Contracts for Q3, 2019

Total Page:16

File Type:pdf, Size:1020Kb

Contracts for Q3, 2019 Q3 2019 Contracts Greater €25,000 Contract Title Supplier Value Contract type 180 Backhoe Comeragh East GARVAN TROY 52,000.00 Framework contract Greyfriars Clock Museum, Electrical Installation Contract WALSH BUTLER LTD 76,450.00 General services contract Installation Of Monitored CCTV Carrickpherish JEC SECURITY LTD 35,000.00 PW-CF5 Ext Of Existing Contractor For Security For Halting Sites & Additional Services FOUR SEASONS PROMOTIONS LTD T/A ACS 90,000.00 General services contract Installation Of Pathway From Kilmeaden Village To Waterford Greenway SUIR PLANT 108,000.00 PW-CF5 Kill Village Enhancement And Ancillary Works - TVRS 2018 SUIR PLANT 99,000.00 PW-CF5 Mahon Bridge Trail Fencing & Ancillary Works CO WATERFORD FARM RELIEF SERVICES LTD 25,630.60 PW-CF5 Mahon Bridge Trail Surfacing Works TONY KIRWAN CIVIL ENGINEERING CONTRACTORS LTD 40,916.50 PW-CF5 N72 Kilroe Pavement Overlay Scheme Phase 1 ROADSTONE LTD (CONTRACTS) 2,555,849.60 Framework contract Tender For Tool & Equipment Hire FRAHER PLANT & TOOL HIRE LTD 25,000.00 Framework contract Tender For Safety Barrier Low Cost Scheme LAGAN OPERATIONS & MAINTENANCE LTD 31,441.42 PW-CF6 Tender For Repair Works To Helvick Pier TBEB LTD 138,800.00 PW-CF6 Installation Of Footpaths And Fencing In Dunhill B EUGENE FALLON PLANT HIRE LTD 25,460.00 SupplyGov Ardmore Cliff Walk Upgrade And Ancillary Works TOORADOO CONSTRUCTION LTD 110,133.00 PW-CF6 Supply Road Diesel To Dungarvan 12/07/2019 CIRCLE K IRELAND ENERGY LTD 34,393.85 Framework contract Tender For LED Chevrons Lights RENNICKS SIGNS IRELAND LTD 29,020.00 Framework contract Purchase Of 1 No. Used PTR Roller DAVE POWER PLANT LTD 36,178.00 General goods contract WCCC 18/565 - North Quays GI By IGSL IGSL LIMITED 251,450.00 PW-CF7 2019 Machine Survey Of Regional And Local Roads PAVEMENT MGT SERVICES LTD 71,000.00 Framework contract Tender For Tractor & Trailer D/L Eng District RICHARD BROPHY 28,000.00 Framework contract Tender For JCB O GRADY BROS LTD 25,000.00 SupplyGov An Post Billpay Service To December 2019 AN POST 50,000.00 General services contract Comeragh Area Macadam Contract 2019 LAGAN ASPHALT LTD 878,575.65 Framework contract Tender For Road Surfacing & Patch Repairs D/L ROAD MAINTENANCE SERVICES LTD 49,974.05 SupplyGov 2019 Bridge Rehabilitation Works Lot A GLAS CIVIL ENGINEERING LTD 73,729.60 PW-CF6 HD28 Retexturing Of National Roads TRACBLAST LTD 61,341.73 PW-CF6 Metro District Macadam Contract 2019 LAGAN ASPHALT LTD 840,599.91 PW-CF5 Road Recycling Works 2019 THOMAS MURPHY & SONS MACHINERY LTD 155,134.80 SupplyGov WCCC16/436 Erection, Maintenance & Removal Of Festive Lighting KILLAREE LIGHTING SERVICES LTD 103,000.00 General services contract Supply And Laying Of Road Markings Metro 2019 MACLOCHLAINN (ROADMARKINGS) LTD 62,449.80 SupplyGov Faithlegg Completion Works CO WATERFORD FARM RELIEF SERVICES LTD 28,710.55 SupplyGov Tender For Safety Barrier COMPLETE HIGHWAY CARE LTD 55,923.00 Framework contract Tender For Duckspool Outfall Pipe MJS Civil Engineering Ltd 343,200.02 PW-CF5 South East Region/Housing First FOCUS IRELAND 250,000.00 WCCC19/292 20019 Winterval Illuminations Every Event Ltd 60,000.00 General services contract Service Contract For Waterford City And County Retail Strategy Review JOHN SPAIN ASSOCIATES 53,900.00 General services contract Hire Of Excavator JAMES CAHILL JUNIOR 31,500.00 Framework contract Hire Of Excavator LIAM WHELAN PLANT HIRE LTD 30,000.00 Framework contract Hire Of Excavator EDWARD O'ROURKE CONTRACTING LTD 30,000.00 Framework contract Tender For Sweeper WALKER VEHICLE RENTALS LTD 25,000.00 Framework contract Tender For Sweeper GPT PLANT & TOOL HIRE 25,000.00 Framework contract 19/343 ESB Diversions- North Quays ESB NETWORKS 448,019.25 ESB Networks WCCC 19/235 Provision Of Event Security & Stewarding For Waterford City & County Council CRYSTAL CONTRACTS SERVICES 100,000.00 General services contract Tender For Road Recycling THOMAS MURPHY & SONS MACHINERY LTD 213,061.70 PW-CF6 Manor Court - Renovation Of 4 No. Apartments ABS CONSTRUCTION LTD 114,377.00 PW-CF6 Lemybrien To Killineen Pavement Overlay LAGAN ASPHALT LTD 3,154,476.56 Framework contract Waterford Refugee Resettlement Project RESPOND 212,700.00 WCCC 19-058 Commission Of Art Work For Main St. Tramore STEPHEN BURKE 70,000.00 General services contract Refurbhment Of House In Shandon Halting Site JOHN SOMERS CONSTRUCTION LTD. 28,706.00 PW-CF6 WCCC 19/126 Clonea Power Flood Defence Works TOM DELAHUNTY PLANT HIRE LTD 132,589.37 PW-CF6 12/12/2019 1 2019 Contracts Greater €25,000.
Recommended publications
  • Section 177-AE Application Report Mahon Falls Car Park.Pdf
    AN BORD PLEANÁLA SECTION 177AE APPLICATION FOR THE PROPOSED EXTENSION TO AN EXISTING MAHON FALLS CAR PARK & ADDITIONAL LAY BYS IN THE TOWNLAND OF COMERAGH MOUNTAIN, CO. WATERFORD. COMERAGH MOUNTAINS SAC (001952) temp March 2021 Table of Contents 1.0 INTRODUCTION ........................................................................................................................... 2 1.1 Introduction .......................................................................................................................... .2 1.2 Background ....................................................................................................................................... .2 2.0 PLANNING CONTEXT ................................................................................................................... 5 2.1 Waterford County Development Plan 2011 – 2017 ............................................................... 5 2.1.1 6.1 (a) Policy with Regards to Areas Designed as Vulnerable ....................................... 5 2.1.2 6.2 (a) Policy with Regards to Areas Designated as Sensitive....................................... 5 2.1.3 Policy ENV3 ................................................................................................................ 6 2.1.4 Policy NH2 .................................................................................................................. 6 2.1.5 Policy NH6 .................................................................................................................. 6 2.1.6
    [Show full text]
  • Roads Report Comeragh 21St July 2021
    DO: GACH BALL DE CHEANTAR BARDASACH AN CHOMARAIGH TO: EACH MEMBER OF THE MUNICIPAL DISTRICT OF COMERAGH ROADS PROGRESS REPORT JULY 2021 A. Roads Works Programme 2021 Strengthening and Surface dressing Works programme has commenced. Drainage discretionary works will be included in RWP 2021 which will be provided across all 3 Areas of the District and these works will continue to take place under the Maintenance budgets. B. Road Maintenance Works The District area crews have been continuously filling potholes and repairing roads. Road repairs (potholes and damaged edges) and drainage discretionary works will continue to take place under the Maintenance budgets. C. Active Travel Measures The Comeragh District have been allocated approximately €1.6 million in funding for the following projects: • Portlaw Village Footpath replacement - €200,000 Gone out to tender for phase 1 – Contractor awarded and has commenced. • Upper Queen Street (L4500) – Signalised Crossing - €30,000 – Section 38 Approved. • Carrick Road, Portlaw (L4033) – Design & construction of new footpaths, bus stop, raised surfaces, traffic calming measures - €350,000 Under design and Part 8 prepared. • Brown Street, Portlaw (L4033) – Design - €5,000 - Consultant carrying out a design • Kilmacthomas Village East Link Greenway (R677) – Design & construction for footpath, signalized crossing, provision for drainage and lighting - €300,000 – Design Stage. Section 38 process commenced. • Kilmacthomas Village West Link Greenway West Terrace (L70991) – Macadam overlay - €45,000 – Completed. • Main Street, Kilmacthomas (L4043) – Signalised crossing - €30,000 – Section 38 Approved. • Walsh’s place to Main Street – Macadam overlay (L4043) - €40,000 Completed. • Main Street Car park, Kilmacthomas – Provision of cycle parking - €20,000 Contractor on site.
    [Show full text]
  • 3B). Roads Report Comeragh 18Th March 2021
    DO: GACH BALL DE CHEANTAR BARDASACH AN CHOMARAIGH TO: EACH MEMBER OF THE MUNICIPAL DISTRICT OF COMERAGH ROADS PROGRESS REPORT MARCH 2021 A. Roads Works Programme 2021 Strengthening and Surface dressing Works have been approved. Drainage discretionary works will be included in RWP 2021 which will be provided across all 3 Areas of the District and these works will continue to take place under the Maintenance budgets. B. Road Maintenance Works The District area crews have been continuously filling potholes and repairing roads. Road repairs (potholes and damaged edges) and drainage discretionary works will continue to take place under the Maintenance budgets. C. Active Travel Measures The Comeragh District have been allocated approximately €1.6 million in funding for the following projects: Portlaw Village Footpath replacement - €200,000 Upper Queen Street (L4500) – Signalised Crossing - €30,000 Carrick Road, Portlaw (L4033) – Design & construction of new footpaths, bus stop, raised surfaces, traffic calming measures - €350,000 Brown Street, Portlaw (L4033) – Design - €5,000 Kilmacthomas Village East Link Greenway (R677) – Design & construction for footpath, signalized crossing, provision for drainage and lighting - €300,000 Kilmacthomas Village West Link Greenway West Terrace (L70991) – Macadam overlay - €45,000 Main Street, Kilmacthomas (L4043) – Signalised crossing - €30,000 Walsh’s place to Main Street – Macadam overlay (L4043) - €40,000 Main Street Car park, Kilmacthomas – Provision of cycle parking - €20,000 St. James National
    [Show full text]
  • 4B). Roads Report Comeragh 15Th January 2020
    DO: GACH BALL DE CHEANTAR BARDASACH AN CHOMARAIGH TO: EACH MEMBER OF THE MUNICIPAL DISTRICT OF COMERAGH ROADS PROGRESS REPORT JANUARY 2019 A. Roads Works Programme 2019 The Roads Works Programme for 2019 is been prepared for Strengthening and Surface Dressing projects and will be brought to council for approval. B. Road Maintenance Works The District area crews have been continuously filling potholes and repairing roads. Road repairs (potholes and damaged edges) and drainage discretionary works will continue to take place under the Maintenance budgets. C. Local Improvement Schemes The following LIS schemes have been carried out and completed: • Croughataggart, Portlaw • Carrowclough, Carrick-on-Suir • Rath, Carrick –on-Suir • Knockarelane, Ballymacarbry • Poulboutin, Cappoquin • Ballybrennock, Dunhill • Comeragh, Lemybrien D. Community Improvement Schemes The Community Involvement Scheme provides funding for works on public roads where the local residents engage with the Council and provide either a financial contribution or work to assist in the upgrade of the road. Two schemes were completed in 2018: • Templeyvrick, Bonmahon • Clondonnell Five Schemes to be completed in 2019 within the Comeragh District: • Knockanbrandaun, Ballymacarbry • Derrinlaur, Clonmel • Ballyclough, Rathgormack • Graigueavurra, Scart Mt Modeligo • Dunhill E. Low Cost Schemes (Non-National Roads) Local Improvement Schemes for 2018 for the Comeragh District Area. The following 3 Schemes have been completed: • R676 Mahon Bridge – New lining is completed along this section of road. • R671/L5093 Junction with R671 Caherbaun – The Comeragh District staff carried out sightline improvement works and is completed. • L4016 Junction with R681, The Sweep near Kilmeaden – Tree felling operations is completed Site clearance works and fencing completed.
    [Show full text]
  • Upland Areas
    Guide to birdwatching sites in Co Waterford Upland areas There are three mountain ranges in County Waterford. The Knockmealdown mountains, divided by one of the most beautiful mountain passes in the country, lie in the north-west of the county, on the border with Tipperary which holds the main part of the range. The Comeragh and Monavullagh mountains, or the Comeraghs as both ranges are collectively known, form a large isolated massif in the heart of Waterford surrounded by rich agricultural land. Although Old Red Sandstone is the predominant rock formation in these mountain ranges, the topography is strikingly different. The flat, almost featureless central plateau of the Comeraghs is ringed by several superb corries, due almost entirely to ice-action or glaciation. By contrast, the Knockmealdowns consist of an impressive row of peaks surrounded by extensive heather moorland with few deep glens or corries. During the Glacial Period, ice and snow was slow to melt in some mountain ranges, particularly on north- and east- facing slopes, and these glaciers, in slipping slowly down the mountain sides, gouged out rocks and boulders, resulting in precipices at the valley tops and often along the sides with deep basins below. The material scooped out was deposited across the valley lower down and the ice and water residue was retained, forming the spectacular corries found in the Comeraghs. There are no less than 16 corrie lakes in the Comeragh range and one in the Knockmealdowns; all occur at around 400 metres in the coums backed by lofty cliffs. The higher reaches of the Waterford mountain ranges are to be visited more for their scenery than for their birdlife.
    [Show full text]
  • Forestplans BAU 6 Strategic P
    Foreword I have great pleasure in publishing Coillte’s South Central Business Area Unit (BAU) strategic plan. The purpose of a BAU strategic plan is to set out plans for the forest and non-forest business that will take place in the BAU during the plan period. In practicing sustainable forest management Coillte’s aim is to develop its forests in a way that is environmentally sustainable, socially sustainable and economically sustainable. Coillte has applied the principles of environmental impact assessment and risk management to the potential interactions between forest activities and standard receptors in compiling these plans. The topics covered in the BAU strategic plan include: Commercial Planning: • planting • timber harvesting • timber sales • forest roads and access • licenses, lettings, recreation and non-forestry land uses • land acquisition and sales • non-forest business – such as renewable energy Planning for public benefits and public use: • Community facilities and benefits • Recreational and tourism infrastructure and partnerships • Access • Environmental enhancement measures such as biodiversity and nature conservation Planning for sustainable use of resources: • sustainable forest management • long term retention of trees • low impact Silvicultural1 systems • water quality • forest design • use of chemicals PJ Trait BAU Manager 1 Growing, cultivating and felling trees 1 Statement of Compliance with Principles of Sustainable Forestry Management The Coillte estate is a rich, high quality environmental resource, with the potential to interact with people, landscape, water and biodiversity. As such, Coillte recognises and seeks to minimise any potential adverse impacts of our business on the environment through responsible environmental management. We are committed to the prevention of pollution.
    [Show full text]
  • New 50-Bed Centre to Replace St. Anthony's Unit in Clonmel
    THURSDAY AUGUST 29, 2019 TipperaryLive.ie Vol24Issue 18 Queen Street, Clonmel Tel 052 617 2500 email: [email protected] [email protected] New50-bed centre to replace St.Anthony'sUnit in Clonmel The HSE has submitted a hairdressing room and in- to SouthTipperary General AHSE spokesperson said planning application to build ternal courtyards and first Hospital. itiscurrentlyconsideringde- anew 50-bedresidential floorterrace spaces, akit- Theroundabout will re- veloping thenew Clonmel chen andlaundry,staff ac- quirethe demolition of a residential careunit forthe centrefor the elderly in commodation and office derelicthousecalledHillview elderly under thePublic Clonmel to replace the ex- space. and twooutbuildings. PrivatePartnership model. isting St.Anthony’sUnit on The HSE is proposingac- The residential careunit Deputy Seamus Healyhas the Western Road. cess to theresidential care will be served by a26square welcomed thesubmission of unit from afour-arm round- metres ESB sub-station. theplanning application, The project is part of the aboutonthe Glenconnor The application alsopro- whichwas expected. government’splan to replace Road,whcih will involvethe poses theexisting road adja- The project wasan- or upgrade up to 90 long-stay realignmentofthe existing centtothe Western Road will nounced in 2017. residential carecentres na- entrance and boundary walls become pedestrian only. tionwide to meetall Health Information and QualityAu- thority(HIQA) standards. It will increase the numberofHSE residential carebeds forthe elderly in Clonmelby29, as thecurrent St.Anthony’s Unit has 21 beds. Tipperary County Council receivedthe application for thetwo-storey 4,422 square metres communitynursing and residential careunit on August 12. The application is currentlyatthe pre-valida- tion stage. According to theapplica- tion, thenew residential care unit will comprise 50 en suite bedroomswithdiningrooms, kitchenettes, dayrooms, sun rooms,anactivitiesroomand quietrooms.
    [Show full text]
  • April 23Rd – 25Th 2021
    West Waterford Festival of Food Presents... Festival Spirit APRIL 23RD – 25TH 2021 #FESTIVALSPIRIT #WWFOF WWW.WESTWATERFORDFESTIVALOFFOOD.COM Contents It is hard to believe it’s just over a year since we took the decision to Cocktail Masterclass 5 postpone the West Waterford Festival of Food, and then six months Taste of the Festival Special later, to postpone it again. But what we have all learned through the Meal Kit Experience 6 past twelve months is the value of home, of the people that form our Menu 7 communities, and of the nature of the landscape that surrounds us – WELCOME whether that is within our 2K, 5K or a little further afield. Forage and Feast from Land to Sea 8 Craft Beer Taste Along 10 All these have been hugely sustaining. Craft Cider Tasting Party 11 To that list I want to add good food and small treats. The producers and makers, chefs and bakers in the West Waterford Region have been a huge highlight in Taste Waterford Launch 12 so many of our lives over the past twelve months. That’s why we have created Cool Kids Café Adventures 14 Festival Spirit, a small celebration with a big heart, to focus on the feast we have on our doorsteps in this beautiful part of Ireland. Kids Chocolate Madness Cook Along 16 You’ll already know this if you’re lucky enough to live in West Waterford, where Kids Grow Along 17 you can take your pick from wild mountain walks, long golden sandy beaches, the rich River Blackwater, and the lush landscape that runs between.
    [Show full text]
  • Transport Thematic Group 10.6.21
    PPN Rep Name James Farnan Other Reps who fed into this Report (if applicable) Meeting Name Transport Thematic Group Date of Meeting 10/06/2021 Location of Meeting Zoom 11am – 12.15 Agenda Item Notes Outcome/Decisions Made Actions Required - by Who & When Points from Previous Bus stops in James reported that relaying of Ongoing Meeting Dungarvan surface for the provision of parking coaches at the causeway in Dungarvan is to take place. Also at the Daycare center it will take place. Accessibility Taxi There is a lack of wheelchair Will complete a review of taxi in Dungarvan the situation. Ongoing New and extended Summer Services A new service to commence in July, August and routes. July will commence in September service for this Kilmacthomas to Lemybrian, year. There will be 6 Mahon Bridge, Mahon Falls, services per day from 8am Kilclooney Wood Rathgormack, to 6pm. Clonea Power and back to Kilmacthomas. Extended Service Route number 361 Ardmore to Dungarvan has now been extended in service and runs 7 days a week. JOD looking at how a service would accommodate the Ongoing. growing population of Ballinroad who need to have access to Dungarvan. This would be similar to the town March 2021 services run in other Local Link areas. Bus Stops A debate around the lack of Bus Pressure will remain on stops took place with both NTA and Aideen will see James O’Donoghue and Fiona where the WCCC can assist Connolly both expressing their in this issue. frustration with NTA who have responsibility for the location of Bus stops.
    [Show full text]
  • Decies Journal of The
    DECIES JOURNAL OF THE I WATERFORDARCHAEOLOGICAL & HISTORICALSOCIETY I No. 53 IRISLEABHARSEANDALA~OCHTA AGUS STAIREPHORT LAIRGE BAXDAS PHOXT LAIXGE WATEXFOXD COXPOXATION The Waterford Archaeological and Historical Society and the editor of DECIES gratefully acknowledge the generous sponsorship of Waterford Corporation towards the publication costs of this journal. Decies 53,1997 ISSN 1393-3116 Published by The Waterford Archaeological and Historical Society Typeset by Phototype-Set Ltd., 2 Lee Road, Dublin Industrial Estate, Glasnevin, Dublin 11. Printed by Leinster Leader Ltd., Naas, Co. Kildare PAGE Conflicting Loyalties - Two Waterford Soldiers - Fenians: PatrickMcCarthy .................................................................................................................................................... 1 The Origin and Development of the Portlaw Cotton Industry, 1825-1840: Tom Hunt ............................................................................................................................................ 17 Charles Smith, 1715-1762: Pioneer of Irish Topography: Willie Fraher ...................... 33 Protestants and the 1826 Waterford County Election: Eugene Broderick ...................................................................................................................................................... 45 Waterford Steamship Company: Bill Irish ........................................................................................ 67 Land Agitation in County Waterford, 1879-1882: Part 1:
    [Show full text]
  • 1999 Waterford County Development Plan
    1999 WATERFORD COUNTY DEVELOPMENT PLAN ADOPTED BY WATERFORD COUNTY COUNCIL JULY 12th 1999 WATERFORD COUNTY COUNCIL County Manager: Mr. Donal Connolly County Secretary: Mr. Peter Carey County Engineer: Mr. John O’Flynn Senior Executive Engineer: Mr. Denis McCarthy TABLE OF CONTENTS Page 1. Development Context 3 1.1 The Regional Context 3 1.2 Population and Economic Activity within the County 4 1.3 Review of Progress under the 1992 Development Plan 6 1.4 Development Opportunities and Constraints in Summary 7 2. Sustainable Development Strategy 8 2.1 Economic Development 9 2.1.1 Development of Industry and Enterprise 9 2.1.2 Retailing and Other Commercial Activity 10 2.1.3 Forestry 12 2.1.4 Agriculture 12 2.1.5 Fisheries and aquaculture 12 2.1.6 Tourism 13 2.2 Social Cohesion 16 2.2.1 Housing Provision 16 2.2.2 Maintenance of Cultural Identity 17 2.2.3 Arts, Culture and Community Facilities 17 2.2.4 Recreation and Amenity 18 2.3 Sustainable Land use and Transportation 19 2.3.1 Land Use and Settlement Strategy 19 2.3.2 Roads ,Transport & Telecommunications 20 2.4 Protection of the Natural Environment 22 2.4.1 Protection of Natural Resources 22 2.4.2 Investment proposed in support of protection of the natural environment 23 2.5 Management of the Landscape 26 2.5.1 General Approach 26 2.5.2 Upland Areas 28 2.5.3 Coastal Areas 28 3. Settlement Strategy 29 3.1 The Settlement Strategy for Waterford 29 3.2 County Service Centres 29 3.3 Development Nodes 32 3.3.1 Aglish 32 3.3.2 Annestown 34 3.3.3 Ardmore 36 3.3.4 Ballinroad 38 3.3.5 Ballyduff (East
    [Show full text]
  • Summer Newsletter 2019 ~Issue 25
    CCJ Newsletter - Issue 25 Summer Newsletter 2019 ~Issue 25 Highlights Editorial Joint Oireachtas visit Dunhill, There is now greater awareness of social enterprise as a separate and distinct sector following years of research by government EU Citizens Dialogue departments, third level colleges, agencies, communities and “The Enterprising Community” (2018) published by Dr. Senan Cooke. The Department of Rural and Community Development completed its final public consultation on its draft social enterprise policy on 14th May. It received many comments and contributions from organisations and individuals across the country, then completed an analysis of the invaluable feedback. The official policy has been finalised and is ready for launch. All involved in the social enterprise sector is hoping the policy can be endorsed by cabinet and launched before the end of July and Dáil summer recess. The next challenge will be to implement the policy. The sector, in particular those who have been engaged in the research have high expectations that the new policy will dramatically facilitate new start- ups, consolidations and expansions of social enterprise projects over the next few years. Built into the policy is a review of progress in 2021. Many people working on the ground have for a long time believed it is a sleeping giant with enormous socio-economic Remote Working potential. They are convinced the new policy is the missing link in awakening this potential to utilise the many valuable and dormant resources that are available to the sector. If the resources and Killinkere Co. Cavan opportunities we know are made available in a Dunhill Community and Copper co-ordinated and galvanised way, it will Coast Geopark Nationwide transform every rural and urban community in the country.
    [Show full text]