Futurefitout.Colliers.Com.Au FITTED OFFICE SPACE and ADAPTING a PRODUCTIVE WORKPLACE for ENHANCED SAFETY

Total Page:16

File Type:pdf, Size:1020Kb

Futurefitout.Colliers.Com.Au FITTED OFFICE SPACE and ADAPTING a PRODUCTIVE WORKPLACE for ENHANCED SAFETY Colliers International and Valmont help businesses return to work safely 12 of the best fitted options in the Sydney market ready for your business Strategies for ensuring your office space is safe and ready for occupation futurefitout.colliers.com.au FITTED OFFICE SPACE AND ADAPTING A PRODUCTIVE WORKPLACE FOR ENHANCED SAFETY The Colliers International Sydney Office Leasing team Some of these solutions include: over recent years has seen an ever-increasing demand CLICK TO VIEW ONLINE LISTING CLICK TO VIEW ONLINE LISTING in the sub-500sqm market for quality fitted office space. SPECIALISED WORK-POINTS Premium high rise suites with Harbour views Character fitted out whole floor This has been driven by a number of factors including; The provision of three key workplaces to allow diversity in how employees engage. The home (focused work), GROSVENOR PLACE SUITES, 225 GEORGE STREET, SYDNEY 280 PITT STREET, SYDNEY 1) Companies looking to get value out of adapting private co-working zones (virtual meet/focus), and the existing fitouts; office (face-to-face collaboration). OLIVER ARCHIBALD TOM BUXTON 0405 782 579 0412 590 873 2) The convenience and shorter turnaround times SENSORY TECHNOLOGY 153.2 – Quality fitouts 4.5-star 39-454m2 Fitted and Excellent involved with moving into an already fitted space and; Touch-less door entry, wireless charging points, and 487.9m2 on offer NABERS furnished views digital assistants to remove physical interfaces are Energy rating 3) The increasing availability of fitted out options via a few of the integrated technologies to improve both flexible workspace providers. efficiency, and health. In our current office climate, and in light of the impacts HEALTHY MATERIALS of COVID-19, this fitted office space segment of the Passively hygienic materials like anti-microbial market remains a popular choice for businesses as they laminates, elegant/integrated hygiene dispensers, and seek convenience, look to reduce costs and risk and UV cleaning hardware at utility bays empower staff and add more flexibility when pursuing a return to a level of guests to be healthy. normality in the workplace. While we may never return to the office as we know CLICK TO VIEW ONLINE LISTING CLICK TO VIEW ONLINE LISTING The convenience and value offered through fitted office it, we will continue to seek out the connections and space aren’t the only consideration businesses are collaboration that comes from physically being with our Fully fitted office in the landmark Citigroup Centre Prominent Parramatta address taking when planning their return to work or their next colleagues. office space in the post-COVID-19 environment. 2 PARK STREET, SYDNEY 25 SMITH STREET, PARRAMATTA Marcel Zalloua of Valmont, who specialise in creating For more information or advice on workplaces and ANGELA CARROLL CHRIS BALTUSSEN 0404 810 680 0439 488 219 and delivering commercial workplaces, confirms that a future-proofing your fitout, please reach out to our number of trends are already emerging in light of the specialists: 127.40 - Centre of the 5.0-star JOCK GILCHRIST 1,293- Superior 5.0-star 650m² Sydney CBD NABERS 0438 847 574 2,594m² Views and NABERS global health pandemic. Energy rating Outlook Energy Rating “At Valmont we are noticing an increase in demand from customers for workspaces that respond to recent health issues and provide simple longer-term solutions for enhanced safety, whilst still supporting productivity.” Jock Gilchrist | National Director Office Leasing [email protected] The challenge lies in how to adapt our existing +61 438 847 574 workplaces to allow companies to be operational as soon as possible without compromising health and safety. In this unprecedented new reality, designing and adapting environments which support the physical, CLICK TO VIEW ONLINE LISTING CLICK TO VIEW ONLINE LISTING cognitive and emotional needs of people in the Marcel Zalloua | Owner Fitted out suites & whole floor Modern fitted out whole floor for sublease workplace has never been more significant. [email protected] 227 ELIZABETH STREET, SYDNEY 580 GEORGE STREET, SYDNEY Moving forward, innovation, productivity and growth Robert Gigliotti | General Manager can continue by repositioning and adapting a workplace [email protected] JOCK GILCHRIST JOCK GILCHRIST via a design to allow diverse ways of working while 0438 847 574 0438 847 574 supporting people’s wellbeing. 02 9698 8605 85-967m² Harbour & 4.5-star TOM BUXTON 750- Excellent 5.0-star TOM BUXTON Hyde Park NABERS 0412 590 873 1,300m2 views NABERS 0412 590 873 views Energy rating Energy Rating Valmont Partnership two scenarios | all around experts CLICK TO VIEW ONLINE LISTING CLICK TO VIEW ONLINE LISTING Stunningly presented whole floor Views and value in Chifley Tower - sublease 9 BARRACK STREET, SYDNEY 2 CHIFLEY SQUARE, SYDNEY “UNLOCKING “FRESH START” TOM BUXTON JOCK GILCHRIST POTENTIAL” 0412 590 873 0438 847 574 1 ... embracing existing fitout elements of 22 ... starting from beginning; 318m² Fitted and Excellent 544m² Outstanding Direct lift the space or repurposing existing fitout opportunities are endless ... furnished natural light Harbour & exposure elements from your previous space ... City views we are renewal specialists design excellence _over 60% of our project incorporate reuse of exist- _ considered & tailored design consultancy ing fitout elements we integrate our solutions seamlessly to give you cost certainty most cost efficiency _ transparency around cost management regardless of the volume of reuse, we maintain our 3 pillars of client service; design excellence, seamless delivery cost certainty, seamless delivery _ complete end to end solution CLICK TO VIEW ONLINE LISTING CLICK TO VIEW ONLINE LISTING d to ma ee rk p e Striking A Grade tower with CBD outlooks Excellent Sublease Space Available Now s t briefing strategy concept design developed documentation tender construction 580 GEORGE STREET, SYDNEY 90 ARTHUR STREET, NORTH SYDNEY design JOHN PAEK DAN WALKER 0422 302 690 0413 597 677 SCENARIO 1 341 - Central CBD 5.0-star CHELSEA ANSTEE 812m² Harbour Fitted out TURN-KEY IN 2 TO 8 WEEKS* 572m² location NABERS 0448 451 143 views and whole floor SCENARIO 2 TURN-KEY IN 8 TO 12 WEEKS* Energy rating natural light *workplace size and approval processes will impact speed to market _Example digital solutions for COVID resilience FOCUS ON WELLNESS our team are wellness experts, as a result, our design solutions inherently focus on your teams long-term health. Instinctively, our CLICK TO VIEW ONLINE LISTING CLICK TO ENQUIRE designs are: Work above Sydney CBD’s flagship retail precinct Flexible workspace in an unrivaled location COVID RESILENT 77 CASTLEREAGH STREET, SYDNEY 100 MARKET STREET, SYDNEY Should you have an existing workplace, and are considering returning to the office soon, JOHN PAEK SAMI SCHIAVI we can offer ourCOVID-resilence Advice 0422 302 690 0427 593 280 by way of a workplace audit and management plan to Premium Brand 4.0-star FRANK SASSINE Access to Brand new Premium ensure you’re working safe from day one. location new COVID NABERS 0408 487 854 Westfield flexible location friendly fitout Energy rating amenity fitouts futurefitout.colliers.com.au Disclaimer The opinions, estimates and information given herein or otherwise in relation hereto are made by Colliers International and affiliated companies in their best judgement, in good faith and as far as possible based on data or sources which are believed to be reliable. The material contained herein is not intended to substitute for obtaining individual advice from Colliers International or another advisor able to provide the services of a qualified professional person. Colliers International, its officers, employees and agents expressly disclaim any liability and responsibility to any person whether a reader of this publication or not in respect of anything and of the consequences of anything done or omitted to be done by any such person in reliance whether wholly or partially upon the whole or any part of the contents of this publication. COPYRIGHT Colliers International. All rights reserved. No part of this work may be reproduced or copied in any form or by any means (graphic, electronic or mechanical, including photocopying, recording, recording taping, or information retrieval systems) without the written permission of Colliers International..
Recommended publications
  • ASIC Insolvency Statistics SERIES 4: Registered Liquidators ASIC Connect–Professional Registers Search
    Australian insolvency statistics Released: July 2019 Series 4A: Registered liquidators lists by region, updated to 30 June 2019 Contents Tables Table 4A.1 - Registered liquidators list, updated to 30 June 2019 – New South Wales Table 4A.2 - Registered liquidators list, updated to 30 June 2019 – Victoria Table 4A.3 - Registered liquidators list, updated to 30 June 2019 – Queensland Table 4A.4 - Registered liquidators list, updated to 30 June 2019 – South Australia Table 4A.5 - Registered liquidators list, updated to 30 June 2019 – Western Australia Table 4A.6 - Registered liquidators list, updated to 30 June 2019 – Tasmania Table 4A.7 - Registered liquidators list, updated to 30 June 2019 – Northern Territory Table 4A.8 - Registered liquidators list, updated to 30 June 2019 – Australian Capital Territory Table 4A.9 - Registered liquidators list, updated to 30 June 2019 – Overseas More information available from the ASIC website Australian insolvency statistics INFORMATION SHEET 80: How to interpret ASIC insolvency statistics SERIES 4: Registered liquidators ASIC Connect–Professional Registers search Disclaimer ASIC has prepared these composite lists of registered liquidators by region from information held on ASIC’s Register of Liquidators. ASIC updates these lists regularly to reflect changes that occur to the Register of Liquidators. The date of the last update is shown above. You should check ASIC’s Register of Liquidators via ASIC Connect before acting on the information in these lists. These lists should not be taken as ASIC endorsing or recommending any particular registered liquidator. Section 1274B of the Corporations Act 2001 [Use, in court proceedings, of information from ASIC’s national database] does not apply to these lists.
    [Show full text]
  • Tyro Payments IPO Prospectus
    PROSPECTUS 2019 TYRO PAYMENTS LIMITED ABN 49 103 575 042 JOINT LEAD MANAGERS AUSTRALIAN LEGAL ADVISER Important notices OFFER No person is authorised to give any information or make any representation in connection with the Offer which is not contained This Prospectus is issued by Tyro Payments Limited in this Prospectus. Any information or representation not so (ACN 103 575 042) (we, us, our, Tyro, and Company) and contained may not be relied on as having been authorised by Tyro SaleCo Limited (ACN 637 258 096) (SaleCo) for the purposes us, SaleCo, any of our Directors, the Joint Lead Managers or any of Chapter 6D of the Corporations Act 2001 (Cth) (Corporations other person in connection with the Offer. You should rely only on Act). The Offer contained in this Prospectus is an initial public information in this Prospectus. offering to acquire fully paid ordinary shares in us (Shares). See Section 7 for further information on the Offer. EXPOSURE PERIOD LODGEMENT AND LISTING The Corporations Act prohibits us from processing applications in the seven day period after the Prospectus Date (Exposure Period). This Prospectus is dated 18 November 2019 (Prospectus Date) The Exposure Period may be extended by ASIC by up to a further and was lodged with the Australian Securities and Investments seven days. The purpose of the Exposure Period is to enable this Commission (ASIC) on that date. Prospectus to be examined by market participants prior to the We will apply within seven days after the Prospectus Date, to ASX raising of funds. The examination may result in the identification Limited (ASX) for admission to the Official List and quotation of of deficiencies in this Prospectus, in which case any application Shares on the ASX.
    [Show full text]
  • Zoë Macdonell Lives and Works in Sydney
    Zoë MacDonell Lives and works in Sydney ACADEMIC QUALIFICATIONS 2002 Printmaking Course, National School of Art, Sydney, Australia. 1998-02 Bachelor of Applied Arts, College of Fine Art, University of New South Wales (Hons), Australia. SELECTED EXHIBITIONS: SOLO 2017 Stealing Fire, Nanda\Hobbs Contemporary, Sydney. 2016 Tapestry of Night, Nanda\Hobbs Contemporary, Sydney. 2015 Liquid Edge, Nanda\Hobbs Contemporary, Sydney. 2014 Sweet Edge, Art Equity, Sydney (Nanda\Hobbs Contemporary). 2010 Antarctic Separation, Chalk Horse, Sydney. 2009 Ecstatic Shadow, BUS Gallery, Artist Run Initiative, Melbourne. 2008 Soft Tension, Window, Grantpirrie Gallery, Sydney. Shadows on the Floor, Chalk Horse, Sydney. 2007 Small Worlds, Amelia Johnson Contemporary, Hong Kong. 2004 An Illusion to Move Me, ‘twocubes’ at Sherman Galleries, Sydney. SELECTED EXHIBITIONS: GROUP 2018 Summer Exhibition, Nanda Hobbs, Sydney. 2017 Summer Exhibition, Nanda Hobbs, Sydney. 2016 Summer Show 2016, Metro Gallery, Melbourne. Resolved: Journeys in Australian Design, The Delmar Gallery, Trinity Grammer School, Sydney. Mosman Art Prize, Mosman Art Gallery, Sydney. 2015 Resolved: Journeys in Australian Design, Geraldton Regional Art Gallery,WA 2015 Mosman Art Prize, Mosman Art Gallery, Sydney. Resolved: Journeys in Australian Design, Cairns Regional Art Gallery, QLD. Resolved: Journeys in Australian Design, Tamworth Regional Art Gallery, NSW. 2014 Signal 8, Cat St Gallery, Hong Kong. Resolved: Journeys in Australian Design, Blue Mountains Cultural Centre Katoomba, NSW. DesignEx: Workshopped, Glebe Island Exhibition Centre, Sydney. Resolved: Journeys in Australian Design; Object: Australian Design Centre. Group Exhibition, Art Equity, Sydney. 2013 Fleurieu Art Prize Finalist Exhibition, curated by Nigel Hurst Director Saatchi Gallery London, McLaren Vale and The Fleurieu Peninsula, South Australia. 2012 The Art of Making a Difference, Lloyds International, Australian Technology Park, Sydney.
    [Show full text]
  • SYDNEY CBD OFFICE Market Overview
    RESEARCH SSSEEEPPPTTTEEEMMMBBBEEERRR 222000111111 SYDNEY CBD OFFICE Market Overview HIGHLIGHTS • After the completion of several major projects in the first half of 2011, the supply pipeline has now entered a softer phase with only one major new project due to complete before the end of 2012. Developers are increasingly looking to progress development opportunities on the back of projected vacancy tightening and improving rents, however it will not be until late 2013 to 2014 that significant new supply will begin to enter the market. • So far, 2011 has been a year of consolidation for office demand with the gains in employment recorded over 2010 having moderated. This moderating pattern has extended to the rental market. In the prime market incentives have started to reduce, however face rental growth has been limited to predominantly high grade assets thus far. • Prime core market yields average between 6.25% and 7.50%, with larger, passive assets likely to trade towards the lower end of this range. Recent benchmark sales have occurred, implying a degree of yield tightening. There remains some potential for investment market yields to run ahead of fundamentals and continue to firm on the back of strong off-shore demand, however further transactions at these levels will be needed before a re-rating is substantiated. SEPTEMBER 2011 SYDNEY CBD OFFICE Market Overview SYDNEY CBD OVERVIEW Table 1 Sydney CBD Office Market Indicators as at July 2011 Grade Total Stock Vacancy Annual Net Annual Net Additions Average Gross Face Average Average Core Market (m²) Rate Absorption (m²) Rent Incentive Yield (%) (m²) ($/m²) (%) (%) Prime 2,448,499 7.8 101,545 108,046 670 - 970 (861 Avg) 26 6.25 - 7.50 (6.89 Avg) Secondary 2,456,429 10.9 -34,793 3,506 450 - 600 (526 Avg) 29 7.75 - 8.75 (8.28 Avg) Total 4,904,928 9.3 66,752 111,552 Source: Knight Frank/PCA NB.
    [Show full text]
  • (C) Retain and Enhance the Urban
    Sydney DCP 2012 – Central Sydney Planning Review Amendment (c) Retain and enhance the urban character, scale and strong linear enclosure of Martin Place by requiring new buildings to: (i) be built to the street alignment; (ii) have street frontage heights consistent with the prevailing form of buildings in the area; and (iii) to have building setbacks above those street frontage heights. (d) Protect and extend sun access and reflected sunlight to Martin Place during lunchtime hours from mid-April to the end of August. (e) Provide sun access to significant sandstone buildings in Martin Place to improve the ground level quality of the public space. (f) Protect existing significant vistas to the east and west and ensure new development will not detrimentally affect the silhouette of the GPO clock tower. (g) Retain human scale at street level, while respecting and positively responding to the monumental nature of the place. (h) Conserve and enhance the heritage significance of the nineteenth and twentieth century institutional and commercial buildings and their settings. (i) Conserve the significant lane network, activated with ground and floor uses and public art work, where compatible with buildings heritage significance. Draft December 2020 1294 22 Sydney DCP 2012 – Central Sydney Planning Review Amendment 2.1.8 Pitt Street Mall Special Character Area Locality Statement Pitt Street Mall is a major retail node and pedestrian space in the City centre. The wide variety of shopping and leisure activities in the area attracts a wide range of users. The intense network of through-site links connecting to Castlereagh and George Streets enhances permeability within the area.
    [Show full text]
  • Landscape and Visual Impact Assessment
    10 MARTIN PLACE STATION Planning context The project includes two sites for Martin Planning context Sydney Development Control Plan Place Station situated between Castlereagh (DCP), City of Sydney, 2012 and Elizabeth Streets. The northern site The following review identifies key The Sydney DCP identifies a number of would be located on Hunter Street, opposite documents which provide the planning Special Character Areas (SCAs). In this Chifley Square, and the southern site would context for the proposed Martin Place precinct, the Martin Place and Chifley Square be located on and to the south of Martin station. SCAs are of relevance. The desired future Place. Sydney Local Environmental Plan, City character and relevant supporting principles of Sydney, 2012 identified for these SCAs are summarised in The project area includes a number of the following paragraphs. heritage sites. This includes heritage listed Martin Place SCA public places such as Martin Place, Richard The Martin Place SCA is described as a place Johnson Square, and Chifley Square, as of “social, cultural and historic significance”. well as numerous heritage listed buildings. It includes various monuments, including a These include: the Flat building (7 Elizabeth Cenotaph, and has been the setting for many Street), the Commonwealth Bank of Australia historical events, which has … “reinforced its (48–50 Martin Place), the former ‘City image as the civic and ceremonial heart of Mutual Life Assurance’ building (10 Bligh the City”. Street), the former ‘Qantas House’ building (68–96 Hunter Street), the former ‘Australian The area is unified by a cohesive built Provincial Assurance’ building (53–63 form, particularly to the east of the area.
    [Show full text]
  • Original Return
    Account Name Address 1: Street 1 Address 1: Street 2 Address 1: Street 3 Address 1: City AddressAddress 1: State/ProvinceAmount 1: ZIP/Postal Received CodeOther Receipts A.T. Kearney Australia Pty Ltd Level 5, MCA Building 140 George Street THE ROCKS NSW 2000 93500 Other Receipt Accenture Australia and New Zealand International House 3 Sussex Street BARANGAROO NSW 2000 93500 Other Receipt Adamantem Capital Level 27, Chifley Tower 2 Chifley Square SYDNEY NSW 2000 93500 Other Receipt AGL Energy Limited Locked Bag 1837 ST LEONARDS NSW 2065 93500 Other Receipt AIA Australia 509 St Kilda Road MELBOURNE VIC 3004 93500 Other Receipt Alcoa of Australia Limited PO Box 252 APPLECROSS WA 6953 93500 Other Receipt Allens Level 37, 101 Collins Street MELBOURNE VIC 3000 93500 Other Receipt Alumina Limited GPO Box 5411 MELBOURNE VIC 3001 93500 Other Receipt Amcor Limited 77 Berkeley Street HAWTHORN VIC 3122 93500 Other Receipt AMP Services GPO Box 4134 SYDNEY NSW 2001 93500 Other Receipt ANZ GPO Box 537E MELBOURNE VIC 3001 93500 Other Receipt Aon Level 33, 201 Kent Street SYDNEY NSW 2000 93500 Other Receipt APA Group PO Box R41 ROYAL EXCHANGE NSW 1225 93500 Other Receipt Ashurst GPO Box 9938 SYDNEY NSW 2001 93500 Other Receipt ATCO Australia Level 12, 2 Mill Street PERTH WA 6000 42854.16 Other Receipt Ausgrid Level 19, 24 Campbell Street HAYMARKET NSW 2000 93500 Other Receipt Australian Foundation Investment Company Level 21, 101 Collins Street MELBOURNE VIC 3000 93500 Other Receipt Australian Securities Exchange Level 6, 20 Bridge Street SYDNEY NSW 2000
    [Show full text]
  • Ann Street Acquisition Circular
    THIS DOCUMENT IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION The definitions and interpretations commencing on page 5 of this Circular apply mutatis mutandis throughout this Circular, including this cover page. If you are in any doubt as to the action you should take, please consult your CSDP, banker, broker, attorney, accountant or other professional advisor immediately. ACTION REQUIRED BY UNITHOLDERS If you have disposed of all or any of your Units, please forward this Circular, together with the attached notice of General Meeting and form of proxy, to the purchaser of such Units or the broker, CSDP, banker or agent through whom you disposed of such Units. Certificated Unitholders and Dematerialised Unitholders with “own name registration” If you are a Certificated Unitholder or hold Dematerialised Units with “own name registration” and you are unable to attend the General Meeting to be held on Friday, 12 September 2014 at: • 09:00 (Johannesburg) in 2nd Floor, Executive Boardroom, Investec Bank Limited, 100 Grayston Drive, Sandown, Sandton; and • 17:00 (Sydney) in Boardroom, Investec Australia Limited, Level 23, The Chifley Tower, 2 Chifley Square, Sydney, NSW 2000, Australia, and wish to be represented thereat, you are requested to complete and return the attached form of proxy in accordance with the instructions contained therein and lodge it with, or post it to, the Responsible Entity or the Transfer Secretaries so as to be received by them no later than 09:00 (Johannesburg)/17:00 (Sydney) on Wednesday, 10 September 2014. Dematerialised Unitholders other than those with “own name registration” If you hold Dematerialised Units through a CSDP or broker other than with an “own name registration” and wish to attend the General Meeting, you must timeously advise your CSDP or broker of your intention to attend and vote at the General Meeting in order for them to provide you with the necessary letter of representation to do so.
    [Show full text]
  • Sydney Metro and Martin Place Station Precinct State Significant Development Application Amending Stage 1 Concept Proposal State
    Sydney Metro and Martin Place Station Precinct State Significant Development Application Amending Stage 1 Concept Proposal Statement of Heritage Impact Prepared for Macquarie Corporate Holdings Pty Ltd June 2018 • Issue D Project number 16 1035 _____________________________________________________________________________________________________________________________ Tanner Kibble Denton Architects Pty Ltd | ABN 77 001 209 392 | www.tkda.com.au Sydney Level 1, 19 Foster Street, Surry Hills NSW 2010 Australia | T+61 2 9281 4399 Brisbane Suite 9A, Level 7, 141 Queen Street, Brisbane QLD 4000 Australia | T+61 7 3087 0160 Principals Alex Kibble, Robert Denton, Megan Jones, John Rose | Practice Directors George Phillips, Jocelyn Jackson, Melanie Mackenzie Senior Associates Ian Burgher, Angelo Casado, David Earp, Emma Lee, Scott MacArthur, Renata Ratcliffe, Lachlan Rowe Associates Paul Dyson, Anna Harris, Theresa Pan, Sean Williams NSW Nominated Architects Robert Denton Registration No 5782 | Alex Kibble Registration No 6015 Sydney Metro and Martin Place Station Precinct • Amending Stage 1 DA Concept Proposal CONTENTS 1 Introduction 1 1.1 Purpose of the report 1 1.2 Background 2 1.3 Site location and description 4 1.4 Context 6 1.5 Heritage management context 8 1.6 Planning Approvals Strategy 10 1.7 Secretary’s Environmental Assessment Requirements 11 1.8 Report structure 12 1.9 Methodology and terminology 12 1.10 Author identification 12 1.11 Project Team 12 1.12 Documentation 13 2 Historical Background 14 2.1 The North Site 14 2.2 Former
    [Show full text]
  • Office Market Update
    SYDNEY CBD OFFICE MARKET UPDATE CI AUSTRALIA Q3 2019 OFFICE MARKET UPDATE - SYDNEY CBD 1 EXECUTIVE SUMMARY. Welcome to our Q3 2019 Office Market Update where we analyse the current leasing activity, supply, investment and development activity in the Sydney CBD. The release of the Property Council of Australia’s Office Market Report in We hope you find this report interesting, and a useful August 2019, reveals that Sydney CBD is currently experiencing record reference tool. All data quoted is either CI Australia low vacancy rates. Research, RCA Analytics, or Research from the Property Council of Australia (August 2019 data release). In this update, we analyse the trends driving these low vacancy rates and the impact this is having on effective net rents and incentives. We If you have questions or would like to request bespoke also comment on the increased competition from metro markets such as research or investment analysis, please don’t hesitate North Sydney and Parramatta and their effect on demand in the Sydney to contact us. CBD. From an investment perspective, Australia continues to experience Andrew Hunter strong demand from both onshore and offshore investors which has [email protected] helped fund purchases such as Chifley Tower and the MLC building, +61 418 222 522 Martin Place. We are also seeing an increased appetite from North America. In this update, we look at key purchases and developments and further benchmark Sydney CBD yields with other major international cities. OFFICE MARKET UPDATE - SYDNEY CBD 2 SPOTLIGHT. WHO’S ON THE MOVE? THE SUPPLY STORY. As the Sydney CBD leasing market becomes more competitive, Currently sitting at 3.7%, vacancy is now only 0.1% above the lowest North Sydney is increasingly becoming an attractive option for ever recorded vacancy rate.
    [Show full text]
  • Planning Proposal Community Consultation Version
    Planning Proposal Amendments to the Sydney LEP 2012 Sydney Metro Martin Place Station Precinct Submitted to Department of Planning and Environment On behalf of Macquarie Corporate Holdings Pty Limited 27 October 2017 | 15879 Community Consultation Version FORMERLY KNOWN AS JBA CONTACT Alexis Cella Director [email protected] (02) 9956 6962 Reproduction of this document or any part thereof is not permitted without prior written permission of ACN 615 087 931 Pty Ltd. This document has been prepared by: This document has been reviewed by: Chris Ferreira Alexis Cella Julie Bindon 27 October 2017 27 October 2017 Reproduction of this document or any part thereof is not permitted without prior written permission of Ethos Urban Pty Ltd. Ethos Urban operates under a Quality Management System. This report has been prepared and reviewed in accordance with that system. If the report is not signed below, it is a preliminary draft. VERSION NO. 4 DATE OF ISSUE: 27.10.17 REVISION BY: CFE APPROVED BY: JB Ethos Urban ACN 615 087 931 Pty Ltd. www.ethosurban.com 173 Sussex Street, Sydney NSW 2000 t 61 2 9956 6952 Ethos Urban Contents 1.0 Introduction 8 1.1 Background 10 1.2 Macquarie Project Objectives 12 1.3 Related Applications 13 1.4 Gateway Determination 14 2.0 Site Context and Description 18 2.1 Location 18 2.2 Site Description 20 2.3 Surrounding Development 29 2.4 Topography 38 2.5 Heritage Context 39 3.0 Key Current Planning Controls 41 3.1 Sydney Local Environment Plan 2012 41 3.2 Sydney Development Control Plan 2012 46 3.3 LEP and DCP Compliant
    [Show full text]
  • First Half 2011 Financial Results 18 July 2011
    First Half 2011 Financial Results 18 July 2011 Building Strengths. Defining Distinction. Important Notice The past performance of K-REIT Asia is not necessarily indicative of its future performance. Certain statements made in this presentation may not be based on historical information or facts and may be “forward-looking” statements due to a number of risks, uncertainties and assumptions. Representative examples of these factors include (without limitation) general industry and economic conditions, interest rate trends, cost of capital and capital availability, competition from similar developments, shifts in expected levels of property rental income, changes in operating expenses, including employee wages, benefits and training, property expenses and governmental and public policy changes, and the continued availability of financing in the amounts and terms necessary to support future business. Prospective investors and unitholders of K-REIT Asia (“Unitholders”) are cautioned not to place undue reliance on these forward- looking statements, which are based on the current view of K-REIT Asia Management Limited (as manager of K-REIT Asia) (the “Manager”) on future events. No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information, or opinions contained in this presentation. None of the Manager, the trustee of K-REIT Asia or any of their respective advisors, representatives or agents shall have any responsibility or liability whatsoever (for negligence or otherwise) for any loss howsoever arising from any use of this presentation or its contents or otherwise arising in connection with this presentation. The information set out herein may be subject to updating, completion, revision, verification and amendment and such information may change materially.
    [Show full text]