Procurement Plan

I. General Public Disclosure Authorized

1. Bank’s approval Date of the procurement Plan [Original: December16, 2016: 1stRevision: June 28, 2017, 2nd Revision: August 18, 2017, 3rd Revision: August 14, 2018, 4th Revision: August 23, 2018 for Mizhi, 5th Revision: August 30 for Yanchang;6th Revision: September 5, 2018 for Heyang, Longxian and Baishui; 7th Revision: December 4, 2018 for Yichuan; 8th Revision: April 4, 2019; 9th Revision: March 16, 2020; 10th Revision: May 18, 2020] 2. Date of General Procurement Notice: Jan 24, 2017 3. Period covered by this procurement plan: 2016-2022

II. Goods and Works and non-consulting services.

Public Disclosure Authorized 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary]

Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual]

4. Reference to (if any) Project Operational/Procurement Manual: Yes

5. Any Other Special Procurement Arrangements: no

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) Public Disclosure Authorized [List the Packages which require Bank’s prior review first and then the other packages]

1 2 3 4 5 6 7

Ref. No. Description Estimated Packages Review Comments Cost Domestic by Bank US$ million Preference (Prior / Post) (yes/no) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of the Shopping (Works) Summary of the ICB (Non- Consultant Services)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6 Ref. Description of Estimated Packages Review Comments No. Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary of 0.0915 5 Post CQS number of contracts that will be let under other methods PROCUREMENT : Poor Rural Areas Community Development Project PLAN General Information

Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-03-20 Revised Plan Date(s): (comma delineated, leave blank if none)2020-05-18 Project ID: P153541 GPN Date: 2017-01-24 Project Name: Shaanxi Poor Rural Areas Community Development Project Loan / Credit No: IBRD / 86840 Executing Agency(ies):Shaanxi Poor Rural PMO

WORKS Bid Evaluation Activity Reference No. Procurement Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Contract / Description Component Review Type Method Document Amount Amount qualification Document / Signed Contract No. Approach Process n (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Completion Type (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

Component B: Economic W/YA/YCH/2017/01 / Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 57,300.00 55,582.83 Completed 2017-04-06 2017-06-01 2017-08-04 Road construction Quotations One Envelope 01 Services Support

W/YA/Y/G/2017/01 / Component B: Economic Request for Single Stage - 2018-03- Apple cold storage civil IBRD / 86840 Infrastructure and Post Open - National 828,000.00 0.00 Canceled 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 Bids One Envelope 20 (4000 tons) Services Support

W/YU/D/Y/2017/02 / Component B: Economic Request for Single Stage - 2018-03- Peasant household sheep IBRD / 86840 Infrastructure and Post Open - National 251,500.00 0.00 Canceled 2017-07-25 2017-09-19 Bids One Envelope 18 shed Services Support

W/YU/D/Y/2018/01 / Component B: Economic Request for Single Stage - 2018-09- Peasant household sheep IBRD / 86840 Infrastructure and Post Open - National 205,800.00 0.00 Canceled 2018-02-06 2018-04-03 Quotations One Envelope 30 shed Services Support

Component B: Economic W/W/B/J/2018/02 / Hail Request for Single Stage - 2018-08- IBRD / 86840 Infrastructure and Post Open - National 257,100.00 0.00 Canceled 2018-01-06 2018-03-03 net 225 mu Bids One Envelope 30 Services Support

W/YU/D/Y/2018/02 / Component B: Economic Request for Single Stage - 2018-11- Peasant household sheep IBRD / 86840 Infrastructure and Post Open - National 425,300.00 0.00 Canceled 2018-02-01 2018-02-06 2018-03-20 2018-04-19 2018-05-24 Bids One Envelope 20 shed Services Support

W/YU/D/Y/2018/03 / Component B: Economic Request for Single Stage - 2018-09- Peasant household sheep IBRD / 86840 Infrastructure and Post Open - National 214,900.00 0.00 Canceled 2018-02-06 2018-04-03 Quotations One Envelope 30 shed Services Support

Component B: Economic W/W/B/F/2018/01 / Hail Request for Single Stage - 2018-10- IBRD / 86840 Infrastructure and Post Open - National 314,300.00 0.00 Canceled 2018-03-06 2018-05-01 net 258 mu Bids One Envelope 28 Services Support

W/B/LX/QQ/2017/02 / Component B: Economic Request for Single Stage - 2018-06- Pepper seedling IBRD / 86840 Infrastructure and Post Open - National 780,200.00 0.00 Canceled 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 Bids One Envelope 20 greenhouse 6 Services Support

Component B: Economic W/W/H/2017/06 / Village Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 61,700.00 0.00 Canceled 2017-06-30 2017-08-25 road 0.85km Quotations One Envelope 21 Services Support

Component B: Economic W/YU/M/2017/07 / Road Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 152,400.00 0.00 Canceled 2017-06-06 2017-08-01 construction Quotations One Envelope 01 Services Support

Component B: Economic W/YU/M/2017/06 / Road Request for Single Stage - 2018-01- IBRD / 86840 Infrastructure and Post Open - National 48,800.00 0.00 Canceled 2017-06-06 2017-08-01 construction Quotations One Envelope 28 Services Support

Component B: Economic W/YA/YC/2017/08 / Road Request for Single Stage - 2018-01- IBRD / 86840 Infrastructure and Post Open - National 207,800.00 0.00 Canceled 2017-06-06 2017-08-01 hardening 2.9km Quotations One Envelope 28 Services Support

W/YA/YC/2017/03 / . Component B: Economic Constructed 5 bridges Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Open - National 243,900.00 0.00 Canceled 2018-07-15 2018-09-09 cemented with M10 Quotations One Envelope 08 Services Support masonry and the wall is based on M12.5 fine stone materials.

W/YA/YC/2017/04 / Yanchuan county. Component B: Economic Constructed 3 bridges Request for Single Stage - 2018-01- IBRD / 86840 Infrastructure and Prior Open - National 146,300.00 0.00 Canceled 2017-06-06 2017-08-01 cemented with M10 Quotations One Envelope 28 Services Support masonry and the wall is based on M12.5 fine stone materials.

W/YA/YC/2017/01 / Component B: Economic Yanchuan county. Request for Single Stage - 2018-11- IBRD / 86840 Infrastructure and Post Open - National 87,800.00 0.00 Canceled 2018-07-25 2018-08-29 Gaojiageta village, road Quotations One Envelope 29 Services Support hardening 0.875km

W/YA/YC/2017/02 / Component B: Economic Yanchuan county. Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Open - National 208,900.00 0.00 Canceled 2018-08-04 2018-09-09 Production road 4.95km Quotations One Envelope 08 Services Support resurfacing with sand.

W/YA/YC/2017/05 / Yanchuan county. 300 sets Component B: Economic Request for Single Stage - 2019-03- of soft rainwater cellars. IBRD / 86840 Infrastructure and Post Open - National 237,800.00 0.00 Canceled 2018-08-04 2018-09-29 Quotations One Envelope 28 Diameter: 3m and depth: Services Support 3m.

W/YA/YC/2017/06 / Yanchuan county. Road Component B: Economic Request for Single Stage - 2019-03- hardening 2.032km. IBRD / 86840 Infrastructure and Post Open - National 157,700.00 0.00 Canceled 2018-08-04 2018-09-29 Quotations One Envelope 28 Shiyao village 1.282km Services Support and Fanjiachuan village 0.75km

W/YA/Y/2017/03 / Component B: Economic , Request for Single Stage - 2018-01- IBRD / 86840 Infrastructure and Post Open - National 27,000.00 0.00 Canceled 2017-06-06 2017-08-01 rainwater cellar Quotations One Envelope 28 Services Support construction in the Farming Orchard, Leichi Town. W/YA/Y/2017/04 / Yanchang county: road construction in 5 Component B: Economic Request for Single Stage - 2018-01- communities including IBRD / 86840 Infrastructure and Post Open - National 27,800.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 28 Jing'gou, Xinglie, Jiechu, Services Support Zhongliang and Houlie of Leiduo village in Leichi township.

W/YA/Y/2017/05 / Yangchang county, 3.448km road construction of Niangeda and Component B: Economic Request for Single Stage - 2018-01- Caiziliang communities of IBRD / 86840 Infrastructure and Post Open - National 18,800.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 28 Xiadaya village in Leichi Services Support township, and 0.285km road resurfacing and construction of Shiganliang community

W/YA/Y/2017/06 / Yanchang county, 1.15km Component B: Economic Request for Single Stage - 2018-01- road construction of IBRD / 86840 Infrastructure and Post Open - National 33,000.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 28 Zhangtao and Shentou Services Support communities in Leichi township.

W/YA/Y/2017/07 / Component B: Economic Request for Single Stage - 2019-03- Yanchang county, 1.75km IBRD / 86840 Infrastructure and Post Limited 18,400.00 17,316.28 Completed 2018-07-16 2017-08-07 2018-09-10 2017-09-11 Quotations One Envelope 09 productive road for Leichi Services Support township.

Page 1 W/YA/Y/2017/02 / Component B: Economic Residential road hardening Request for Single Stage - 2018-01- IBRD / 86840 Infrastructure and Post Open - National 152,500.00 0.00 Canceled 2017-06-06 2017-08-01 from Leichi township to Quotations One Envelope 28 Services Support Wapenyaozi village.

W/W/F/2017/01 / Fuping County, asphalt road Component B: Economic Pending Request for Single Stage - 2018-01- construction with 3.3 IBRD / 86840 Infrastructure and Post Open - National 820,100.00 0.00 Implement 2017-04-01 2017-04-06 2017-05-18 2017-06-17 2017-07-22 Bids One Envelope 22 kilometers in width and 6 Services Support ation meters in length

W/W/F/2017/02 / Fuping county, 5.47km road Component B: Economic Pending construction in which Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Open - National 391,900.00 0.00 Implement 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 3.5m width of road for Bids One Envelope 31 Services Support ation out use and 3m width for residence use.

W/W/F/2017/03 / Fuping Component B: Economic county, 11.1km length and Request for Single Stage - 2018-12- IBRD / 86840 Infrastructure and Post Open - National 163,300.00 0.00 Canceled 2018-04-01 2018-04-06 2018-05-18 2018-06-17 2018-07-22 3m width of road Bids One Envelope 31 Services Support construction.

W/W/F/D/2017/01 / Fuping county, construction of peeling factories of 1,000 square Component B: Economic Pending meters, cold storage Request for Single Stage - 2019-02- IBRD / 86840 Infrastructure and Post Open - National 474,800.00 0.00 Implement 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 building of 500 tons and Bids One Envelope 28 Services Support ation 500 square meters, peeling factories of 2400 square meters , drying rooms of 400 square meters and 1500 square meters. W/W/B/2017/03 / , 3.2km residential Component B: Economic Request for Single Stage - 2018-01- road construction in IBRD / 86840 Infrastructure and Post Open - National 204,900.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 28 Zhaoyao community in Services Support Lingao project area.

W/W/B/2017/04 / Baishui county. One cement concrete road from Component B: Economic Xiguojiashan village to Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 247,600.00 0.00 Canceled 2017-07-06 2017-08-31 Xiyou village 1.8km, Quotations One Envelope 27 Services Support another road from Guojiashan village to Dongsunjiashan village 1.1km, together is 2.9km.

W/W/B/2018/12 / Baishui Component B: Economic Pending county. 2.2km road Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 167,700.00 0.00 Implement 2018-07-17 2018-09-11 hardening for Lingao Quotations One Envelope 10 Services Support ation community.

W/W/B/2018/14 / Baishui Component B: Economic Pending Request for Single Stage - 2019-03- village. 1.27km road IBRD / 86840 Infrastructure and Post Limited 96,800.00 0.00 Implement 2018-07-17 2018-09-11 Quotations One Envelope 10 hardening for Gaoxi Services Support ation village.

W/W/B/2018/15 / Baishui Component B: Economic Pending Request for Single Stage - 2019-03- county. 3.38km productive IBRD / 86840 Infrastructure and Post Limited 51,500.00 0.00 Implement 2018-07-17 2018-09-11 Quotations One Envelope 10 road for Wuyao village. Services Support ation

W/W/B/2018/17 / Baishui Component B: Economic Request for Single Stage - 2019-03- county. 0.9km productive IBRD / 86840 Infrastructure and Post Limited 13,700.00 0.00 Canceled 2018-07-17 2018-09-11 Quotations One Envelope 10 road for Gaoxi village. Services Support

W/W/B/2018/18 / Baishui county. Repair 1 well for Pujun village and drill 3 Component B: Economic Request for Single Stage - 2019-03- well for the following IBRD / 86840 Infrastructure and Post Limited 159,300.00 163,502.49 Completed 2018-07-17 2018-06-25 2018-09-11 2018-07-28 Quotations One Envelope 10 palces: Lingao community, Services Support Wuyao village and Taowa village, 1 for each.

W/W/B/2018/19 / Baishui county, 200 square meters Component B: Economic Request for Single Stage - 2019-03- biological fermented IBRD / 86840 Infrastructure and Post Limited 18,300.00 21,370.72 Completed 2018-07-17 2018-06-25 2018-09-11 2018-07-26 Quotations One Envelope 10 fertilizer pits construction Services Support in Lingao project area.

W/B/LX/2017/01 / Long county, construction of 4 wells in which 2 well constructed in Liujiazu Component B: Economic community, 1 well Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 88,300.00 0.00 Canceled 2017-07-06 2017-08-31 constructed in Quotations One Envelope 27 Services Support Hujiazhuang community and 1 well construction on Shangliang community with 150 meters depth respectively.

W/B/LX/2017/02 / Long county, new construction of 8.123 km diversion canal, in which 3.523 km in the crossing of Component B: Economic Request for Single Stage - 2018-02- Liangfuhe community in IBRD / 86840 Infrastructure and Post Open - National 195,700.00 0.00 Canceled 2017-08-01 2017-08-22 Quotations One Envelope 18 Shangliang village and Services Support Xialiang village, 1.1 km in Liujiazui village, and 3.5 km between tanyuanpo community in Liujiazui and railway.

W/B/LX/2017/03 / Long county, construction of 3 bridges, in which 1 bridge between Hujiazhuang community and Liujiazui Component B: Economic Request for Single Stage - 2018-04- community, 1 bridge in IBRD / 86840 Infrastructure and Post Open - National 54,900.00 0.00 Canceled 2017-09-06 2017-11-01 Quotations One Envelope 30 Yinqigou community in Services Support Sanjiaodian village, and 1 bridge in Duimianqiao community in Sanjiaodian village.

W/YU/D/2017/03 / , construction of 1 300 Component B: Economic Request for Single Stage - 2018-04- meters-deep water well for IBRD / 86840 Infrastructure and Post Open - National 45,700.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 01 farming use (equipped Services Support with pump, high- and low voltage wire, transformer, water collection pool).

W/YU/D/2017/01 / Dingbian county, 7 km residential concrete road Component B: Economic Pending Request for Single Stage - 2019-05- construction Road IBRD / 86840 Infrastructure and Post Open - National 747,000.00 0.00 Implement 2018-07-24 2018-07-29 2018-09-09 2018-10-09 2018-11-13 Bids One Envelope 16 construction from Services Support ation Shangendi village to No. 303 provincial road of Shaanxi.

W/YU/D/2017/02 / Dingbian county, 5.4 km residential road from Xiaoqu community to Tuwozi community, which Component B: Economic Pending Request for Single Stage - 2018-12- is divided into 2 parts: IBRD / 86840 Infrastructure and Post Open - National 576,200.00 0.00 Implement 2018-04-19 2018-04-24 2018-04-29 2018-05-04 2018-05-30 Bids One Envelope 28 the first part is 1.9 km Services Support ation from Xiaoqu community to a triple path, and the second part is 3.5 km from Liwazi community to Tuwozi community.

Page 2 W/YU/D/Y/2017/01 / Dingbian county. 5700 Component B: Economic Request for Single Stage - 2018-01- square meter of peasant IBRD / 86840 Infrastructure and Post Open - National 191,200.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 28 household sheep shed for Services Support Yangwan village.

W/YU/D/2017/04 / Dingbian county, construction of sheep Component B: Economic trading market covering Request for Single Stage - 2018-04- IBRD / 86840 Infrastructure and Post Open - National 109,800.00 0.00 Canceled 2017-06-06 2017-08-01 5,000 square meters, brick Quotations One Envelope 01 Services Support floor, 0.5 meter high wall on which welded 1 meter iron column.

W/YU/M/2018/01 / Mizhi Component B: Economic county. 1.4km road Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 42,700.00 37,663.39 Completed 2018-07-18 2018-05-23 2018-09-12 2018-06-21 hardening for Aijiawa Quotations One Envelope 11 Services Support village.

W/YU/M/2018/03 / Mizhi Component B: Economic county. Middle part of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 38,100.00 56,047.63 Completed 2018-07-18 2018-05-23 2018-09-12 2018-06-21 Long town. Management Quotations One Envelope 11 Services Support of land and terrace for 125 Mu.

W/B/LY/2017/03 / Linyou county, 2.2km road Component B: Economic Request for Single Stage - 2018-01- hardening in the first, IBRD / 86840 Infrastructure and Post Open - National 76,200.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 28 second and fourth group Services Support of Sujia village.

W/YU/M/2018/02 / , land management Component B: Economic and terracing in the front Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 165,500.00 171,339.93 Signed 2018-07-18 2018-05-23 2018-09-12 2018-06-21 part of Long Township, Quotations One Envelope 11 Services Support with a total dimension of 543 mu.

W/B/LY/2017/04 / Linyou county, 2.3km road Component B: Economic Request for Single Stage - 2018-03- hardening in Aoli IBRD / 86840 Infrastructure and Post Open - National 162,300.00 0.00 Canceled 2017-08-06 2017-10-01 Quotations One Envelope 30 community in Changfeng Services Support village.

W/B/LY/2017/05 / Linyou Component B: Economic county, 3km road Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 245,400.00 0.00 Canceled 2017-07-06 2017-08-31 hardening from Quotations One Envelope 27 Services Support Guanzhuang village to Zhujiayuan community.

W/YU/M/2018/05 / Mizhi county. Water tower for Component B: Economic Request for Single Stage - 2019-03- orchard irrigation. 10 high IBRD / 86840 Infrastructure and Post Limited 99,100.00 93,719.52 Completed 2018-07-18 2018-05-23 2018-09-12 2018-06-21 Quotations One Envelope 11 water tower and 1 low Services Support water tower.

W/YU/M/2018/04 / Mizhi County, land management Component B: Economic Request for Single Stage - 2019-03- and terracing at the rear IBRD / 86840 Infrastructure and Post Limited 131,700.00 56,047.63 Signed 2018-07-18 2018-05-23 2018-09-12 2018-06-21 Quotations One Envelope 11 of Long Town, with a Services Support total dimension of 432 mu.

W/B/LY/2017/06 / Linyou county, 1.7km road Component B: Economic Request for Single Stage - 2018-02- hardening from Shenjia IBRD / 86840 Infrastructure and Post Open - National 170,000.00 0.00 Canceled 2017-07-06 2017-08-31 Quotations One Envelope 27 community to Xizhuang Services Support community.

W/B/LY/2017/01 / Linyou county, 3.75km road Component B: Economic Request for Single Stage - 2018-02- hardening from Changfeng IBRD / 86840 Infrastructure and Post Open - National 387,500.00 402,955.92 Signed 2017-04-01 2018-07-13 2017-04-06 2017-05-18 2018-08-15 2017-06-17 2018-08-28 2017-07-22 2018-09-01 Bids One Envelope 21 township to Shenjia Services Support community.

W/YU/M/2018/06 / Mizhi Component B: Economic Request for Single Stage - 2019-03- county. 10 well house for IBRD / 86840 Infrastructure and Post Limited 15,200.00 13,358.13 Completed 2018-07-18 2018-05-22 2018-09-12 2018-06-21 Quotations One Envelope 11 orchard irrigation. Services Support

W/B/LY/2017/02 / Linyou Component B: Economic county, 4.9km road Request for Single Stage - 2018-03- IBRD / 86840 Infrastructure and Post Open - National 451,900.00 452,335.87 Signed 2017-05-01 2018-05-28 2017-05-06 2017-06-17 2018-06-28 2017-07-17 2018-06-28 2017-08-21 2018-07-23 hardening from Changfeng Bids One Envelope 21 Services Support township to Wushen village.

W/YU/M/2018/07 / Mizhi county. Water tower for Component B: Economic Request for Single Stage - 2019-03- orchard irrigation and IBRD / 86840 Infrastructure and Post Limited 218,800.00 139,324.08 Signed 2018-07-18 2018-05-22 2018-09-12 2018-06-21 Quotations One Envelope 11 ancillary facility Services Support engineering with a total number of 10.

W/YU/M/2017/13 / Mizhi County, Irrigation pipeline Component A: Farmer Request for Single Stage - 2018-08- construction in the IBRD / 86840 Cooperative and Value Post Open - National 134,100.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 01 orchard garden with a Chain Development. total dimension of 550 mu.

W/YU/M/2018/08 / Mizhi Component A: Farmer county. Pipeline for Request for Single Stage - 2019-03- IBRD / 86840 Cooperative and Value Post Limited 134,100.00 125,734.94 Completed 2018-07-18 2018-05-22 2018-09-12 2018-06-21 orchard irrigation. The Quotations One Envelope 11 Chain Development. depth is 1m, and the material is PE.

W/YU/M/2017/14 / Mizhi County, irrigation and Component B: Economic Request for Single Stage - 2018-08- outlet pile construction in IBRD / 86840 Infrastructure and Post Open - National 88,900.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 01 the orchard garden with Services Support 1000 water piles.

W/B/LY/2017/07 / Linyou county, 5.775km road Component B: Economic Request for Single Stage - 2018-01- resurfaced with sand in IBRD / 86840 Infrastructure and Post Open - National 88,000.00 0.00 Canceled 2017-06-06 2017-08-01 Quotations One Envelope 28 the farmland of in Services Support Changfeng village and Changle village.

W/B/LY/2017/08 / Linyou county, construction of Component B: Economic 4.5km water pipelines Request for Single Stage - 2018-01- IBRD / 86840 Infrastructure and Post Open - National 27,600.00 0.00 Canceled 2017-06-06 2017-08-01 from the water factory in Quotations One Envelope 28 Services Support Changfeng village to Changle village.

W/W/H/2017/01 / Heyang Component B: Economic Request for Single Stage - 2018-03- County, 2 wells in Xiyang IBRD / 86840 Infrastructure and Post Open - National 233,300.00 0.00 Canceled 2017-07-25 2017-09-19 Quotations One Envelope 18 and Diantou Village. Services Support

W/W/H/2017/03 / Heyang Component B: Economic County, 2 wells in Xiao Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 233,300.00 0.00 Canceled 2017-06-30 2017-08-25 Community and Meng Quotations One Envelope 21 Services Support Community.

W/W/H/2017/02 / Heyang Component B: Economic county. 1 well for Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 233,300.00 0.00 Canceled 2017-07-05 2017-08-30 Xiangong village and Quotations One Envelope 26 Services Support another well for Chengcun village.

W/W/H/2017/07 / , production of 5 Component B: Economic Request for Single Stage - 2018-02- roads with a total length IBRD / 86840 Infrastructure and Post Open - National 89,200.00 0.00 Canceled 2017-06-30 2017-08-25 Quotations One Envelope 21 of 6060 meters in Diantou Services Support Village.

W/W/H/2017/08 / Heyang Component B: Economic county, 2.57km road Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 38,000.00 0.00 Canceled 2017-06-30 2017-08-25 construction in Xiaocun Quotations One Envelope 21 Services Support community.

Page 3 W/W/H/2017/09 / Heyang Component B: Economic Request for Single Stage - 2018-02- county, 4.97km in IBRD / 86840 Infrastructure and Post Open - National 73,500.00 0.00 Canceled 2017-06-30 2017-08-25 Quotations One Envelope 21 Xiangong village. Services Support

W/X/C/2017/01 / . Road hardening. Component B: Economic The total length is Request for Single Stage - 2018-06- IBRD / 86840 Infrastructure and Post Open - National 80,800.00 0.00 Canceled 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-08-21 5298m: 3919m for Santai Bids One Envelope 21 Services Support village and 1379m for Fanluo village.

W/X/C/2017/02 / Changwu county. Road hardening . Component B: Economic The total length is Request for Single Stage - 2018-02- IBRD / 86840 Infrastructure and Post Open - National 195,300.00 0.00 Canceled 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-08-21 2562m: 2111m for Santai Bids One Envelope 21 Services Support village and 451m for Fanluo village.

W/X/C/2017/03 / Changwu county. Associated Component B: Economic drainage channel of Request for Single Stage - 2018-08- IBRD / 86840 Infrastructure and Post Open - National 70,100.00 0.00 Canceled 2017-06-06 2017-08-01 hardening road for Santai Quotations One Envelope 01 Services Support village and Fanluo village, the total length is 3678m.

W/W/H/2017/05 / Heyang Component B: Economic Pending Request for Single Stage - 2019-10- county. 5.8km village road IBRD / 86840 Infrastructure and Post Open - National 457,100.00 0.00 Implement 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 Bids One Envelope 20 for Xiaocun community. Services Support ation

W/W/H/2017/04 / Heyang Component B: Economic Pending county, 6.7km road Request for Single Stage - 2019-10- IBRD / 86840 Infrastructure and Post Open - National 528,400.00 0.00 Implement 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 construction in Diantou Bids One Envelope 20 Services Support ation village.

W/X/C/L/2017/01 / Changwu county. Controlling office area of 5650sqm, Cold storage refrigeration to build Component B: Economic Under 2000t, fence engineering Request for Single Stage - 2019-10- IBRD / 86840 Infrastructure and Post Open - National 734,200.00 0.00 Implement 2019-01-01 2019-03-04 2019-01-06 2019-02-17 2019-03-19 2019-04-23 315m, refrigeration room Bids One Envelope 20 Services Support ation door and controlling area, equipment room 400sqm, housing construction 300sqm, workshop 300sqm and 2 bathroom.

W/W/F/2017/03A / Fuping Component B: Economic county, 11.1km length and Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 163,300.00 237,695.04 Signed 2018-08-07 2018-08-10 2018-10-02 2018-09-26 3m width of road Quotations One Envelope 31 Services Support construction.

W/X/C/2017/01A / Changwu county. Road Component B: Economic Pending hardening. The total Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 80,800.00 0.00 Implement 2018-08-07 2018-10-02 length is 5298m: 3919m Quotations One Envelope 31 Services Support ation for Santai village and 1379m for Fanluo village.

W/X/C/2017/02A / Changwu county. Road Component B: Economic hardening . The total Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 195,300.00 188,909.89 Signed 2018-08-07 2018-08-02 2018-10-02 2018-09-07 length is 2562m: 2111m Quotations One Envelope 31 Services Support for Santai village and 451m for Fanluo village.

Component B: Economic Pending W/YA/YCH/2017/06A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 35,800.00 0.00 Implement 2018-08-07 2018-10-02 Road hardening Quotations One Envelope 31 Services Support ation

W/YA/YCH/2017/15A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 55,900.00 45,644.98 Completed 2018-08-07 2017-09-25 2018-10-02 2017-10-19 production gravel road of Quotations One Envelope 31 Services Support Shuangquan Villege in Macha is 3.9km

W/B/LY/2017/03A / Linyou county, 2.2km road Component B: Economic Request for Single Stage - 2019-03- hardening in the first, IBRD / 86840 Infrastructure and Post Limited 76,200.00 59,292.77 Completed 2018-08-07 2017-12-20 2018-10-02 2018-03-05 Quotations One Envelope 31 second and fourth group Services Support of Sujia village.

W/YA/YCH/2017/14A / 1 hallucinogenic water stone Component B: Economic Pending Request for Single Stage - 2019-03- bridge and the total IBRD / 86840 Infrastructure and Post Limited 38,400.00 0.00 Implement 2018-08-07 2018-10-02 Quotations One Envelope 31 length of hardening road Services Support ation of Shimengou is 0.2 km

W/YU/D/2017/04A / Dingbian county, construction of sheep Component B: Economic Pending trading market covering Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 109,800.00 0.00 Implement 2018-08-07 2018-10-02 5,000 square meters, brick Quotations One Envelope 31 Services Support ation floor, 0.5 meter high wall on which welded 1 meter iron column.

W/B/LX/QQ/2017/02A / Component B: Economic Pending Request for Single Stage - 2019-05- Pepper seedling IBRD / 86840 Infrastructure and Post Open - National 780,200.00 0.00 Implement 2018-08-02 2018-08-07 2018-09-18 2018-10-18 2018-11-22 Bids One Envelope 21 greenhouse 6 Services Support ation

Component B: Economic W/W/B/2018/11A / Village Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 192,000.00 50,423.54 Completed 2018-08-07 2018-06-25 2018-10-02 2018-07-26 road 2.68km Quotations One Envelope 31 Services Support

Component B: Economic W/YA/YCH/2017/09A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 71,600.00 70,311.80 Completed 2018-08-07 2018-07-25 2018-10-02 2018-08-20 Road hardening Quotations One Envelope 31 Services Support

Component B: Economic W/YU/M/2017/01A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 170,700.00 209,790.64 Completed 2018-08-07 2017-09-30 2018-10-02 2017-11-15 Hardened Road Quotations One Envelope 31 Services Support

Component B: Economic Under W/W/B/2017/01A / Village Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 107,500.00 0.00 Implement 2018-08-07 2017-09-23 2018-10-02 road 1.5km Quotations One Envelope 31 Services Support ation

Component B: Economic W/W/B/2017/07A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 77,200.00 80,666.96 Completed 2018-08-07 2017-09-23 2018-10-02 2017-10-25 Production of road 5.25km Quotations One Envelope 31 Services Support

W/YA/YCH/2017/31A / Component B: Economic Request for Single Stage - 2019-03- Construction of revetment: IBRD / 86840 Infrastructure and Post Limited 47,100.00 44,681.05 Completed 2018-08-07 2017-09-06 2018-10-02 2017-10-10 Quotations One Envelope 31 800 m3 Services Support

Component B: Economic Pending W/W/B/2018/10A / Village Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 70,900.00 0.00 Implement 2018-08-07 2018-10-02 road 0.99km Quotations One Envelope 31 Services Support ation

W/B/LY/2017/07A / Linyou county, 5.775km Component B: Economic Request for Single Stage - 2019-03- road resurfaced with sand IBRD / 86840 Infrastructure and Post Limited 88,000.00 70,186.90 Signed 2018-08-07 2018-07-09 2018-10-02 2018-08-09 Quotations One Envelope 31 in the farmland of in Services Support Changfeng village and Changle village.

W/YA/Y/2017/06A / Yanchang county, 1.15km Component B: Economic road construction of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 33,000.00 31,133.30 Completed 2018-08-07 2017-08-07 2018-10-02 2017-09-11 Zhangtao and Shentou Quotations One Envelope 31 Services Support communities in Leichi township.

Page 4 W/YU/D/2017/03A / Dingbian county, construction of 1 300 Component B: Economic meters-deep water well for Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 45,700.00 41,366.16 Completed 2018-08-07 2018-10-22 2018-10-02 2018-10-30 farming use (equipped Quotations One Envelope 31 Services Support with pump, high- and low voltage wire, transformer, water collection pool).

W/YU/M/2017/13A / Mizhi County, Irrigation pipeline Component A: Farmer Request for Single Stage - 2019-03- construction in the IBRD / 86840 Cooperative and Value Post Limited 134,100.00 125,648.03 Completed 2018-08-07 2018-05-22 2018-10-02 2018-06-21 Quotations One Envelope 31 orchard garden with a Chain Development. total dimension of 550 mu.

Component B: Economic W/YA/YCH/2017/03A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 71,600.00 77,328.58 Completed 2018-08-07 2018-05-28 2018-10-02 2018-06-20 Road hardening Quotations One Envelope 31 Services Support

Component B: Economic Under W/W/B/2018/02A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 93,900.00 0.00 Implement 2018-08-07 2018-05-04 2018-10-02 Production of road 6.38km Quotations One Envelope 31 Services Support ation

Component B: Economic Pending W/W/B/2018/04A / Village Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 186,300.00 0.00 Implement 2018-08-07 2018-10-02 road 3.2km Quotations One Envelope 31 Services Support ation

W/YA/Y/2017/03A / Yanchang County, Component B: Economic Pending Request for Single Stage - 2019-03- rainwater cellar IBRD / 86840 Infrastructure and Post Limited 27,000.00 0.00 Implement 2018-08-07 2018-10-02 Quotations One Envelope 31 construction in the Services Support ation Farming Orchard, Leichi Town.

W/YA/YC/2017/01A / Component B: Economic Yanchuan county. Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 87,800.00 78,445.11 Completed 2018-08-07 2018-05-28 2018-10-02 2018-07-28 Gaojiageta village, road Quotations One Envelope 31 Services Support hardening 0.875km

Component B: Economic Pending W/W/B/2018/03A / Water Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 197,700.00 0.00 Implement 2018-08-07 2018-10-02 diversion canal 12 km Quotations One Envelope 31 Services Support ation

Component B: Economic Pending W/YA/YC/2017/07A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 31,800.00 0.00 Implement 2018-08-07 2018-10-02 Road hardening 2.9 km Quotations One Envelope 31 Services Support ation

W/YA/YCH/2017/19A / Component B: Economic Request for Single Stage - 2019-03- The total length of IBRD / 86840 Infrastructure and Post Limited 57,300.00 57,899.22 Completed 2018-08-07 2017-09-25 2018-10-02 2017-10-19 Quotations One Envelope 31 hardening0.81.0 km Services Support

W/B/LY/2017/04A / Linyou county, 2.3km road Component B: Economic Request for Single Stage - 2019-03- hardening in Aoli IBRD / 86840 Infrastructure and Post Limited 162,300.00 130,351.36 Completed 2018-08-07 2017-12-20 2018-10-02 2018-03-05 Quotations One Envelope 31 community in Changfeng Services Support village.

W/W/H/2017/08A / Component B: Economic Heyang county, 2.57km Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 38,000.00 30,407.37 Signed 2018-08-07 2018-08-31 2018-10-02 2018-10-10 road construction in Quotations One Envelope 31 Services Support Xiaocun community.

Component B: Economic Under W/W/B/2018/01A / Road Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 91,500.00 0.00 Implement 2018-08-07 2018-05-04 2018-10-02 1.2km Quotations One Envelope 31 Services Support ation

W/YA/YCH/2017/23A / Component B: Economic Pending Request for Single Stage - 2019-03- The total length of IBRD / 86840 Infrastructure and Post Limited 21,500.00 0.00 Implement 2018-08-07 2018-10-02 Quotations One Envelope 31 hardening road of Services Support ation Machagou is 0.3 km

W/YA/YC/2017/06A / Yanchuan county. Road Component B: Economic Request for Single Stage - 2019-03- hardening 2.032km. IBRD / 86840 Infrastructure and Post Limited 157,700.00 146,301.25 Completed 2018-08-07 2018-05-28 2018-10-02 2018-07-29 Quotations One Envelope 31 Shiyao village 1.282km Services Support and Fanjiachuan village 0.75km

W/W/H/2017/02A / Component B: Economic Heyang county. 1 well for Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 233,300.00 228,869.39 Signed 2018-08-07 2018-07-24 2018-10-02 2018-08-15 Xiangong village and Quotations One Envelope 31 Services Support another well for Chengcun village.

W/B/LY/2017/08A / Linyou county, Component B: Economic construction of 4.5km Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 27,600.00 24,575.78 Completed 2018-08-07 2018-11-14 2018-10-02 2018-12-06 water pipelines from the Quotations One Envelope 31 Services Support water factory in Changfeng village to Changle village.

W/W/H/2017/09A / Component B: Economic Request for Single Stage - 2019-03- Heyang county, 4.97km in IBRD / 86840 Infrastructure and Post Limited 73,500.00 75,506.50 Signed 2018-08-07 2018-08-31 2018-10-02 2018-10-10 Quotations One Envelope 31 Xiangong village. Services Support

W/X/C/2017/03A / Changwu county. Component B: Economic Pending Associated drainage Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 70,100.00 0.00 Implement 2018-08-07 2018-10-02 channel of hardening road Quotations One Envelope 31 Services Support ation for Santai village and Fanluo village, the total length is 3678m.

W/B/LX/2017/03A / Long county, construction of 3 bridges, in which 1 bridge between Hujiazhuang community and Liujiazui Component B: Economic Request for Single Stage - 2019-03- community, 1 bridge in IBRD / 86840 Infrastructure and Post Limited 54,900.00 79,080.34 Signed 2018-08-07 2018-07-06 2018-10-02 2018-08-20 Quotations One Envelope 31 Yinqigou community in Services Support Sanjiaodian village, and 1 bridge in Duimianqiao community in Sanjiaodian village.

W/YA/YCH/2017/17A / 2 Component B: Economic Request for Single Stage - 2019-03- hallucinogenic water stone IBRD / 86840 Infrastructure and Post Limited 48,200.00 54,253.42 Completed 2018-08-07 2018-06-18 2018-10-02 2018-07-12 Quotations One Envelope 31 bridges in Machagou Services Support

W/YA/Y/2017/05A / Yanchang county, 3.448km road construction of Niangeda and Caiziliang Component B: Economic Request for Single Stage - 2019-03- communities of Xiadaya IBRD / 86840 Infrastructure and Post Limited 18,800.00 17,704.84 Completed 2018-08-07 2017-08-07 2018-10-02 2017-09-11 Quotations One Envelope 31 village in Leichi township, Services Support and 0.285km road resurfacing and construction of Shiganliang community

W/W/H/2017/01A / Component B: Economic Request for Single Stage - 2019-03- Heyang County, 2 wells IBRD / 86840 Infrastructure and Post Limited 233,300.00 221,564.15 Signed 2018-08-07 2018-06-27 2018-10-02 2018-07-21 Quotations One Envelope 31 in Xiyang and Diantou Services Support Village.

Component B: Economic Pending W/W/B/2018/08A / Village Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 53,400.00 0.00 Implement 2018-08-07 2018-10-02 road 3.5km Quotations One Envelope 31 Services Support ation

W/YA/YCH/2017/18A / Component B: Economic Request for Single Stage - 2019-03- total length of hardening IBRD / 86840 Infrastructure and Post Limited 71,600.00 107,512.53 Completed 2018-08-07 2018-05-28 2018-10-02 2018-06-20 Quotations One Envelope 31 road of Machagou is 1.0 Services Support km

Component B: Economic W/YA/YCH/2017/07A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 63,000.00 41,451.19 Completed 2018-08-07 2017-09-06 2018-10-02 2017-10-10 Gravel road construction Quotations One Envelope 31 Services Support

Page 5 Component B: Economic Pending W/W/B/2018/05A / Village Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 119,700.00 0.00 Implement 2018-08-07 2018-10-02 road 1.57km Quotations One Envelope 31 Services Support ation

W/YA/YCH/2017/13A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 43,000.00 98,598.60 Completed 2018-08-07 2018-05-29 2018-10-02 2018-06-21 production gravel road of Quotations One Envelope 31 Services Support Shimengou is 3.0 km

Component B: Economic Pending W/W/B/2018/06A / Road Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 51,800.00 0.00 Implement 2018-08-07 2018-10-02 0.68 Km Quotations One Envelope 31 Services Support ation

W/YA/YCH/2017/25A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 71,600.00 46,661.44 Completed 2018-08-07 2017-09-25 2018-10-02 2017-10-19 hardening road of Quotations One Envelope 31 Services Support Machagou is 1.0 km

W/YA/YCH/2017/26A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 35,800.00 43,089.30 Completed 2018-08-07 2017-09-07 2018-10-02 2017-10-10 hardening road of Quotations One Envelope 31 Services Support Xinzhaigou Villege is 0.5 km

W/YA/YCH/2017/30A / Component B: Economic Pending Request for Single Stage - 2019-03- The total length of IBRD / 86840 Infrastructure and Post Limited 71,600.00 0.00 Implement 2018-08-07 2018-10-02 Quotations One Envelope 31 hardening road of Services Support ation Machagou is 1.0 km

W/YA/YCH/2017/22A / 2 Component B: Economic Pending Request for Single Stage - 2019-03- hallucinogenic water stone IBRD / 86840 Infrastructure and Post Limited 48,200.00 0.00 Implement 2018-08-07 2018-10-02 Quotations One Envelope 31 bridges in Shitaisi Services Support ation

Component B: Economic Pending W/W/B/2018/09A / Village Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 53,400.00 0.00 Implement 2018-08-07 2018-10-02 road 3.5km Quotations One Envelope 31 Services Support ation

W/W/H/2017/03A / Component B: Economic Heyang County, 2 wells Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 233,300.00 217,076.38 Signed 2018-08-07 2018-06-27 2018-10-02 2018-07-21 in Xiao Community and Quotations One Envelope 31 Services Support Meng Community.

W/B/LY/2017/06A / Linyou county, 1.7km road Component B: Economic Request for Single Stage - 2019-03- hardening from Shenjia IBRD / 86840 Infrastructure and Post Limited 170,000.00 143,040.24 Signed 2018-08-07 2017-12-20 2018-10-02 2018-03-05 Quotations One Envelope 31 community to Xizhuang Services Support community.

W/YA/YCH/2017/10A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 71,600.00 44,182.06 Completed 2018-08-07 2017-09-06 2018-10-02 2017-10-09 production gravel road of Quotations One Envelope 31 Services Support Liuchagou is 5.0 km

W/YA/YCH/2017/24A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 38,700.00 40,739.23 Completed 2018-08-07 2017-09-07 2018-10-02 2017-10-10 hardening road of Quotations One Envelope 31 Services Support Xinzhaigou Villege in Shike is 2.7 km

W/YA/YCH/2017/20A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 43,000.00 49,809.56 Completed 2018-08-07 2017-09-25 2018-10-02 2017-10-19 hardening road of Quotations One Envelope 31 Services Support Guanshang Villege is 0.6km

W/YA/YCH/2017/28A / 2 Component B: Economic Request for Single Stage - 2019-03- hallucinogenic water stone IBRD / 86840 Infrastructure and Post Limited 48,200.00 46,812.92 Completed 2018-08-07 2017-09-08 2018-10-02 2017-10-10 Quotations One Envelope 31 bridge in Yadi Villeges Services Support

W/B/LX/2017/01A / Long county, construction of 4 wells in which 2 well constructed in Liujiazu Component B: Economic community, 1 well Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 88,300.00 149,600.80 Signed 2018-08-07 2018-07-06 2018-10-02 2018-09-04 constructed in Quotations One Envelope 31 Services Support Hujiazhuang community and 1 well construction on Shangliang community with 150 meters depth respectively.

W/YA/YC/2017/04A / Yanchuan county. Component B: Economic Constructed 3 bridges Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Prior Limited 146,300.00 0.00 Canceled 2018-08-07 2018-10-02 cemented with M10 Quotations One Envelope 31 Services Support masonry and the wall is based on M12.5 fine stone materials.

W/B/LX/2017/02A / Long county, new construction of 8.123 km diversion canal, in which 3.523 km in the crossing of Component B: Economic Request for Single Stage - 2019-03- Liangfuhe community in IBRD / 86840 Infrastructure and Post Limited 195,700.00 143,637.93 Signed 2018-08-07 2018-06-19 2018-10-02 2018-08-06 Quotations One Envelope 31 Shangliang village and Services Support Xialiang village, 1.1 km in Liujiazui village, and 3.5 km between tanyuanpo community in Liujiazui and railway.

W/YU/D/Y/2017/01A / Dingbian county. 5700 Component B: Economic Request for Single Stage - 2019-03- square meter of peasant IBRD / 86840 Infrastructure and Post Limited 191,200.00 182,235.95 Completed 2018-08-07 2017-09-08 2018-10-02 2017-11-22 Quotations One Envelope 31 household sheep shed for Services Support Yangwan village.

W/YA/YCH/2017/21A / Component B: Economic Pending The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 73,100.00 0.00 Implement 2018-08-07 2018-10-02 production gravel road Quotations One Envelope 31 Services Support ation road of Machagou is 5.1 km

W/YU/M/2017/14A / Mizhi County, irrigation and Component B: Economic Request for Single Stage - 2019-03- outlet pile construction in IBRD / 86840 Infrastructure and Post Limited 88,900.00 25,417.62 Signed 2018-08-07 2018-05-22 2018-10-02 2018-06-21 Quotations One Envelope 31 the orchard garden with Services Support 1000 water piles.

W/W/B/2017/04A / Baishui county. One cement concrete road from Component B: Economic Xiguojiashan village to Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 247,600.00 233,530.20 Completed 2018-08-07 2017-08-04 2018-10-02 2017-10-08 Xiyou village 1.8km, Quotations One Envelope 31 Services Support another road from Guojiashan village to Dongsunjiashan village 1.1km, together is 2.9km.

W/YA/Y/2017/04A / Yanchang county: road construction in 5 Component B: Economic communities including Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 27,800.00 26,228.81 Completed 2018-08-07 2017-08-07 2018-10-02 2017-09-11 Jing'gou, Xinglie, Jiechu, Quotations One Envelope 31 Services Support Zhongliang and Houlie of Leiduo village in Leichi township.

W/YA/YCH/2017/16A / The total length of Component B: Economic Request for Single Stage - 2019-03- production gravel road of IBRD / 86840 Infrastructure and Post Limited 43,000.00 40,661.10 Completed 2018-08-07 2017-09-07 2018-10-02 2017-10-10 Quotations One Envelope 31 Nanwan Village in Services Support Guanshang is 3.0 km

W/YA/YC/2017/03A / Yanchuan county. Component B: Economic Constructed 5 bridges Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 243,900.00 196,422.06 Signed 2018-08-07 2017-11-16 2018-10-02 2017-12-15 cemented with M10 Quotations One Envelope 31 Services Support masonry and the wall is based on M12.5 fine stone materials.

Page 6 W/YA/YC/2017/02A / Component B: Economic Yanchuan county. Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 208,900.00 139,365.60 Completed 2018-08-07 2018-05-28 2018-10-02 2018-08-05 Production road 4.95km Quotations One Envelope 31 Services Support resurfacing with sand.

W/YA/YCH/2017/27A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 78,800.00 84,572.57 Completed 2018-08-07 2018-05-29 2018-10-02 2018-06-21 hardening road of Quotations One Envelope 31 Services Support Machagou is 5.5 km

W/B/LY/2017/05A / Component B: Economic Linyou county, 3km road Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 245,400.00 206,793.35 Signed 2018-08-07 2017-12-20 2018-10-02 2018-03-05 hardening from Quotations One Envelope 31 Services Support Guanzhuang village to Zhujiayuan community.

W/YA/YCH/2017/29A / Component B: Economic The total length of Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 71,600.00 64,389.01 Completed 2018-08-07 2017-07-25 2018-10-02 2018-08-20 production gravel road of Quotations One Envelope 31 Services Support Yadi Village is 1.0 km

W/YA/YCH/2017/11A / 2 Component B: Economic Pending Request for Single Stage - 2019-03- hallucinogenic water stone IBRD / 86840 Infrastructure and Post Limited 48,200.00 0.00 Implement 2018-08-07 2018-10-02 Quotations One Envelope 31 bridges in Liuchagou Services Support ation

W/YA/YCH/2017/32A / Component B: Economic Pending Request for Single Stage - 2019-03- Construction of irrigation IBRD / 86840 Infrastructure and Post Limited 35,300.00 0.00 Implement 2018-08-07 2018-10-02 Quotations One Envelope 31 canals:600m Services Support ation

W/W/B/2017/03A / Baishui county, 3.2km Component B: Economic Request for Single Stage - 2019-03- residential road IBRD / 86840 Infrastructure and Post Limited 204,900.00 185,525.62 Completed 2018-08-07 2017-10-18 2018-10-02 2017-10-26 Quotations One Envelope 31 construction in Zhaoyao Services Support community in Lingao project area.

Component B: Economic Pending W/W/B/2018/07A / Village Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 45,700.00 0.00 Implement 2018-08-07 2018-10-02 road 3km Quotations One Envelope 31 Services Support ation

W/YA/Y/2017/02A / Component B: Economic Pending Residential road hardening Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 152,500.00 0.00 Implement 2018-08-07 2018-10-02 from Leichi township to Quotations One Envelope 31 Services Support ation Wapenyaozi village.

W/YA/YC/2017/05A / Yanchuan county. 300 sets Component B: Economic Request for Single Stage - 2019-03- of soft rainwater cellars. IBRD / 86840 Infrastructure and Post Limited 237,800.00 73,265.09 Completed 2018-08-07 2018-05-28 2018-10-02 2018-08-25 Quotations One Envelope 31 Diameter: 3m and depth: Services Support 3m.

W/W/H/2017/07A / Heyang County, Component B: Economic Request for Single Stage - 2019-03- production of 5 roads with IBRD / 86840 Infrastructure and Post Limited 89,200.00 107,433.71 Signed 2018-08-07 2018-08-31 2018-10-02 2018-10-10 Quotations One Envelope 31 a total length of 6060 Services Support meters in Diantou Village.

Component B: Economic W/YA/YCH/2017/02A / Request for Single Stage - 2019-03- IBRD / 86840 Infrastructure and Post Limited 51,600.00 44,435.72 Completed 2018-08-07 2018-09-28 2018-10-02 2017-10-09 Road construction. Quotations One Envelope 31 Services Support

W/YA/YCH/2018/07 / Component B: Economic Yichuan county. The 2km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 143,300.00 139,974.70 Completed 2018-08-18 2018-07-05 2018-10-13 2018-07-26 harden road for Mashan Quotations One Envelope 11 Services Support village and Lijialing village.

W/YA/YCH/2018/08 / Component B: Economic Yichuan county. 2 bridges Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 65,900.00 66,809.77 Completed 2018-08-18 2018-07-06 2018-10-13 2018-07-27 for Miaogoukou and Quotations One Envelope 11 Services Support Yunwanggou. And 1 culvert.

W/YA/YCH/2018/09 / Component B: Economic Yichuan county. 1.4km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 149,000.00 152,418.37 Completed 2018-08-18 2018-07-12 2018-10-13 2018-08-03 hardening road and 1.7km Quotations One Envelope 11 Services Support new drainage ditch.

W/YA/YCH/2018/10 / Component B: Economic Yichuan county. 10km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 71,600.00 79,192.00 Completed 2018-08-18 2018-07-09 2018-10-13 2018-08-01 productive road for Ruyi Quotations One Envelope 11 Services Support village.

W/YA/YCH/2018/11 / Yichuan county. 2.6km Component B: Economic hardening road for Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 206,300.00 213,039.37 Completed 2018-08-18 2018-07-05 2018-10-13 2018-07-26 Shijiazhuang village, as Quotations One Envelope 11 Services Support well as 0.7km new drainage ditch.

W/YA/YCH/2018/12 / Component B: Economic Pending Request for Single Stage - 2019-04- Yichuan county. 1 water IBRD / 86840 Infrastructure and Post Limited 57,300.00 0.00 Implement 2018-08-18 2018-10-13 Quotations One Envelope 11 well for Shijiazhuang Services Support ation village.

W/YA/YCH/2018/13 / Component B: Economic Pending Yichuan county. 8.05km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 57,700.00 0.00 Implement 2018-08-18 2018-10-13 productive road for Quotations One Envelope 11 Services Support ation Shijiazhuang village.

W/YA/YCH/2018/14 / Component B: Economic Yichuan county. 10km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 143,300.00 148,410.58 Completed 2018-08-18 2018-08-14 2018-10-13 2018-09-07 gravel road for Quotations One Envelope 11 Services Support Shijiazhuang village.

W/YA/YCH/2018/15 / Component B: Economic Yichuan county. 9.5km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 136,100.00 137,645.14 Completed 2018-08-18 2018-07-23 2018-10-13 2018-08-15 gravel road for Guantou Quotations One Envelope 11 Services Support and Shijiazhuang village.

W/YA/YCH/2018/16 / Component B: Economic Yichuan county. 4 bridges. Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 114,600.00 118,335.44 Completed 2018-08-18 2018-08-10 2018-10-13 2018-09-03 2 for Shishao village and Quotations One Envelope 11 Services Support other 2 for Taiping village.

W/YA/YCH/2018/17 / Component B: Economic Yichuan county. 9km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 110,300.00 111,144.29 Completed 2018-08-18 2018-07-09 2018-10-13 2018-08-01 productive road and 7 Quotations One Envelope 11 Services Support culvert for Shishao village.

W/YA/YCH/2018/18 / Yichuan county. 0.825km Component B: Economic Request for Single Stage - 2019-04- hardening road and 0.5km IBRD / 86840 Infrastructure and Post Limited 73,400.00 85,765.04 Completed 2018-08-18 2018-07-23 2018-10-13 2018-08-15 Quotations One Envelope 11 drainage ditch for Shishao Services Support village.

W/YA/YCH/2018/19 / Component B: Economic Yichuan county. 1.8km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 129,000.00 133,625.18 Completed 2018-08-18 2018-07-06 2018-10-13 2018-07-27 hardening road for Quotations One Envelope 11 Services Support Nanbutou village.

W/YA/YCH/2018/20 / Yichuan county. 11km Component B: Economic Request for Single Stage - 2019-04- productive road and 2 IBRD / 86840 Infrastructure and Post Limited 96,000.00 99,156.80 Completed 2018-08-18 2018-08-10 2018-10-13 2018-09-03 Quotations One Envelope 11 culvert for Nanbutou Services Support village and Yanqu village.

W/YA/YCH/2018/21 / Yichuan county. 8km Component B: Economic productive road for Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 75,200.00 75,944.92 Completed 2018-08-18 2018-07-09 2018-10-13 2018-08-01 Nanbutou village, 0.5km Quotations One Envelope 11 Services Support road for Guanzhuan village and 2km road for Mayuan.

Page 7 W/YA/YCH/2018/22 / Yichuan county. 2 bridges Component B: Economic Request for Single Stage - 2019-04- for Zuishang and Yadi IBRD / 86840 Infrastructure and Post Limited 74,500.00 81,085.62 Completed 2018-08-18 2018-07-24 2018-10-13 2018-08-17 Quotations One Envelope 11 village, 2 culverts for Services Support Guanzhuang village.

W/YA/YCH/2018/23 / Yichuan county. 5km Component B: Economic Request for Single Stage - 2019-04- productive road for IBRD / 86840 Infrastructure and Post Limited 60,900.00 59,685.66 Completed 2018-08-18 2018-07-09 2018-10-13 2018-08-01 Quotations One Envelope 11 Nantou village and 3km Services Support road for Dahumiao village.

W/YA/YCH/2018/24 / Component B: Economic Yichuan county. 10km Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 71,600.00 72,424.47 Completed 2018-08-18 2018-07-06 2018-10-13 2018-08-13 productive road for Quotations One Envelope 11 Services Support Nantou village.

W/YA/YCH/2018/25 / Yichuan county. 4 watering place for 4 Component B: Economic Request for Single Stage - 2019-04- villages, Zuishang, IBRD / 86840 Infrastructure and Post Limited 70,200.00 68,606.54 Completed 2018-08-18 2018-07-24 2018-10-13 2018-08-17 Quotations One Envelope 11 Taiping, Shijiazhuang and Services Support Heling village. 1km drainage ditch for Lingshang village.

W/YA/YCH/2018/26 / Component B: Economic Pending Request for Single Stage - 2019-04- Yichuan county. Gravel IBRD / 86840 Infrastructure and Post Limited 14,300.00 0.00 Implement 2018-08-18 2018-10-13 Quotations One Envelope 11 road for Taiping village. Services Support ation

W/YA/YCH/2018/27 / Component B: Economic Pending Request for Single Stage - 2019-04- Yichuan county. bridge for IBRD / 86840 Infrastructure and Post Limited 28,700.00 0.00 Implement 2018-08-18 2018-10-13 Quotations One Envelope 11 Nanbutou village. Services Support ation

W/YU/M/2018/09 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Road hardening IBRD / 86840 Infrastructure and Post Limited 153,000.00 141,804.45 Completed 2018-08-28 2018-08-13 2018-10-23 2018-09-10 Quotations One Envelope 21 for Yangjiagou village. Services Support

W/YU/M/2018/10 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Hardened Road IBRD / 86840 Infrastructure and Post Limited 171,000.00 155,034.40 Signed 2018-08-28 2018-08-13 2018-10-23 2018-09-10 Quotations One Envelope 21 for Sigou village. Services Support

W/YU/M/2018/11 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Hardened Road IBRD / 86840 Infrastructure and Post Limited 166,000.00 149,236.86 Signed 2018-08-28 2018-08-13 2018-10-23 2018-09-10 Quotations One Envelope 21 for Gongjiagou village. Services Support

W/YU/M/2018/12 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Hardened Road IBRD / 86840 Infrastructure and Post Limited 142,000.00 139,888.43 Completed 2018-08-28 2018-08-13 2018-10-23 2018-09-10 Quotations One Envelope 21 for Gongjiagou village. Services Support

W/YU/M/2018/13 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Hardened Road IBRD / 86840 Infrastructure and Post Limited 266,000.00 232,514.61 Completed 2018-08-28 2018-08-13 2018-10-23 2018-09-10 Quotations One Envelope 21 for Li village. Services Support

W/YU/M/2018/14 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Hardened road for IBRD / 86840 Infrastructure and Post Limited 270,000.00 243,566.55 Signed 2018-08-28 2018-08-14 2018-10-23 2018-09-10 Quotations One Envelope 21 Yuejiacha village. Services Support

W/YU/M/2018/15 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Hardened road for IBRD / 86840 Infrastructure and Post Limited 263,000.00 228,317.30 Signed 2018-08-28 2018-08-14 2018-10-23 2018-09-10 Quotations One Envelope 21 Yuejiacha village. Services Support

W/YU/M/2018/16 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Hardened road for IBRD / 86840 Infrastructure and Post Limited 213,000.00 194,405.69 Completed 2018-08-28 2018-08-14 2018-10-23 2018-09-10 Quotations One Envelope 21 Majiaxiaogou village. Services Support

W/YU/M/2018/17 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Hardened road for IBRD / 86840 Infrastructure and Post Limited 231,000.00 270,463.98 Signed 2018-08-28 2018-08-14 2018-10-23 2018-09-10 Quotations One Envelope 21 Houjiagou village. Services Support

Component B: Economic W/YU/M/2018/18 / Mizhi Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 266,000.00 187,710.00 Signed 2018-08-28 2018-09-07 2018-10-23 2018-10-09 county. Land governance. Quotations One Envelope 21 Services Support

W/YU/M/2018/19 / Mizhi county. Well engineering Component B: Economic Request for Single Stage - 2019-04- for Yangjiagou village, IBRD / 86840 Infrastructure and Post Limited 166,000.00 157,195.31 Signed 2018-08-28 2018-09-07 2018-10-23 2018-10-09 Quotations One Envelope 21 Gongjiagou village and Li Services Support village.

Component B: Economic W/YU/M/2018/20 / Mizhi Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 161,000.00 153,883.66 Signed 2018-08-28 2018-09-07 2018-10-23 2018-10-09 county. Well engineering Quotations One Envelope 21 Services Support

W/YU/M/2018/21 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Water storage IBRD / 86840 Infrastructure and Post Limited 118,000.00 125,126.94 Signed 2018-08-28 2018-09-07 2018-10-23 2018-10-09 Quotations One Envelope 21 engineering. Services Support

W/YU/M/2018/22 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Water supply IBRD / 86840 Infrastructure and Post Limited 200,000.00 149,051.21 Signed 2018-08-28 2018-09-07 2018-10-23 2018-10-09 Quotations One Envelope 21 irrigation. Services Support

W/YU/M/2018/23 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Water supply IBRD / 86840 Infrastructure and Post Limited 244,000.00 186,891.43 Signed 2018-08-28 2018-09-07 2018-10-23 2018-10-09 Quotations One Envelope 21 Engineering. Services Support

W/YU/M/2018/24 / Mizhi Component B: Economic Request for Single Stage - 2019-04- county. Drainage system IBRD / 86840 Infrastructure and Post Limited 140,000.00 154,499.71 Signed 2018-08-28 2018-09-07 2018-10-23 2018-10-09 Quotations One Envelope 21 construction service. Services Support

W/YU/M/2018/25 / Mizhi Component B: Economic Pending Request for Single Stage - 2019-04- county. Environmental IBRD / 86840 Infrastructure and Post Limited 197,000.00 0.00 Implement 2018-08-28 2018-10-23 Quotations One Envelope 21 engineering. Services Support ation

W/YU/M/2018/26 / Mizhi Component B: Economic Pending Request for Single Stage - 2019-04- county. Market IBRD / 86840 Infrastructure and Post Limited 177,000.00 0.00 Implement 2018-08-28 2018-10-23 Quotations One Envelope 21 construction. Services Support ation

W/YA/Y/2018/01A / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. IBRD / 86840 Infrastructure and Post Limited 148,000.00 131,912.29 Signed 2018-09-04 2018-07-04 2018-10-30 2018-07-31 Quotations One Envelope 28 Irrigation project. Services Support

W/YA/Y/2018/02 / Component B: Economic Yanchang county. Repair Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 57,000.00 43,236.31 Signed 2018-09-04 2018-07-02 2018-10-30 2018-07-27 the 4km productive road Quotations One Envelope 28 Services Support for Donggou village.

W/YA/Y/2018/03 / Component B: Economic Yanchang county. Repair Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 43,000.00 24,144.77 Signed 2018-09-04 2018-07-02 2018-10-30 2018-07-27 the productive road for Quotations One Envelope 28 Services Support Liku village.

W/YA/Y/2018/04 / Component B: Economic Yanchang county. Repair Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 57,000.00 28,252.87 Signed 2018-09-04 2018-07-04 2018-10-30 2018-07-31 the productive road for Quotations One Envelope 28 Services Support Liku village.

W/YA/Y/2018/05 / Component B: Economic Yanchang village. Repair Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 43,000.00 44,057.11 Signed 2018-09-04 2018-07-02 2018-10-30 2018-07-27 road from Liku village to Quotations One Envelope 28 Services Support Yanliujiaxigou village.

W/YA/Y/2018/06 / Component B: Economic Yanchang county. Repair Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 36,000.00 18,730.86 Signed 2018-09-04 2018-07-02 2018-10-30 2018-07-27 the 2.5km productive road Quotations One Envelope 28 Services Support for Zhaojialiang village.

Page 8 W/YA/Y/2018/07 / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. 2 IBRD / 86840 Infrastructure and Post Limited 50,000.00 38,625.65 Signed 2018-09-04 2018-07-02 2018-10-30 2018-07-27 Quotations One Envelope 28 productive road for Services Support Yanliujia village.

W/YA/Y/2018/08 / Component B: Economic Pending Request for Single Stage - 2019-04- Yanchang county. The IBRD / 86840 Infrastructure and Post Limited 21,000.00 0.00 Implement 2018-09-04 2018-10-30 Quotations One Envelope 28 productive road for Services Support ation Luozizui village.

W/YA/Y/2018/09 / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. The IBRD / 86840 Infrastructure and Post Limited 29,000.00 24,134.28 Signed 2018-09-04 2018-07-04 2018-10-30 2018-07-31 Quotations One Envelope 28 productive road for Services Support Kushuizuiliang village.

W/YA/Y/2018/10 / Component B: Economic Pending Request for Single Stage - 2019-04- Yanchang county. 3 IBRD / 86840 Infrastructure and Post Limited 40,000.00 0.00 Implement 2018-09-04 2018-10-30 Quotations One Envelope 28 productive roads for Services Support ation Shangjia village.

W/YA/Y/2018/11 / Component B: Economic Pending Request for Single Stage - 2019-04- Yanchang county. Repair IBRD / 86840 Infrastructure and Post Limited 47,000.00 0.00 Implement 2018-09-04 2018-10-30 Quotations One Envelope 28 2 productive roads for Services Support ation Shangpan village.

W/YA/Y/2018/12 / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. Repair IBRD / 86840 Infrastructure and Post Limited 50,000.00 34,779.65 Signed 2018-09-04 2018-07-03 2018-10-30 2018-07-30 Quotations One Envelope 28 2 productive roads for Services Support Shangpan village.

W/YA/Y/2018/13 / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. 3 IBRD / 86840 Infrastructure and Post Limited 73,000.00 41,532.26 Signed 2018-09-04 2018-07-03 2018-10-30 2018-07-30 Quotations One Envelope 28 productive roads for Services Support Yangjia village.

W/YA/Y/2018/14 / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. The IBRD / 86840 Infrastructure and Post Limited 43,000.00 27,696.02 Signed 2018-09-04 2018-07-03 2018-10-30 2018-07-30 Quotations One Envelope 28 productive road for Services Support Dongjinggou village.

W/YA/Y/2018/15 / Component B: Economic Yanchang county. The Request for Single Stage - 2019-04- IBRD / 86840 Infrastructure and Post Limited 29,000.00 16,926.88 Signed 2018-09-04 2018-07-03 2018-10-30 2018-07-30 productive road from Quotations One Envelope 28 Services Support Nanling village to Gadamao village.

W/YA/Y/2018/16 / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. 2 IBRD / 86840 Infrastructure and Post Limited 64,000.00 16,042.03 Signed 2018-09-04 2018-07-03 2018-10-30 2018-07-30 Quotations One Envelope 28 productive roads for Services Support Xiayuan village.

W/YA/Y/2018/17 / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. IBRD / 86840 Infrastructure and Post Limited 269,000.00 229,693.22 Signed 2018-09-04 2018-07-04 2018-10-30 2018-07-31 Quotations One Envelope 28 Hardening road for Anhe Services Support community.

W/YA/Y/2018/18 / Component B: Economic Request for Single Stage - 2019-04- Yanchang county. New IBRD / 86840 Infrastructure and Post Limited 109,000.00 94,524.01 Signed 2018-09-04 2018-07-04 2018-10-30 2018-07-31 Quotations One Envelope 28 road. Services Support

W/W/B/2018/20 / Baishui Component B: Economic Request for Single Stage - 2019-05- county. Repairing new IBRD / 86840 Infrastructure and Post Limited 229,000.00 67,114.18 Completed 2018-09-10 2019-04-30 2018-11-05 2019-05-20 Quotations One Envelope 04 road. Services Support

Component B: Economic Pending W/W/B/2018/21 / Baishui Request for Single Stage - 2019-05- IBRD / 86840 Infrastructure and Post Limited 182,000.00 0.00 Implement 2018-09-10 2018-11-05 county. Repair new road. Quotations One Envelope 04 Services Support ation

Component B: Economic W/B/LX/2018/01 / Long Request for Single Stage - 2019-05- IBRD / 86840 Infrastructure and Post Limited 43,000.00 42,052.07 Signed 2018-09-10 2018-09-21 2018-11-05 2018-10-25 county. Land reclamation. Quotations One Envelope 04 Services Support

W/B/LX/2018/02 / Long Component B: Economic Request for Single Stage - 2019-05- county. Repair the gravel IBRD / 86840 Infrastructure and Post Limited 116,000.00 107,309.26 Completed 2018-09-10 2018-09-21 2018-11-05 2018-11-02 Quotations One Envelope 04 road. Services Support

W/B/LX/2018/03 / Long Component B: Economic Request for Single Stage - 2019-05- county. Repair the gravel IBRD / 86840 Infrastructure and Post Limited 125,000.00 112,494.82 Completed 2018-09-10 2018-09-21 2018-11-05 2018-11-09 Quotations One Envelope 04 road. Services Support

W/B/LX/2018/04 / Long Component B: Economic Request for Single Stage - 2019-05- county. Repair the gravel IBRD / 86840 Infrastructure and Post Limited 64,000.00 57,768.16 Completed 2018-09-10 2018-10-17 2018-11-05 2018-11-16 Quotations One Envelope 04 road. Services Support

Component B: Economic Pending W/W/H/2018/01 / Heyang Request for Single Stage - 2019-05- IBRD / 86840 Infrastructure and Post Limited 242,000.00 0.00 Implement 2018-09-10 2018-11-05 county. Village road. Quotations One Envelope 04 Services Support ation

Component B: Economic Pending W/W/H/2018/02 / Heyang Request for Single Stage - 2019-05- IBRD / 86840 Infrastructure and Post Limited 191,000.00 0.00 Implement 2018-09-10 2018-11-05 county. Production road. Quotations One Envelope 04 Services Support ation

Component B: Economic Pending W/W/H/2018/03 / Heyang Request for Single Stage - 2019-05- IBRD / 86840 Infrastructure and Post Limited 123,000.00 0.00 Implement 2018-09-10 2018-11-05 county. Production road. Quotations One Envelope 04 Services Support ation

Component B: Economic Pending W/W/H/2018/04 / Heyang Request for Single Stage - 2019-05- IBRD / 86840 Infrastructure and Post Limited 108,000.00 0.00 Implement 2018-09-10 2018-11-05 county. Production road. Quotations One Envelope 04 Services Support ation

W/W/H/2018/06 / Heyang county. 1 elevated tank of Component B: Economic Pending Request for Single Stage - 2019-05- 1000 cubic meters in IBRD / 86840 Infrastructure and Post Limited 151,000.00 0.00 Implement 2018-09-10 2018-11-05 Quotations One Envelope 04 Xiang village, expand 1 Services Support ation secondary pump station in lingao.

W/W/H/2018/09 / Heyang Component B: Economic Pending Request for Single Stage - 2019-05- county. Irrigation pipe IBRD / 86840 Infrastructure and Post Limited 270,000.00 0.00 Implement 2018-09-10 2018-11-05 Quotations One Envelope 04 network. Services Support ation

W/W/H/2018/10 / Heyang Component B: Economic Pending Request for Single Stage - 2019-05- county. Irrigation pipe IBRD / 86840 Infrastructure and Post Limited 161,000.00 0.00 Implement 2018-09-10 2018-11-05 Quotations One Envelope 04 network. Services Support ation

W/W/H/2018/05 / Heyang Component B: Economic Pending Request for Single Stage - 2019-06- county. New pump IBRD / 86840 Infrastructure and Post Open - National 528,000.00 0.00 Implement 2018-09-05 2018-09-10 2018-10-22 2018-11-21 2018-12-26 Bids One Envelope 24 station. Services Support ation

W/W/H/2018/07 / Heyang Component B: Economic Pending Request for Single Stage - 2019-06- county. Irrigation pipe IBRD / 86840 Infrastructure and Post Open - National 436,000.00 0.00 Implement 2018-09-05 2018-09-10 2018-10-22 2018-11-21 2018-12-26 Bids One Envelope 24 network Services Support ation

W/W/H/2018/08 / Heyang Component B: Economic Pending Request for Single Stage - 2019-06- county. Irrigation pipe IBRD / 86840 Infrastructure and Post Open - National 302,000.00 0.00 Implement 2018-09-05 2018-09-10 2018-10-22 2018-11-21 2018-12-26 Bids One Envelope 24 network. Services Support ation

W/W/H/H/2018/01 / Component B: Economic Pending Request for Single Stage - 2019-06- Heyang county. Irrigation IBRD / 86840 Infrastructure and Post Open - National 344,000.00 0.00 Implement 2018-09-05 2018-09-10 2018-10-22 2018-11-21 2018-12-26 Bids One Envelope 24 pipe network. Services Support ation

W/YA/YC/2017/04B / Yanchuan county. Component B: Economic Constructed 3 bridges Request for Single Stage - 2019-06- IBRD / 86840 Infrastructure and Post Limited 146,300.00 136,731.49 Completed 2018-10-31 2017-11-07 2018-12-26 2017-12-10 cemented with M10 Quotations One Envelope 24 Services Support masonry and the wall is based on M12.5 fine stone materials.

W/YA/YCH/2017/12 / Component B: Economic Request for Single Stage - 2019-08- Yichuan county, hardening IBRD / 86840 Infrastructure and Post Limited 68,330.00 69,666.45 Completed 2018-12-09 2017-09-06 2019-02-03 2017-10-05 Quotations One Envelope 02 road in Liuchagou village. Services Support

Component B: Economic Pending W/B/LX/2019/01 / 20 new Request for Single Stage - 2020-01- IBRD / 86840 Infrastructure and Post Limited 308,100.00 0.00 Implement 2019-04-04 2019-04-09 2019-05-21 2019-06-20 2019-07-25 motor-pumped well Bids One Envelope 21 Services Support ation

Page 9 Component B: Economic Pending W/B/LX/2019/02 / Newly Request for Single Stage - 2020-01- IBRD / 86840 Infrastructure and Post Limited 487,800.00 0.00 Implement 2019-04-04 2019-04-09 2019-05-21 2019-06-20 2019-07-25 making 40km canal Bids One Envelope 21 Services Support ation

W/B/LX/2019/03 / Component B: Economic Pending Request for Single Stage - 2019-12- Retaining works including IBRD / 86840 Infrastructure and Post Limited 14,300.00 0.00 Implement 2019-04-09 2019-06-04 Quotations One Envelope 01 2 elevated tank Services Support ation

W/B/LX/2019/04 / 6km Component B: Economic Pending Request for Single Stage - 2019-12- new water-works IBRD / 86840 Infrastructure and Post Limited 68,800.00 0.00 Implement 2019-04-09 2019-06-04 Quotations One Envelope 01 engineering Services Support ation

Component B: Economic Pending W/B/LX/2019/05 / 4.8km Request for Single Stage - 2019-12- IBRD / 86840 Infrastructure and Post Limited 27,500.00 0.00 Implement 2019-04-09 2019-06-04 new drainage work Quotations One Envelope 01 Services Support ation

W/B/LX/2019/06 / 3.5km Component B: Economic Pending Request for Single Stage - 2019-12- newly making road inside IBRD / 86840 Infrastructure and Post Limited 250,800.00 0.00 Implement 2019-04-09 2019-06-04 Quotations One Envelope 01 village Services Support ation

W/B/LX/2019/07 / 8km Component B: Economic Pending Request for Single Stage - 2019-12- road maintenance inside IBRD / 86840 Infrastructure and Post Limited 172,000.00 0.00 Implement 2019-04-09 2019-06-04 Quotations One Envelope 01 the village Services Support ation

Component B: Economic Pending W/W/B/2019/02 / 12km Request for Single Stage - 2019-12- IBRD / 86840 Infrastructure and Post Limited 197,700.00 0.00 Implement 2019-04-09 2019-06-04 new canal construction Quotations One Envelope 01 Services Support ation

W/W/B/2019/03 / 1.89km Component B: Economic Pending Request for Single Stage - 2019-12- road construction in IBRD / 86840 Infrastructure and Post Limited 162,500.00 0.00 Implement 2019-04-09 2019-06-04 Quotations One Envelope 01 Yanghe village Services Support ation

W/W/B/2019/04 / 1.183km Component B: Economic Pending Request for Single Stage - 2019-12- road hardening in IBRD / 86840 Infrastructure and Post Limited 101,700.00 0.00 Implement 2019-04-09 2019-06-04 Quotations One Envelope 01 Yangxia village Services Support ation

W/YU/M/2019/01 / Biogas Component B: Economic Pending Request for Single Stage - 2019-12- engineering in civil IBRD / 86840 Infrastructure and Post Limited 9,100.00 0.00 Implement 2019-04-09 2019-06-04 Quotations One Envelope 01 engineering Services Support ation

Component B: Economic W/YA/YCH/2018/01 / Request for Single Stage - 2020-01- IBRD / 86840 Infrastructure and Post Limited 35,100.00 57,521.52 Completed 2019-05-20 2018-05-29 2019-07-15 2018-06-21 2.3km gravel road Quotations One Envelope 11 Services Support

W/YA/YCH/2018/02 / Component B: Economic Request for Single Stage - 2020-01- Gravel road in Tasi IBRD / 86840 Infrastructure and Post Limited 25,900.00 57,521.52 Completed 2019-05-20 2018-05-29 2019-07-15 2018-06-21 Quotations One Envelope 11 village. Services Support

W/YA/YCH/2018/03 / Component B: Economic Request for Single Stage - 2020-01- Productive road in Yadi IBRD / 86840 Infrastructure and Post Limited 53,400.00 95,634.58 Completed 2019-05-20 2018-05-29 2019-07-15 2018-06-21 Quotations One Envelope 11 village. Services Support

W/YA/YCH/2018/04 / Component B: Economic Request for Single Stage - 2020-01- Small bridge in IBRD / 86840 Infrastructure and Post Limited 25,600.00 104,693.88 Completed 2019-05-20 2018-05-28 2019-07-15 2018-06-20 Quotations One Envelope 11 Shuangquan village. Services Support

W/YA/YCH/2018/05 / Component B: Economic Request for Single Stage - 2020-01- Hardening road in IBRD / 86840 Infrastructure and Post Limited 72,400.00 68,141.73 Completed 2019-05-20 2018-07-05 2019-07-15 2018-07-26 Quotations One Envelope 11 Nanwan village. Services Support

W/YA/YCH/2018/06 / Component B: Economic Hardening road in Request for Single Stage - 2020-01- IBRD / 86840 Infrastructure and Post Limited 76,200.00 67,438.15 Completed 2019-05-20 2018-05-28 2019-07-15 2018-06-20 Matouling and Xingshu Quotations One Envelope 11 Services Support village.

W/W/F/2019/01 / 7 1.655 km 3.5 m wide concrete roads from Ren Wanli to Component B: Economic Pending Zhoubesen Gate, Jiangjia Request for Single Stage - 2020-10- IBRD / 86840 Infrastructure and Post Limited 250,600.00 0.00 Implement 2020-03-09 2020-05-04 to Huangfeng Road, and Quotations One Envelope 31 Services Support ation 635 M 4 m wide concrete roads from village committee south to Shanggou Group.

W/W/F/2019/02 / Three 750 m 3.5 m wide Component B: Economic Pending concrete roads from Jixian Request for Single Stage - 2020-10- IBRD / 86840 Infrastructure and Post Limited 79,000.00 0.00 Implement 2020-03-09 2020-05-04 Village, Jixian Village, to Quotations One Envelope 31 Services Support ation Lianbian, Yimen Village, Du Haimen to Sun Jianqiangmen.

W/W/F/2019/03 / Six 1.092km3.5m wide concrete roads from the front of Wang youru's Component B: Economic Pending Request for Single Stage - 2020-11- gate of xiancunwang IBRD / 86840 Infrastructure and Post Limited 115,100.00 0.00 Implement 2020-03-11 2020-05-06 Quotations One Envelope 02 group to Zhizhang Road, Services Support ation genrui's gate of Xijie group to Xiyu line, Sien's gate of Miaoqian group, etc.

W/W/F/2019/04 / Three 2.12 km 3.5 m wide concrete roads from Component B: Economic Pending Jidong Group of Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 223,400.00 0.00 Implement 2020-03-11 2020-05-06 Zhuangzhen Village to Quotations One Envelope 02 Services Support ation Lianwu Village, Huizengmen Gate of Jixi Group to Dongliu Crossing, Jixi Group to Zhaocun, etc. W/W/F/2019/05 / In villages east to Xirencun, Component B: Economic Pending Xian project area, 330 m Request for 2020-11- IBRD / 86840 Infrastructure and Post 270,500.00 0.00 Implement 2020-03-06 2020-05-06 3.5 m wide concrete road Quotations 02 Services Support ation to vineyard and two 1.965 km 4 m wide concrete roads.

W/W/F/2019/06 / There are 4 1.47 km 3.5 m wide concrete roads from Dongren Village Jiebei Group to the park, Zheng Component B: Economic Pending Baiwa Gate to Beinian, Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 232,300.00 0.00 Implement 2020-03-16 2020-05-11 Zhengqiang Gate to Quotations One Envelope 07 Services Support ation Tianshimen Gate, and 645 M 4 m wide concrete roads from Zhongnan Village to LiuCement Road North in Jiexi Group.

W/W/F/2019/07 / Four sets of concrete roads 400 m 4 m wide from the Component B: Economic Pending Request for Single Stage - 2020-11- base of Wangcun IBRD / 86840 Infrastructure and Post Limited 48,000.00 0.00 Implement 2020-03-16 2020-05-11 Quotations One Envelope 07 Shanzhuang to Zhanbacun Services Support ation newly moved to Huidian Village, Xian Project Area.

W/W/F/2019/08 / 1.49 km Component B: Economic Pending of 10 groups of road in Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 157,700.00 0.00 Implement 2020-03-16 2020-05-11 Taibai Village, Cao Village Quotations One Envelope 07 Services Support ation Project Area.

W/YU/D/2020/01 / 1.4 km Component B: Economic Pending Request for Single Stage - 2020-11- Residential district road; IBRD / 86840 Infrastructure and Post Limited 167,700.00 0.00 Implement 2020-03-16 2020-05-11 Quotations One Envelope 07 150 m Drainage Channel Services Support ation

Component B: Economic Pending W/YU/M/S/2020/01 / Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 417,500.00 0.00 Implement 2020-03-16 2020-05-11 Apple preservation project Quotations One Envelope 07 Services Support ation

Page 10 W/X/C/2020/01 / Component B: Economic Pending Request for Single Stage - 2020-11- Residential road 1,753 IBRD / 86840 Infrastructure and Post Limited 224,600.00 0.00 Implement 2020-03-16 2020-05-11 Quotations One Envelope 07 meters. Services Support ation

Component B: Economic Pending W/X/C/2020/02 / 7,310 m Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 154,900.00 0.00 Implement 2020-03-16 2020-05-11 production road Quotations One Envelope 07 Services Support ation

Component B: Economic Pending W/X/C/2020/03 / Water Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 133,700.00 0.00 Implement 2020-03-16 2020-05-11 well drilling Quotations One Envelope 07 Services Support ation

W/B/LX/2020/01 / Build three overflow river Component B: Economic Pending bridges among Tieyuan Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 172,000.00 0.00 Implement 2020-03-16 2020-05-11 first group, Tieyuan Quotations One Envelope 07 Services Support ation second group, Tieyuan third group and Tieyuan fourth group.

W/B/LX/2020/02 / Build Component B: Economic Pending Request for Single Stage - 2020-11- three new restrooms in IBRD / 86840 Infrastructure and Post Limited 107,500.00 0.00 Implement 2020-03-16 2020-05-11 Quotations One Envelope 07 the Tieyuan project area. Services Support ation

W/B/LX/2020/03 / Build 400 square meters food court, which is used for Component B: Economic Pending poor households to start Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 129,000.00 0.00 Implement 2020-03-16 2020-05-11 businesses. There will be Quotations One Envelope 07 Services Support ation 50 exhibition shops, and each of them is 10 square meters.

Component B: Economic Pending W/YA/YC/2020/01 / 144 Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 94,000.00 0.00 Implement 2020-03-17 2020-05-12 sets of Soft water cellar Quotations One Envelope 08 Services Support ation

Component B: Economic Pending W/YA/YC/2020/02 / Road Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 81,500.00 0.00 Implement 2020-03-17 2020-05-12 hardening 0.707 km Quotations One Envelope 08 Services Support ation

Component B: Economic Pending W/YA/YC/2020/03 / Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 216,000.00 0.00 Implement 2020-03-17 2020-05-12 Production road 5.903 km Quotations One Envelope 08 Services Support ation

Component B: Economic Pending W/YA/YC/2020/04 / Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 225,400.00 0.00 Implement 2020-03-17 2020-05-12 Production road 6.16 km Quotations One Envelope 08 Services Support ation

Component B: Economic Pending W/YA/YC/2020/05 / Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 96,500.00 0.00 Implement 2020-03-17 2020-05-12 Production road 2.638 km Quotations One Envelope 08 Services Support ation

Component B: Economic Pending W/YA/YC/2020/06 / Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 229,300.00 0.00 Implement 2020-03-17 2020-05-12 Production road 6.266 km Quotations One Envelope 08 Services Support ation

Component B: Economic Pending W/YA/YC/2020/07 / Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 110,200.00 0.00 Implement 2020-03-17 2020-05-12 Production road 3.011 km Quotations One Envelope 08 Services Support ation

W/YA/YC/2020/08 / 6 Component B: Economic Pending Request for Single Stage - 2020-11- production bridges and IBRD / 86840 Infrastructure and Post Limited 266,700.00 0.00 Implement 2020-03-17 2020-05-12 Quotations One Envelope 08 culverts Services Support ation

W/W/B/2019/05A / 11.8 km production road Component B: Economic Pending Request for Single Stage - 2020-11- construction project in IBRD / 86840 Infrastructure and Post Limited 265,400.00 0.00 Implement 2020-04-06 2020-06-01 Quotations One Envelope 28 Dayang village, Houwa Services Support ation village and Fengjiayuan village.

W/W/B/2019/06A / 4 Component B: Economic Pending pumping well construction Request for Single Stage - 2020-11- IBRD / 86840 Infrastructure and Post Limited 229,100.00 0.00 Implement 2020-04-06 2020-06-01 programs in Dayang Quotations One Envelope 28 Services Support ation village and Fengjiayuan village.

W/W/B/2019/07 / Road Component B: Economic Pending hardening engineering in Request for Single Stage - 2020-12- IBRD / 86840 Infrastructure and Post Limited 98,500.00 0.00 Implement 2020-05-04 2020-06-29 Dukang project area Quotations One Envelope 26 Services Support ation 0.85km (4m in width).

GOODS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

G/YA/YCH/F/2017/04 / Component B: Economic Request for Single Stage - Provide 1400 sheep(70 IBRD / 86840 Infrastructure and Post Open - National 128,000.00 216,070.23 Signed 2017-07-06 2017-09-28 2017-08-31 2017-08-04 2018-02-27 Quotations One Envelope poor Families) Services Support

Component B: Economic G/YA/YC/C/2017/01 / 342 Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 130,300.00 0.00 Canceled 2017-10-06 2017-12-01 2018-05-30 heads of moggy Quotations One Envelope Services Support

G/B/LY/CF/SYJ/2017/03 / associated equipment of Component B: Economic spawn production Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 172,900.00 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 baseautoclave equipment Quotations One Envelope Services Support of culture room sun shading facilities

Component B: Economic G/YA/YC/C/2018/01 / 342 Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 130,300.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 heads of moggy Quotations One Envelope Services Support

Component B: Economic G/YA/YC/C/2018/03 / 342 Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 130,300.00 0.00 Canceled 2018-10-06 2018-12-01 2019-05-30 heads of moggy Quotations One Envelope Services Support

Component B: Economic G/YA/YC/C/2019/01 / 342 Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 130,300.00 0.00 Canceled 2019-06-06 2019-08-01 2020-01-28 heads of moggy Quotations One Envelope Services Support

G/W/F/D/2018/02 / 1 set Component B: Economic Request for Single Stage - of cold storage IBRD / 86840 Infrastructure and Post Open - National 234,100.00 0.00 Canceled 2018-04-01 2018-04-22 2018-10-19 Quotations One Envelope refrigeration equipment Services Support

G/W/F/D/2017/05 / Component B: Economic Stainless steel workbench, Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 108,700.00 0.00 Canceled 2017-09-01 2017-09-22 2018-03-21 persimmons hang 30 Quotations One Envelope Services Support square meters, 2.189 million

Component B: Economic G/YA/Y/Z/2017/02 / Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 83,800.00 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 Carrier (4) Quotations One Envelope Services Support

Component B: Economic G/W/F/D/2017/03 / Drying Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 105,500.00 0.00 Canceled 2017-08-06 2017-10-01 2018-03-30 shed 6020 square meters Quotations One Envelope Services Support

G/W/F/D/2017/01 / Component A: Farmer Automatic peeling IBRD / 86840 Cooperative and Value Post Direct Selection Direct 588,800.00 0.00 Canceled 2017-04-01 2017-04-06 2017-05-11 2017-12-11 machines, drying Chain Development. machines, drying trolleies

Page 11 Component B: Economic G/W/B/F/2018/01 / A cold Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 180,100.00 0.00 Canceled 2018-03-01 2018-03-22 2018-09-18 storage equipment Quotations One Envelope Services Support

Component B: Economic G/YU/D/Y/2017/02 / little Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 127,100.00 0.00 Canceled 2017-10-06 2017-12-01 2018-05-30 ewes Quotations One Envelope Services Support

Component B: Economic G/YU/D/Y/2018/01 / little Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 169,200.00 0.00 Canceled 2018-09-06 2018-11-01 2019-04-30 ewe Quotations One Envelope Services Support

Component B: Economic G/YU/M/L/2018/01 / Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 213,400.00 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 donkeys Quotations One Envelope Services Support

Component B: Economic G/YU/M/L/2017/01 / Request for Single Stage - IBRD / 86840 Infrastructure and Post Open - National 213,400.00 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 donkeys Quotations One Envelope Services Support

G/YA/YC/2018/01 / Yanchuan county. laptop computer3, computer 5, Component D: Project Request for Single Stage - printer 3, copier 1, IBRD / 86840 Management, Monitoring Prior Limited 19,100.00 0.00 Canceled 2018-07-20 2018-09-14 2019-03-13 Quotations One Envelope camera 1, fax machine 1, and Evaluation (M&E). video camera 1, projector 1, scanner 1, office software 8

G/YA/Y/2018/01 / Yanchang County, 10 kinds of office suppliers including desktop Component C: Technical computers 5, notebook Request for Single Stage - IBRD / 86840 Assistance and Capacity Post Limited 19,100.00 17,706.07 Completed 2018-07-16 2018-05-21 2018-09-10 2018-06-15 2019-03-09 2018-07-23 computers 3, laser Quotations One Envelope Building Support printers 3, photocopier 1, laser fax machine 1, video projector 1, scanner 1, digital camera 1, video camera 1, and office suite software. G/W/B/2018/01 / Baishui county, 2 sets of Component B: Economic Pending Request for Single Stage - equipment for biological IBRD / 86840 Infrastructure and Post Limited 36,600.00 0.00 Implementa 2018-07-19 2018-08-06 2018-09-06 Quotations One Envelope fermented fertilizer in Services Support tion Shiguan project area.

G/W/B/2018/02 / Baishui Component B: Economic Pending county, 1 set of Request for Single Stage - IBRD / 86840 Infrastructure and Post Limited 30,500.00 0.00 Implementa 2018-07-17 2018-09-11 2019-03-10 equipment for fermented Quotations One Envelope Services Support tion fertilizer pits in Lingao project area.

G/B/LX/2017/01 / Long county, 3 laptop computers, 5 desktop computers, 3 laser Component B: Economic Pending Request for Single Stage - printers, 1 photocopier, IBRD / 86840 Infrastructure and Post Limited 19,100.00 0.00 Implementa 2018-07-17 2018-09-11 2019-03-10 Quotations One Envelope 1 digital camera, 1 laser Services Support tion fax machine, 1 video camera, 1 video projector, 1 scanner, 8 suites of office software.

G/YU/D/2017/01 / Component D: Project Dingbian county, 3 laptop Request for Single Stage - IBRD / 86840 Management, Monitoring Post Open - National 6,300.00 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 computers,, 1 camera, 8 Quotations One Envelope and Evaluation (M&E). suites of office software.

G/B/LY/2017/01 / Linyou county, 3 laptop computers, 5 desktop Component D: Project computers, 3 laser Request for Single Stage - IBRD / 86840 Management, Monitoring Post Open - National 19,100.00 0.00 Canceled 2017-03-06 2017-05-01 2017-10-28 printers, 1 photocopier, 1 Quotations One Envelope and Evaluation (M&E). digital camera, 1 laser fax machine, 1 video camera, 1 video projector, 1 scanner.

G/W/H/2017/01 / Heyang County, Notebook computers 3, Desktop computers 5, Scanner 1, Component D: Project Request for Single Stage - Office suite softwares 8, IBRD / 86840 Management, Monitoring Post Open - National 19,100.00 0.00 Canceled 2017-04-06 2017-06-01 2017-11-28 Quotations One Envelope Photocopiers 1, Digital and Evaluation (M&E). camera 1, Laser printer 3, Video projector 1, Digital voice recorder 1, Laser fax machine 1.

G/W/H/J/2018/01 / Heyang county. 1050mu of drip irrigation: 300mu for Component B: Economic Request for Single Stage - Diantou village, 150mu for IBRD / 86840 Infrastructure and Post Open - National 197,200.00 0.00 Canceled 2018-01-25 2018-03-22 2018-09-18 Quotations One Envelope Chengcun village, 100mu Services Support for Xiaocun village and 500mu for Mengcun village.

G/W/H/J/2018/02 / Component B: Economic Pending Request for Single Stage - Heyang county. 557 acres IBRD / 86840 Infrastructure and Post Open - National 285,400.00 0.00 Implementa 2018-12-01 2018-12-06 2019-01-17 2019-02-16 2019-03-23 2019-09-19 Bids One Envelope of new varieties of apple Services Support tion tree.

G/W/F/D/2017/01A / Component A: Farmer Pending Automatic peeling IBRD / 86840 Cooperative and Value Post Direct Selection Direct 712,500.00 0.00 Implementa 2018-08-02 2018-08-07 2018-09-11 2019-04-13 machines, drying Chain Development. tion machines, drying trolleies

Component D: Project Pending G/SH/2018/01A / Office Request for Single Stage - IBRD / 86840 Management, Monitoring Post Limited 124,500.00 0.00 Implementa 2018-08-07 2018-10-02 2019-03-31 equipment 176 set Quotations One Envelope and Evaluation (M&E). tion

G/W/H/2017/01A / Heyang County, Notebook computers 3, Desktop computers 5, Scanner 1, Component D: Project Pending Request for Single Stage - Office suite softwares 8, IBRD / 86840 Management, Monitoring Post Limited 19,100.00 0.00 Implementa 2018-08-07 2018-10-02 2019-03-31 Quotations One Envelope Photocopiers 1, Digital and Evaluation (M&E). tion camera 1, Laser printer 3, Video projector 1, Digital voice recorder 1, Laser fax machine 1.

G/W/H/J/2018/01A / Heyang county. 1050mu of drip irrigation: 300mu for Component B: Economic Pending Request for Single Stage - Diantou village, 150mu for IBRD / 86840 Infrastructure and Post Limited 197,200.00 0.00 Implementa 2018-08-07 2018-10-02 2019-03-31 Quotations One Envelope Chengcun village, 100mu Services Support tion for Xiaocun village and 500mu for Mengcun village.

Component B: Economic Pending G/YA/YCH/F/2018/01A / Request for Single Stage - IBRD / 86840 Infrastructure and Post Limited 194,800.00 0.00 Implementa 2018-08-07 2018-10-02 2019-03-31 Providing 2130 sheep Quotations One Envelope Services Support tion

G/YU/D/2017/01A / Component D: Project Dingbian county, 3 laptop Request for Single Stage - IBRD / 86840 Management, Monitoring Post Limited 6,300.00 4,799.03 Completed 2018-08-07 2017-08-24 2018-10-02 2017-11-22 2019-03-31 2017-12-29 computers,, 1 camera, 8 Quotations One Envelope and Evaluation (M&E). suites of office software.

G/YA/YCH/F/2017/02A / Component A: Farmer Pending Request for Single Stage - Livestock breeding: 100 IBRD / 86840 Cooperative and Value Post Limited 152,400.00 0.00 Implementa 2018-08-07 2018-10-02 2019-03-31 Quotations One Envelope rams Chain Development. tion

G/B/LY/2017/01A / Linyou county, 3 laptop computers, 5 desktop Component D: Project Pending computers, 3 laser Request for Single Stage - IBRD / 86840 Management, Monitoring Post Limited 19,100.00 0.00 Implementa 2018-08-07 2018-10-02 2019-03-31 printers, 1 photocopier, 1 Quotations One Envelope and Evaluation (M&E). tion digital camera, 1 laser fax machine, 1 video camera, 1 video projector, 1 scanner.

Page 12 G/W/B/2017/01A / Notebook computers, Desktop computers, Component D: Project Pending Request for Single Stage - Scanners, Office suite IBRD / 86840 Management, Monitoring Post Limited 19,100.00 0.00 Implementa 2018-08-07 2018-10-02 2019-03-31 Quotations One Envelope software, Digital cameras, and Evaluation (M&E). tion Video projectors, Printers, Fax machines, Copiers

G/YA/YCH/F/2017/06A / Component B: Economic Pending Request for Single Stage - 100 rams (demonstration IBRD / 86840 Infrastructure and Post Limited 152,400.00 0.00 Implementa 2018-08-07 2018-10-02 2019-03-31 Quotations One Envelope farms) Services Support tion

G/B/LX/2019/01 / Component B: Economic Pending Request for Single Stage - Equipment Purchase of IBRD / 86840 Infrastructure and Post Limited 36,600.00 0.00 Implementa 2019-04-09 2019-06-04 2019-12-01 Quotations One Envelope 100 dustbin Services Support tion

G/YU/M/2019/01 / 2 Component B: Economic Pending Request for Single Stage - HLJK and 1 tank car IBRD / 86840 Infrastructure and Post Limited 32,000.00 0.00 Implementa 2019-04-09 2019-06-04 2019-12-01 Quotations One Envelope equipment Services Support tion

Component B: Economic Pending G/B/LX/2020/01 / 60 sets Request for Single Stage - IBRD / 86840 Infrastructure and Post Limited 20,100.00 0.00 Implementa 2020-03-16 2020-05-11 2020-11-07 of sales booths Quotations One Envelope Services Support tion

G/YA/YC/2018/01A / Yanchuan county. laptop computer3, computer 5, Component D: Project Request for Single Stage - printer 3, copier 1, IBRD / 86840 Management, Monitoring Post Limited 19,100.00 14,061.34 Signed 2020-04-06 2018-05-24 2020-06-01 2018-08-05 2020-11-28 Quotations One Envelope camera 1, fax machine 1, and Evaluation (M&E). video camera 1, projector 1, scanner 1, office software 8

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. Actual Short List and Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of / Description Component Review Type Method Amount Terms of Reference Draft Request for Technical Proposals Evaluation Report Signed Contract Contract Completion No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NegotiatedPlanned ContractActual Planned Actual Planned Actual

C/SH/2018/02 / studies Component D: Project Consultant on sustainable Pending IBRD / 86840 Management, Monitoring Post Qualification Open - National 76,200.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 development under the Implementation and Evaluation (M&E). Selection background of relative poverty

Component C: Technical Consultant C/SH/2017/07 / Project Under IBRD / 86840 Assistance and Capacity Post Qualification Open - National 182,900.00 0.00 2017-10-20 2017-11-10 2017-12-24 2018-01-23 2018-03-07 2018-03-07 purchasing agent Implementation Building Support Selection

C/SH/2017/05 / studies Component D: Project Consultant Pending on cooperatives and ways IBRD / 86840 Management, Monitoring Post Qualification Open - National 91,500.00 0.00 2018-06-30 2018-07-21 2018-09-03 2018-10-03 2018-11-07 2019-11-07 Implementation of poverty alleviation and Evaluation (M&E). Selection

Component D: Project Consultant C/SH/2018/04 / Entrust IBRD / 86840 Management, Monitoring Post Qualification Open - National 45,400.00 0.00 Canceled 2018-05-31 2018-06-21 2018-08-04 2018-09-03 2018-10-08 2019-10-08 training and investigation and Evaluation (M&E). Selection

C/SH/2017/06 / studies Component D: Project Consultant on ways for supporting IBRD / 86840 Management, Monitoring Post Qualification Open - National 45,700.00 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-05 2018-01-09 2018-07-08 inclusive finance and Evaluation (M&E). Selection (including insurance) in poor areas

C/SH/2018/01 / studies Component D: Project Consultant on city and countryside IBRD / 86840 Management, Monitoring Post Qualification Open - National 76,200.00 0.00 Canceled 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 integration of poor areas and Evaluation (M&E). Selection

C/SH/2018/03 / studies Component D: Project Consultant on value chain and IBRD / 86840 Management, Monitoring Post Qualification Open - National 45,700.00 0.00 Canceled 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 industrialization poverty and Evaluation (M&E). Selection alleviation in poor areas

Component D: Project Quality And C/SH/2017/02 / project Under IBRD / 86840 Management, Monitoring Post Cost-Based Open - National 457,300.00 0.00 2018-12-01 2018-09-26 2018-12-22 2018-09-26 2019-02-04 2019-03-04 2019-04-03 2019-05-08 2019-06-12 2020-06-11 monitoring and evaluation Implementation and Evaluation (M&E). Selection

C/SH/2020/01 / Research Component D: Project Consultant on Value Chain Pending IBRD / 86840 Management, Monitoring Post Qualification Open - National 18,300.00 0.00 2020-05-18 2020-06-08 2020-07-22 2020-08-21 2020-09-25 2021-03-24 Construction and Implementation and Evaluation (M&E). Selection Industrial Poverty Alleviation

C/SH/2020/02A / Study Component D: Project Consultant on the mechanism of Pending IBRD / 86840 Management, Monitoring Post Qualification Open - National 18,300.00 0.00 2020-05-18 2020-06-08 2020-07-22 2020-08-21 2020-09-25 2021-03-24 poverty reduction of Implementation and Evaluation (M&E). Selection farmers' professional cooperatives

C/SH/2020/03A / Research on the Component D: Project Consultant Pending Improvement of the IBRD / 86840 Management, Monitoring Post Qualification Open - National 18,300.00 0.00 2020-05-18 2020-06-08 2020-07-22 2020-08-21 2020-09-25 2021-03-24 Implementation Operation Ability of and Evaluation (M&E). Selection Farmers' Professional Cooperatives

C/SH/2020/04A / Research on the Effective Component D: Project Consultant Pending Connection between IBRD / 86840 Management, Monitoring Post Qualification Open - National 18,300.00 0.00 2020-05-18 2020-06-08 2020-07-22 2020-08-21 2020-09-25 2021-03-24 Implementation Sustainable Development and Evaluation (M&E). Selection and Rural Rejuvenation in Poor Areas

C/SH/2020/05A / Research on the Component D: Project Consultant Pending Development of IBRD / 86840 Management, Monitoring Post Qualification Open - National 18,300.00 0.00 2020-05-18 2020-06-08 2020-07-22 2020-08-21 2020-09-25 2021-03-24 Implementation Cooperatives in Poor and Evaluation (M&E). Selection Areas and the Modernization of Community Governance

INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Status Contract (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Component C: Technical Individual C/YA/YCH/J/2017/01 / IBRD / 86840 Assistance and Capacity Post Consultant Open 9,100.00 1,812.48 Signed 2017-07-20 2017-07-04 2017-09-07 2017-07-04 2017-09-28 2017-08-04 2017-11-02 2017-08-04 2018-05-01 sheep breeding expert 1 Building Support Selection

Component C: Technical Individual C/YU/D/2017/01 / Animal IBRD / 86840 Assistance and Capacity Post Consultant Open 4,600.00 0.00 Canceled 2017-04-01 2017-05-20 2017-06-10 2017-07-15 2018-05-15 husbandary expert Building Support Selection

Component C: Technical Individual C/W/H/2017/01 / Project IBRD / 86840 Assistance and Capacity Post Consultant Open 30,500.00 0.00 Canceled 2017-07-20 2017-09-07 2017-09-28 2017-11-02 2018-05-01 bidding consultants 2 Building Support Selection

C/W/2017/01 / 1 Component C: Technical Individual procurement technical IBRD / 86840 Assistance and Capacity Post Consultant Open 4,600.00 0.00 Canceled 2017-07-20 2017-09-07 2017-09-28 2017-11-02 2018-05-01 expert Building Support Selection

Component C: Technical Individual C/W/2017/03 / 1 project IBRD / 86840 Assistance and Capacity Post Consultant Open 4,600.00 0.00 Canceled 2017-07-20 2017-09-07 2017-09-28 2017-11-02 2018-05-01 consultant Building Support Selection

Page 13 Component C: Technical Individual C/W/2017/02 / 1 financial IBRD / 86840 Assistance and Capacity Post Consultant Open 4,600.00 0.00 Canceled 2017-07-20 2017-09-07 2017-09-28 2017-11-02 2018-05-01 management expert Building Support Selection

C/W/H/2017/05 / Component C: Technical Individual Cooperative operation and IBRD / 86840 Assistance and Capacity Post Consultant Open 4,600.00 0.00 Canceled 2018-12-01 2019-01-19 2019-02-09 2019-03-16 2019-09-12 management 1 consultant Building Support Selection

Component C: Technical Individual C/YU/D/2017/02 / animal IBRD / 86840 Assistance and Capacity Post Consultant Open 13,700.00 0.00 Canceled 2018-12-01 2019-01-19 2019-02-09 2019-03-16 2019-09-12 husbandman Building Support Selection

Component C: Technical Individual C/W/H/2017/02 / Civil IBRD / 86840 Assistance and Capacity Post Consultant Open 4,600.00 0.00 Canceled 2018-12-01 2019-01-19 2019-02-09 2019-03-16 2019-09-12 Engineering Consultant 1 Building Support Selection

C/W/H/2017/03 / Component C: Technical Individual Hydraulic Engineering IBRD / 86840 Assistance and Capacity Post Consultant Open 4,600.00 0.00 Canceled 2018-12-01 2019-01-19 2019-02-09 2019-03-16 2019-09-12 Consultant 1 Building Support Selection

C/W/H/2017/06 / 1 the Component C: Technical Individual cooperative marketing IBRD / 86840 Assistance and Capacity Post Consultant Open 4,600.00 0.00 Canceled 2018-12-01 2019-01-19 2019-02-09 2019-03-16 2019-09-12 expert Building Support Selection

C/B/LY/2017/03 / Component C: Technical Individual consultant expert of IBRD / 86840 Assistance and Capacity Post Consultant Open 7,600.00 0.00 Canceled 2018-12-01 2019-01-19 2019-02-09 2019-03-16 2019-09-12 cooperative operation Building Support Selection management: 1

C/YA/YCH/J/2017/04A / Component C: Technical Individual Pending Project sourcing specialist IBRD / 86840 Assistance and Capacity Post Consultant Limited 9,100.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation 1 Building Support Selection

C/B/LY/2017/01A / Component C: Technical Individual Pending consultant expert of edible IBRD / 86840 Assistance and Capacity Post Consultant Limited 7,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation fungi planting technology: Building Support Selection 2

C/W/B/2017/02A / 1 Component C: Technical Individual Pending financial management IBRD / 86840 Assistance and Capacity Post Consultant Limited 9,100.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation expert Building Support Selection

C/W/H/2017/05A / Component C: Technical Individual Pending Cooperative operation and IBRD / 86840 Assistance and Capacity Post Consultant Limited 4,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation management 1 consultant Building Support Selection

C/W/B/2017/01A / 1 Component C: Technical Individual cooperative consulting Pending IBRD / 86840 Assistance and Capacity Post Consultant Limited 8,200.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 industry development Implementation Building Support Selection specialist

Component D: Project Individual C/SH/2017/04A / social Pending IBRD / 86840 Management, Monitoring Post Consultant Limited 76,200.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 safety monitoring Implementation and Evaluation (M&E). Selection

C/SH/2017/03A / Component D: Project Individual Pending environment safety IBRD / 86840 Management, Monitoring Post Consultant Limited 76,200.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation monitoring and Evaluation (M&E). Selection

C/X/C/2017/01A / 1 Component C: Technical Individual cooperative operation Pending IBRD / 86840 Assistance and Capacity Post Consultant Limited 4,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 management consulting Implementation Building Support Selection expert

Component C: Technical Individual C/YU/D/2017/02A / Pending IBRD / 86840 Assistance and Capacity Post Consultant Limited 13,700.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 animal husbandman Implementation Building Support Selection

C/YU/D/2017/03A / Component C: Technical Individual Pending Cooperative construction IBRD / 86840 Assistance and Capacity Post Consultant Limited 3,000.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation specialist Building Support Selection

Component C: Technical Individual C/X/C/2017/03A / 1 Pending IBRD / 86840 Assistance and Capacity Post Consultant Limited 3,000.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 financial consultant Implementation Building Support Selection

C/YA/YCH/J/2017/03A / Component C: Technical Individual Pending cooperative management IBRD / 86840 Assistance and Capacity Post Consultant Limited 9,100.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation expert 1 person Building Support Selection

C/YA/YCH/J/2017/05A / Component C: Technical Individual Pending community financial IBRD / 86840 Assistance and Capacity Post Consultant Limited 9,100.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation expert 1 person Building Support Selection

Component C: Technical Individual C/W/H/2017/02A / Civil Pending IBRD / 86840 Assistance and Capacity Post Consultant Limited 4,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Engineering Consultant 1 Implementation Building Support Selection

Component C: Technical Individual C/YA/YCH/J/2017/02A / Pending IBRD / 86840 Assistance and Capacity Post Consultant Limited 9,100.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 apiarist 1 person Implementation Building Support Selection

Component C: Technical Individual C/YU/D/2017/04A / Pending IBRD / 86840 Assistance and Capacity Post Consultant Limited 1,500.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Financial expert Implementation Building Support Selection

C/X/C/2017/02A / 1 the Component C: Technical Individual Pending cooperative marketing IBRD / 86840 Assistance and Capacity Post Consultant Limited 7,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation expert Building Support Selection

C/W/B/2017/03A / Component C: Technical Individual Pending engineering consulting IBRD / 86840 Assistance and Capacity Post Consultant Limited 12,200.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation experts 2 Building Support Selection

C/W/H/2017/03A / Component C: Technical Individual Pending Hydraulic Engineering IBRD / 86840 Assistance and Capacity Post Consultant Limited 4,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation Consultant 1 Building Support Selection

C/W/H/2017/06A / 1 the Component C: Technical Individual Pending cooperative marketing IBRD / 86840 Assistance and Capacity Post Consultant Limited 4,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation expert Building Support Selection

C/B/LY/2017/04A / expert Component C: Technical Individual Pending of cooperative marketing: IBRD / 86840 Assistance and Capacity Post Consultant Limited 7,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation 1 Building Support Selection

C/W/H/2017/07A / Apple Component C: Technical Individual Pending pest control 1 technical IBRD / 86840 Assistance and Capacity Post Consultant Limited 4,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation consulting experts Building Support Selection

C/B/LY/2017/02A / Component C: Technical Individual Pending finance consultant expert: IBRD / 86840 Assistance and Capacity Post Consultant Limited 4,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 Implementation 1 Building Support Selection

C/B/LY/2017/03A / Component C: Technical Individual consultant expert of Pending IBRD / 86840 Assistance and Capacity Post Consultant Limited 7,600.00 0.00 2018-08-02 2018-08-07 2018-08-28 2018-10-02 2019-03-31 cooperative operation Implementation Building Support Selection management: 1