Allens Farmhouse, Church Road, Teversham

Total Page:16

File Type:pdf, Size:1020Kb

Allens Farmhouse, Church Road, Teversham ALLENS FARMHOUSE, CHURCH ROAD, TEVERSHAM A wonderful modernisation/re-development opportunity of a circa 1950s detached house with planning permission to extend, situated within large gardens, adjoining farmland on the outskirts of the village. Cambridge City Centre 4.5 miles, A14 1 mile, Mainline Railway Station (King's Cross and Liverpool Street lines) 4 miles, (distances are approximate). Property Summary Gross Internal Floor Area: 1673 sq ft (155 sq m) • Ground Floor: Entrance Hall, Cloakroom, Sitting Room, Dining Room, Kitchen, Utility Room, Conservatory. • First Floor: 4 Bedrooms, Bathroom, Separate WC. • Outside: Parking for Several Cars, Detached Double Length Garage, Mature Gardens and Grounds. In all the property comprises 0.94 of an acre (0.381 hectares). Please read Important Notice on the floor plan page ALLENS FARM HOUSE , 8 CHURCH ROAD, TEVERSHAM, CB1 9AZ £750,000 (GUIDE PRICE) Description Allens Farmhouse is believed to date from the 1950s and is constructed with brick elevations under a tiled roof. In need of updating, the property provides prospective purchasers with an excellent opportunity to acquire a detached house within wonderful established gardens approaching 1 acre and to carry out alterations and improvements to their own particular taste and standard. Alternatively, detailed planning permission has already been granted to extend and alter the existing property to create a stylish family house, providing an additional 31%/518 sq ft (48 sq m) internal space. Outside The property is set well back from the road within wonderful secluded gardens , which are a particularly fine feature of the property. A long sweeping driveway leads to a parking area to the front of the house and a Detached Double Length Garage . A large area of lawn is well screened by a variety of established trees and bushes. A delightful walled garden to the rear offers views towards the church and over surrounding farmland. There is a large expanse of lawn and a variety of mature trees, shrubs and bushes. Planning Permission Planning Permission was granted by South Cambridgeshire District Council Ref: S/3558/16/FL on Restrictive Covenant 6 April 2017 for the extension and re-design of the The property is sold subject to a restrictive covenant not existing dwelling, demolition of the existing outbuilding to use the property or any part of it for any purpose and associated works. A copy of the decision notice other than as a single residential dwelling in the and associated drawings are available to view online at occupation of one family. South Cambridgeshire District Council (www.scambs.gov.uk) by following the planning link. Location Additional Information Allens Farmhouse occupies a delightful, secluded position within a Conservation Area, with views over surrounding Local Authority farmland and the parish church of All Saints. Teversham lies South Cambridgeshire on the eastern outskirts of Cambridge and includes a primary District Council school, rated as ‘good’ by OFSTED in January 2017, 0345 045 0500 recreation ground, Indian restaurant and social club. Local Outgoings shopping is available in the neighbouring village of Cherry Council Tax Band: G Hinton, or the nearby BP garage with M & S outlet, and Council Tax Payable se condary school education at Bottisham. Nearby Cambridge 2017/2018: £2,761.92 provides an excellent choice of schools for all ages and the city centre offers an attractive combination of ancient and Services modern buildings, colleges, winding lanes, the tree lined River Mains water, electricity and Cam and an extensive range of shopping and cultural drainage are connected. Oil facilities. fired central heating. Cambridge is not only world renowned for its academic Fixtures & Fittings achievements but has also become a "high tech" and "bio All items normally tech" hub with the University Research and Development designated as tenant’s Laboratory, Science Park and Addenbrooke's fixtures and fittings Hospital/Biomedical Campus. including curtains and light fittings, are expressly excluded from the sale. The nearby A14 provides good access to the Science Park However, certain items may and M11 to the west and to the A11 and Newmarket, which is be available by separate recognised as the Headquarters of the British Racing Industry negotiation. and stages some of the finest racing in the world, to the east. There are mainline railway stations at Cambridge North and Energy Rating E Cambridge, with the latter providing services to London's King's Cross and Liverpool Street in approximately 52 minutes Tenure & Possession The property is for sale and 67 minutes respectively. freehold with vacant possession on completion Viewing By prior telephone appointment with Bidwells Health & Safety 01223 841842 In the interest of Health and Safety, please ensure that you take due care Enquiries when inspecting any Robert Couch property. 01223 559367 [email protected] bidwells.co.uk 01223 841842 bidwells.co.uk Important notice: These particulars do not form part of any offer or contract and sh ould not be relied upon as statements or representatives of fact. Bidwells LLP has no authority to make or give in writing or verbally any representation or warranties in relation to the property. Any areas of measurements or distances are approximate. The text, photographs and plans are for guidance only and are not necessarily comprehensive. No assumptions should be made that the property has all necessary planning, building regulation or other consents. Bidwells LLP have not carried out a survey, nor tested the services, appliances or facilities. Purchasers must satisfy themselves by inspection or otherwise. The site and location plans are not to scale and are provided for identification purposes only. OS licence NO. ES100017734. © Copyright Bidwells LLP 2016. We may hold your name on our database unless you instruct us otherwise. Bidwells LLP is a limited liability partnership registered in England and Wales (registered number OC344553). Registered office is Bidwell House, Trumpington Road, Cambridge CB2 9LD .
Recommended publications
  • South Cambridgeshire DC Liberal Democrat Group
    South Cambridgeshire DC Liberal Democrat Group The Review Officer (South Cambridgeshire) Local Government Boundary Commission for England 14th Floor Millbank Tower 21-24 Millbank London 25 July 2016 Dear Sir or Madam, Boundary Review of South Cambridgeshire - Consultation Response I am pleased to be able to enclose the comments of the Liberal Democrat Group of South Cambridgeshire District Council to the consultation on the draft recommendations in the district. Number of three- and two- member wards The draft recommendations propose 5 three-member wards, 10 two-member wards and 10 single-member wards. This means that only 22% of councillors are in single-member wards, with the rest in multi-member wards. By contrast, the submission of the Liberal Democrat Group had 16 single-member wards and only 3 three-member wards. There is no obvious advantage to the LGBCE proposals over our proposals except that there are fewer wards with over 10% variance. It would be perfectly possible to support our proposals if preference is given to single-member wards and to creating wards that have some geographical coherence. For an entirely rural area like ours where parishes are almost always indivisible, a strict adherence to keeping wards within the 10% variance is detrimental to the creation of good and sustainable relationships between councillors and their residents. The Council, supported by the Liberal Democrat Group, chose to have all-up elections rather than elections by thirds because this would enable us to have the highest number of single- member wards. The LGBCE’s insistence on having so few wards with a variance over 10% means that this has not happened.
    [Show full text]
  • St Mary the Virgin Fen Ditton
    Cambridge Judge Business School 1 REACH Ely Case Study Series Reimagining Churches as Community Assets for the Common Good ST MARY THE VIRGIN FEN DITTON Text, design, photography REACH Ely (Reimagining Churches as 2 Dr Timur Alexandrov Community Assets for the Common Good) Cambridge Centre for Social Innovation is a multi-partner research project that Cambridge Judge Business School aims to help communities make fuller use of their churches. Editorial board The project is implemented by Dr Helen Haugh Centre for Social Innovation at Cambridge Centre for Social Innovation Cambridge Judge Business School Cambridge Judge Business School and the Diocese of Ely Geoffrey Hunter with the generous support of Allchurches Trust Diocese of Ely and Historic England www.reachely.org The challenges facing church communities and their buildings have been extensively studied in the light of declining church attendance in the United Kingdom over several decades. REACH Ely aims to address the less-well-understood opportunities for churches to engage and reconnect with the 97.7 per cent of the local communities in the Diocese of Ely who do not attend their parish churches. With the absence of universal determinants of success and failure of churches in the community engagement context, the REACH Ely project will provide an understanding of the relationship between communities and wider use of church buildings as well as the contribution that churches make to the common good. The project will determine community values, needs and opportunities that can be used in the most effective way to ensure a win-win outcome for communities and sustainable future of church buildings.
    [Show full text]
  • S/3290/19/RM – Land East of Teversham Road, Fulbourn
    13 January 2021 Report to: South Cambridgeshire District Council Planning Committee Lead Officer: Joint Director of Planning and Economic Development S/3290/19/RM – Land East of Teversham Road, Fulbourn Proposal: Approval of matters reserved for appearance, landscaping, layout and scale following Outline planning permission S/0202/17/OL for the development of 110 dwellings with areas of landscaping and public open space and associated infrastructure works Applicant: Castlefield International Limited Key material considerations: Compliance with the Outline Planning Permission Housing Provision (including affordable housing) Open Space Provision The Reserved Matters: Layout Scale Appearance Landscape Biodiversity Flood Risk and Drainage Highway Safety, Management of Roads and Parking Residential Amenity Heritage Assets Other matters Date of Member site visit: None Is it a Departure Application: Yes (advertised 2nd October 2019) Decision due by: 18th January 2021 (Extension of time agreed) Application brought to Committee because: Fulbourn Parish Council requests the application is determined by Planning Committee Officer Recommendation: Approval Presenting officer: Katie Christodoulides, Principal Planning Officer Executive Summary 1. This application seeks reserved matters approval for the appearance, layout, scale of buildings and landscaping following the principle of residential development of the site for 110 dwellings being established under outline planning consent S/0202/17/OL, granted on 26th October 2017. 2. The application has been amended by the applicants following consultee comments. The amendments comprise changes to the design, layout, parking layout, mix, drainage, trees, landscaping and dispersion of affordable dwellings. 3. The amendments are considered to further improve the quality of the scheme to ensure that it preserves the character and appearance of the area and fits comfortably within its rural context.
    [Show full text]
  • Green Belt Study 2002
    South Cambridgeshire District Council South Cambridgeshire Hall 9-11 Hills Road Cambridge CB2 1PB CAMBRIDGE GREEN BELT STUDY A Vision of the Future for Cambridge in its Green Belt Setting FINAL REPORT Landscape Design Associates 17 Minster Precincts Peterborough PE1 1XX Tel: 01733 310471 Fax: 01733 553661 Email: [email protected] September 2002 1641LP/PB/SB/Cambridge Green Belt Final Report/September 2002 CONTENTS CONTENTS SUMMARY 1.0 INTRODUCTION 2.0 CAMBRIDGE GREEN BELT: PLANNING CONTEXT 3.0 METHODOLOGY 4.0 BASELINE STUDIES Drawings: 1641LP/01 Policy Context: Environmental Designations 1641LP/02 Policy Context: Cultural and Access Designations 1641LP/03 Topography 1641LP/04 Townscape Character 1641LP/05 Landscape Character 1641LP/06 Visual Assessment 5.0 SETTING AND SPECIAL CHARACTER Drawings: 1641LP/07 Townscape and Landscape Analysis 1641LP/08 Townscape and Landscape Role and Function 6.0 QUALITIES TO BE SAFEGUARDED AND A VISION OF THE CITY Drawings: 1641LP/09 Special Qualities to be Safeguarded 1641LP/10 A Vision of Cambridge 7.0 DETAILED APPRAISAL EAST OF CAMBRIDGE Drawings: 1641LP/11 Environment 1641LP/12 Townscape and Landscape Character 1641LP/13 Analysis 1641LP/14 Special Qualities to be Safeguarded 1641LP/15 A Vision of East Cambridge 8.0 CONCLUSIONS Cover: The background illustration is from the Cambridgeshire Collection, Cambridge City Library. The top illustration is the prospect of Cambridge from the east and the bottom illustration is the prospect from the west in 1688. 1641LP/PB/SB/Cambridge Green Belt Final Report/September 2002 SUMMARY SUMMARY Appointment and Brief South Cambridgeshire District Council appointed Landscape Design Associates to undertake this study to assess the contribution that the eastern sector of the Green Belt makes to the overall purposes of the Cambridge Green Belt.
    [Show full text]
  • Annual Report 2018
    Red RGB:165-29-47 CMYK: 20-99-82-21 Gold RGB: 226-181-116 CMYK: 16-46-91-1 Blue RGB: 39-47-146 CMYK: 92-86-1-0 Annual Report 2018 Published 12 June 2019 Ely Diocesan Board of Finance We pray to be generous and visible people of Jesus Christ. Nurture a confident people of God Develop healthy churches Serve the community Re-imagine our buildings Target support to key areas TO ENGAGE FULLY AND COURAGEOUSLY WITH THE NEEDS OF OUR COMMUNITIES, LOCALLY AND GLOBALLY TO GROW GOD’S CHURCH BY FINDING DISCIPLES AND NURTURING LEADERS TO DEEPEN OUR COMMITMENT TO GOD THROUGH WORD, WORSHIP AND PRAYER. ENGAGE • GROW • DEEPEN | 3 Contents 04 Foreword from Bishop Stephen 05 Ely2025 – A Review 06 Safeguarding 09 Ministry 11 Mothers' Union 12 Mission 15 Retreat Centre 16 Church Buildings and Pastoral Department 20 Secretariat 21 Programme Management Office 23 Changing Market Towns 24 Parish Giving Scheme 25 Contactless Giving (Card Readers) 26 Communications and Database 29 Education 32 Finance 34 Houses Sub-Committee 35 Diocesan Assets Sub-Committee 37 Ministry Share Tables 4 | ENGAGE • GROW • DEEPEN Foreword from Bishop Stephen As a Diocese we are seeking to be People Fully Alive, as we One of the most important ways in which we serve our pray to be generous and visible people of Jesus Christ. We communities is through the Diocesan family of schools, as we are seeking to do this as we engage with our communities educate over 15,000 children. These are challenging times for locally and globally, as we grow in faith, and as we deepen in the education sector and especially for small and rural schools.
    [Show full text]
  • Teversham News Winter 2014 Final
    TEVERSHAM PARISH COUNCIL!WINTER 2014 Teversham News Public Drop Ins Grand Opening of the Come and find out more... Kiosk Library Exchange Your local area is growing with up to 1,300 homes, a Saturday 29th March 2014 primary school, and sports facilities all part of a new at 12 noon housing development in South Cambridgeshire. It’s part of the ‘Wing’ development north of Newmarket Road in Come and join us for the Grand Opening of the Kiosk Cambridge, and members of the Planning Team at South Library. We hope to invite the press to help us launch Cambridgeshire District Council will be available to this exciting project. We would welcome donations of explain more and answer any questions you may have any type of book for the kiosk library on the village on the following days and times: green and these can be collected (contact the Clerk) • Wednesday 29th January – 5.30pm till 8pm – Fen or dropped off at Teversham Engineering. Village Hall, Church Street, Fen Ditton • Thursday 30th January – 5.30pm till 8pm – Teversham Primary School, Church Road, Teversham • Saturday 1st February – 10am till 1pm – East Barnwell Centre, Newmarket Road, Cambridge For further information please call Edward Durrant on 01954 713266 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Proposal for New Recreation Facilities at Borley Way Play Area As you know, Teversham Parish Council value feedback received from all of our residents. Over a prolonged period, the Parish Council has been asked to provide ‘skate’ facilities by the younger members of our parish. The Parish Council are also happy to receive your comments A working party has been researching the possibility and it and will have a full set of plans available for view at their next is now time to present their findings.
    [Show full text]
  • Site Assessment Rejected Sites Broad Location 8 [PDF, 0.8MB]
    Site Assessments of Rejected Green Belt Sites for Broad Location 8 500 Cambridge City Council / South Cambridgeshire District Council Green Belt Site and Sustainability Appraisal Assessment Proforma Site Information Broad Location 8 Land east of Gazelle Way Site reference number(s): SC296 Site name/address: Land east of Gazelle Way Functional area (taken from SA Scoping Report): City only Map: Site description: Large flat arable fields with low boundary hedges to Gazelle Way. Woodland belt adjoins Cherry Hinton Road, more significant hedges elsewhere. Suburban residential to west of Gazelle Way. Major electricity transformer station to south at junction of Gazelle Way and Fulborn Old Drift with two lines of pylons, one high, metal pylon line to eastern field boundary and a second double line of lower power, wooden pylons crosses the middle of the site. Tesco supermarket to south. Prefab housing site adjoins Fulbourn Old Drift to the east. The land very gently falls away towards the east. Current use: Agricultural Proposed use(s): Residential Site size (ha): 21 approximately Assumed net developable area: 10.5 approximately Assumed residential density: 40 dph Potential residential capacity: 420 Site owner/promoter: Known Landowner has agreed to promote site for development?: Landowners appear to support development Site origin: Green Belt assessment 501 Relevant planning history: Planning permission granted in 1981 for land fronting onto the northern half of Gazelle Way for housing development, open space and schools. A subsequent planning permission in 1985 limited built development to the west of Gazelle Way only, which was implemented. The Panel Report into the draft Cambridgeshire & Peterborough Structure Plan published in February 2003 considered proposals for strategic large scale development to the east of Cambridge Airport around Teversham and Fulbourn.
    [Show full text]
  • THE STORY of an ENGLISH SAINT's CULT: an ANALYSIS of the INFLUENCE of ST ÆTHELTHRYTH of ELY, C.670
    THE STORY OF AN ENGLISH SAINT’S CULT: AN ANALYSIS OF THE INFLUENCE OF ST ÆTHELTHRYTH OF ELY, c.670 – c.1540 by IAN DAVID STYLER A thesis submitted to the University of Birmingham for the degree of DOCTOR OF PHILOSOPHY Department of History School of History and Cultures College of Arts and Law University of Birmingham August 2019 University of Birmingham Research Archive e-theses repository This unpublished thesis/dissertation is copyright of the author and/or third parties. The intellectual property rights of the author or third parties in respect of this work are as defined by The Copyright Designs and Patents Act 1988 or as modified by any successor legislation. Any use made of information contained in this thesis/dissertation must be in accordance with that legislation and must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the permission of the copyright holder. ABSTRACT This thesis charts the history of the cult of St Æthelthryth of Ely, arguing that its longevity and geographical extent were determined by the malleability of her character, as narrated within the hagiographical texts of her life, and the continued promotion of her shrine by parties interested in utilising her saintly power to achieve their goals. Arranged chronologically and divided into five distinct periods, the thesis demonstrates that this symbiotic relationship was key in maintaining and elongating the life of the cult. Employing digital humanities tools to analyse textual, archaeological, material, cartographic, and documentary sources covering the cult’s eight-hundred-year history, the study charts its development firstly within East Anglia, and subsequently across the whole country, and internationally.
    [Show full text]
  • Diocese of Ely Directory
    Diocese of Ely Directory Published: 12 February 2021 For comments, corrections or suggestions please email Jackie Williamson on [email protected] Introduction This directory has been ordered alphabetically by Archdeaconry > Deanery > Benefice - and then Church/Parish. For each Church/Parish, the names and contact details (email and telephone) have been included for the Licensed Clergy and Churchwardens. Where known a website and “A Church Near You” link have also been included. Towards the back of the directory, details have also been included that include, where known, the following contact details: • Rural Deans (name, number and email) • Clergy (name, number and email) • Clergy with Permission to Officiate (name, number and email) • General Synod Members from the Diocese of Ely - (name only) • Bishops Council (name only) • Diocesan Synod Members (Ely) (name only) • Assistant Bishops (name only) • Surrogates (name only) • Bishop’s and Archdeacons Office, Ely Diocesan Board of Finance staff, Cathedral Staff How to update or amend details If your details are inaccurate, or you would prefer a change to what is included, please direct your query as follows: • Licensed Clergy: Please contact the Bishop’s Office (https://www.elydiocese.org/about/contact-us/) • Clergy with PTO: Please contact the Bishop’s Office (https://www.elydiocese.org/about/contact-us/) • Churchwardens: Please contact the Archdeacon’s Office (https://www.elydiocese.org/about/contact-us/) • PCC Roles: [email protected] • Deanery/Benefice/Parish/Church names: DAC Office on [email protected] Data Protection The Ely Diocesan Board of Finance considers there to be a legitimate justification for publishing the contact details for Licensed Clergy (including those with PTO), Churchwardens and Diocesan staff (including those in the Archdeacons’ and Bishops’ offices) and key staff in Ely Cathedral in this Directory and on occasion the Diocesan website.
    [Show full text]
  • Directions to Victoria House, Fulbourn
    Victoria House The headquarters for NHS East of England is at Victoria House in From the A14 From the M11 From the A11 Fulbourn, a small village to the east of Cambridge. If you are arriving by train 1. Leave the A14 at junction 35, 1. From the M11 north & southbound, exit 1. From the A11 north & southbound, or coach, you will need to take a taxi or signposted for A1303 for Newmarket, at junction 11 and follow the A1309. exit at turn off signed Fulbourn, bus to Fulbourn. Cambridge and Stow Cum Quay. 2. Take the second major turning on your Balsham and Teversham. 2. At the roundabout, follow signs for right into Long Road (A1134) and then 2. Go through Fulbourn village. By Bus Cambridge (A1303). straight on over the next roundabout 3. On exiting Fulbourn, Capital Park Take the City 1 Fulbourn bus from Emanuel 3. At the next roundabout, turn left, and traffic lights. Business Park is situated on the right Street, central Cambridge or from the train following signs for Teversham, 3. Go straight on at the next roundabout. hand side after approximately 1 mile. station. The bus stops in the centre of Cherry Hinton and Fulbourn. 4. Follow Queen Edith’s Way until you see 4. Turn right into the Capital Park Business Capital Business Park then follow the signs 4. Continue to the next roundabout and the sign for Fulbourn and Cambridge Park and follow the signs for NHS East for Victoria House. turn left following signs for Fulbourn, Airport. of England. Trumpington and Addenbrooke’s.
    [Show full text]
  • 53 Fulbourn Road, Teversham, Cambridge, CB1 9AJ Guide Price £465,000 Freehold
    53 Fulbourn Road, Teversham, Cambridge, CB1 9AJ Guide Price £465,000 Freehold rah.co.uk 01223 800860 A MOST ATTRACTIVE VICTORIAN HOUSE EXTENDED AND FULLY REFURBISHED AND OFFERING ELEGANT AND STYLISH ACCOMMODATION SET WITHIN A LARGE GARDEN AND CONVENIENTLY PLACED FOR CAMBRIDGE CITY, ADDENBROOKE’S AND COMMUTER ROAD LINKS Entrance hall • sitting room • snug • kitchen/dining room • utility and cloakroom wc •3 bedrooms • en suite bathroom • family bathroom • long rear garden • off road parking This stunning end of terrace dates back to 1890 and is set back from the road within this sought after village just outside Cambridge City limits. Ideally located for the City centre, Addenbrooke’s Campus and within close striking distance of the A14 and M11. The current owners have transformed the property with a program of expansion and full refurbishment, yet retaining many features of the era. The original sash windows have been replaced with environmentally friendly double glazed equivalent, however a viewer may be forgiven for thinking they are the original at first glance. The panelled front door again is a modern twist on the original and opens to a spacious entrance hall with ceramic tiled flooring. Off the hall is a handy laundry room with plumbing for a washing machine and tumble dryer and a cloakroom wc. The sitting room has a large picture sash window to the front aspect, a feature fireplace with inset wood burning stove and exposed brick chimney breast and quarry tiled hearth. The room opens to a versatile snug, currently utilised as a child’s playroom, but would also make an ideal office.
    [Show full text]
  • Land North of Cherry Hinton
    LAND NORTH OF CHERRY HINTON SUPPLEMENTARY PLANNING DOCUMENT March 2018 Approved for adoption with the Local Plan © Terence O’Rourke Ltd 2018. All rights reserved. No part of this document may be reproduced in any form or stored in a retrieval system without the prior written consent of the copyright holder. All figures (unless otherwise stated) © Terence O’Rourke Ltd 2018. Based upon the 2017 Ordnance Survey mapping with the permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office © Crown Copyright Terence O’Rourke Ltd Licence number 100019980. 2 LAND NORTH OF CHERRY HINTON SUPPLEMENTARY PLANNING DOCUMENT LAND NORTH OF CHERRY HINTON SUPPLEMENTARY PLANNING DOCUMENT 01 INTRODUCTION 2 03 THE SITE AND SURROUNDING AREA 12 05 FRAMEWORK PRINCIPLES AND 44 MASTERPLAN Overview of the Site 2 Surrounding areas and adjacent uses 12 Purpose of the development framework 2 Transport and movement 14 Overview 44 Structure of the development brief 2 Services and facilities in Cambridge 16 Summary of consultation 45 Achieving a high quality development 6 Local facilities 17 Movement 46 Green infrastructure 20 Environmental considerations & sustainability 8 02 PLANNING POLICY CONTEXT Open spaces and recreation 21 site-wide sustainability 56 Introduction 8 Ecology 22 Surface water drainage strategy 58 Local plan policies 9 Local statutory and non-statutory designations 23 Landscape and OS 62 Green belt 11 Historic growth and urban grain 24 Land uses 67 Neighbourhood context analysis 25 Character and form 69 The Site 30–40 Development and
    [Show full text]