Blackwater Rail Corridor Fact Sheet 385KB

Total Page:16

File Type:pdf, Size:1020Kb

Blackwater Rail Corridor Fact Sheet 385KB Blackwater Rail Corridor The Blackwater Coal Rail System is one of four systems in Aurizon’s Central Queensland Coal Network (CQCN). It has the largest route length of the four coal systems. The Blackwater system links Central System facts. Queensland mines from the Bowen Basin to two export terminals at the Track manager Aurizon Port of Gladstone — RG Tanna Coal Terminal and the Wiggins Island Track axle load 26.5 tonnes Coal Export Terminal (WICET). Track gauge Narrow (1067 mm) In late 2015 Aurizon completed Track configuration Combination of single and duplicated tracks the Wiggins Island Rail Project (WIRP), which involved the staged Export terminals 2 development of new rail lines and upgrading of existing lines to WICET. Blackwater is largely an electrified WIRP created a vital link between the system, however, Aurizon also runs coal terminal and mines in the Southern a small number of diesel services. Bowen and Surat Basins. The rail expansion comprised interdependent Major Aurizon customers in the infrastructure projects across the Blackwater system include BMA, Blackwater Rail System, the Moura Jelinbah Resources, Westfarmers Rail System and the North Coast Line. and Glencore. On the long-haul Blackwater system, Aurizon meets customers’ needs through a heavy haul fleet of locomotives and multiple crewing points. Train depots at Callemondah and Bluff are used to provision train services. Fact Sheet Blackwater Rail Corridor Moranbah North South Walker Creek Isaac Plains Coppabella (Macarthur) Coppabella Moranbah Peak Downs Eagle Downs Saraji Lake Vermont Dysart Middlemount Bowen Clermont German Creek Basin Rio Tinto Aluminium (RTA) Foxleigh (German Creek) Fisherman's Landing (FL) Gladstone Power Station (GPS) Oaky Creek Stanwell Power Station (St PS) Gregory Yarrabee (Boonal) Kestrel Port of Gladstone Ensham Jellinbah East (Boonal) Curragh Rockhampton Emerald Stanwell RG Tanna Coal Terminal (RGTCT) Blackwater mine Bluff Barney Point Coal Terminal (BPCT) (Blackwater & Boorgoon) Callemondah Wiggins Island Coal Terminal Minerva Blackwater Gladstone Togara North Queensland Alumina Limited (QAL) Cook Baralaba Springsure (Koorilgah) Callide Coalfield (Boundary Hill) Callide Basin Callide Coalfield (Dunn Creek) Rolleston Dawson Biloela Moura West Rolleston Maryborough Monto Bundaberg Basin Theodore Colton Rollingstock depot Metallurgical coal Proposed mines Blackwater Coal Goonyella Coal Train crew depot Mixed coal product Domestic terminal Rail Corridor Rail Corridor LEGEND Thermal mine WandoanCity/town Operating export terminal Moura Coal Rail Corridor Existing rail Wandoan Cameby Downs Gympie (Columboola) Nambour Roma Chinchilla Clarence-Moreton Basin Contact us T 13 23 32 E [email protected] W aurizon.com.au.
Recommended publications
  • Ensuring Reliable Electricity Supply in Victoria to 2028: Suggested Policy Changes
    Ensuring reliable electricity supply in Victoria to 2028: suggested policy changes Associate Professor Bruce Mountain and Dr Steven Percy November 2019 All material in this document, except as identified below, is licensed under the Creative Commons Attribution-Non- Commercial 4.0 International Licence. Material not licensed under the Creative Commons licence: • Victoria Energy Policy Centre logo • Victoria University logo • All photographs, graphics and figures. All content not licenced under the Creative Commons licence is all rights reserved. Permission must be sought from the copyright owner to use this material. Disclaimer: The Victoria Energy Policy Centre and Victoria University advise that the information contained in this publication comprises general statements based on scientific research. The reader is advised and needs to be aware that such information may be incomplete or unable to be used in any specific situation. No eliancer or actions must therefore be made on that information without seeking prior expert professional, scientific and technical advice. To the extent permitted by law, the Victoria Energy Policy Centre and Victoria University (including its employees and consultants) exclude all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses and any other compensation, arising directly or indirectly from using this publication (in part or in whole) and any information or material contained in it. Publisher: Victoria Energy Policy Centre, Victoria University, Melbourne, Australia. ISBN: 978-1-86272-810-3 November 2019 Citation: Mountain, B. R., and Percy, S. (2019). Ensuring reliable electricity supply in Victoria to 2028: suggested policy changes. Victoria Energy Policy Centre, Victoria University, Melbourne, Australia.
    [Show full text]
  • Gladstone Region Population Report, 2016
    Queensland Government Statistician’s Office Gladstone region population report, 2016 Introduction The Gladstone region population report, 2016 provides estimates of Figure 1 Gladstone region the non-resident population of the Gladstone region during the last week of June 2016, based on surveys conducted by Queensland Government Statistician’s Office (QGSO). Information regarding the supply and take-up of commercial accommodation by non-resident workers is also summarised. The non-resident population represents the number of fly-in/fly-out and drive-in/drive-out (FIFO/DIDO) workers who were on-shift in the region at the time of collection. This group includes those involved in the production, construction, and maintenance of mining and gas industry operations, projects and related infrastructure. Non-resident workers are not included in estimated resident population (ERP) data released annually by the Australian Bureau of Statistics. As a result, the full–time equivalent (FTE) population estimates presented in this report, which combine the resident and non-resident populations, provide a more complete indicator of total demand for certain services than either measure used alone. Key findings Key findings of this report include: The non-resident population of the Gladstone region was The Gladstone region – at a glance estimated at 1,540 persons at the end of June 2016, around 3,890 persons or 72% lower than in June 2015. The Gladstone region comprises the local government area (LGA) of Gladstone (R), which Gladstone region's non-resident population in 2015–16 largely includes the city and port of Gladstone, as well as comprised FIFO/DIDO workers engaged in construction of three other residential centres and the rural hinterland.
    [Show full text]
  • Submission to the Independent Review of the Port of Gladstone
    A member group of Lock the Gate Alliance www.savethereef.net.au Dr Andrew Jeremijenko [email protected] 0438372653 Chad Kirby [email protected] Dr Libby Connors [email protected] 0429487110 Gladstone Review Secretariat PO Box 787 Canberra ACT 2601 Email: [email protected] Submission to the Independent Review of the Port of Gladstone Thank you for this opportunity to make a submission. Save the Reef would like to respond to points a) to e) of the terms of reference. a) all previous review findings and information used as a basis for the current approvals for development in the Port of Gladstone; Save the Reef has concerns about the approvals process. There is the suspicion that pressure has been applied at all levels from the inception of the idea, where World Heritage Status and the Outstanding Universal Value of Gladstone harbour and Curtis Island was not properly accounted, through to the Environmental Impact Statements that minimised the environmental sensitivity of the area and did not adequately assess the risks, through to the approval process at both state and federal levels. Coordinator-General Decision-Making Process Three CSG/LNG plants are currently being constructed on Curtis Island. Additionally, the statutory authority, Gladstone Ports Corporation [GPC] is undertaking major coal terminal expansion and preparatory work for potential additional csg/LNG plants on the mainland. In order to support this infrastructure Gladstone Ports Corporation is undertaking the largest dredging operation ever attempted in the Great Barrier Reef World Heritage Area. The Ports Corporation plans to dredge 46 million cubic tonnes from Gladstone Harbour and the LNG sites.
    [Show full text]
  • NRG Energy Successful in Bid for Flinders Power in South Australia
    NRG Energy Successful in Bid for Flinders Power in South Australia August 2, 2000 MINNEAPOLIS, Aug 02, 2000 (BUSINESS WIRE)---NRG Energy, Inc. (NYSE:NRG) announced today it has been named the successful bidder in the South Australian Government's electricity privatization auction for Flinders Power, South Australia's final generation company to be privatized. NRG agreed to pay (Aus.) $313 million ($180 million U.S.) cash for a 100-year lease of the Flinders Power assets. Flinders Power includes two power stations totaling 760 megawatts (MW), the Leigh Creek coal mine 175 miles north of the power stations, a dedicated rail line between the two, and Leigh Creek township. The lease agreement also includes managing the long-term fuel supply and power purchase agreement for the 180-MW Osborne Cogeneration Station. NRG expects to close the transaction in early September. "Flinders gives NRG a strong position in the vibrant South Australian power market," said Keith G. Hilless, NRG Asia-Pacific managing director and CEO. The power stations are the 240-MW Playford Power Station and the 520-MW Northern Power Station, both located in Port Augusta on the Spencer Gulf--approximately 190 miles north of South Australia's capital city, Adelaide. The Playford and Northern power stations use pulverized coal-fired steam turbine generation technology. Northern is a baseload facility and is the lowest-cost generator in South Australia, while Playford is a peaking facility. "Flinders Power confirms our long-term commitment to the Australian power generation market," commented David H. Peterson, chairman, president and CEO of NRG. "This project is right in line with NRG's strategy of acquiring assets that complement our core portfolio and represent a variety of dispatch levels." Flinders Power, which NRG will operate, is the only generator in South Australia to own its own fuel source.
    [Show full text]
  • Wiggins Island Rail Project Balloon Loop
    Wiggins Island Rail Project Balloon Loop The Wiggins Island Rail Project (WIRP) is the staged development of new rail lines and upgrading of existing lines to service the new Wiggins Island Coal Export Terminal (WICET) at the Port of Gladstone. About the Project WIRP Stage One includes constructing a new 13km Balloon Loop Fast Facts Balloon Loop from the North Coast Line near Yarwun to enable unloading of coal for the new port facility. Construction of 13km rail loop Works at the Balloon Loop project site include earthworks and drainage, track infrastructure, Location: Near Yarwun, Gladstone overhead electrical equipment, power systems, signals and telecommunications. Approximate project value: $200 million Once operational, coal trains will travel from mines Construction start: Mid 2012 in the southern Bowen Basin along Aurizon’s rail network to the Balloon Loop where it will be unloaded onto Est. construction completion: End 2013 WICET’s conveyor and carried to the port for export. Up to five trains can be held on the Balloon Loop Workers at peak construction: Approximately 180 at one time - three on the arrival side waiting to be unloaded, one at the unloader unloading coal, and one on the departure side heading back to the mines. Environment Beaks Creek Diversion Aurizon aims to continuously improve our Beaks Creek flows from the southern slope of Mount environmental performance. Martin in the Calliope Conservation Park, prior to meeting the Calliope River about one kilometre A comprehensive Environmental Management Plan upstream of the Calliope River rail bridges. will be implemented on site. As a result of the Balloon Loop works, a new drainage Aurizon will work to offset environmental rehabilitation channel is needed to manage flows from Beaks Creek.
    [Show full text]
  • Natural, Cultural & World Heritage Values of Curtis Island, Queensland
    NATURAL, CULTURAL & WORLD HERITAGE VALUES OF CURTIS ISLAND, QUEENSLAND Capricorn Conservation Council Inc. A Summary Report of the values and current threats to Curtis Island within the Great Barrier Reef World Heritage Area August 2013 Contents Introduction ............................................................................................................................................ 2 Recommendations .................................................................................................................................. 3 Background to Curtis Island and Current Threats ................................................................................... 5 LIST OF KNOWN THREATS TO THE WORLD HERITAGE VALUES OF CURTIS ISLAND ....................... 6 Natural Values of Curtis Island ................................................................................................................ 8 Geomorphology and vegetation ......................................................................................................... 8 Curtis Island Vegetation .................................................................................................................... 11 The Narrows ...................................................................................................................................... 14 The Contribution of Curtis Island to GBR World Heritage Values and Diversity .................................. 15 Marine Plain of North Curtis Island..................................................................................................
    [Show full text]
  • Master-Planning-Sustainable-Development-Priority-Port-Of-Gladstone.Pdf
    Department of State Development Priority port master planning Sustainable development of the priority Port of Gladstone Queensland | Australia | 2017 Master planning for the priority Por t of Gladstone The priority Port of Gladstone is Queensland’s largest multi-commodity port and plays a critical role in supporting the state’s economy. Through master planning under the Sustainable Ports Development Act 2015 (Ports Act) the Queensland Government is demonstrating its commitment to supporting its sustainable development, jobs creation in the region and growth of the state’s trade and investment opportunities. The priority Port of Gladstone is representing approximately The master plan considers issues located 525 kilometres from Brisbane 34 per cent of the state’s total beyond strategic port land, including and operates within the Great Barrier trade port throughput. marine and land-based impacts, Reef World Heritage Area (GBRWHA). port and supply chain infrastructure The state government is delivering The priority port is a major economic capacity and connectivity and a master plan for the priority hub for central Queensland and economic, community and Port of Gladstone in accordance handles over 30 different products environmental interests. with the Ports Act. including the export of coal, alumina, cement, Liquefied Natural Gas (LNG), The master plan will establish petroleum and grain. a long-term strategic outlook for the port and the surrounding land In 2015-16, the port had a total and marine areas vital for its throughput of 115.9 million tonnes, sustainable development. Photo courtesy QGC Pty Limited Port of Gladstone Located 525 kilometres north of Brisbane, the Port of Gladstone covers 4 448 hectares of land, including more than 700 hectares of reclaimed land.
    [Show full text]
  • Gladstone Region Major Industry & Infrastructure Providers
    Gladstone region Major Industry & Infrastructure Providers CONTENTS NRG Gladstone Power Station 2 Central Queensland Ports Authority 3 Gladstone Area Water Board 5 Queensland Rail 6 Queensland Gas Pipeline 7 Boyne Smelters Limited 8 Cement Australia (Qld) Pty Ltd 9 Queensland Energy Resources Limited 11 Comalco Alumina Refinery 11 Queensland Alumina Limited 12 Orica Australia Pty Ltd 14 Austicks and Frost Enterprises 15 Industry Profiles: January 2005 The Gladstone Region NRG GLADSTONE POWER The station was sited to take advantage of seawater for cooling and to be near to Central STATION Queensland’s vast coal reserves. The station’s six-megawatt turbogenerators each output 16,200 volts to transformers that convert the power to a level suitable for transmission at 132,000 or 275,000 volts. CUSTOMERS The Gladstone Power Station sells most of its electricity to Boyne Smelters under a long-term contract. The station remains inter-connected with the Queensland Electricity grid and the remainder of the power generated is committed to OWNERSHIP AND OPERATION the state. The Gladstone Power Station is a world class COAL SUPPLY power station providing safe, reliable low cost electricity to customers. Since 1994 the station More than four million tonnes of coal each year has been operated by NRG Gladstone Operating are railed to the station from coalfields in Central Services on behalf of the joint venture Queensland. participants, Comalco Ltd (42.125%) and NRG Energy Inc (37.5%), as well as SLMA GPS Pty Coal is stockpiled after unloading, then reclaimed Ltd (8.50%), Ryowa II GPS Pty Ltd (7.125%) and from the stockpiles by either of two stacker YKK GPS (Queensland) Pty Ltd (4.75%).
    [Show full text]
  • Legislative Assembly Hansard 1951
    Queensland Parliamentary Debates [Hansard] Legislative Assembly THURSDAY, 27 SEPTEMBER 1951 Electronic reproduction of original hardcopy 470 Questions. [ASSEMBLY.] Questions. Hon. E. J. WALSH (Bundaberg)' repli&d- '' 1. £133,709 lls. 1d. '' 2. The whole question of the develop-· ment and future control of Mourilyan Har­ bour has already been discussed with me· by the hon. member for Mourilyan. Any decision arrived at will be made known in• due course. '' THURSDAY, 27 SEPTEMBER, 1951. RETENTION AREAS, WANDOAN-TAROOM SOLDIER SETTLEMENT. Mr. SPEAKER (Hon. J. H. Mann, :Mr. ALLPASS (Condamine) asked the· Brisbane) took the chair at 11 a.m. Secretary for Public Lands and Irrigation- ' 'In reference to the resumption of the· QUESTIONS. Wandoan-Taroom lands for soldier settle­ ment, is it a fact that he gave a promise CHANNEL DEPTHS, BRISBANE RIVER. to a deputation from the R.S.S.A.I.L.A. that in case of a resumed property held by :Mr. HILEY (Coorparoo) asked the tenants in common, where one of such Acting Treasurer- tenants is a returned soldier each of them " 1. What is the latest recorded depth of will be granted a retention area W'' the Brisbane River:-(a) in the Hamilton Reach Cutting; (b) in the Bar Cutting; Hon. T. A. FOLEY (Belyando) replied­ (c) in the Bulimba Reach; (d) in the '' No. I promised that I would consider· South Brisbane Reach f each case as sympathetically as possible on '' 2. When is it anticipated that the new its merits.'' dredges on order will be delivered and to .:what ports will they be allotted~ DAMAGE TO TREES BY MISTLETOE.
    [Show full text]
  • Background Briefing on Environmental Protection and Development
    Background Briefing on Environmental Protection and Development Great Barrier Reef World Heritage Area Prepared by the Queensland LNG Industry | May 2013 Contents Purpose 1 Context 2 Key Themes 3 General 3 1. LNG Safety 3 2. Economic Contribution 3 3. Environmental Management 4 4. Environmental Protection and Development 4 5. Gladstone Harbour Historical Context 4 6. Australia’s Exemplary Record on World Heritage 5 7. Fair Treatment of Australia 5 LNG Safety 6 Economic Contribution 8 Environmental Management 9 Environmental Protection and Development 10 Gladstone Harbour Historical Context 11 Australia’s Exemplary Record on World Heritage 12 Fair Treatment of Australia 13 Questions and Answers 15 Contacts BC 142°E 144°E 146°E 148°E 150°E 152°E 154°E S ° 0 1 TORRES STRAIT Ashmore Reef Thursday Island Ja rd in e R iver Jardine River NP River unty lh S u S ° D Cape Grenville ° 2 er 2 1 Riv 1 Olive W enloc k R iv e r Iron Range NP L o ck h a C O R A L S E A r t R i ve r Mungkan Archer Rive Kandju r Great Barrier Reef NP Marine Park KULLA (excludes harbours and islands) (McIlwraith Range) Osprey Reef S er S ° v NPA ° Ri Flinders Group 4 l 4 al 1 Ken d NP 1 r d Rive Holro y Ann r ie R e iver Cape iv R Melville E in dw k ard u r NP R ive r L e iv Cole ma n River R ad he re Lakefield Jack River o Starcke M NP NP NP r Mitchell- e iv COOKTOWN Alice Rivers R a % r C A P E Y O R K u NP a L e Cedar Bay P E N II N S U L A tl it L NP iver r R Palmer Goldfield S me S ° P al RSR ° 6 Daintree 6 1 NP 1 Cape Tribulation Holmes Reef r Mount Windsor ive ll
    [Show full text]
  • Air Emissions
    coal purchase agreements. purchase coal meet air quality specifi cations before entering entering before cations specifi quality air meet • Conduct comprehensive studies to ensure coals coals ensure to studies comprehensive Conduct • ratios in the combustion processes. combustion the in ratios to minimise our environmental footprint. environmental our minimise to operational controls to optimise air to fuel fuel to air optimise to controls operational workplace and Gladstone Power Station’s efforts efforts Station’s Power Gladstone and workplace • Use advanced computer technology and and technology computer advanced Use • oxide gases. oxide satisfy their own minds about the health of our our of health the about minds own their satisfy Gary Macnamara on (07) 4976 5504. 4976 (07) on Macnamara Gary technology to reduce the production of nitrogen nitrogen of production the reduce to technology will provide the community with the knowledge to to knowledge the with community the provide will contact Community Relations Offi cer, cer, Offi Relations Community contact • Utilise Burner out of Service (BOOS) (BOOS) Service of out Burner Utilise • We hope that the factual overview in this brochure brochure this in overview factual the that hope We nitrogen and sulphur gases. sulphur and nitrogen Employees who would like further information can can information further like would who Employees • Blend coal types to reduce the production of of production the reduce to types coal Blend • now and into the future. the into and now concentrations. it is likely
    [Show full text]
  • Powerlink Queensland Annual Report 2011/12
    POWERLINK ANNUAL REPORT 2011/12 25 NETWORK DEVELOPMENT NETWORK DEVELOPMENT ACHIEVING Assessing the need for network development There are a number of drivers that trigger the need for Powerlink to develop our network. The main drivers include: ■■ completed four major regulated (prescribed) transmission network development projects ■■ the need to build new infrastructure or implement to replace transmission equipment reaching non-network solutions to meet electricity demand the end of its useful life ■■ replacement of aged infrastructure to maintain security of electricity supply ■■ completed two non-regulated customer connection projects ■■ construction to directly connect a major industrial customer into the transmission network. ■■ work is progressing on construction of 10 major regulated (prescribed) transmission Non-regulated customer connections developments to be completed over the New transmission lines and substations may be constructed coming years, which include both new when a major industrial customer (such as a generator or and replacement projects. mine) needs to connect into the electricity network. When Powerlink constructs a new transmission line or substation as a non-regulated customer connection, the cost of acquiring easements, constructing and operating the transmission line or substation are paid for by the customer making the connection request, under a user-pays arrangement over the life of the agreement. For more information about our customer connection process, please refer to 16. POWERLINK 26 ANNUAL REPORT 2011/12 CASE STUDY Regulated (prescribed) investment Powerlink is required to deliver electricity transmission TRANSMISSION LINE WILL services to the reliability of supply standards set for it by the Queensland Government, at the lowest long- BOOST SUPPLY TO CENTRAL run cost for consumers.
    [Show full text]