39.92 9.50 39.6 (36m ICD) 9.89

3 STNBBS14 6 9.00

9 3

7

9.

3

Fence C/L HIGHWAY 8

.4

39

0 ass

9.8 3 Gr Grass Field 39.95 39.73 Shrubs

0

9

9. 39.54 3 2 50 . 8

9. 39

3

71

9. 40.00

BOUNDARY. 3 37

88

Fence P/W

9. .0 3 0

8 Grass 8 0 39.75 37.0 39.

50 9.53 3

40.

50 .

8

3 39.96 Brambles / Bushes / Small Trees

39.97

.83

39

0

39.6 0

Grass ence C/L .0 8

61 F 3

0. 39.5 4 39.58

nce P/L 99 . 8

Fe 39

39.77 3 39.54 6 39.39

9.

3 39.

39.96 50

39.78 39.52 .91

39 Brambles / Bushes / Small Trees 39.66

2 39.78 39.66 G .86 9 39.21 9. 39 39.77 3 G 39.95 Asphalt 39.79

Shrubs Grass 39.79 95 Fence C/L 9.

3

39.93 Fence P/W ( Under Canopies )

40.00 .85 39.12

39

.00

40

39.81 PED CYCLE 50 39.93 39.53 39.50 Grass 39.00 Grass Grass Field 37. 39.79

2

0

0. 4 INSET A - ILLUSTRATIVE GARDEN CENTRE ENTRANCE FEATURE WALLS STNBBS13 39.60 /L

38.82

CROSSING Fence C CYCLEWAY TO TIE IN 40.40 39.52 38.69

0

36 0 7. 3 39.

38.5 LOCATION TBC 39.63 1

WITH EXISTING AND 3 39.50 6 Fence P/W ( Under Canopies ) .5

0

COMMITTED 38.22

38.01

.50 6 DEVELOPMENT SCHEME 3

37.64

Grass Field 37.2 5 Fence P/W ( Under Canopies )

37.04

36.86

.26 36

36.63 36.35 Fence P/W

36.41 36.24

PROPOSED ACCESS ROAD

PROPOSED FOOTWAY

GRASS / VERGE

PROPOSED KERB

Reproduced from Promap by permission of Ordnance Survey® on behalf of The Controller of Her Majesty’s Stationery Office. ©Crown copyright 2017. All rights reserved. Licence number 100020449.

PROJECT TITLE CLIENT DATE Cannon Consulting Engineers Cambridge House, Kentford, Newmarket, Cambs, CB8 7PN MARRIOTTS PARK M SCOTT PROPERTIES MAR 19 Tel: +44 (0)1638 555 107 [email protected] www.cannonce.co.uk DRAWING TITLE DESIGNED DRAWN CHECKED PASSED SCALE @ A3 ISSUE STATUS DRAWING NUMBER REV PROPOSED ROUNDABOUT LAYOUT A INSET ADDED FOR ENTRANCE DETAIL DS DS APR 19 DR DR DCS - 1:1000 PRELIMINARY REV DESCRIPTION CH PA DATE U741_PL03 D NOTE THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN CANNON CONSULTING ENGINEERS AND MUST NOT BE COPIED OR REPRODUCED IN ANY WAY WITHOUT THEIR WRITTEN CONSENT 18 SECTION TWO TECHNICAL ANALYSIS . - DATE - REV. ... DR CH PA PRELIMINARY ISSUE STATUS . DE - - - AUG 2017 DATE Tel: +44 (0)1638 555 107 CYCLEWAY PROPOSED CARRIAGEWAY PROPOSED FOOTWAY PROPOSED TACTILE PAVING PROPOSED KERB J121_211 Cannon Consulting Engineers A1067 JUNCTION IMPROVEMENTS CENTRE NORFOLK TAVERHAM GARDEN [email protected] www.cannonce.co.uk 1:800 DESCRIPTION M SCOTT PROPERTIES . DR DR Cambridge House, Kentford, Newmarket, Suffolk, CB8 7PN ACCORDANCE WITH“THE TRAFFIC SIGNS AND GENERAL DIRECTIONS". AUTODESK VEHICLE TRACKING 2016.1 WORK FROM FIGURED DIMENSIONS ONLY. SIGNS SHALL BE PROVIDED IN SURVEY DATUM. OTHERWISE STATED. CONJUNCTION ALL RELEVANT DOCUMENTS. . 4. THIS DRAWING IS TO BE READ IN 2. DO NOT SCALE FROM THIS DRAWING, 6. VEHICLE SWEPT PATH GENERATED WITH 5. CARRIAGEWAY MARKINGS AND ROAD 3. ALL LEVELS RELATE TO ORDNANCE NOTES: 1. ALL DIMENSIONS ARE IN METRES UNLESS REV DESIGNED BY DRAWN BY CHECKED BYSCALES @ A1 SIZE PASSED BY PROJECT TITLE DRAWING TITLE CLIENT DRAWING NUMBER Pond copyright 2017. All rights reserved. Licence number 100020449. Reproduced from Promap by permission of Ordnance Survey® on behalf The Controller Her Majesty’s Stationery Office. ©Crown

Reepham Road Fakenham Road Marriott’s Way Following recent discussions with Norfolk Highways, a As part of the granted planning permission for retail A detailed design for crossing Marriott’s Way is being priority junction along Reepham Road is deemed suitable development at Taverham Garden Centre (application no. produced, replicating the crossing at Pendlesham Rise. for the location and volume of movement. Although 20171001) the exisiting Fakenham Road – Fir Covert Road Priority will be given to pedestrian and cycle movements initial designs of a 30m roundabout have been scoped, junction will be upgraded, providing a signal controlled along the National Cycle Route, focusing on the safety further detailed design, consultations and safety audits crossroads to improve the safety of vehicular and Playing Field of the public. Further consulation with Norfolk County will determine the extent of the works required, providing pedestrian movements. Council will ensure a suitable design of high quality is suitable access. produced.

Longacre

ENHANCED GREEN DEFINED MARRIOTT’S WAY INFRASTRUCTURE CENTRAL 67 ALONG MARRIOTT’S SQUARE

WAY NOTE THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN CANNON CONSULTING ENGINEERS MUST NOT BE COPIED OR REPRODUCED A NY WAY WITHOUT THEIR WRITTEN CONSENT REEPHAM ROAD

SPINE ROUTE

CLEARLY DEMARCATED ACTIVE FRONTAGE FROM ENTRANCE INTO MIXED USE GROUND THE CENTRE FLOOR ELEMENTS PEDESTRIAN / CYCLE CROSSING - PRIORITY AVENUE KINGSWOOD

BUS

STOP

ED & Ward Bdy

Def

PARKING SCREENED TO REAR

Indicative draft sketch of local centre within Breck Fram - 13.03.2020 M:\J121 Taverham Garden Centre, NORFOLK\DRAWINGS\AUTOCAD\CURRENT DRGS\J121_211 Junction improvements A1.dwg Drawing not to scale

PROPOSED ACCESS ROAD

PROPOSED FOOTWAY

PROPOSED TACTILE PAVING

PROPOSED KERB

Reproduced from Promap by permission of Ordnance Survey® on behalf of The Controller of Her Majesty’s Stationery Office. ©Crown copyright 2017. All rights reserved. Licence number 100020449.

PROJECT TITLE CLIENT DATE Cannon Consulting Engineers Cambridge House, Kentford, Newmarket, Cambs, CB8 7PN BRECK FARM TAVERHAM M SCOTT PROPERTIES MAR 2017 Tel: +44 (0)1638 555 107 [email protected] www.cannonce.co.uk DRAWING TITLE DESIGNED DRAWN CHECKED PASSED SCALE @ A3 ISSUE STATUS DRAWING NUMBER REV

.. .. . PROPOSED ACCESS 1:500--DRDR PRELIMINARY U741/203 . REV DESCRIPTION CH PA DATE REEPHAM ROAD ROUNDABOUT NOTE THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN CANNON CONSULTING ENGINEERS AND MUST NOT BE COPIED OR REPRODUCED IN ANY WAY WITHOUT THEIR WRITTEN CONSENT

19 2.4 Local community 2.4.1 Community aspirations

Scott Properties believe that the key to a successful strategic development is engagement with the local community and stake holders. Engagement with the GNLP team, Broadland and District Councils and Taverham Parish Council has informed the requirements of the local community to ensure their aspirations are delivered. The main points included:

» A ‘Local Heart’ » Social & community infrastructure » Sensitivity to Marriott’s Way » Intergration with local connectivity network » Green Infrastructure & public open space » Recreational Facilities » Allotments

North

20 SECTION TWO TECHNICAL ANALYSIS 2.5 Market requirements 2.5.1 Demographics

Policy 5 - Homes The policy requires that residential proposals should Age 2,015 2,036 Net Change address the need for homes for all sectors of the community having regard to the latest housing evidence, 0-4 6,046 6,031 -15 including a variety of homes in terms of tenure and cost. 5-9 6,539 6,738 199 10-14 6,596 7,206 610 An Ageing Population 15-19 7,014 6,897 -117 Taverham Parish Council have highlighted the 20-24 5,568 5,388 -180 requirement for homes for the ageing population, and are 25-29 5,803 6,070 267 encouraging the incorporation of bungalows within the development to meet the market demand. 30-34 6,095 6,013 -82 35-39 6,666 7,129 463 This requirement is demonstrated in the Central 40-44 8,534 8,336 -198 Norfolk Strategic Housing Market Assessment 2017; the 45-49 9,757 8,639 -1,118 demographics are changing drastically with the growth 50-54 9,650 8,423 -1,227 of the population in the 65+ age group accounting for 10,925 of the 11,827 population increase in Broadland, i.e. 55-59 8,588 8,138 -450 93% of the overall growth. This highlights the need for 60-64 8,130 8,724 594 appropriate and specific housing for the retirement sector. 65+ 31,642 44,722 13,080 Total 126,628 138,454 11,826 Additionally, the Strategic Housing Market Assessment Central Norfolk Strategic Housing Market Assessment 2017 suggests thaat around 3,900 additional communal establishment places for over 75’s will be required by 2038.

21 22 SECTION THREE DESIGN FRAMEWORK SECTION THREE.

DESIGN FRAMEWORK 3.1 Framework 3.1.1 Design

The development framework has been informed from the extensive surveys and reports, alongside the community engagement to provide a development capable of delivering a wide variety of uses in suitable locations.

Design Code The development will be designed to create a distinct sense of place that will integrate with its surrounding environment and communities. Distinctive character areas and focal points will be created throughout the Site to reflect and enhance the diverse characteristics of Taverham, and to provide attractive green infrastructure to promote active lifestyles.

Key

Site boundary

Care village

Education (primary school)

Commercial North

Mixed-use

24 SECTION THREE DESIGN FRAMEWORK 3.1 Framework 3.1.2 Community Aspirations

Scott Properties believe that the key to a successful countryside beyond, to encourage healthy active lifestyles strategic development is engagement with the local for the existing and new communities. Connectivity paths community and stake holders. Engagement with the will stitch the development to existing surrounding green GNLP team, Broadland and South Norfolk District infrastructure such as Breck Farm, Broom Close and Councils, the NHS, Taverham Surgery and Taverham Kingswood Avenue tree belts, Thorpe Marriott Green and Parish Council has informed the requirements of the local Greenway, and existing cycle routes along the Broadland community to ensure their aspirations are delivered. Northway.

A ‘Local Heart’ Recreational Facilities Policy TAV4 of the Taverham Neighbourhood Plan ensures The scale of the proposed development provides the that large scale developments should ‘include a heart opportunity to deliver new formal and informal sports or focal point’. An area of c. 5 acres of land has been and leisure facilities. An area of c. 5 acres, adjacent to safeguarded for the provision of social and community the existing recreation facility Hinks Meadow, has been facilities, which could include a new medical centre. allocated to safeguard an extension to the current playing Emphasis has been put on ensuring the key facilities are fields. centrally located within the development adjacent to Marriott’s Way. Allotments Taverham Parish Council have expressed a local interest Marriott’s Way and requirement for a new allotment area Enhancements to Marriott’s Way will provide key benefits, both in terms of accessibility and biodiversity. An area Education adjacent to Marriott’s Way has been allocated for a large Taverham has the capacity for education for the proposed area of community open space, with the potential for a car first phase of the development. For the wider site, an area park to attract visitors to the area, creating a destination of c. 5 acres has been safeguarded for the provision of a and focal point. new primary school.

Green Infrastructure Extensive new areas of public open space are proposed as part of the development, to be complemented by improved accessibility to Marriott’s Way and the

25 3.1 Framework 3.1.3 Density

Density To ensure efficient use of the land, the development will aim to achieve a minimum of 25 dwellings per hectare on a net basis. This will be achieved by utilising a mixture of densities, ranging from 22 to 35 dwellings per hectare, contributing to delivering a variety of dwelling types and tenures to promote a mixed community suitable for all members of society.

Housing Mix The indicative housing mix for the development will reflect both the Strategic Housing Market Assessment and the market requirements, ensuring suitable dwellings are built in the correct place at the required time.

The provision of 33% affordable homes will be achievable on Site, with the type and tenure to be discussed with Broadland District Council on each phase to ensure the affordable housing demand is suitably met.

North

26 SECTION THREE DESIGN FRAMEWORK 3.1 Framework 3.1.4 Masterplan

As a result of the urban design analysis, a series of opportunities have been identified that will be capitalised on by the new development at Breck Farm:

» Define and locate a central ‘local centre’ offering a hub of activity for both new and existing communities set along Marriott’s Way; » Maximise both aspect and permeability to Marriott’s Way; » Stitch the development to existing surrounding context assets such as Thorpe Marriott Greenway and existing cycle routes along Broadland Northway; » Define a central ‘link road’ (east-west) as a singular well-defined street to aid wayfinding and legibility; and » Retention and enhancement to existing wildlife and ecology to generate biodiversity enrichment.

North

27 28 SECTION FOUR DELIVERY SECTION FOUR.

DELIVERY 4.1 Delivery & Phasing 4.1.1 Phasing

Scott Properties will work with the Greater Norwich Local Plan team, Broadland and South Norfolk District Councils 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 and Taverham Parish Council to provide appropriate Submission of timing and delivery of the Site through each phase. Q2 application Through recent discussions with developers, and the Determination Q4 strong interest received to date, it is anticipated that the of application Site will operate two sales outlets, one at Fir Covert Road, Commencement Q2 and the second at Reepham Road. Scott Properties will of works aim to work with the developers to provide high quality Occupation of products through each phase of the development, Q3 ensuring infrastructure is delivered within a suitable first dwellings timescale. The indicative timeline shows how the delivery Dwellings sold 20 155 175 130 130 130 120 120 90 100 90 90 50 0 0 0 of the Site could progress through the plan period. Cumulative 0 0 20 175 350 480 610 740 860 980 1070 1170 1260 1350 1400 1400 1400 1400 dwellings sold

Completion Q1

Indicative delivery timeline

30 SECTION FOUR DELIVERY 4.1 Delivery & Phasing 4.1.2 Developers

First Phase Issue Status

Scott Properties are keen to commence delivery on Site This drawing is copyright. Only figured dimensions to be worked to . Revision Drawn Check Date at the earliest available opportunity. The intention is to submit a detailed planning application for the first phase of development, including 100 bungalows developed by Scott Residential and 100 family homes developed by Abel Homes, together with a 90 bed care facility provided by Saffron Housing, in 2021.. Discussions with Broadland District Council and other key stakeholders have been ongoing for a number of months. Formal pre-application discussions are due to commence in April 2020 with Broadland District Council.

Future Phases Scott Properties has received further interest from developers regarding future phases of the development. N

Abel Homes have shown interest in providing additional 5acres land retention for family homes adjacent to the first phase, Scott Residential future community use

SCALE 1:1250 will look to provide the remaining bungalows, and Saffron 0 30 60 90

client Housing have expressed an interest in a parcel of land Scott Properties

project adjoining Reepham Road. Additional parties are in the Residential Development, Breck Farm, Taverham early stages of discussions with strong interest shown. Phase 1 drawing Proving Layout

date scale @ A2 Feb 20 1:1250 drawn checked by JDA JSB

A R C H I T E C T U R E + P L A N N I N G I s s u i n g O ffi c e : N O R W I C H H U N T I N G D O N - 0 1 6 0 3 6 2 9 8 7 1 0 1 4 8 0 4 3 2 2 2 0 Brown&Co Offices : Banbury, Brigg, Bury St . Edmunds, Grantham, Holt, Huntingdon, King's Lynn , Melton Mowbray , Norwich, Retford, Spalding, St Neots , Caribbean, Poland (Torun ), Romania 20 026667 04 -

31 32 SECTION FOUR DELIVERY SECTION FIVE.

SUMMARY 5.1 Delivery statement 5.1.1 Summary

Breck Farm provides an excellent opportunity to deliver a high-quality development that could deliver much needed market and affordable housing across a range of types and tenures, alongside a comprehensive suite of amenities including care, health, education and commercial uses and large areas of functional public open space.

This document demonstrates that there are no constraints to the delivery of the Site and its ability to contribute towards the identified need in the short and medium term. The proposed development constitutes a natural extension to the village of Taverham, being bounded entirely by existing infrastructure.

Breck Farm can deliver tangible outputs against policy aspirations, whilst also responding positively to the proposed consultation with the GNLP team, Broadland District Council, Taverham Neighbourhood Plan Steering Group and the local community. The Landowners and Promoter are able to offer flexibility in how the development is delivered, with the ability to respond to existing and emerging local needs from the outset and through the life of the development.

34 SECTION FIVE SUMMARY Existing photo of Marriott’s Way