Download Brochure

Total Page:16

File Type:pdf, Size:1020Kb

Download Brochure UNPARALLELED Without question, the best office building in Leeds. CENTRALCENTRAL SQUARE SQUARE LEEDS LEEDS GAME CHANGER A building of incomparable quality, Central Square boasts a prime location in the heart of corporate Leeds. Its striking modern design, open and flexible floor plates and market-leading green credentials are bound to impress clients and attract and retain the brightest and best employees. 4 CENTRAL SQUARE LEEDS OUTSIDE IN The stunning seven-storey, fully glazed atrium houses Central Square’s Winter Garden, where work meets play in a contemporary public space that brings first-class amenities directly to your doorstep. In addition, the ninth-floor Sky Garden is an exceptional break out and entertainment space, exclusively available to office tenants of Central Square. A relaxed and peaceful setting above the hustle and bustle of the city, it promotes a casual and collaborative working environment with panoramic views across Leeds and beyond. 6 CENTRAL SQUARE LEEDS HEAD TURNER 8 CENTRAL SQUARE LEEDS 10 CENTRAL SQUARE LEEDS JAW DROPPING From top to bottom, Central Square is the most prestigious development the city has ever seen. Every aspect exudes unrivalled quality and attention to detail, from the luxuriously appointed reception lounge to the striking full height glazing throughout. 12 CENTRAL SQUARE LEEDS BRIGHTER BIGGER BETTER 14 CENTRAL SQUARE LEEDS PwC BDO “Central Square is a fantastic building in a great location in which we have designed a space that encourages collaboration, flexible working and work-life balance.” Will Richardson, Senior Partner, PricewaterhouseCoopers “We wanted to move to a more central location to be part of the prime office core not “It’s important to be at the heart of the business district in Leeds and Central Square only for the business but for our staff. Central Square offered us on site amenities is ideally situated in that perspective, but it’s also very accessible by train, by car such as the sky garden and the retail in the atrium. The flexible floorplates and and by bus, so for clients and colleagues it’s a perfect location for us. The large floor market-leading specification allowed us to space plan more efficiently and future plate has allowed us to house all our people on one floor which permits us to work proof our accommodation needs.” better internally for the benefit of our clients.” Terry Jones, Partner and Head Kevin O’Connor, Regional Managing Partner BDO Leeds RSM 16 CENTRAL SQUARE LEEDS SANDERSON WEATHERALL CRISP 18 CENTRAL SQUARE LEEDS SPECIFICATION OFFICE ACCOMMODATION Flexible, efficient and finished to an exceptional standard, Central Square raises the bar for office buildings. Measured in accordance with IPMS3 measurements SQ FT SQ M First Floor Suite 1 Let to Crisp Thinking • BREEAM Outstanding • EPC “A” First Floor Suite 2 7,583 704 • Single floorplates up to 26,229 sq ft First Floor Suite 3 1,640 152 • VRF Air Conditioning Second Floor 26,229 2,436 • LED lighting Third Floor 25,749 2,392 • Localised Heat Recovery Units (Supply & Extract), ideal for tenant fit out and service flexibility Fourth Floor Let to Sky Subscriptions • Raised access floors Fifth Floor Let to RSM • 2.8m floor to ceiling height Sixth Floor (Part) Let to BDO • Metal tiled ceilings • 8 x 21 person passenger lifts (2 glass scenic lifts) Sixth Floor (Part) Let to Sanderson Weatherall • M&E designed with flexibility to accommodate occupation Sixth Floor (Part) 5,126 476 at up to 1:10 sq m Seventh Floor Let to PWC • Floor loading 4.0 + 1.0 KN/M2 • Dramatic winter garden with excellent amenities Eighth Floor Let to PWC • Sky Garden Ninth Floor Let to PWC • High quality materials used throughout Tenth Floor 11,727 1,089 • 128 basement car parking spaces including dedicated electric car charging points Eleventh Floor Let to Clipper Logistics Plc • On site cycle storage, showers and locker rooms Total 78,054 7,249 STYLE AND SUBSTANCE 20 CENTRAL SQUARE LEEDS TYPICAL UPPER FLOOR PLAN TENTH FLOOR - SPACE PLANNING - HIGH CORE HIGH DENSITY OPEN PLAN OFFICE STAFF 330 NO. MEETING ROOM MEETING ROOM (16 PEOPLE) (3 PEOPLE) 1-2-1 MEETING ROOM (4 PEOPLE) RECEPTION & ENTRANCE AREA CLIENT WAITING AREA R RISE R RISE MEETING & E TRAINING ROOM (12 PEOPLE) WC STOR MEETING ROOM (3 PEOPLE) WC . L4 RISER TOILETS WC (EVAC / GDS) WC KITCHEN & WC BREAKOUT AREA (32 PEOPLE) L5 WC LOBBY LEVEL 10 WC WC VOID 3 WC WC STAIR COMMS ROOM MEETING ROOM (4 PEOPLE) MEETING ROOM (3 PEOPLE) FOCUS ROOM PRINT AREA 21.88 M S MEETING ROOM (3 PEOPLE) FOCUS ROOM PRINT AREA S BREAKOUT SEATING RISER 6 PERSON OFFICE MALE WC L10 21.68 M CUPBOARD. ELEC. FEMALE WC 4 UNUSED STAIR S4 FF LOBBY 10 TENTH FLOOR - SPACE PLANNING - MEDIUM FIRST FLOOR PLAN MEDIUM DENSITY MEETING ROOM OPEN PLAN MEETING ROOM (16 PEOPLE) (3 PEOPLE) STAFF 210 NO. 1-2-1 MEETING ROOM CORE (4 PEOPLE) MEETING ROOM OFFICE (14 PEOPLE) RECEPTION & ENTRANCE AREA CLIENT WAITING AREA R RISE R RISE E WC STOR SUITE 2 MEETING ROOM (3 PEOPLE) WC . R L4 RISE KITCHEN & TOILETS WC (EVAC / GDS) BREAKOUT AREA (28 PEOPLE) WC WC PRINT HUB L5 WC LOBBY LEVEL 10 WC WC VOID 3 WC WC STAIR COMMS ROOM MEETING ROOM (4 PEOPLE) OPEN PLAN OFFICE (100 WORKSTATIONS - 1800MM) LET TO CRISP THINKING SUITE 3 BREAKOUT SEATING RISER 6 PERSON OFFICE MALE WC L10 ELEC. CUPBOARD. ELEC. FEMALE WC 4 UNUSED STAIR S4 FF LOBBY 10 22 CENTRAL SQUARE LEEDS OUTSTANDING EFFICIENCY Central Square Leeds is at the pinnacle of sustainability for a Grade ‘A’ office building. The building has been awarded a BREEAM OUTSTANDING rating. EPC ‘A” RENEWABLE ENERGY The building has been designed and developed with Central Square is the first UK office building to utilise a energy efficiency in mind resulting in a market-leading LOW CARBON SYNGAS CHP (Combined Heat & Power) Unit Energy Performance rating (EPC) A. which will generate the total hot water demand and provide electricity to the building. EFFICIENCY OF OCCUPATION WATER CONSERVATION MEASURES The size, flexibility & efficiency of the floorplates are designed • Dual flush sensor flow WC’s. to accommodate occupational densities up to 1:10 sq m but • Waterless urinals this can be enhanced to 1:6 sq m. • Low flow showers. 24 CENTRAL SQUARE LEEDS CENTRE STAGE UNBEATABLE CONNECTIONS Central Square is a two minute walk from Leeds Train Station Plans to transform Leeds Train Station into a new, high speed transport hub will see the city step further into the limelight. With significant improvements to the existing East-West rail network, Leeds will be at the centre of the Northern Powerhouse, cementing its position as a national and international business, retail and leisure destination. 26 CENTRAL SQUARE LEEDS CITY CENTRE IN GOOD COMPANY Explore all that Leeds has to offer, with high end retail, premier leisure With a thriving mix of blue chip organisations, local independent businesses, a range of premium and high street destinations and the city’s office core on your doorstep. retailers and a bustling night-life, Leeds is an established yet continually developing business hub. CENTRAL SQUARE LEEDS ROUND FOUNDRY PARK SQUARECITY SQUARE TRINITY VICTORIA LEEDS LEEDS ARENA THE HEADROW PARK SQUARE 17 CA 18 L VERL 14 EY ST 16 20 21 TRINITY RE ET 19 A64(M) A58(M) 11 23 15 GREAT GEORGE STREET W 12 COOK CITY SQUARE E MERRION STRE AC ET ORD RO F R IDGE ST IDGE ST. ANNE’S ST. St. John’s A58(M) OX Centre 13 ORD PL TEMP F E LAR STREET 10 OX AT GRAND AR . G CADE PARK LANE The Light MARK WELLINGTON ST WESTGATE LANE THE HEADROW HARRISON ST W BRIG UPPER BA UPPER . 22 1 LADY LANE ST NE ST 2 . PARK SQ. N. A DE SOUTH S S ST PARADE NE E RE E EA ET T STGA ARE WE TE RA SINGHA OS LA RL SW RE AN ST UA ING . 4 PA QU K . S ST AR ST CHA ANE BEDFORD STRE IC L ET V L UNION STRE RK SQ ARK CR EA TS COUR ET 9 3 ARK L ST L THORNT 8 P T ONS OD ST P DS PA N BU ARCADE . WO ST PE ST ST GREEK STRE LA E PAUL’S STREET ET R QUEENS A H TE 6 ARCADE R’ W T ALBION PLACE STRE S PARK PLACE RUSSELL ST RO . K BOND ST KING ED TREE WARD INFIRMA R S G ST LO 7 TRAIN STATION . STRE ET N Crof PA ET W COMMERCIAL ST. KI RY LE QUEEN ST t’ s Cour STRE E A58(M) QUEEN ST . R TT YORK PL ACE St RIVER AIRE ALBION t ET BA LI o KIRKG SI 5 T QUEB TE NIA D. E N N R AT WHITEHALL RD GA EC STREToront G E ET RE L TA H NEW YORK STRE I T 24 ALL ST ALL S RA BRIG BR ET WELLINGTON ST Leeds NT Shopping CE . NORTHERN ST Plaza NE DUNCAN LA AIRE ST BO AR LANE STREET LL CA BISHOP SG THE CALL AT S WHITEHALL RD E STRE ET CK ST SOVEREIGN ST DO LA ST WATERLOO ST BOWMAN E L L GLOBE ROAD I NE EV LA E N WATER LAN ADOW ME CH A D CROWN POINT RD D A GRE W T V AT WI M I LSON ST S C I A D L K B R V L S S S A W I H T C U T T BACK RO A T B E H N L O K A L L R S R C R O E T IA HU A T A N A SL L W D RD R ET B MANOR D LA S ARMOURIE B R ID G CARLISLE ST E T 1.
Recommended publications
  • Towards an Understanding of the Contemporary Artist-Led Collective
    The Ecology of Cultural Space: Towards an Understanding of the Contemporary Artist-led Collective John David Wright University of Leeds School of Fine Art, History of Art and Cultural Studies Submitted in accordance with the requirements for the degree of Doctor of Philosophy December 2019 The candidate confirms that the work submitted is his own and that appropriate credit has been given where reference has been made to the work of others. This copy has been supplied on the understanding that it is copyright material and that no quotation from the thesis may be published without proper acknowledgement. The right of John David Wright to be identified as Author of this work has been asserted by him in accordance with the Copyright, Designs and Patents Act 1988. 1 Acknowledgments Thank you to my supervisors, Professor Abigail Harrison Moore and Professor Chris Taylor, for being both critical and constructive throughout. Thank you to members of Assemble and the team at The Baltic Street Playground for being incredibly welcoming, even when I asked strange questions. I would like to especially acknowledge Fran Edgerley for agreeing to help build a Yarn Community dialogue and showing me Sugarhouse Studios. A big thank you to The Cool Couple for engaging in construcutive debate on wide-ranging subject matter. A special mention for all those involved in the mapping study, you all responded promptly to my updates. Thank you to the members of the Retro Bar at the End of the Universe, you are my friends and fellow artivists! I would like to acknowledge the continued support I have received from the academic community in the School of Fine Art, History of Art and Cultural Studies.
    [Show full text]
  • June 2018 • £8.00 Tipping Point for Landfill
    SHOPPINGCENTREThe business of retail destinations www.shopping-centre.co.uk June 2018 • £8.00 Tipping point for landfill Technology diverts food waste from landfill 10 Development 12 Sustainability 17 Parking Intu Watford Centres face food Global tech alliance nears completion waste challenge to streamline parking The Highcross Beacons, @HXBeacons Creative LED solutions to make spaces and places memorable. ADI design content-driven experiences and exceptional digital installations that deliver the unexpected. We combine giant LED platforms with larger-than-life creative to drive large scale IRKEKIQIRXERHMRXIVEGXMSR8SƼRHSYX more visit www.adi.tv/shoppingcentre For more information visit www.adi.tv/shoppingcentre 0800 592 346 | [email protected] | www.adi.tv CONTENTS Editor’s letter Editor Graham Parker 07956 231 078 Fraser is widely forecast to be Wolfson has complained that [email protected] next, with as many as 30 stores a two-tier market is emerging Editorial Assistant earmarked for closure. with retailers paying widely dif- Iain Hoey However the CVA is a form ferent rents for adjacent stores 07757 946 414 of insolvency and the question depending on whether or not [email protected] has to be asked whether these they have been through a CVA. Sales Manager businesses are in fact insolvent. He’s now inserting CVA clauses Trudy Whiston In the end that’s a decision for into leases allowing Next to 01293 416 090 [email protected] lawyers and accountants and claim a rent cut if a neighbour- not magazine editors, but the ing brand wins one through a Database Manager At last there are signs that land- suspicion is that companies CVA.
    [Show full text]
  • Leeds Civic Trust Annual Report Donations and Sponsorship 2017 Chair’S Introduction
    16/17 LEEDS CIVIC TRUST ANNUAL REPORT DONATIONS AND SPONSORSHIP 2017 CHAIR’S INTRODUCTION The Trust gratefully acknowledges the support its work has received from partners and supporters in the form of grants, donations The Trust has had another terrific year at the forefront of As well as Facebook and Twitter we can now add Instagram and gifts in kind. a wide range of discussions that affect this wonderful city to our social media presence. These platforms enable us to of ours! reach out to a much wider audience and they will make a This year, we were pleased to welcome ten new corporate members to the Trust. They comprise the nine members listed in bold significant contribution to broadening our membership. Hand below plus Oakapple Group, who joined us as a gold member. The work of Leeds Civic Trust has not in the least been in hand with this comes our new website. Our thanks must impeded by changes in Director and Chair.We welcomed go to Meleri who has worked extremely hard to bring this to GOLD CORPORATE MEMBERS CORPORATE MEMBERS Martin Hamilton as Director Designate to the Trust in fruition. All of this must surely mark our arrival into the 21st Acanthus WSM Architects Leeds Beckett University October 2016 and it was officially handed over into his very century! A sleeker and more user-friendly approach to our CEG Adair Paxton LLP Leeds Building Society capable hands on Kevin’s retirement in December 2016. communications will no doubt bring us enormous benefits in www.ceg.co.uk Leeds College of Music the long term.
    [Show full text]
  • Approved Agreement
    TWENTY FIFTH SUPPLEMENTAL AGREEMENT between NETWORK RAIL INFRASTRUCTURE LIMITED and NORTHERN TRAINS LIMITED _____________________________________ relating to amendments to the Track Access Contract (Passenger Services) dated 3 March 2016 _____________________________________ THIS TWENTY FIFTH SUPPLEMENTAL AGREEMENT is dated 05 May 2020 and made between: (1) NETWORK RAIL INFRASTRUCTURE LIMITED, a company registered in England under company number 02904587, having its registered office at 1 Eversholt Street, London NW1 2DN ("Network Rail"); and (2) NORTHERN TRAINS LIMITED, a company registered in England and Wales under company number 03076444, having its registered office at Albany House, Floor 8, 94-98 Petty France, London, England, SW1H 9EA (the "Train Operator"). Background: (A) Network Rail and Arriva Rail North Limited entered into a Track Access Contract (Passenger Services) dated 3 March 2016 as amended by various supplemental agreements (which track access contract as subsequently amended is hereafter referred to as the "Contract"). (B) On 1st March 2020, the rights and obligations of Arriva Rail North Limited under the contract were transferred to the Train Operator pursuant to a transfer scheme made by the Secretary of State for Transport on 1st March under schedule 2 of the Railways Act 2005. (C) The parties propose to amend the Contract in the manner and on the terms described below. IT IS HEREBY AGREED as follows: 1. INTERPRETATION In this Supplemental Agreement: 1.1 Words and expressions defined in and rules of interpretation set out in the Contract shall have the same meaning and effect when used in this Supplemental Agreement except where the context requires otherwise. 1.2 “Effective Date” shall mean the later of: 1.2.1 the date upon which the Office of Rail and Road issues its approval pursuant to section 22 of the Act of the terms of this Supplemental Agreement; and 1.2.2 02:00 on the Subsidiary Change Date 2020 2.
    [Show full text]
  • Messages Report Nov 1 Copy.Pptx
    FACEBOOK Blah blah Messages etc.. ENGAGEMENT ANALYSIS CHARTS The chart in this document is collated daily by us as part of our commitment to ensure the marketing we conduct at our schemes is as social as it is effective for both the centres and their tenants. The statistics represent independent figures provided by Facebook and is based on the algorithms they run evaluating the relative performance of Pages and Posts relative to ‘Engagement’, measuring reactions, comments and shares. Messages PR harvest figures for 240 UK Shopping Centres and present them in a tabular form. We display the results in relative terms, which allows us to judge the performance of Pages when comparing the size of schemes and the number of ‘Page likes’ they enjoy. We also show the absolute positions where more Page likes, bigger budgets and boosts all work to generate increased engagement. Messages PR deliver astonishing results, regardless of how they are measured. In this vital Christmas sales period, our centres were placed within 10 of the top 20 places in relative terms and occupied the entire top 7. Even in absolute terms we placed 4 schemes in the top 10 UK Centre pages. Pentagon, Chatham was also number one in absolute terms, the best performing UK Shopping Scheme on Facebook, outperforming the mega centre Bluewater. Similarly Parkway in Middlesbrough outperformed The Metro Centre and Grays outperformed intu Lakeside by significant margins as you can see from the charts. We do not achieve these results by clever tweaking of posts, giveaways or boosts – It is because the work we undertake is genuinely social that we generate extraordinary results on social media.
    [Show full text]
  • NORTHERN RAIL FRANCHISE Service Level Commitment Dated May 2014
    NORTHERN RAIL FRANCHISE Service Level Commitment Dated May 2014 Consolidated to include all agreed amendments from December 2006 until May 2014 inc. Core Version December 2006 - Amendment table: Route(s) Amended Amendment dated First complete issue 10-Dec-2006 Second complete issue 14-Dec-2008 Updated version 16 Sep 2010 Further updated version 25 Nov 2011 Correct an error, Route WY3 and WY7 30 Jan 2012 As after Consultation 15 April 2014 Page 1 of 260 Northern SLC for May 2014 Core Version: Sunday, 10th December 2006 1. CONSTRUCTION AND INTERPRETATION 1.1 Unless otherwise stated this Service Level Commitment shall be interpreted in accordance with the Definitions Agreement between the Authority, each Executive and the Franchisee dated [•]. 1.2 Terms used in this Service Level Commitment shall have the following meaning: “Boxing Day” means 26 December of any year; “Christmas” means 25 December of any year; “Journey Time” means the time in the Timetable to be taken by a service in travelling between the specified departure point and specified destinations for that service; “New Year” means 1 January of any year; “Request Stop Station” means, in relation to any particular train or Passenger Service, a station at which such train or service need only call when a passenger or intending passenger wishes to join such train or service or leave such train or service at such station; “Route” means each of the sub divisions listed in paragraph 9 of this Service Level Commitment; “ScotRail” means the passenger rail franchise let by the Authority in respect of the Scottish domestic passenger services and sleeper services from Scotland to London; “TransPennine Express” the passenger rail franchise let by the Authority in respect of the inter-urban passenger services operated at the date of the Franchise Agreement by First/Keolis TransPennine Limited.
    [Show full text]
  • Leeds Central Portfolio
    Leeds Central Portfolio 132 modern apartments 3 prime, city centre locations 2 I Leeds Central Portfolio Executive Summary • A well established and professionally managed portfolio of 132 modern apartments spread across 9 blocks in 3 central locations • Strong rental demand with the portfolio enjoying consistently high occupancy rate – which is currently at 94% Offers are invited for the • Leeds City Region acts as the regional centre for Yorkshire whole of our clients long and Humber with an economic output of £65.5 billion leasehold interests by and the 3rd fastest growing city centre population in the UK 5:00pm on Tuesday 11th • High tenant retention rate with an average occupancy time of 2.62 years across the portfolio December • Diverse locations with each providing quick access to different elements of the city core • 20 of the apartments are subject to a “covenant-lite” affordable housing s106 agreement • Unit mix of studio, 1 bedroom and 2 bedroom apartments Estimated vacant • Total current income of £864,000 rising to £927,000 on letting possession value of circa of current voids with significant further proven reversion to realise through active management £20 million • Opportunity for short term rental growth through letting of vacant units and reviewing passing rents on let units to ERV 3 I Leeds Central Portfolio Portfolio Analysis Accommodation Income Outgoings Location Total Units Studios 1 bed 2 bed Vacant Passing Rent ERV Service Charge Ground Rent WATERLOO STREET Waterloo Apartments 20 0 14 6 1 £129,000 £142,860 £26,153.2
    [Show full text]
  • Yorkshire and Humber Route Utilisation Strategy Draft for Consultation  Foreword
    Yorkshire and Humber Route Utilisation Strategy Draft for Consultation Foreword It is a pleasure to introduce the Route The additional capacity provided at Leeds in Utilisation Strategy (RUS) for Yorkshire and the last five years has already been largely Humber. This RUS, like the previous ones, used up as a result of the growth in demand, sets out the strategic vision for the future of and the RUS identifies the best solution for a particular part of the rail network. the next decade as being the introduction of more short distance cross-Leeds services in The network in Yorkshire and Humber is the peak. It proposes an additional service incredibly diverse, with heavily used services each hour between Leeds and Manchester, and fast-growing demand into the larger cities as well as some journey time improvements. such as Leeds and Sheffield and across the Additionally, the proposal in the East Coast Pennines to Manchester. There is a great Main Line RUS to introduce a regular clock- deal of freight traffic, particularly to and from face timetable should assist considerably the ports. By contrast, some rural parts of the in terms of both local and “east to network are relatively lightly used. west” services. A number of generic gaps have been Further into the future we can expect to see identified. These include the need for further journey time improvements between additional capacity at peak hours for Leeds and Manchester, between Leeds and commuters into the cities and in the core Sheffield, between Sheffield and Manchester, Leeds to Manchester corridor; the need to and between Bradford and Manchester.
    [Show full text]
  • Northern Trains Limited 30Th Supplemental Agreement
    OFFICIAL THIRTIETH SUPPLEMENTAL AGREEMENT between NETWORK RAIL INFRASTRUCTURE LIMITED and NORTHERN TRAINS LIMITED _____________________________________ relating to amendments to the Track Access Contract (Passenger Services) dated 3 March 2016 _____________________________________ OFFICIAL THIS THIRTIETH SUPPLEMENTAL AGREEMENT is dated 4th December 2020 and made between: (1) NETWORK RAIL INFRASTRUCTURE LIMITED, a company registered in England under company number 02904587, having its registered office at 1 Eversholt Street, London NW1 2DN ("Network Rail"); and (2) NORTHERN TRAINS LIMITED, a company registered in England and Wales under company number 03076444, having its registered office at Albany House, Floor 8, 94-98 Petty France, London, England, SW1H 9EA (the "Train Operator"). Background: (A) Network Rail and Arriva Rail North Limited entered into a Track Access Contract (Passenger Services) dated 3 March 2016 as amended by various supplemental agreements (which track access contract as subsequently amended is hereafter referred to as the "Contract"). (B) On 1st March 2020, the rights and obligations of Arriva Rail North Limited under the contract were transferred to the Train Operator pursuant to a transfer scheme made by the Secretary of State for Transport on 1st March under schedule 2 of the Railways Act 2005. (C) The parties propose to amend the Contract in the manner and on the terms described below. IT IS HEREBY AGREED as follows: 1. INTERPRETATION In this Supplemental Agreement: 1.1 Words and expressions defined in and rules of interpretation set out in the Contract shall have the same meaning and effect when used in this Supplemental Agreement except where the context requires otherwise. 1.2 “Effective Date” shall mean the later of: 1.2.1 the date upon which the Office of Rail and Road issues its approval pursuant to section 22 of the Act of the terms of this Supplemental Agreement; and 1.2.2 02:00 on the Principal Change Date 2020 2.
    [Show full text]
  • Yorkshire Sculpture International 2019 Festival Report
    FESTIVAL REPORT 1 “Yorkshire takes sculpture to heart.” Yorkshire Post, October 2019 Image: Artist Tau Lewis in front of her work The Coral Reef Preservation Society, 2019, at The Hepworth Wakefield Courtesy of the artist and Cooper Cole, Toronto Photography: Danny Lawson/PA Wire 2 About The Festival Yorkshire Sculpture International 2019 was the first major collaborative project between the Henry Moore Institute, Leeds Art Gallery, The Hepworth Wakefield and Yorkshire Sculpture Park. Yorkshire Sculpture International featured new commissions, debut presentations and major exhibitions in the galleries, sculpture outdoors in Leeds and Wakefield, and a lively programme of events throughout the 100 days of the festival from 22 June – 29 September 2019. – One million people saw sculpture in Leeds and Wakefield – 47,000 people participated in 923 events – 19,000 school children visited – 77 artists – 18 international, 39 based in Yorkshire, 20 from across the UK – 620 press features – reaching 2 billion people – £8.3 million contributed to the Yorkshire Economy Image: Visitors at Leeds Art Gallery for the opening of Yorkshire Sculpture International Photography: George Baggaley 3 “This is a 100-year story. Barbara Hepworth and Henry Moore were in Leeds beginning their study of sculpture, and in the past 40 years, in one way or another, both have been relevant to the development of Yorkshire Sculpture Park, The Hepworth Wakefield, the Henry Moore Institute and Leeds Art Gallery, but the critical mass of what is here now seems so strong and
    [Show full text]
  • Our Spaces Strategy Report Appendix
    CITY CENTRE Our Spaces Strategy embodies our vision for the creation of vibrant, inclusive and world-class city centre public realm. Our ambition is that through this strategy our public realm will become the city’s greatest cultural asset. Cover image © Simon Dewhurst for Victoria Leeds CONTENT FOREWORD 04 01 EXECUTIVE SUMMARY 05 02 INTRODUCTION 09 03 OUR CHALLENGES 24 04 OUR PRINCIPLES 38 05 TRANSFORMING OUR CITY 47 06 CONCLUSION 77 Published March 2020 In collaboration with: 03 FOREWORD | LEEDS OUR SPACES STRATEGY FOREWORD Our city centre is changing rapidly and the Our Spaces Strategy is vital to support the Council and stakeholders in transforming the quality and quantity of the city’s public realm. The Our Spaces Strategy is much more than a public realm-focussed project however. It is a call to action to ensure that the creation of green infrastructure is at the forefront of all new development proposals being brought forward. In doing so it supports our ambition to become carbon neutral by 2030; to improve the lives of our citizens by improving air quality, providing spaces to relax and safe places to walk and cycle; and improve the environment for our wildlife by increasing biodiversity. It is a catalyst for sustainable regeneration, inclusive growth and city resilience. It takes account of the changing needs of the city centre, recognising that more people will be living there in the future, and their requirements, from the youngest children to the oldest people, need to be considered in our spaces. It is a route map to ensure that the delivery of new and improved public realm meets our vision for the creation of world-class, inclusive and vibrant spaces that can improve the health and well-being of our city centre and all the people who use it.
    [Show full text]
  • 27Th Leeds International Film Festival 6 - 21 November 2013
    27th Leeds International Film Festival 6 - 21 November 2013 Official Selection Retrospectives Fanomenon Free Guide Cinema Versa Short Film City Welcome WELCOME TO THE 27th LEEDS INTERNATIONAL FILM FESTIVAL The LIFF27 Guide is just the start to your experience of one of the most diverse and exciting film festival programmes in Europe. Every year the mission of Leeds International Film Festival is to bring to the city the full, incredible world of global filmmaking and to make the experience for audiences accessible and unforgettable. GUIDE CONTENTS In these pages are listed all the feature films, events and short film programmes at time of going to press for our five major programme sections: Official Selection, Retrospectives, Fanomenon, Cinema Versa, and Short Film City. Full details of tickets, SCREENING INFORMATION passes, and venues are up front (a full pass is only £90), while at the back you will find • LIFF does not show trailers or adverts before films and where an invaluable day by day guide to more possible all screenings start at the time advertised: sometimes than 250 screenings and events in LIFF27. a LIFF programmer or a guest will make a short introduction. Leeds Film City 4 • Any film not in English language has subtitles, and this is Tickets & Passes 5 indicated in the film listings as ST. Where films are subtitled the Map & Venues 6 - 7 original language is usually the same as the country of origin. Partners 9 For full details see www.leedsfilm.com Official Selection A to Z 11 - 19 • Most films in the programme have recommended certificates: Retrospectives A to Z 21 - 29 please contact the festival office or city centre box office for Fanomenon A to Z 33 - 45 advice on suitability.
    [Show full text]