M R Id T It Ath It F Thil D Mass Rapid Transit Authority of Thailand

Total Page:16

File Type:pdf, Size:1020Kb

M R Id T It Ath It F Thil D Mass Rapid Transit Authority of Thailand Mass Rapid Trans it Au thor ity of Tha iland March 2016 M.R.T. Project Development Department 1 Project Analysis Section Government Agency State Enterprise Office of Ministry of Transport Expressway Authority of Thailand Office of Transport and Policy Planning Bangkok Mass Transit Authority Department of Highway Transport Co., Ltd. Mass Rapid Transit Authority of Thailand Department of Rural Highway State Railway of Thailand Depppartment of Land Transport Airport Rail Link Co., Ltd. Marine Department Port Authority of Thailand Department of Civil Aviation Thai-Amadeus Southeast Asia Co.,Ltd. Thai Airways Int’l PCL Thai Smile Airways Airport of Thailand PCL Aeronautical Radio of Thailand Civil Aviation Training Center Suvarnabhumi Airport Hotel Co.,Ltd. 2 Mass Rapid Transit Authority of Thailand (MRTA) (State Enterprise under Supervision of MOT) Implement of the rail mass rapid transit in Bangkok Ministry of Transport : MOT and other provinces State Railway of Thailand (SRT) (State Enterprise under Supervision of MOT) Implement of the rail (MRT & Commuter Train) along Office of Transport and Traffic Policy and the existing rail corridor throughout Thailand Planning (OTP) Airport Rail Link Co., Ltd. (ARL) (Governmental Agency) (State Enterprise under Supervision of MOT) Operate existing Suvarnabhumi Airport Rail Link • Study and Plan for Transport System • Provide Mass Rapid Transit Master Plan Bangkok Metropolitan Administration : BMA (Local Governmental Agency) Impl ement of the rail mass rapid trans it in Bang ko k 3 Mission of MRTA 1. Operate Mass Transit System in Bangkok and vicinities including other provinces 2. Study, Analyze and Prepare Mass Transit Project including Research and Development 3. Carry on Business that benefit to passengers Bangkok Metropolitan Region (BMR) BMR TOTAL AREA 7,785 sq.km., Population 17.5 Millions, GDP 68% of National GDP BMR AREA Pathum Thani Nakhon Pathom Nonthaburi 85 km. Bangkok Samut Prakan Samut Sakhon 115 km. 5 Mass Rapid Transit Network 6 Primary Line 1. Dark Red Line (Thammasat - Mahachai) Feeder Line 4. Dark Green Line (Lamlukka–Mochit–Bearing-Samut prakarn) 7. Purple line 9. Pink Line (Bangyai - Ratburana) (Khaerai - Minburi) 2. Light Red Line 8. Orange Line (Salaya - Huamark) (Talingchan - Minburi) 3. Airport Rail Link (Bangsue–Phayathai-Suvarnabhumi) 5. Light Green Line 10. Yellow Line (Yotse - Bangwa) (Ladphrao - Samrong) 6. Blue Line (Bangsue–Hualamphong –Thaphra-Phutthamonthon 4) 7 North Green Line North Green Line (Mochit - SaphanMai - Kukot) (Kukhot - Lumlukka) North Purple Line (Bang Yai – Bang Sue) Pink Line (Khaerai – Minburi) West Orange (Taling Chan-Thailand Cultural Centre) East Orange Line West Blue Line (Thailand Cultural Centre - (Bang Sue - Thaphra) Minburi (Suwinthawong)) (Hua Lamphong - Bangkhae) (Bangkhae - Phutthamonthon Sai 4) East Blue Line Yellow Line Chaloem (Ladprao - Samrong) Ratchamongkhon Line South Purple Line South Green Line (Taopun - Ratburana) (Samut Prakan – Bangpu) South Green Line (Bearing - Samut Prakan) 8 Distance Construction Start Operation Status Projects (km. ) (m-y) (m-y) Current path Chaloem Ratchamongkhon Line 20 1999 Jun – 04 Under Purple Line :Bang Yai – Bang Sue 23 Nov –09 Aug –16 Construction Blue Line : Hualamphong – Bangkae 14 Apr –11 May –20 (81 km.) Bang Sue – Thaphra 13 Apr – 11 May – 20 Green Line : Baering – Samutprakan 13 Mar –12 Aug –20 Mochit - Khukot 18 Jun –15 Aug –20 Start tendering on Orange Line :Thailand Cultural Centre – Minburi 21 Oct – 16 Jun – 22 2016 Pink Line : Khaerai – Minburi 35 Appr –17 Jul –20 (110 km.) Yellow Line : Ladprao – Samrong 30 Arp – 17 Jul – 20 Purple Line : Tao Pun – Rat Burana 24 Feb – 17 Oct – 22 Start tendering Orange Line :Talingchan –Thailand Cultural Centre 18 May – 17 Jan – 23 since 2017 Blue Line : Bangkae – Phuttamonthon Sai 4 8 Jun – 17 Jun – 21 (41 km.) Green Line : Samutprakan – Bang Pu 7 Dec – 17 Dec – 21 Khucot - Lamlukka 8 Dec –17 Dec –21 10 « Opened to ppyublic : on July 3rd,, 2004 Underground heavy rail system ¬ with the 20 km length and 18 stations « Investment scheme : PPP Net Cost Concessionaire : BMCL (( 25 yearsears)) Total project cost is 106,,311106 311 M. Baht Averaggpe ridership : 250,, 000 trips/day ¬ 11 Purple Line North Section Green Line North Section Blue Line Extension Green Line South Section 12 13 Bangyai – Bangsue Project Details Elevated MRT (Heavy Rail) with 23 km length and 16 Stations (1 depot 4 Park & Ride Bldg.) Cost 63,333.42 Million Baht Construction November 2009 Star t Opera tion AtAugust 2016 Status (January 2016) Contract 1-3,6 Construction 100% completed Contract 4 M&E works (89.97% Completed) Contract 5 The cabinet assigned PPP Policy Committee negotiate with BEM. 14 15 Hualamphong-Bangkae and Bangsue-Thaphra Project Details Hualamphong-Bangkae Section - Underground MRT with 5 km length and 4 stations - Elevated MRT with 9 km length and 7 stations Bangsue-Thaphra Section - Elevated MRT with 13 km length and 10 stations Cost 82,369.17 Million Baht Construction April 2011 Start Operation May 2020 Status (January 2016) Contract 1-5 Under construction (72.06% completed) Contract 6 PPP Policy Committee adjourn PPP fast track plan, the PPP report will be presented on April 2016 16 17 Bearing – Samutprakarn Project Details Elevated MRT with 13 km length and 9 stations CtCost 27,819.08 MBM.Ba ht Construction March 2012 Start Operation August 2020 Status (January 2016) Contract 1-2 under construction (77.25% completed) 18 19 Mochit – Saphanmai – Khukot Project Details Elevated MRT with 18.2 km length and 16 stations Cost 58,384.45 M.Baht Construction June 2015 Start Operation August 2020 Status (January 2016) Civil works under construction (3.20% completed) 20 Pink Line Orange Line East Section Purple Line South Section Yellow LIne 21 22 Thailand Cultural Centre – Minburi Project Details Underground structure for 12.2 km and 10 Stations Elevated structure for 9 km and 7 Stations Cost 110,116.86 Million Baht Construction October 2016 Start Operation June 2022 Status (January 2016) Cabinet on 8 Dec. 15 approved in principle of Project Implementation and approved Land Acquisition Budget. It is expected the Cabinet will approve Civil Works at the beginning of March 16. 23 24 Khaerai – Minburi Project Details Straddle monorail system with 34.5 km length and 30 stations Cost 56,691.00 Million Baht Construction April 2017 Start Operation July 2020 Status (January 2016) Waiting for PPP Policy Committee and Cabinet approval of Project investment scheme in accordance with PPP Act B.E. 2556 25 26 Ladprao – Samrong Project Details Straddle monorail system with 30.4 km length and 23 stations Cost 54,644.00 Million Baht Construction April 2017 Start Operation July 2020 Status (January 2016) Waiting for PPP Policy Committee and Cabinet approval of Project investment scheme in accordance with PPP Act B. E. 2556 27 28 Tao Pun – Ratburana PjtProject DtilDetails Un dergroun d struct ure for 12126.6 km and 10 SttiStations Elevated structure for 11 km and 7 Stations Cost 131,004.00 Million Baht Construction February 2017 Start Operation October 2022 Status (January 2016) Waiting for Cabinet approval of Civil Works 29 Green Line North Extension to Lamlukka Orange Line West Section Blue Line Extension to Budhamonthon Sai 4 Green Line South Extension to Bangpu 30 31 Talingchan -Thailand Cultural centre Project Details Underground structure for 18.2 km. with 12 stations Cost 85,288.54 Million Baht Construction May 2017 Start Operation January 2023 Status (January 2016) During feasibility study, EIA report and tender document preparation 32 Bangkae - Phutthamonthon Sai 4 Project Details Elevated MRT with 8 km length and 4 stations Cost 21,223 Million Baht Construction June 2017 Start Operation June 2021 Status (January 2016) During feasibility study, EIA report and tender document preparation 33 Sawangkhanivat Samut Prakan (Bang Ping) – Bang Pu Muaeng Boran Project Details Elevated MRT with 7 km length and 4 stations Cost 13,701.21 Million Baht Sichanpradit Construction December 2017 Bangpu Start Operation December 2021 Tamru Status ((yJanuary 2016) - EIA Approved - during feasibility study review and tender document preparation 34 Khukot – Lamlukka Project Details Elevated MRT with 8 km length and 4 stations Cost 11,989.33 Million Baht Construction December 2017 Start Operation December 2021 Status (January 2016) -EIA Approved -During feasibility study review and tender document preparation 35 Investment 36 Investment Scheme Public Private Partnership (PPP) : government & private sector share investment in each part Public Sector Comparator (PSC) : government invest 100% and may engage private sector to operate and maintain system Public Private Public Project Project Level of PPP Investment Ratio Investment Ratio High Low 1 2 3 PPP PPP PPP Project Project Project Government Private sector Government Private sector Government Private sector Land Rolling Land Rolling Land Rolling Civil Work M&E Civil Work M&E Civil Work M&E Acquisition Stock Acquisition Stock Acquisition Stock Land Acquisition Land Acquisition ent Land Acquisition Civil Work Civil Work Governm M&E Civil Work M&E Rolling Stock M&E Rolling Stock ivate sector rr P Rolling Stock PPP Scheme NtNet CtCost Concess ion Gross Cost Concession Modified Gross Cost Concession remuneration Revenue remuneration + Bonus Share Private Public Private Public Private Public Invest + Invest + Invest + Operation Fare & Non Fare Operation Operation Revenue Fare & Non Fare Fare & Non Fare Cost Cost Revenue Cost
Recommended publications
  • CONTRACT AGREEMENT MRT Blue Line Extension Project Hua
    Contract Agreement CA-1 CONTRACT AGREEMENT MRT Blue Line Extension Project Hua Lamphong - Bang Khae and Bang Sue - Tha Phra Sections Contract 4: Elevated Civil Works Tha Phra - Lak Song Section This Contract is made at the Mass Rapid Transit Authority of Thailand, 175 Rama IX Road, Huay Khwang, Bangkok 10320 on 17 day of February B.E. 2554 (A.O. 2011) between: (1) MASS RAPID TRANSIT AUTHORITY OF THAILAND by Mr.Ronnachit Yaemsaard, the MRTA Acting Governor, with office located at 175 Rama IX Road, Huay Khwang, Bangkok 10320, hereinafter referred to as the "MRTA" or the "Employer", as the case may be, of the one part and ; (2) SINO-THAI ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED a company registered and existing under the laws of Thailand, with head office located at 27th floor, Sino-Thai Tower, 32/59-60, Sukhumvit 21 Road , Klang Toey Nua Sub-District, Wattana District, Bangkok, 10110, Thailand by Mr. Vallop Rungkijvorasathien authorized to sign and bind the company, hereinafter referred to as the "Contractor" of the other part. WHEREAS the Employer is desirous that certain Works should be executed by the Contractor, viz, the construction of Elevated Structure at Tha Phra - Lak Song Section with precast segment box girder viaduct of approximately 10.5 km. in length, elevated approximately 17 meters above existing ground, transition structure, with the construction of 7 elevated stations, architectural works and building services within the stations, and the intermodal transfer facilities (ITF), Depot, Operation and Control Center (OCC), Park & Ride Buildings and other works as defined in the Contract, and has accepted a Tender by the Contractor for execution and completion of such Works and the remedying of any defects therein.
    [Show full text]
  • Bangkok Expressway and Metro Public Company Limited (BEM) FEBRUARY 2021 Business Overview
    Bangkok Expressway and Metro Public Company Limited (BEM) FEBRUARY 2021 Business Overview COMMERCIAL ROAD INVESTMENT RAIL DEVELOPMENT Total Expressway Total Rail BL = IBL + BL Ex Infrastructure portfolio SES 38.50 km BL 48 km 38 stations For advertising in Stations & • Owns 99.99% in NECL Sector C+ 32.00 km PPL 23 km 16 stations Trains, Retailing and • Owns 90.52% in BMN SOE 17.06 km Total 71 km 54 stations Telecommunications • Owns 18.47% in TTW Total 87.56 km • Owns 16.64% in CKP BL Ridership PPL to be negotiated with MRTA Traffic Volume Jan 2021 Profit sharing in P&L Jan 2021 151,237 trips/day Expressway Ads on SES Y2019 173 MB 799,583 trips/day Growth -61.95% YoY 9M/2020 - MB Growth -34.30% YoY Avg. 2021 CD Revenue Avg. 2021 151,237 trips/day Y2019 783 MB Cash Dividend Received 799,583 trips/day Growth -61.95% YoY 9M/2020 586 MB Y2019 489 MB Growth -34.30% YoY Growth 4.30% YoY 9M/2020 483 MB BL farebox Tolls Revenue Jan 2021 Jan 2021 4.24 MB/day 17.33 MB/day Growth -60.05% YoY Growth -37.67% YoY Avg. 2021 Avg. 2021 4.24 MB/day 17.33 MB/day Growth -60.05% YoY Growth -37.67% YoY PPL O&M service income Annual Income apx.1,800 - 2,000 MB/year 2 Financial Highlights & Earnings Outlook REVENUE STRUCTURE TOTAL REVENUE As of 9M/2020 Unit: MB SteadyRevenue with Growth 20,404 trong Earnings with Good Dividend 19,087 S Rail : 34% 15,393 13,232 Stable Cash Flow Road : 60% 10,589 Road Gearing for new investment Rail Commercial CD Development : Other 6% 2016 2017 2018 2019 9M/2020 NET PROFIT DPS / EPS NET IBD/E Unit: MB Unit: THB Unit : Times 5,317* 5,435** 1.44 3,123 0.35* 0.36** 1.38 2,606 1.37 1.34 1,482 0.20 1.33 0.17 0.15 0.15 0.11 0.13 0.10 DPS EPS 2016 2017 2018 2019 9M/2020 2016 2017 2018 2019 9M/2020 2016 2017 2018 2019 9M/2020 Remark : * Including non - cash extra item from reclassified the investment in CKP ** Including non - cash extra item from reclassified the investment in TTW 3 Expressway Map Expressway Network Distance (km) Operator 1.
    [Show full text]
  • ESCAP PPP Case Study #1
    Public-Private Partnerships Case Study #1 Traffic Demand Risk: The case of Bangkok’s Skytrain (BTS) by Mathieu Verougstraete and Isabelle Enders (March 2014) The following case study examines the issue of traffic demand risk and sheds light on how the problem of inaccurate ridership forecasts can impact a PPP project by using the example of the Bangkok SkyTrain. TRAFFIC DEMAND RISK FIGURE 1 : ACTUAL/FORECAST TRAFFIC Even though literature is rich about theory and practice of traffic forecasting, insufficient attention has been paid to the predicted accuracy of traffic forecasting models and the consequences of occurring errors. Emperical studies suggest however that traffic forecasts in the transport sector are characterized by large errors and considerable optimism bias.1 This statement goes in line with the review conducted on PPP projects financed by the European Investment Bank which states that major issues in road projects BANGKOK BTS: CASE SUMMARY occurred because of traffic performance has been overestimated. Findings disclose that Bangkok covers about 606 square miles 1/2 of toll road projects failed to meet their and is densely populated. By 1990 it was early-year forecasts; often by some margin renowned for its chronic traffic congestion, 2 (errors of 50% - 70%). and over the subsequent decade vehicle ESCAP supports govern- ownership more than doubled. Heavy traffic ments in Asia-Pacific in This pattern of forecasting error and volume which is caused by bus, car and implementing measures systematic optimism-bias is even more motorbike journeys was making Bangkok to efficiently involve marked in the case of toll roads compared the private sector in one of the worst cities in the world in terms infrastructure develop- to toll-free road as illustrated in figure 1, of congestion and air pollution caused by which compares two samples of international ment.
    [Show full text]
  • 3 Assessment of Urban Transport Systems in Bangkok
    Assessment Urban Transport System: Bangkok, Thailand Siradol Siridhara Mahidol University BLAK Bangkok Metro and Vicinity Population 16.43 million Bkk Population 5.56 million Employment 10.42 million Income 39,459 baht/hh Bangkok Metro and Vicinity 35 million trips per day. ≈ 70% by private vehicles. Average Speeds Morning peak hour 10.7 kph Evening peak hour 14.2 kph Key Players Regulators, Project Owners & Operators Rail Bus Regulators Project Owners Project Operators 3 Current Rail Network Current Network: 5 Lines, 97 Stations, 142.9 km Light Green Line 32 stations 39.5 km Dark Green Line 13 stations 14.7 km Blue Line 26 stations 47.0 km Purple Line 16 stations 23.6 km Airport Rail Link 8 Stations 28.6 km Total 153.4 km Green Blue Purple Red Ridership (approx.) 1500000 trips/day4 Future Rail Network Future Network: Approx. 540 km Light Green Line 55 stations 66.5 km Dark Green Line 20 stations 22.5 km Blue Line 42 stations 55.0 km Purple Line 32 stations 42.8 km Orange Line 30 stations 35.4 km Pink Line 30 stations 36.0 km Yellow Line 23 stations 30.4 km Brown Line 23 stations 21.0 km Gold Line 4 stations 2.7 km Grey 39 stations 26.0 km Light Blue Line 19 stations 30.0 km Light Red Line 55 stations 58.5 km Dark Red Line 20 stations 80.8 km Airport Rail Link 14 Stations 49.5 km Total 504 km 5 Assessment Urban Transport System: Bangkok SUTI01 Extent to Which Transport Plans Cover Public Transport, Intermodal Facilities and Infrastructure for Active Modes MIN SCORE MAX 0 11 16 No Aspects Explanation Score 1 Walking Networks Little attention has been paid to pedestrian network planning, although the awareness of maintenance of walkways and other pedestrian facilities have 2 been raised from the general public.
    [Show full text]
  • Skripsi Yunda
    CHAPTER 1 INTRODUCTION 1.1 General Overview of Research Object 1.1.1 Light Rail Transit Figure 1.1 LRT Source : www.kabar3.com The Palembang Light Rail Transit (Palembang LRT) is an operational light rail transit system in Palembang, Indonesia which connects Sultan Mahmud Badaruddin II International Airport and Jakabaring Sports City. Starting construction in 2015, the project was built to facilitate the 2018 Asian Games and was completed in mid-2018, just a few months before the event. Costing Rp 10.9 trillion for construction, the system is the first operational light rail transit system in Indonesia, and utilizes trains made by local manufacturer PT.INKA. The system's only line has a total of 13 stations (6 operational). As Palembang was to host the 2018 Asian Games, the project was pushed to be completed before the event began. Groundbreaking for the project occurred on 1 November 2015, with state-owned company Waskita Karya being appointed as the primary contractor following the issuance of Presidential Regulation 116 of 2015 on Acceleration of Railway Train Operation in South Sumatera Province. The contract, which was signed in February 2017, was initially valued at Rp 12.5 trillion. Construction was scheduled for completion in February 2018, with commercial service beginning in May 2018. However, the completion date was moved to June 2018 with operations beginning in July, only one month before the Asian Games. A test run was done on 22 May 2018 and was inaugurated by President Joko Widodo on 15 July 2018. Operations for the LRT started on 1 August, several days before the Jakarta LRT began running, making it the first operational LRT system in the country.
    [Show full text]
  • SUPPLEMENTARY INFORMATION Doi:10.1038/Nature11520
    SUPPLEMENTARY INFORMATION doi:10.1038/nature11520 Other intraplate earthquakes in the India-Australia plate off Sumatra and Coulomb stress changes for a selection of possible intraplate faults. Extensional events at the trench wall are located in positive Coulomb stress change areas for receiver faults striking parallel to the trench both off Nicobar Islands (~N180°E) and off Nias (~N135°E) (see Figure A1). Any Aceh or Nias slip distribution that has weak surface displacement does not predict a positive Coulomb stress change in these areas close to the trench toe. These normal faults are active as a result of extensional bending stresses at the trench wall46,47 that are unrelated to the NW-SE compression in the Wharton Basin. The strike of the nodal planes shown on Figure A1 is following the trench line orientation. These normal faults are neo-formed faults since the normal fault fabric (N105°E to N110°E) is not perpendicular enough to the trench-normal bending stresses to be reactivated (with the exception of the two southernmost events in 2005, in the Wharton fossil spreading ridge area). Slip on neo-formed reverse faults perpendicular to the NW-SE intraplate P-axis is not favoured by the Aceh and Nias earthquakes (Figure A1), which is in agreement with the historical style of deformation in the Wharton Basin. A minority of thrust faults mechanisms is recorded, while most of the events are strike-slip. Figure A2 shows increased Coulomb stress change on N110°E oriented vertical planes (right- lateral slip) when compared to N15°E oriented vertical planes (left-lateral slip, Fig.
    [Show full text]
  • Social Impact of Railway Project A
    SOCIAL IMPACT OF RAILWAY PROJECT A CASE STUDY OF MASS RAPID TRANSIT (MRT) JAKARTA, INDONESIA DAMPAK SOSIAL PROYEK KERETA API STUDI KASUS MASS RAPID TRANSIT (MRT) JAKARTA, INDONESIA Listifadah Research and Development Land Transportation-Ministry of Transportation Jl. Medan Merdeka Timur No. 5 Jakarta Pusat 10110 email: [email protected] Diterima: 11 November 2014, Revisi 1: 1 Desember 2014, Revisi 2: 10 Desember 2014, Disetujui: 19 Desember 2014 ABSTRACT Jakarta MRT system had been planned since the 1980’s. Many constraints such as political, finan- cial, as well as bureaucratic make the project delayed for a long time. When the plan scheduled to be implemented in a couple years ago, some protests arise. Communities and some interest group against. The fears of income decline and loss of livelihood become their main concerns which in- duce protests before the project really started. Based on this experience, this paper tries to reveal social impacts of transport development in case MRT Jakarta. Now the project construction is being carried out. Social impact as well as the project construction continues. This study investigate how social impact of railway project was happened. Literatures and documents analysis was used to analyze this study. The result of the study were the MRT Jakarta project inevitably have negative and positive impacts both for society and environment. But with the start of the project after a long delay, it gives hope to the community for better transportation. It is a positive impact before the project was completed. Community engagement in a meeting or discusssion should more be em- phasized in the process in order to minimize the conflicts of interest.
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • Thailand MRTA Initial System Project (Blue Line) I–V
    Thailand MRTA Initial System Project (Blue Line) I–V External Evaluator: Hiroyasu Otsu, Graduate School of Kyoto University Field Survey: August 2007 – March 2008 1. Project Profile and Japan’s ODA Loan Myミャンマーanmar ラオスLaos Thailandタイ Banバンコクgkok ◎ カンボジアCambodia プロジェクトサイトProject Site Map of the project area Bangkok Subway (MRT Blue Line) 1.1 Background Accompanying the rapid economic development in Bangkok starting in the 1990s, regular traffic congestion and the associated air pollution became evident in the urban area. The Thai government drew up the Bangkok Mass Transit Master Plan (produced by the Office of the Commission for the Management of Road Traffic (OCMRT) and hereinafter referred to as the “master plan”) in 1995 based on the 7th National Economic and Social Development Plan (1992–1996) for the purpose of developing a mass transit network and also for developing a network of ordinary roads and expressways to achieve steady economic growth, together with resolving the above-mentioned traffic congestion and air pollution. Furthermore, the development of the mass transit network proposed in the master plan is also specified in the subsequent 8th National Economic and Social Development Plan (1997–2000), and it is positioned as an extremely important national project in Thailand. The plan for the Bangkok mass transit system, part of the master plan, involves the construction of five lines that will radiate out and join the Bangkok Metropolitan Area (BMA) with the Bangkok Metropolitan Region (BMR)1 together with creating a network 1 The Bangkok Metropolitan Region includes Bangkok, which is a special administrative area, and the surrounding five provinces of Samut Prakan, Pathum Thani, Samut Sakhon, Nakhon Pathom, and Nonthaburi.
    [Show full text]
  • Special Assistance for Project Implementation for Bangkok Mass Transit Development Project in Thailand
    MASS RAPID TRANSIT AUTHORITY THAILAND SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION FOR BANGKOK MASS TRANSIT DEVELOPMENT PROJECT IN THAILAND FINAL REPORT SEPTEMBER 2010 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS, CO., LTD. EID JR 10-159 MASS RAPID TRANSIT AUTHORITY THAILAND SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION FOR BANGKOK MASS TRANSIT DEVELOPMENT PROJECT IN THAILAND FINAL REPORT SEPTEMBER 2010 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS, CO., LTD. Special Assistance for Project Implementation for Mass Transit Development in Bangkok Final Report TABLE OF CONTENTS Page CHAPTER 1 INTRODUCTION ..................................................................................... 1-1 1.1 Background of the Study ..................................................................................... 1-1 1.2 Objective of the Study ......................................................................................... 1-2 1.3 Scope of the Study............................................................................................... 1-2 1.4 Counterpart Agency............................................................................................. 1-3 CHAPTER 2 EXISTING CIRCUMSTANCES AND FUTURE PROSPECTS OF MASS TRANSIT DEVELOPMENT IN BANGKOK .............................. 2-1 2.1 Legal Framework and Government Policy.......................................................... 2-1 2.1.1 Relevant Agencies....................................................................................... 2-1 2.1.2
    [Show full text]
  • Climate Policies in Transport Sector of Vietnam And
    MINISTRY OF TRANSPORT TRANSPORT DEVELOPMENT AND STRATEGY INSTITUTE URBAN PUBLIC TRANSPORT SYSTEM IN VIETNAM Presenter: Le Thi Thanh Nhan (MSc) Energy Efficiency in Emerging Economies Training Week for Southest Asia Jakarta, 16 to 20 July, 2018 Vietnam at a glance Population: 93.5 million people Urban population: 32.3 million people Urbanization rate: 34.5% Urban contribution: 70 - 75% of the GDP Vietnam at a glance • There are 788 urban areas in the whole Viet Nam, including 02 special urban areas (Ha Noi, HCMC) Several figures: 2.9 million automobiles 46 million motorbikes 492 motorbike/1000 population • The competitive index of Vietnam transport infrastructures ranked the 67th of the 138 countries in 2015-2016 period • The urbanization process growths very fast (3.4% per year) resulting in higher and higher traffic demands, and a boom of individual vehicles (i.e. cars, motorbikes) in large urban areas, and severe status of traffic congestion Urban Public Transport in Vietnam Conventional bus BRT Metro River bus Urban Public Transport in Vietnam Conventional bus 61/63 provinces have public bus system with total passenger transported: more than 1 billion/year Structure of bus routes in cities in 2015 Urban Public Transport in Vietnam River bus Operating in Ho Chi Minh City with 01 route 10,8km Metros Under construction in 02 cities are Ha Noi and Ho Chi Minh City MRT system in Hanoi Hanoi: ( Decision 1259/2011/QD-TTg) 8 metro lines with 318 km Line 2A and 3: under construction Line 2A: 13.1 km elevated, 12 stations Line 3: 12.5 km (8.5 km elevated, 4 km underground, 12 stations MRT system in HCMC HCMC: (Decision 568/2013/QD-TTg) 08 metro lines (1, 2, 3a, 3b, 4, 4b, 5, 6) 03 tram lines/1 monorail line (T) 01 elevated rail line (E) MRT Line 1, 2, 5: Under construction BRT system in Hanoi .
    [Show full text]
  • An Inventory and Assessment of National Urban Mobility in Thailand
    Development of a National Urban Mobility Programme - an Inventory and Assessment of National Urban Mobility in Thailand A project of the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) in collaboration with the Thai Office of Transport and Traffic Policy and Planning (OTP) Final Report November 2019 Development of a National Urban Mobility Programme Project Background Transport is the highest energy-consuming sector in 40% of all countries worldwide, and causes about a quarter of energy-related CO2 emissions. To limit global warming to two degrees, an extensive transformation and decarbonisation of transport is necessary. The TRANSfer project’s objective is to increase the efforts of developing countries and emerging economies for climate-friendly transport. The project acts as a mitigation action preparation facility and thus, specifically supports the implementation of the Nationally Determined Contributions (NDC) of the Paris Agreement. The project supports several countries (including Peru, Colombia, the Philippines, Thailand, Indonesia) in developing greenhouse gas mitigation measures in transport. The TRANSfer project is implemented by GIZ and funded by the International Climate Initiative (IKI) of the German Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) and operates on three levels. Mobilise Prepare Stimulate Facilitating the Preparation of Knowledge products, Training, MobiliseYourCity Mitigation Measures and Dialogue Partnership Standardised support Based on these experiences, TRANSfer The goal of the multi- packages (toolkits) are is sharing and disseminating best stakeholder partnership developed and used for the practises. This is achieved through the MobiliseYourCity, which is preparation of selected development of knowledge products, currently being supported by mitigation measures. As a the organisation of events and trainings, France, Germany and the result, measures can be and the contribution to an increasing European Commission, is that prepared more efficiently, level of ambition.
    [Show full text]