FM 691 CORRIDOR PLAN for SHERMAN-DENISON
Total Page:16
File Type:pdf, Size:1020Kb
FM 691 CORRIDOR PLAN For SHERMAN-DENISON METROPOLITAN PLANNING ORGANIZATION December 2008 Table of Contents Executive Summary ........................................................ iii 1.0 Introduction ............................................................. 1 Project Description ........................................................................................................ 1 Need and Purpose .......................................................................................................... 3 Study Goals ....................................................................................................................... 3 Methodology..................................................................................................................... 4 Trip Generation .............................................................................................................. 5 Trip Distribution ............................................................................................................ 9 Trip Assignment .......................................................................................................... 10 2.0 The US 75/FM 691 Interchange ............................ 16 Short-term (2010) Traffic Analysis ...................................................................... 17 Long-term (2015) Traffic Analysis ....................................................................... 19 US 75 Ramp Alternatives .......................................................................................... 21 3.0 The FM 691 Corridor ............................................. 27 Future Development and Roadway Network Changes .................................. 27 Functional Classification .......................................................................................... 27 Evaluation of FM 691 Corridor Improvements (SH 289 to FM 131/ Loy Lake Road) ....................................................................................................... 31 Evaluation of FM 691 Corridor Improvements (FM 131/ Loy Lake Road to SH 91) ..................................................................................... 35 Phasing of FM 691 Corridor Improvements ...................................................... 35 Access Management ................................................................................................... 37 FM 691 Corridor Study i 4.0 Public Involvement Process ................................ 45 Technical Steering Committee Meeting .............................................................. 45 Sherman-Denison MPO Transportation Policy Board Meeting ................. 46 Public Meeting .............................................................................................................. 46 5.0 Study Recommendations and Phasing Plan ...... 47 Study Recommendations .......................................................................................... 47 Phasing Plan ................................................................................................................. 49 Appendix A Appendix B FM 691 Corridor Study ii Executive Summary The FM 691 Corridor Study was initiated to determine short and long term improvements of the US 75/FM 691 interchange as well as capacity improvements along the entire length of FM 691. With a significant level of development planned near the interchange, the study will present capacity improvements that will accommodate projected traffic volumes. With the planned extension of SH 289, located west of the North Texas Regional Airport/Perrin Field, the study will also evaluate potential FM 691 alignment extensions. The input of Texoma Council of Governments (TexomaCOG), Cities of Denison and Sherman officials, TxDOT, Grayson County officials and the general public was extremely important to the development of the specific goals of this study. Through meetings with these stakeholders, the following study goals for the project were determined. Improve mobility at the US 75/FM 691 interchange by developing an implementation plan with the addition of the Texoma Medical Center, the hotel/conference center, proposed Town Center and ancillary development; Improve east-west mobility by developing an implementation plan for the FM 691 corridor with the extension of FM 691 to future SH 289; Minimize environmental and social impacts; and, Maximize future opportunity for development. The Study Team recommended the short and long-term needs for the road, helped the public officials and local community identify the desired “look and feel” of the facility and the right-of- way, and develop a general approach to access management that will achieve the safety, operational efficiency, and capacity of FM 691 that can be implemented through a partnership of Grayson County, TxDOT, the Cities of Sherman and Denison, and the Grayson County Regional Mobility Authority. A rural four-lane roadway with the ability to expand to six-lanes in the future is recommended for the section of FM 691 between the future SH 289 extension and FM 131/Loy Lake Road. An expandable four-lane to six-lane urban roadway section is recommended between FM 131/Loy Lake Road and SH 91. The rural roadway section will require between 140 and 160 feet of right-of-way while the urban roadway section would be able to fit within a right-of-way width of approximately 120 feet. As part of the long-term solutions to the US 75/FM 691 interchange, three conceptual ramping configurations along US 75 are presented. The ramping solutions build on the planned ultimate ramping scheme south of FM 691 that has been developed conceptually by TxDOT. While these potential ramping solutions are developed, additional detail will need to be gathered and analyzed prior to determining a final recommendation. The success of implementing the recommended solutions is dependent on the coordination between a variety of entities. Understanding that funding is a significant component in the development and construction of these recommendations, a phased approach of the actions that need to be taken in order to provide a successful transportation network along this corridor is developed. A summary of this phasing plan is provided in Table 1. FM 691 Corridor Study iii Table 1 Summary of Phased Recommendations FM 691 Corridor Study iv 1.0 Introduction Project Description FM 691 is an east-west Farm-to-Market (FM) route that serves central Grayson County from the North Texas Regional Airport/Perrin Field on the west to SH 91 (Texoma Parkway) on the east (See Figure 1). Serving the City of Sherman to the south and Denison to the north, it is the nominal city limit line where the two major urban areas of Grayson County share a boundary. The two-lane, rural section roadway begins at the intersection with FM 1417 and, proceeding eastward, crosses Preston Road (FM 131 to the south), Loy Lake Road (FM 131 to the north), US 75, Theresa Drive, and terminates at SH 91 on the east, for a total designated route of 5.3 miles. There are several growth factors that make the FM 691 Corridor a key facility in the future of Grayson County and the Cities of Sherman and Denison. Development of the property at US 75/FM 691 includes the Texoma Medical Center on the northeast quadrant and a hotel/ conference center along with retail to open in 2010. A proposed Town Center development which could include restaurants and retail is forecasted to open in 2015. This is in addition to the Cigna Operations Center that opened in 2007 and other office and commercial sites on FM 691 and Pool Road. Additional residential development located west of the proposed Town Center as well as near Theresa Drive are potential developments that were incorporated into the study. The west end of FM 691 is anchored by the North Texas Regional Airport/Perrin Field. This facility encompasses nearly 1,400 acres of property and currently has 34 businesses, employing more than 1,000 workers. More than 400 acres are suitable for aviation and industrial development including heavy aircraft maintenance, flight operations, aviation and industrial manufacturing and intermodal (air/rail/truck) cargo facilities. The site also includes several facilities of the Grayson County College. The College’s main campus is located just over a mile to the east of the North Texas Regional Airport on FM 691. The extension of State Highway 289 will affect development in the area and the future requirements for FM 691. From its current terminus at SH 56, SH 289 is being extended to FM 120 in Pottsboro. It will be adjacent to and west of the Airport. It will provide ready access to more than 160-acres of property on the west side of the Airport for intermodal, aviation and industrial development. These factors have prompted the TexomaCOG to initiate the FM 691 Corridor Study. These aspects and others identified by the Study Team will be analyzed from an engineering, environmental and traffic evaluation of the corridor alternatives. Through the study process, the Study Team met with an identified Technical Steering Committee comprised of local City and State officials, the Transportation Policy Board as well as the general public. FM 691 Corridor Study 1 Figure 1 FM 691 Corridor Study Area FM 691 Corridor Study 2 Need and Purpose Through a collaboration of the Technical Steering Committee, Transportation Policy Board, Study Team, and general public, a study need and purpose statement was developed. The purpose of this study is to improve mobility for the US