Coega Wind Energy Project, Eastern Cape Province of South Africa

Total Page:16

File Type:pdf, Size:1020Kb

Coega Wind Energy Project, Eastern Cape Province of South Africa PROPOSED COEGA WIND ENERGY PROJECT, EASTERN CAPE PROVINCE OF SOUTH AFRICA ENVIRONMENTAL IMPACT ASSESSMENT VOLUME 3: ENVIRONMENTAL IMPACT ASSESSMENT REPORT DEA REFERENCE NUMBER: 12/12/20/2085 Prepared for: Prepared by: InnoWind (Pty) Limited Coastal & Environmental Services P.O. Box 934 P.O. Box 1116 Grahamstown, 6140 Port Elizabeth, 6000 South Africa South Africa MAY 2011 REPORTS PRODUCED AS PART OF THIS EIA: Volume 1: Environmental Scoping Report Volume 2: Specialist Reports Volume 3: Environmental Impact Assessment Report Volume 4: Environmental Management Programme This Report should be cited as follows: Coastal & Environmental Services (May 2011). Environmental Impact Assessment for the Proposed Coega Wind Energy Project. Volume 3: Environmental Impact Assessment Report. CES, Grahamstown. COPYRIGHT INFORMATION This document contains intellectual property and propriety information that is protected by copyright in favour of Coastal & Environmental Services and the specialist consultants. The document may therefore not be reproduced, used or distributed to any third party without the prior written consent of Coastal & Environmental Services. This document is prepared exclusively for submission to InnoWind (Pty) Limited, and is subject to all confidentiality, copyright and trade secrets, rules intellectual property law and practices of South Africa. Volume 3: Environmental Impact Report – May 2011 EXECUTIVE SUMMARY Background InnoWind (Pty) Limited - a Franco-South African Independent Power Producer that develops, finances, builds, operates and maintains commercial wind powered electricity generation facilities, plans to develop a wind energy facility (often referred to as a „wind farm‟) on a portion of Zone 14 of the Coega Industrial Development Zone (IDZ), two property portions adjacent to Zone 14, and on Pretoria Portland Cement (PPC) property immediately north of Zone 14. The IDZ is situated in the Nelson Mandela Bay Metropolitan Municipality (NMBMM) in the Eastern Cape Province of South Africa, approximately 15km north-east of Port Elizabeth. The PPC portion of the study area is currently mined for limestone ore for the production of cement. Coastal & Environmental Services (CES) have been appointed by InnoWind as the Environmental Assessment Practitioner (EAP) to conduct the Environmental Impact Assessment (EIA) process. According to InnoWind the motivation for the proposed project in general terms arose from the following potential benefits: Electricity supply Over the last few years, Port Elizabeth has been adversely impacted by interruptions in the supply of electricity for the area. The implementation of an embedded renewable power generation facility (i.e. one that is not located in the traditionally centralized coal-power producing regions of the Republic of South Africa) next to the city, while forming part of the national power grid, will help stabilize and supplement the local power grid, especially during cold fronts of the winter season when consumption is at its highest and wind yields are too. It will further ease the increased electricity consumption that the expansion of industrial and residential facilities will require. The establishment of the proposed project will contribute to strengthening the existing electricity grid for the area and will aid the government in achieving its goal of a 30% share of all new power generation being derived from Independent Power Producers (IPP). Employment and skills transfer The proposed project will help with the creation of employment and transfer of new technical skills to the residents of the area during both the project development and operations phases of the project. Research and training The proposed development will be located close to Nelson Mandela Metropolitan University (NMMU) and as such, will provide a unique opportunity for students and academics to study a wind farm in the South African context. Such research could include monitoring the effectiveness of proposed mitigation measures. It is to be noted that InnoWind and NMMU signed a Memorandum of Understanding in March 2010 to strengthen the collaboration between the two parties. Social upliftment and local participation The need to improve the quality of life of previously disadvantaged communities is critical to South Africa. The proposed project as structured by InnoWind and in collaboration with Nelson Mandela Metropolitan University (NMMU), will contribute directly to the employment of individuals within the project study area, and more specifically to the identification of community development, education and welfare upliftment initiatives that will be resourced by way of a community development trust fund, the Ibhayi Winds of Change Trust, that will be established specifically for that purpose and funded by a significant portion of the wind energy facility profits themselves. The identified social development projects will be aimed at the fundamental improvement of communities residing near Coega, and more specifically in the adjacent Motherwell Township. To achieve this, InnoWind has entered into an agreement with NMMU to jointly carry-out work relating to the establishment of the above- mentioned trust as InnoWind has done in other wind farm projects, most notably that with Rhodes University for the proposed Waainek Wind Farm Project near Grahamstown. Coastal & Environmental Services i Coega Wind Energy Project Volume 3: Environmental Impact Report – May 2011 Reduction in CO2 emissions: The current project will contribute towards the growth of the South African renewable energy sector and, more specifically, the country‟s wind energy portfolio. Once a number of wind energy facilities are in operation around the country, it is highly probable that at least some will be spinning at any given time. As such, collectively they will provide a reliable “green” input to the national grid (although less than their theoretical maximum combined generating capacity). Initial modelling has been performed and shows a likely 30% capacity base-load from installed wind capacity in SA, thanks to its geographically dispersed different wind regimes. As such, each MWh generated from a wind farm will equate to a MWh not being produced by a conventional source (coal), and thus avoiding the emission of approximately 1 ton of CO2 into the atmosphere. Further, in addition to the above-mentioned benefits, the proposed project site was selected due to: Preliminary indications of good wind resources suitable for the installation of a wind energy facility. Proximity to grid connection opportunities such as the Eskom Dedisa and Grassridge Substations located within the Coega IDZ and the Motherwell municipal substation. The surrounding area is not densely populated and is situated in an approved IDZ suitable for this type of industry i.e. land use compatibility with an industrial zone which already includes a number of tall structures. Need for additional energy capacity – both with the IDZ and the Nelson Mandela Bay Metropolitan Municipality (NMBMM). The potential and appetite within the NMBMM to engage with new and clean technologies. The proposed Coega wind energy project study area is depicted in Figure 1 below. Figure 1: Google Maps image indicating the location of individual property portions within the study area (blue polygons) Coastal & Environmental Services ii Coega Wind Energy Project Volume 3: Environmental Impact Report – May 2011 Project Description As per government notification from DEA (1st April 2011), the aforementioned property layout of four property portions and seventy five (75) turbines as stated within the Scoping report (Coastal & Environmental Services, November 2010: Final Environmental Scoping Report: Proposed Coega Wind Energy Project. CES, Grahamstown), has been reduced. The wind farm will now be spread over two adjacent property portions in the Coega/Grassridge area. The two land portions are planned to host up to seventy (70) turbines, each with a nominal power output ranging between 2-3 Mega Watts (MW). The total potential output of the wind farm would be approximately 210 MW, which will serve to further support the regional and national power balance. Provisionally, the 70 turbines have been allocated to the respective property portions as follows: 1. Zone 14 IDZ (Farms Bontrug 301 and Brak River SW 224): 15 turbines 2. PPC (Farms Grassridge 190, 227 and 228, Oliphants Kop 201): 55 turbines The final number of turbines and their definitive placement have been further informed by EIA phase specialist study and assessment conducted for this report. The ultimate size of the wind turbines will depend on further technical assessments but will typically consist of rotor turbines (3x50m length blades) with rotor diameters of around 100 meters mounted atop a 80 - 100 meter high steel (or hybrid steel/concrete) tower. Other infrastructure components associated with the proposed wind energy facility are inter alia: Concrete foundations to support the wind turbine towers; Approximately 4 meter wide internal access roads to each turbine Underground electricity reticulation cables connecting the wind turbines to one another 33 kilo Volt (kV) overhead power lines linking the site to the Grassridge or/and Motherwell Substation (to be confirmed) The necessary upgrades/extensions to the Eskom substations that may be required, additional line bays and transformers, busbars etc. The term “wind energy” describes the process by which wind is used to generate mechanical power or electricity.
Recommended publications
  • Cape St. Frances to Port Elizabeth Map 2020
    Cape St. Francis, Jeffreys Bay, Port Elizabeth and Addo Elephant National Park map Waterford Road to Sumerset East Road to Klipfontein Road to Road to Cookhouse / Cradock Graaf-Reinet Graaf-Reinet R335 Greystone R400 Renosterfontein Darlington Road to 137Km Dam Riebeek East / Grahamstown (Wolwefontein to Graaf Reinet) N10 R400 Kuzuko Lodge Swartwaterspoort Riebeek East Klein-Winterhoekberge R75 R335 Frontier Safaris R329 Sundays River Game Farm 138Km Wolwefontein (Wolwefontein to Willowmore) Addo Elephant Rockdale National Park Game Ranch Kleinpoort 245Km Alicedale (Port Elizabeth to Cradock) 205Km (Paterson to Cradock) Suurberg Tootabi Lobengula Lodge Hunting 37Km Safaris (Wolwefontein to Glenconnor) R75 Wit River Zuurberg Glenconnor Nyathi Rest Camp Bayethe Tented Lodge Pumba Kirkwood National Park Private Game R336 Boesmans Explorer Eagles Kwantu R335 Private Game Reserve & Spa Residents Only River Camp 28Km Coerney River Crag Reserve River Bend Lodge 25Km R342 Inzolo Exclusive Game Lodge Info G A T E T I M E S Shamwari Fuel Bayeti Game Residents Only JAN - 05h30 - 18h30 Paterson Restaurant Domkrag Dam Private Game Reserve Addo Main Camp Nzipondo Loop FEB - 05h30 - 18h30 Hide Woodlands MAR - 05h30 - 18h30 Reserve Rooidam Gwarrie APR - 06h00 - 18h00 Long Lee Pan MAY - 06h00 - 18h00 Manor 128Km Zuurkop Garoh JUNE - 06h00 - 18h00 Road to Lookout Loop JULY - 06h00 - 18h00 Sindile Luxury (Port Elizabeth 60Km Ngulube Zuurkop AUG - 06h00 - 18h00 Tented Camp to Grahamstown) Grahamstown 35Km R336 Waterhole SEPT - 06h00 - 18h00 (Uitenhage to
    [Show full text]
  • Population Trends of Seabirds Breeding in South Africa's Eastern Cape and the Possible Influence of Anthropogenic and Environ
    Crawford et al.: Population trends of seabirds breeding in South Africa 159 POPULATION TRENDS OF SEABIRDS BREEDING IN SOUTH AFRICA’S EASTERN CAPE AND THE POSSIBLE INFLUENCE OF ANTHROPOGENIC AND ENVIRONMENTAL CHANGE ROBERT J.M. CRAWFORD,1,2 PHILIP A. WHITTINGTON,3,4 A. PAUL MARTIN,5 ANTHONY J. TREE4,6 & AZWIANEWI B. MAKHADO1 1Department of Environmental Affairs and Tourism, Marine and Coastal Management, Private Bag X2, Rogge Bay, 8012, South Africa ([email protected]) 2Animal Demography Unit, Department of Zoology, University of Cape Town, Rondebosch, 7701, South Africa 3East London Museum, PO Box 11021, Southernwood, 5213, South Africa 4Department of Zoology, PO Box 77000, Nelson Mandela Metropolitan University, Port Elizabeth, 6031, South Africa 5PO Box 61029, Bluewater Bay, 6212, South Africa 6PO Box 211, Bathurst, 6166, South Africa Received 28 August 2008, accepted 4 April 2009 SUMMARY CRAWFORD, R.J.M., WHITTINGTON, P.A., MARTIN, A.P., TREE, A.J. & MAKHADO, A.B. 2009. Population trends of seabirds breeding in South Africa’s Eastern Cape and the possible influence of anthropogenic and environmental change. Marine Ornithology 37: 159–174. Eleven species of seabird breed in South Africa’s Eastern Cape Province. Numbers of African Penguin Spheniscus demersus and Cape Gannet Morus capensis in the province increased in the 20th century, but penguins decreased in the early 21st century. A recent eastward displacement of Sardine Sardinops sagax off South Africa increased the availability of this food source to gannets but did not benefit penguins, which have a shorter foraging range. Fishing and harbour developments may have influenced the recent decrease of penguins.
    [Show full text]
  • Southern Corridor, Cape St Francis / Port Elizabeth, Eastern Cape Province, South Africa
    FINAL DRAFT REPORT HERITAGE IMPACT ASSESSMENT OF THUYSPUNT NUCLEAR 400kV INTEGRATION PROJECT: SOUTHERN CORRIDOR, CAPE ST FRANCIS / PORT ELIZABETH, EASTERN CAPE PROVINCE, SOUTH AFRICA Assessment and report by For SiVEST Environmental Division Telephone Jenny Barnard 021 852 2988 Box 20057 Ashburton 3213 PIETERMARITZBURG South Africa Telephone 033 326 1136 Facsimile 086 672 8557 082 655 9077 / 072 725 1763 2 March 2009 [email protected] HERITAGE IMPACT ASSESSMENT OF THUYSPUNT NUCLEAR 400kV INTEGRATION PROJECT: SOUTHERN CORRIDOR Management summary eThembeni Cultural Heritage was appointed by SiVEST Environmental Division to undertake a heritage impact assessment of the proposed northern corridor of the Thuyspunt Nuclear 400kV project between Cape St Francis and Port Elizabeth, in terms of the Heritage Resources Act No 25 of 1999. Two eThembeni staff members inspected the area on 9 to 12 September 2008 and 10 to 13 February 2009 and completed a controlled-exclusive surface survey, as well as a database and literature search. The purpose of this heritage impact assessment has been to identify potential heritage problem areas associated with the five kilometre wide southern corridor servitude, within which two power lines and a substation will be located. We had to take the following factors into consideration: o The constraints of fieldwork and a desktop study of a five kilometre wide servitude over 140 kilometres; o The fact that the southern corridor will definitely be utilised and that the only mitigation option is that of routing the power lines differently within the five kilometre wide servitude; o The linear nature of the project where, apart from the proposed substation location, tower positions can be altered to avoid direct impacts on heritage resources; o All categories of heritage resource (with the possible exception of sites associated with slavery and movable objects) occur throughout the proposed development area.
    [Show full text]
  • Draft Basic Assessment Report: Proposed
    DRAFT BASIC ASSESSMENT REPORT: PROPOSED UPGRADING OF NATIONAL ROUTE R335 BETWEEN MOTHERWELL (KM 5.600) AND ADDO (KM 37.600), WITHIN THE NELSON MANDELA BAY MUNICIPALITY AND SUNDAYS RIVER VALLEY LOCAL MUNICIPALITY, EASTERN CAPE PROVINCE NOVEMBER 2018 Terratest (Pty) Ltd Reference No.: 41643 DEA Reference No.: Pending NEAS Reference No.: Pending Prepared by: TERRATEST (PTY) LTD PO Box 27308, Greenacres Port Elizabeth, 6057 Telephone: (041) 390 8730 Contact: Mrs Cherize Coetzee Email: [email protected] DBAR: R335 Upgrade, Motherwell to Addo 41643 VERIFICATION PAGE TITLE: PROPOSED UPGRADING OF NATIONAL ROUTE R335 BETWEEN MOTHERWELL (KM 5.600) AND ADDO (KM 37.600), WITHIN THE NELSON MANDELA BAY MUNICIPALITY AND SUNDAYS RIVER VALLEY LOCAL MUNICIPALITY, EASTERN CAPE PROVINCE PROJECT NO.: DATE: REPORT STATUS: 41643 November 2018 Draft CARRIED OUT BY: COMMISSIONED BY: Terratest (Pty) Ltd, Pietermaritzburg South African National Roads Agency SOC Ltd PO Box 27308 PO Box 24210 Greenacres Baywest Boulevard, Hunters Retreat Port Elizabeth Port Elizabeth 6057 6025 Tel: (041) 398 3249 Tel: (033) 343 6789 Fax: (041) 363 1922 Tel: (033) 343 6701 Email: [email protected] Email: [email protected] AUTHORS: CLIENT CONTACT PERSON: Ms Imke Summers Mr S Robertson SYNOPSIS: Basic Assessment Report for the proposed upgrading of the R335 road between Motherwell and Addo, within the Nelson Mandela Bay Municipality and Sundays River Valley Local Municipality KEY WORDS: R335 Road, Motherwell, Addo, Upgrade, Widening, Bridges, Culverts, Basic Assessment, Environmental Management Programme, EIA Regulations (2014, as amended), Nelson Mandela Bay Municipality, Sundays River Valley Local Municipality, SANRAL © Copyright Terratest (Pty) Ltd QUALITY VERIFICATION This report has been prepared under the controls established by a quality management system that meets the requirements of ISO9001: 2008 which has been independently certified by DEKRA Certification under certificate number 90906882.
    [Show full text]
  • Public Participation Process: Bayview Wind Farmdraft
    PUBLIC PARTICIPATION PROCESS: BAYVIEW WIND FARM DRAFT AMENDED ENVIRONMENTAL IMPACT REPORT (EIR) 1. PROOF OF SITE NOTICE DATE PLACED: 21 AUGUST 2020 LOCATION: 33°43'2.91"S, 25°35'42.66"E (along the R335 road) 1 2 2. UPDATED STAKEHOLDER AND I&AP DATABASE BAYVIEW WIND FARM: UPDATED STAKEHOLDER AND I&AP DATABASE AFFECTED PROPERTY, COMPANY OR TELEPHONE CONTACT PERSON ADDRESS EMAIL ADDRESS DEPARTMENT NUMBER Remaining Extent of the Farm Jakkie Erasmus and Elma 0825745653 PO Box 1197, Uitenhage, 6230 [email protected] Oliphants Kop 201 Erasmus 0722295169 Portion 4 of the Farm Steins Valley 084 854 4774 SP Meiring PO Box 126, Kirkwood, 6120 [email protected] 202 042 230 0426 Remaining Extent of Portion 8 of the Johan Hugo 083 233 3176 - [email protected] Farm Ebb and Vloed 230, Portion 1 of the Farm Oliphants Kop 201 PPC Cement 011 386 9489 Private Bag 2016, North End, 6056, Port [email protected] Remaining Extent of the Farm Aili Zeeman 078 450 7009 Elizabeth Grassridge 225, Remaining Extent Coega Development Corporation Coega IDZ Business Centre, Corner (CDC) 041 403 0664 Remaining Extent of Coega Erf 248 Alcyon Road & Zibuko Street, Port [email protected] Operations project manager: 082 657 4648 Elizabeth, 6100 Andrea Shirley ESKOM 041 405 0515 Uitenhage Farms 612 - [email protected] Eddie Leach 011 800 8111 Remaining Extent of the Farm PPC Cement 011 386 9489 Grassridge 227 Aili Zeeman Private Bag 2016, North End, 6056, Port [email protected] 078 450 7009 Remaining Extent of the Farm Elizabeth Geluksdal 590 Magnus
    [Show full text]
  • Appendix H.4 –
    Curriculum Vitae CHRISTELLE DU PLESSIS 38 Hely Road, Fernglen, Port Elizabeth Mobile: +27 74 148 5583, Email: [email protected] Identity number 8306140057087 Nationality South African Languages Afrikaans (Mother tongue); English (Fluent) Driver’s licence Code B KEY COMPETENCIES I am an environmental consultant with seven years’ experience in the environmental consulting field. My experience includes the management of water use, waste management and environmental applications, strategic environmental management, the development of construction and operational environmental management plans, compliance auditing and monitoring, and project management. I have worked in and managed multidisciplinary teams, and have strong report writing and interpersonal skills. EDUCATION AND PROFESSIONAL STATUS MSc Ecology (cum laude ), Nelson Mandela Metropolitan University, South Africa, 2009 BSc (Hons) Zoology, Nelson Mandela Metropolitan University, South Africa, 2005 BSc Zoology ( cum laude ), Nelson Mandela Metropolitan University, South Africa, 2004 Certificate: Environmental Impact Assessment, Rhodes University, South Africa, 2009 Registered as Professional Natural Scientist with SACNASP (Registration No 400105/17) EMPLOYMENT AND EXPERIENCE RECORD June 2017 – current HABITAT LINK CONSULTING Managing Director / Environmental Consultant • Environmental impact assessments • Strategic environmental management • Compliance monitoring and auditing (against national and international lender standards) • Environmental advisory services • Project
    [Show full text]
  • Chapter 3: Description of the Affected Environment
    Proposed extension to the container berth and construction of an administration craft basin at the Port of Ngqura Chapter 3 : Description of the Affected Environment Chapter 3: Description of the Affected Environment Final Scoping Report – CSIR, April 2007 Page i Proposed extension to the container berth and construction of an administration craft basin at the Port of Ngqura Chapter 3 : Description of the Affected Environment Description of the Affected Environment 3. DESCRIPTION OF THE AFFECTED ENVIRONMENT________ 3-1 3.1 Introduction _________________________________________________________3-1 3.2 Site location_________________________________________________________3-1 3.3 Biophysical environment _______________________________________________3-2 3.3.1 Climate ____________________________________________________________ 3-2 3.3.2 Terrestrial features: landscape and geology ________________________________ 3-2 3.3.3 Vegetation __________________________________________________________ 3-3 3.3.4 Birds ______________________________________________________________ 3-3 3.3.5 Marine ecosystems ___________________________________________________ 3-3 3.4 Socio-economic environment ___________________________________________3-4 3.4.1 Demographics and human development___________________________________ 3-4 3.4.2 In-migration _________________________________________________________ 3-4 3.4.3 Initiatives to promote economic development _______________________________ 3-5 Final Scoping Report – CSIR, April 2007 Page ii Proposed extension to the
    [Show full text]
  • Nelson Mandela Bay ULI Panel Report
    Port Elizabeth Nelson Mandela Bay Municipality South Africa November 1–6, 2015 Advisory ServicesReport Panel A ULI Port Elizabeth Nelson Mandela Bay Municipality South Africa Connectivity and Regeneration in the Baakens River Valley Precinct November 1–6, 2015 Advisory Services Panel Report A ULI A ULI About the Urban Land Institute THE MISSION OF THE URBAN LAND INSTITUTE is ■■ Sustaining a diverse global network of local practice to provide leadership in the responsible use of land and in and advisory efforts that address current and future creating and sustaining thriving communities worldwide. challenges. ULI is committed to Established in 1936, the Institute today has more than ■■ Bringing together leaders from across the fields of real 38,000 members worldwide, representing the entire spec- estate and land use policy to exchange best practices trum of the land use and development disciplines. Profes- and serve community needs; sionals represented include developers, builders, property owners, investors, architects, public officials, planners, ■■ Fostering collaboration within and beyond ULI’s real estate brokers, appraisers, attorneys, engineers, membership through mentoring, dialogue, and problem financiers, academics, students, and librarians. solving; ULI relies heavily on the experience of its members. It is ■■ Exploring issues of urbanization, conservation, regen- through member involvement and information resources eration, land use, capital formation, and sustainable that ULI has been able to set standards of excellence in development; development practice. The Institute has long been rec- ■■ Advancing land use policies and design practices that ognized as one of the world’s most respected and widely respect the uniqueness of both the built and natural quoted sources of objective information on urban planning, environments; growth, and development.
    [Show full text]
  • Palaeontological Impact Assessment: Desktop Study
    PALAEONTOLOGICAL IMPACT ASSESSMENT: DESKTOP STUDY Proposed construction of two filling stations adjacent to the N2, Zones 1 and 2 of the Coega IDZ, Nelson Mandela Bay Municipality, Eastern Cape Province John E. Almond PhD (Cantab.) Natura Viva cc, PO Box 12410 Mill Street, Cape Town 8010, RSA [email protected] April 2010 1. SUMMARY The two proposed filling station developments are located either side of the N2 in Zones 1 and 2 of the Coega IDZ, between St George’s Strand and Motherwell, Nelson Bay Municipality. Both development sites are underlain by limestone-rich shallow marine sediments of the Alexandria Formation (Algoa Group), with intermittent cover of pebbly residual weathering products (the so-called Bluewater Bay Formation). The Alexandria Formation has a high palaeontological sensitivity since it hosts a rich fossil marine biota of Miocene to Pliocene age that is dominated by molluscs and various other invertebrates, together with rare fish and (possibly) other vertebrate remains. Although much of the Alexandria Formation within the Coega IDZ has been altered by weathering and calcretization, seriously reducing its fossil content, the two filling station developments are situated close to an established fossil site (an abandoned limestone quarry) within this formation. Palaeontological mitigation is therefore recommended in both cases. Should thin sandstones and mudrocks of the Sundays River Formation beneath the Algoa Group limestone capping be exposed during deep excavations, these potentially fossil-rich sediments will also require palaeontological mitigation. Mitigation by a qualified palaeontologist should entail (a) the field examination of new excavations, (b) the recording of sedimentological and palaeontological data, (c) the judicious sampling of fossil material and (d) recommendations for any further action required to safeguard fossil heritage.
    [Show full text]
  • Luc Strydom Environmental Consultant
    SRK Consulting Page 1 Luc Strydom Environmental Consultant Profession Environmental Scientist Education BA Environmental Management, University of South Africa, 2015 Registrations/ Registered EAP, EAPASA (2020/1504) Affiliations Certificated Natural Scientist (EIA), SACNASP (Reg No. 120385) Member, South African Wetland Society (Membership No.: 193665) Member, International Association of Impact Assessors, South Africa (IAIAsa), Volunteer, Custodians of Rare and Endangered Wildflowers (CREW). Specialisation Wetland and aquatic impact assessments, botanical surveys, vegetation impact assessments, invasive alien monitoring and control plans, rehabilitation plans, environmental impact and basic assessments, environmental management programmes (EMPrs), water use license applications (WULAs), environmental auditing (environmental control officer), geo-hydrological sampling, section 24G applications & GIS systems. Expertise Luc Strydom has previous experience in GIS, working for Setplan PE, a town planning consultancy group. His expertise in GIS includes map production, data capturing, data manipulation, data acquisition and database management. Luc has developed his skills and expertise over the years as he has been involved in many different types of environmental projects, such as: • environmental impact assessments (EIAs); • wetland and aquatic impact assessments (wetland screening, delineation, PES & EIS determination, ecosystem services assessment, etc.); • environmental management plans/programmes (EMPr); • environmental auditing (acting
    [Show full text]
  • Protest May 2021
    National Crime Assist (NCA) REG NO 2018/355789/08 K2018355789 (NPC) PROTEST MAY 2021 www.nca247.org.za Fighting crime is what we do! 01 May 2021 MP - Secunda WC - Cape Town * CBD (peaceful march) GP - Kliprivier/Heidelberg, R59, Petrol Tanker set alight 02 May 2021 KZN - Durban * Warwick/Old Dutch rd (Taxi blockade) GP - Pretoria *Dr Swanepoel/ Dr vd Merwe str (road blocked with stones) 03 May 2021 KZN - Greytown > Mooiriver * TRP, Dwarsriver mine (all entrances blocked) GP - Midrand * c/o Klipriver dri/ Booysens rd GP – Vosloosrus * N3 LP - Vaalwater *R33, various locations (stone throwing, vehicle taken, violence, closing shops) (protestors tried to enter Police Station) EC - East London * Various roads closed (stone throwing, burning tyres) EC- Mdantsane * All entrys closed (burning tyres) KZN - Louwsburg / Vryheid, R69 * road closed (with rocks and branches) NC - Jan Kempdorp (town closed off) KZN – Richards Bay * N2, Closed (truck blocking road) KZN - Nseleni * N2, blocked at Zenith Estates NW - Brits * van Velden str (court protest) WC- Mitchels Plain * 10th Ave/ Charlie str GP - Bronkhorstspruit *Diamond Hill Plaza * N4 Bridge (Stone throwing) KZN - Durban * Broad str (Eff march, firing shots) * West str KZN - Eshowe * R66 LP Steelpoort * Minning Area MP Bethal/Morgenzon * R35, truck set alight, by ADTF protesters driver shot, luckily not serious. 04 May 2021 KZN - Eshowe * R66, 10km before Eshowe (burning tyres) WC – Cape Town * R300/N1 (7 taxi blocked road) *Botlary Rd (Paarl taxis blocking road) *c/o N7 / Malibongwe dr * M17,
    [Show full text]
  • Upgrade of Main Road 435, Coega Industrial Development Zone, Eastern Cape
    UPGRADE OF MAIN ROAD 435, COEGA INDUSTRIAL DEVELOPMENT ZONE, EASTERN CAPE FINAL SCOPING REPORT Prepared by Coastal & Environmental Services P.O. Box 934 Grahamstown 6140 For Coega Industrial Development Zone and Port Libra Chambers Oakworth Road Humerail Port Elizabeth 6001 C/O Ninham Shand/Manong & Associates Joint Venture 120 Villiers Road Walmer 6070 Port Elizabeth March 2005 Coastal & Environmental Services TABLE OF CONTENT SECTION 1: SCOPING REPORT ................................................................................................... 1 1. INTRODUCTION ................................................................................................................. 1 1.1 Background ............................................................................................................. 1 1.2 Brief project description ........................................................................................... 1 1.3 Alternatives .............................................................................................................. 2 1.4 Project methodology ................................................................................................ 2 1.5 Scope of work .......................................................................................................... 3 1.6 Study team .............................................................................................................. 4 1.7 Structure of report ...................................................................................................
    [Show full text]