Borough Local Highway Panel - Approved Works Programme 2017/18

Schemes Key Completed Cancelled Update

Ref Cost Code Scheme Parish Finish Scheme Stage Works Description Allocated Budget Comments

Approved Schemes - Prioritised for 2017/18 delivery

1) Install yellow backed mini roundabout and give way signs adjacent to the give way markings on the eastbound High Street approach to the mini roundabout. 2) Replaced the existing mini roundabout sign for westbound High Street traffic with a yellow backed version to increase its conspicuity. 1 LCAS151003 Seaview Road junction with High Street 27-Apr-17 Total Scheme 3) Installed a dome in the central island of a mini roundabout. £26,000 Casualty reduction scheme completed . 4) Reloaction of 2 bus bus stops. 5) Add a 20 mph roundel on the carriageway at the existing eastbound gateway into the 20mph zone. 6) Renewed all existing carriageway markings throughout the junction and on the approaches to the mini roundabout.

Delivery of scheme to remove build out and replace with 2 LCAS162027 Mornington Road Canvey Island 24-Apr-17 Total Scheme £30,000 Completed . speed hump or other suitable traffic calming measure.

Delivery of the following measures: Most of the works have been completed , UKPN still need to 1) Zebrite belisha beacon. 3 LCAS161006 High Road, Benfleet Benfleet Quarter 2 Implementation £70,000 undertake one transfer from an old column to a new one. After this 2) Internally illuminated modular posts, we will need to revisit site to withdraw the old columns. 3) Refreshing high friction surfacing, footway improvements .

4 LCAS162053 St Michaels Road, Hadleigh- Chevron Bend Hadleigh Quarter 3 Total Scheme Addition of a chevron sign on bend. £6,000

Kents Hill Road North junction with A13- Relocate stop marking at junction back to provide more space 5 LCAS162055 Quarter 3 Total Scheme £6,000 Relocating road marking for traffic turning in to Kents Hill Road.

Study to look at improving the traffic movements around the 6 LCAS172002 Benfleet Station South Benfleet Quarter 3 Feasibility £5,000 station. Possibly explore a one way system.

Implementation of advisory 20 with wig wags as designed in 7 LCAS172001 Hart Road outside Cedar Hall School- Variable 20 South Benfleet Quarter 4 Implementation £6,500 2016-17

8 LCAS152059 111 Church Road, Hadleigh Hadleigh Quarter 2 Total Scheme Removal of bollards which are restricting parking. £1,500

Installation delayed due to delay in delivery of lighting columns and now encountered further delays due to issues with gaining the 9 LCAS162022 Mitchells Avenue Canvey Island 12-Jul-17 Total Scheme Installation of zebra crossing. £45,000 required works permit for erecting new columns near to existing overhead power cables. New date for intallation is the 12 July 2017. Castle Point Borough Local Highway Panel - Approved Works Programme 2017/18

Schemes Key Completed Cancelled Update

Ref Cost Code Scheme Parish Finish Scheme Stage Works Description Allocated Budget Comments

Feasibility Study and detailed design to provide full review of 10 LCAS162050 All routes surrounding Manor Trading Estate South Benfleet Quarter 4 Feasibility HGV signage on routes leading to and from Manor Trading £5,000 Estate

11 LCAS152007 New Road, Hadleigh, Build out Removal Hadleigh Quarter 2 Total Scheme Removal of build out at Rectory Road end of road. £18,000

Advanced design - Link Road between Second Avenue and 12 LCAS171001 Link Road j/w Third Avenue Canvey Island Quarter 4 Total Scheme Third Avenue, to determine if the location is suitable for a new £78,000 Casualty Reduction Scheme. zebra crossing.

1) Remove the traffic island currently separating the general A13 on East side of Rectory Road 4 mtrs north of traffic and bus lane. 13 LCAS171002 Hadleigh Quarter 4 Total Scheme £21,000 Casualty Reduction Scheme. j/w Church Road, Hadleigh, Benfleet. 2) Revise the layout to suit, with three adjacent lanes and a single straight across crossing.

Approved Schemes - For 2018/19 Rolling Programme

Feasibility study to look at possibility of converting grassed Based on Prioritisation at March 2017 Panel meeting, this scheme 14 LCAS162063 Parkfields, Hadleigh- Feasibility for parking bays Hadleigh 2018/19 Feasibility £5,000 areas into parking bays is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 15 LCAS166001 Church Road (o/s Manor Auto Park), Thundersley 2018/19 Total Scheme Replace existing Wig Wag sign. £4,000 is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 16 LCAS168001 Footpath 10 Canvey Island Canvey Island 2018/19 Total Scheme New footpath edging and surface. £20,000 is in the LHP rolling programme of works.

Footpath 15 and 17, Benfleet- Footway Based on Prioritisation at March 2017 Panel meeting, this scheme 17 LCAS168002 South Benfleet 2018/19 Total Scheme New footpath edging and surface. £20,000 improvements is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 18 LCAS162012 Broughton Road, Hadleigh- One Way System Hadleigh 2018/19 Implementation Replacement bus shelter £7,000 is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 19 LCAS165002 Rivers Corner - IM239b South Benfleet 2018/19 Total Scheme Replacement bus shelter £6,500 is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 20 LCAS165003 Central Avenue - 41004010 South Benfleet 2018/19 Total Scheme Replacement bus shelter £6,500 is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 21 LCAS165004 Limetree Avenue - 41011003 South Benfleet 2018/19 Total Scheme Replacement bus shelter £6,500 is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 22 LCAS165005 Cemetery Corner IM1950b South Benfleet 2018/19 Total Scheme Replacement bus shelter £6,500 is in the LHP rolling programme of works. Castle Point Borough Local Highway Panel - Approved Works Programme 2017/18

Schemes Key Completed Cancelled Update

Ref Cost Code Scheme Parish Finish Scheme Stage Works Description Allocated Budget Comments

Based on Prioritisation at March 2017 Panel meeting, this scheme 23 LCAS165006 Cedar Road - 41006002 South Benfleet 2018/19 Total Scheme Replacement bus shelter £6,500 is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 24 LCAS165007 Woodmans Arms - 41004001 South Benfleet 2018/19 Total Scheme Replacement bus shelter £6,500 is in the LHP rolling programme of works.

Elsinor Avenue junction with Somnes Avenue- Request to look at improving the visibility of vehicles exiting Based on Prioritisation at March 2017 Panel meeting, this scheme 25 LCAS162065 Canvey Island 2018/19 Feasibilty £4,000 Improve visibility Elsinor Avenue. is in the LHP rolling programme of works.

Based on Prioritisation at March 2017 Panel meeting, this scheme 26 LCAS165009 South Road 41013011 South Benfleet 2018/19 Total Scheme Replacement bus shelter £6,500 is in the LHP rolling programme of works.

Information received update will be provided once all information 27 LCAS142012 Roscommon Way, Canvey Canvey Island 2018/19 Feasibility Signage Review £35,000 has been reviewed.

Data has been received, policy / guidance reviewed and site visits Feasibility to look at implementing 20mph restrictions outside 28 LCAS152024 Castle Point Schools 20mph review Borough Wide 2018/19 Feasibility £20,000 made. Still need to analyse data and formulate measures and school locations detail in report.

Detailed design and risk assessment (RSA2) to confirm safety Based on Prioritisation at March 2017 Panel meeting, this scheme 29 LCAS154001 Way Cycle Lane 2018/19 Design £3,000 and costs of option 3 in Essex Way cycle lane feasibility study. is in the LHP rolling programme of works. This is currently on hold.