Public Disclosure Authorized Disclosure Authorized Public Public Goods and Works Procurement Plan in 2007 2007 Name of Subproject: Nuisance Free Vegetable, County (

Review by Issuing of Bid Contract Cost estimate Procurement P- Contract No. Bank BD opening signing Contract Description method Q USD ( RMB (Y/N) Equivalent Y/N)

Works Public Disclosure Authorized Disclosure Authorized Public Public Vegetable processing 800 NCB Hn workshop 800 , Vegetable 300 Ã Ã 1 1 Ã Ã Ã quality test room 300

NCB GJP 80 type plastic sheds GJP80 Hn à à 1 1 à à à 42979 42979 m2

Subtotal à Ã

Goods Public Disclosure Authorized Disclosure Authorized Public Public

1 Public Disclosure Authorized Disclosure Authorized Public Public Goods and Works Procurement Plan in 2007 2007 Name of Subproject: Nuisance Free Vegetable, (

Review by Issuing of Bid Contract Cost estimate Procurement P- Contract No. Bank BD opening signing Contract Description method Q USD ( RMB (Y/N) Equivalent Y/N)

Vegetable Test Devices, including: dehumidifiers 4sets, air conditioners 4sets, refrigerators 4sets, fresh- keeping refrigerated cabinets   4sets, ultrasonic cleaners  3sets, centrifuges 3sets,  drying cabinets 3sets,   stainless steel electrical  distillers 6sets, rotary  evaporators 4sets, rapid  16 Hn à à 1 1    detector of pesticide residues  6sets, residual pesticide  meters 6sets, full automatic thermo wellwash plus 1sets,  electro-heating constant  temperature cultivators 6sets,  3+  multifunctional vibrators   6sets, precise PH meters 6sets, freezing dryers 6sets, spiral slice vacuum machines 6sets.

2 Goods and Works Procurement Plan in 2007 2007 Name of Subproject: Nuisance Free Vegetable, Changsha County (

Review by Issuing of Bid Contract Cost estimate Procurement P- Contract No. Bank BD opening signing Contract Description method Q USD ( RMB (Y/N) Equivalent Y/N)

Vegetable Processing Devices, including: vertical  steam boiler 1set, disc mill  1set, tilting type jacketed  kettles 3sets, table type  electric pad printer 1set, small  16  Ã Ã 1 1    Hn electrical heating steam boiler  1set, air compressor 1set,  bottle punching machine 1set,  horizontal type autoclave 1set,  ozone sterilizer 1set, vacuum   sealer 1set, ink jet printer 1set.

Subtotal à Ã

Total  

3 )

Unit:Thousand Expected Start/Duratio Remark n(months)

 

 

4 )

Unit:Thousand Expected Start/Duratio Remark n(months)

 

5 )

Unit:Thousand Expected Start/Duratio Remark n(months)

 

6 Goods and Works Procurement Plan in 2007 2007 Name of Sub-Project: Melon and Fruit Farm, city Unit:Thousand

P- Review by Issuing of Contract Expected Cost estimate Procuremen Bid opening Contract No. Q Bank BD signing Start/Duration( Contract Description t method USD (Y/ (Y months) RMB Equivalent N) /N)

Works

Soil amelioration 490 ha., field roads  NCB( Hn-2-1 Ã 226.92 N N Ã    6km.  )

NCB( Hn-2-2 Warehouse 2000m2 P Ã 92.31 N N     )

NCB( Hn-2-3 Multi span shed 4000m2 P Ã 97.44 N N     )

Subtotal à Ã

Goods

Pollination tools 5000 thousand sets,  NCB( Hn-2-4 bracket for cultivator 880 thousand   Ã 169.23 N N     ) sets, seedbed vehicle 450 sets.

Packaging machine 2 sets, Cooling  NCB( Hn-2-5 equipment 1 set, Pumpkin processing à 262.82 N N       ) production line 1 set.

Subtotal à Ã

Total à Ã

7 Unit:Thousand

Remark

8 Goods and Works Procurement Plan in 2007 2007 Name of Sub-Project "Green" yellow Day-lily,

Expected P- Review by Issuing of Contract Cost estimate Procuremen Bid opening Start/Duration( Contract No. Q Bank BD signing Contract Description t method months) USD (Y/ (Y RMB Equivalent N) /N)

Works

Field infrastructure of production demonstration NCB  Hn-3-1 Ã 277.46 N N Ã   base, include: flood relief   channel 13076m

Yellow Day-lily farm 300 production establishment CP  Hn-3-2 Ã 582.00 N N  (300ha.), include: seedling,  basic fertilizer, labor.

Total 6703.80 859.46

9 Unit:Thousand

Remark

10 Goods and Works Procurement Plan in 2007 2007 Name of Sub-Project Beef Cattle, city

P- Review by Issuing of Contract Expected Cost estimate Procuremen Bid opening Contract No. Q Bank BD signing Start/Duration(m Contract Description t method USD (Y/ (Y onths) RMB Equivalent N) /N)

Works

Cattle raising households 883 (883HH), include: cattle 2649 2649 13245 No. cattle shed 13245 m2 &3 Hn-4-1 883 à à 1 1  ü2007.12 methane pit 883 sets à 883 1324.5 silage pit 883 sets pasture reclamation 1324.5 mu .

Subtotal à Ã

Goods

Equipment of technology 16 Hn-4-2  Ã Ã 1 1     service stations 56 sets.

Subtotal 132.00 16.92

Total 8274.00 1060.77

11 Unit:Thousand

Remark

12 Goods and Works Procurement Plan in 2007 2007

Name of Sub-Project Beef cattle , Jiahua

Expected P- Review by Issuing of Contract Cost estimate Procuremen Bid opening Start/Duration Contract No. Q Bank BD signing Contract Description t method (months) USD (Y/ (Y RMB Equivalent N) /N)

Works

Cattle raising households  (550 poverty HH)    Ã Ã CP 1 1  Hn-5-1 ,include:Cattle 1650 No.,cattle    shed 12100 m2 ,methan tank  4400 m3, silage pit 7150 m3.

Pasture demonstration area 16  Hn-5-2  Ã Ã 1 1    3900mu. 

Subtotal à Ã

Goods

Baler 3 sets, Fermented forage   16  Ã Ã 1 1    Hn-5-3 harvester 3sets, Manure   spreader 3 sets.

Equipment of technology 16  Hn-5-4 Ã Ã 1 1    service stations 1 set  

Subtotal à Ã

Total  

13 Unit:Thousand

Remark

14 Goods and Works Procurement Plan in 2007 2007 Name of Sub-Project Zhenghong pig production, province (

Unit:Thousand

P- Review by Issuing of Contract Expected Cost estimate Procuremen Bid opening Contract No. Q Bank BD signing Start/Duration(mon Contract Description USD t method RMB (Y/ (Y ths) Equivalent N) /N)

Works

%XLOGLQJVÃRIÃÃVHUYLFHà   NS( Hn à à N N    2007.6--2007.10 VWDWLRQVÃà  )

%UHHGLQJÃÃKRXVHKROGVÃÃÃ ++ÃSLJSHQÃPÃ+RJÃÃ  FDWHÃÃVHWV0DWKWDQHÃ  CP Hn WDQNÃVHWVEUHHGLQJÃÃ   Ã Ã 1 1   SLJÃÃÃ1R:DWHUÃDQGÃ    HOHFWULFLW\ÃVXSSO\Ã HTXLSPHQWÃVHWV

Subtotal à Ã

Goods

DC Hn Ã%UHHGLQJÃSLJVÃÃ1R  Ã Ã 1 <    2007.6--2007.9

Subtotal à Ã

Total à Ã

15 Unit:Thousand

Remark

16 Goods and Works Procurement Plan in 2007 2007 Name of Sub-Project Triploid Chinese White poplar,

Unit:Thousand

P- Review by Issuing of Contract Expected Cost estimate Procuremen Bid opening Contract No. Q Bank BD signing Start/Duration(mo Contract Description USD t method RMB (Y/ (Y nths) Equivalent N) /N)

Works

Household plantation 1900 CP( Hn-8-1 1900 Ã Ã N N  2007.3--2007.6 ha. )

Total à Ã

17 Unit:Thousand

Remark

18 Goods and Works Procurement Plan in 2007 2007

Name of Sub-Project Oil Tea project, ( )

Unit:Thousand P- Review by Issuing of Contract Expected Cost estimate Procuremen Bid opening Contract No. Q Bank BD signing Start/Duration(mon Contract Description USD t method RMB (Y/ (Y ths) Equivalent N) /N)

Works

Oil Tea Household CP Hn-9-1 414 Ã Ã N N  2007.3—2007.12 plantation 414 hectare

Oil Tea Household re- 157.3 CP Hn-9-2 Ã Ã N N  2007.3—2007.10 graphting 157.33 hectare 3

NCB Buildings of 3 technology Hn-9-3 3 1000 Ã Ã N N    2007.8—2007.11 service stations 1000

Total à Ã

19 Unit:Thousand

Remark

20 Goods and Works Procurement Plan in 2007 2007 Name of Sub-Project Citrus Project, city

Unit:Thousand

P- Review by Issuing of Contract Expected Cost estimate Procuremen Bid opening Contract No. Q Bank BD signing Start/Duration(m Contract Description t method USD (Y/ (Y onths) RMB Equivalent N) /N)

Works

Farmer household plantation  CP Hn-10-1 Ã Ã N N   of citrus 6604 mu. 

Subtotal à Ã

Goods

Audio Visual of farmer association include copier     1set,portable computer 16 Hn-10-2 1set,computer 2sets,camera    '9' Ã Ã 1 1     1set,DVD 1set,Air-     conditioning 1set,training table   and chair 200 sets.

16 Hn-10-3 Autotruck 5 ton 4 sets.   Ã Ã 1 1    

Subtotal à Ã

Total  

21 Unit:Thousand

Remark

22 Goods and Works Procurement Plan in 2007 2007

Name of Sub-Project Borneol Camphor Tree, Xinhuang Dong Nationality

Unit:Thousand

Expected Cost estimate P- Review by Issuing of Contract Procuremen Bid opening Start/Duration( Contract No. Q Bank BD signing Contract Description t method months) USD (Y/ ( RMB Equivalent N) Y/N)

Works

Farmer household plantation 306 306ha, include: seedlings, CP Hn-11-1 Ã Ã N N  2007.4--2007.12 compound fertilizer, chernical, labour.

Total  

23 Unit:Thousand

Remark

24 Goods and Works Procurement Plan in 2007 2007 Name of Sub-Project Two--system super Hybrid paddy, Hunan Unit:Thousand Expected Cost estimate P- Review by Issuing of Bid Contract Procuremen Start/Duration( Contract No. Q Bank BD opening signing Contract Description t method months) USD (Y/ ( RMB Equivalent N) Y/N)

Works

Project area of suxian: Farm roads 7 km Pumping stations 4 No. Irrigation 7 4 canals 16 km Ridge NCB 16 Hn-12-1 compaction 10 Ã Ã ÃÃÃÃÃÃÃÃÃN N    2007.8--2007.12 10 60 km Protection afforestation 50 60 ha. Seed drying yards 50 100 No. Soil improvement 100 ha.

Project area of rucheng: Farm roads 7 km Pumping 7 stations 2 No. Irrigation 2 canals 14 km Ridge 14 10 NCB compaction 10 km. Protection Hn-12-2 60 Ã Ã ÃÃÃÃÃÃÃÃÃN N    2007.8--2007.12 afforestation 60 ha. Seed 50 drying yards 50 No. Soil 100 improvement 100 ha. Base 21.5 for breeding of parent seed 21.5 ha.

Seed quality test center 400  NS( Hn-12-3 Ã Ã N N    2007.6--2007.10 m2  )

Sterile line multipoint&purity NS( Hn-12-4 Ã Ã N N    2007.6--2007.12 valuation 9 ha.  )

25 Subtotal à Ã

Goods

Instruments and Devices: fully automatic fluorescence stereoscopic microscope 1set, portable photosynthesis  fluorescence measuring  system 1set, steel high  efficiency incubating frames 1&% $&6ü$  Ã Ã    Hn-12-5 40sets, ACS-A electronic ;&ü& N N 2007.8--2007.10 scales 4sets, 5XC-2C seed  ;-&ü$ cleaning trucks 2sets, 5XJC-  3A seed cleaning trucks 2sets,  automatic seed measuring and  packing machine groups 2sets, automatic sealing machines 4sets.

Equipment of training, include: projector 2 sets, digital camera 3sets, Digital Video   NS( Hn-12-6 Ã Ã N N    2007.8--2007.9 systems 2 sets, notebook   ) computer 3sets, chair and  table 250 sets.

Subtotal à Ã

Total  

26 Unit:Thousand

Remark

27 28 Agriculture Technology Transfer Project Loan No.:4773-CHA Summary of Hunan Province Procurement Plan

General Procurement Notice: Original Procurement Plan: Mar.26,2007

Works Goods Consultant Services

Name of subproject Contract No. Contract Cost Contract No. Contract Cost Contract No. Contract Cost 000 000 000 ’ ’ ’

Nuisance Free Vegetable,Changsha County  Ã  

Melon and Fruit Farm,Shaoyang city  Ã  

"Green" yellow Day-lily,Qidong County  Ã

Beef Cattle,Lianyuan city  Ã  

Beef cattle,Jiahua  Ã  

Zhenghong pig production, Hunan province  Ã  

Triploid Chinese White poplar, Changde  Ã

Oil Tea project, chaling county  Ã

Citrus Project, yuanjiang city  Ã  Ã

Borneol Camphor Tree, Xinhuang Dong  Ã Nationality Two--system super Hybrid paddy,Hunan  Ã  Ã

      UNIT: USD Total Contract No. Contract Cost

000 ’  Ã

 Ã

 Ã

 Ã

 Ã

 Ã

 Ã

 Ã

 Ã

 Ã

 Ã