Safeguarded Wharves Review – 2018 Individual Site Assessments

Total Page:16

File Type:pdf, Size:1020Kb

Safeguarded Wharves Review – 2018 Individual Site Assessments Safeguarded Wharves Review – 2018 Individual Site Assessments 1 Individual Site Assessments by sub-region West 1. Hurlingham 4 2. Swedish 7 3. Comley’s 10 4. Smuggler’s Way 13 5. Pier 16 6. Cringle Dock 19 7. Kirtling 22 8. Middle 25 9. Cremorne 28 10. Walbrook 31 South East 11. Convoys 34 12. Brewery 37 13. Tunnel 40 14. Victoria Deep Water Terminal 43 15. Angerstein 46 16. Murphy’s 49 17. Riverside 52 18. Middleton 55 19. Mulberry 58 20. Pioneer 61 21. Albion 64 22. Erith 67 23. Railway 70 24. Town 73 25. Standard 76 North East 26. Northumberland 79 27. Orchard 82 28. Priors 85 29. Mayer Parry 88 30. Thames 91 31. Peruvian 94 31A.Royal Primrose 97 32. Manhattan 100 33. Sunshine 103 34. Thames Refinery 106 35. Welbeck 109 36. Alexander 112 37. Pinns 115 38. Steel 118 39. Rippleway 121 40. Docklands 124 41. Victoria Stone 127 42. DePass 130 43. Dagenham 133 44. Pinnacle Terminal 135 2 45. No.1 Western Extension 138 46. East Jetty 140 47. No.4 Jetty 142 48. Ford Dagenham Terminal 145 49. Phoenix 148 50. Halfway 150 3 1. Hurlingham 4 Address Carnwath Road, London SW6 Local Authority Hammersmith & Fulham Grid reference E 525,603/ N 175,568 Site area 0.51 ha Boundary Change None Road Access Access to Carnwath Road from north via Wandsworth Bridge Road, A217 (SRN) with connections to New Kings Road, A308 (SRN), access from south via Wandsworth Bridge Road, A217 (SRN) Congestion (delay Wandsworth Brdige Road A217 between j/w York Road (A3205) in minutes/km) and j/w King’s Road (A308): North bound: 0.5 to over 1.5 South bound 0.5 to over 1.5 Rail Access N/A Comments Wandsworth Bridge Road, A217 (SRN) offers connections to west and southwest London via junctions with A308 (SRN), A3 (TLRN), and a number of other strategic routes. Wandsworth Bridge Road experiences significant HGV flows at present. There are capacity constraints at the junction of Wandsworth Bridge Road and Carnwath Road, especially at peak times. However, the local Highway Authority has identified an improvement scheme to provide additional capacity. A Delivery and Servicing Plan could help to mitigate the noise and air quality effects of road freight activity at the wharf. Retaining wharf capacity in the area could help encourage mode shift to water, reducing the amount of strategic road freight passing through west London. Min. and max. Dries 2.26 metres to 3.68 metres berth depths Wall or jetty berth Wall berth (80 metres) (and length) Vessel size N/A LOA x beam x draft (m) Comments A drying berth, typical of the river upstream of the Thames Barrier. No campshed. Berth characteristics appropriate for barge traffic, which travels to the wharf on the flood tide, mooring at or near high water. Works to the berth are to be undertaken prior to Tideway’s use of the wharf in connection with the Thames Tideway Tunnel which should improve the wharf’s viability. Site’s planning The LB Hammersmith & Fulham Core Strategy (October 2011) in status paragraph 7.140 seeks the consolidation of wharf capacity onto fewer Surrounding land better located sites and in para 7.141 calls for the removal of the use and planning safeguarded designation at this wharf in the next Mayoral safeguarded context wharves review. The wharf forms part of the Carnwarth Road main drive site for the Thames Tideway Tunnel scheme. Current Use Vacant, last cargo handled c.1997 when wharf acquired by property (if vacant date and developer. last handled cargo) 5 Recent average N/A tonnage (2012- 2016) On-site processing N/A Environmental See Separate WSP Consulting Appendices Impacts Market Interest The wharf is to be used in connection with the Thames Tideway and alternative Tunnel project until 2022, handling over 1mt of cargo by water, wharves including CD&E waste, aggregates and tunnel lining segments. In addition, there continues to be substantial interest from operators within and new to the Port of London for handling bulk cargoes, especially aggregates and containerised traffic. Safeguarding Retain safeguarding. Site is viable and long-standing interest has been Recommendation expressed in it by a range of cargo-handling operators. 6 2. Swedish 7 Address Townmead Road, London SW6 Local Authority Hammersmith & Fulham Grid reference W 525,942/N 175,722 Site area 0.55 ha Boundary Change None Road Access From north via Wandsworth Bridge Road, A217 (SRN)) with connections to New Kings Road, A308 (SRN), from south via Wandsworth Bridge Road, A217 (SRN), then left / right turn on to Townmead Road. Congestion (delay Wandsworth Bridge Road A217 between j/w York Road (A3205) and in minutes/km) j/w King’s Road (A308) North bound 0.5 to over 1.5 South bound 0.5 to over 1.5 Rail Access N/A Comments Wandsworth Bridge Road, A217 (SRN) offers connections to west and southwest London via junctions with A308 (SRN), A3 (TLRN), and a number of other strategic routes. Wandsworth Bridge Road experiences significant HGV flows at present. There are capacity constraints at the junction of Wandsworth Bridge Road and Townmead Road, especially at peak times. The Local Highway Authority has identified an improvement scheme to provide additional capacity. A Delivery and Servicing Plan could help to mitigate the noise and air quality effects of road freight activity at the wharf. Retaining wharf capacity in the area could help encourage mode shift to water, reducing the amount of strategic road freight passing through west London. Min. and max. Dries 2.86 metres to 3.08 metres berth depths Wall or jetty berth Wall berth (50 metres) (and length) Vessel size N/A LOA x beam x draft (m) Comments A drying berth, typical of the river upstream of the Thames Barrier. No campshed. Berth characteristics appropriate for barge traffic, which travels to the wharf on the flood tide, mooring at or near high water. Site’s planning The LB Hammersmith & Fulham Core Strategy (October 2011) in status paragraph 7.140 seeks the consolidation of wharf capacity onto fewer Surrounding land better located sites. The site is in industrial use (fuel storage) but is use and planning not currently utilising water transport. The site falls under the COMAH context regulations, which control the loading, storage and security of fuels at the site. Planning consent for a consolidated wharf with Comley’s Wharf and Albert wharf (not safeguarded) with residential development above granted in 2015, not yet implemented. Total throughput across the consolidated wharf projected at 115ktpa. 8 Current Use Petroleum products by road. Last cargo handled c.2004. Site has (if vacant date and substantial fuel storage tanks and pipes for fuel transmission from last handled cargo) the river. Recent average N/A tonnage (2012- 2016) On-site processing N/A Environmental See Separate WSP Consulting Appendices Impacts Market Interest Although planning consent granted for consolidation, there and alternative continues to be substantial interest from operators within and new wharves to the port of London for handling bulk cargoes. Safeguarding Retain safeguarding. Site is viable and long-standing interest has been Recommendation expressed in it by a range of cargo-handling operators. 9 3. Comley’s 10 Address Townmead Road, London SW6 Local Authority Hammersmith & Fulham Grid reference E 525,975/N 175,743 Site area 0.44 ha Boundary Change Minor change to reflect operations, ownership and highway works Road Access From north via Wandsworth Bridge Road, A217 (SRN)) with connections to New Kings Road, A308 (SRN), from south via Wandsworth Bridge Road, A217 (SRN), then left / right turn on to Townmead Road. Wharf site is located on southern side of road. Congestion (delay Wandsworth Bridge Road A217 between j/w York Road (A3205) and in minutes/km) j/w King’s Road (A308) North bound: 0.5 to over 1.5 South bound: 0.5 to over 1.5 Rail Access N/A Comments Wandsworth Bridge Road, A217 (SRN) offers connections to west and southwest London via junctions with A308 (SRN), A3 (TLRN), and a number of other strategic routes. Wandsworth Bridge Road experiences significant HGV flows at present. There are capacity constraints at junction with Wandsworth Bridge Road especially at peak times. The Local Highway Authority has identified an improvement scheme to provide additional capacity. - The finalised section 106 agreement for the development at this wharf will include transfer to the borough of a 5 metre strip along Townmead Road for the purposes of related highway improvements. A Delivery and Servicing Plan could help to mitigate the noise and air quality effects of road freight activity at the wharf. Retaining wharf capacity in the area could help encourage mode shift to water, reducing the amount of strategic road freight passing through west London. Min. and max. Dries 1.96 metres to 3.98 metres berth depths Wall or jetty berth Wall Berth (50 metres) (and length) Vessel size Tugs and tows and motorised barges LOA x beam x draft (m) Comments A drying berth, typical of the river upstream of the Thames Barrier. No campshed. Berth characteristics appropriate for barge traffic, which travels to the wharf on the flood tide, mooring at or near high water.Limited dredging works to berth approaches undertaken in 2015 prior to wharf’s reactivation. Site’s planning The LB Hammersmith & Fulham Core Strategy (October 2011) in status paragraph 7.140 seeks the consolidation of wharf capacity onto fewer Surrounding land better located sites. The site is currently in use for aggregates use and planning transhipment and the owners have received planning permission to context upgrade the facilities and increase the capacity of the site, subject to a S106 agreement.
Recommended publications
  • Alternative Options Investigated to Address the Issues at Blackwall Tunnel
    Alternative options considered to address the issues at the Blackwall Tunnel We have considered a wide range of options for schemes to help address the transport problems of congestion, closures and incidents, and resilience at the Blackwall Tunnel and believe that our proposed Silvertown Tunnel scheme is the best solution. This factsheet examines a number of potential alternative schemes, including some which were suggested by respondents to our previous consultation, and explains why we do not consider them to be feasible solutions to the problems at the Blackwall Tunnel. Further detail on each alternative as well as other alternatives is included in the Preliminary Case for the Scheme, which can be found at www.tfl.gov.uk/Silvertown-tunnel. Building a bridge between Silvertown and the Greenwich Peninsula, rather than a tunnel We have considered building a bridge at Silvertown, instead of a tunnel. However, any new bridge built in east London needs to provide at least 50m of clearance above the water level to allow tall sea-going shipping to pass beneath safely. A bridge with this level of clearance would require long, sloping approach ramps. Such ramps would create a barrier within the local area, as well as dramatically affecting the visual environment and going against local authorities’ development plans. A high-level bridge would also not be feasible in the current location due to it’s proximity to the Emirates Air Line cable car. We also considered the option of a lifting bridge (like Tower Bridge). This could be constructed at a lower level, with less impact on the local area.
    [Show full text]
  • Battersea Reach London SW18 1TA
    Battersea Reach London SW18 1TA Rare opportunity to buy or to let commercial UNITS in a thriving SOUTH West London riverside location A prime riverside location situated opposite the River Thames with excellent transport connections. Brand new ground floor units available to let or for sale with Battersea flexible planning uses. Reach London SW18 1TA Units available from 998 sq ft with A1, A3 & E planning uses Local occupiers • Thames-side Battersea location, five minutes from Wandsworth Town station Bathstore • Excellent visibility from York Road which has Mindful Chef c. 75,000 vehicle movements per day Richard Mille • Outstanding river views and and on-site Chelsea Upholstery amenities (including gym, café, gastropub, and Tesco Express) Cycle Republic • Units now available via virtual freehold or to let Fitness Space • Availability from 998 sq ft Randle Siddeley • Available shell & core or Cat A Roche Bobois • Flexible planning uses (A1, A3 & E) • On-site public parking available Tesco Express Yue Float Gourmet Libanais A THRIVING NEW RIVER THAMES NORTH BatterseaA RIVERSIDE DESTINATION ReachB London SW18 1TA PLANNED SCHEME 1,350 RESIDENTIAL UNITS 20a 20b 143 9 3 17 WITH IN EXCESS OF 99% NOW LEGALLY ASCENSIS LOCATION TRAVEL TIMES TOWER COMPLETE OR EXCHANGED Battersea Reach is BALTIMORElocated Richmond COMMODORE14 mins KINGFISHER ENSIGN HOUSE HOUSE HOUSE HOUSE WANDSWORTH BRIDGE near major road links via A3, South Circular (A205) and Waterloo 15 mins 1 First Trade 14 Young’s 23 Wonder Smile A24. KING’S CROSS A10 Bank ST PANCRAS28 mins INTERNATIONAL Waterfront Bar 21a ISLINGTON 2 Cake Boy 24 Ocean Dusk The scheme is five minutesREGENTS EUSTON PARKKing’s Cross 29 mins SHOREDITCH and Restaurant walk from Wandsworth Town15c STATION 8a French Pâtisserie 4 A406 21b 13 10 A1 25 Fonehouse MAIDARailway VALE StationA5 and is a 15b 8b 2 and Coffee Shop 15a Creativemass Heathrow CLERKENWELL31 mins 5 short distance from London15a 8c 18/19 26a PTAH 21c MARYLEBONE A501 4 Gym & Tonic 15b Elliston & NORTH ACTON Heliport.
    [Show full text]
  • Upper Tideway (PDF)
    BASIC PRINCIPLES OF TIDEWAY NAVIGATION A chart to accompany The Tideway Code: A Code of Practice for rowing and paddling on the Tidal Thames > Upper Tideway Code Area (Special navigation rules) Col Regs (Starboard navigation rule) With the tidal stream: Against either tidal stream (working the slacks): Regardless of the tidal stream: PEED S Z H O G N ABOVE WANDSWORTH BRIDGE Outbound or Inbound stay as close to the I Outbound on the EBB – stay in the Fairway on the Starboard Use the Inshore Zone staying as close to the bank E H H High Speed for CoC vessels only E I G N Starboard (right-hand/bow side) bank as is safe and H (right-hand/bow) side as is safe and inside any navigation buoys O All other vessels 12 knot limit HS Z S P D E Inbound on the FLOOD – stay in the Fairway on the Starboard Only cross the river at the designated Crossing Zones out of the Fairway where possible. Go inside/under E piers where water levels allow and it is safe to do so (right-hand/bow) side Or at a Local Crossing if you are returning to a boat In the Fairway, do not stop in a Crossing Zone. Only boats house on the opposite bank to the Inshore Zone All small boats must inform London VTS if they waiting to cross the Fairway should stop near a crossing Chelsea are afloat below Wandsworth Bridge after dark reach CADOGAN (Hammersmith All small boats are advised to inform London PIER Crossings) BATTERSEA DOVE W AY F A I R LTU PIER VTS before navigating below Wandsworth SON ROAD BRIDGE CHELSEA FSC HAMMERSMITH KEW ‘STONE’ AKN Bridge during daylight hours BATTERSEA
    [Show full text]
  • Parks Open Spaces Timeline
    Wandsworth Council Parks time line There are many large green open places in south west London. The commons of Barnes, Battersea, Clapham, Putney, Streatham, Tooting, Wandsworth and Wimbledon date from ‘time immemorial’. Though largely comprising the wastes or heathland of a parish, the commons were integral to mediaeval land settlements and were owned by lords of the manors. As London developed during the nineteenth century the land was increasingly developed for housing. Several legal battles took place to defend the commons as open land. Garratt Green had long been ‘defended’ by the infamous Mayors of Garratt elections. Listed below are the green places in the Borough of Wandsworth that are managed by Wandsworth Parks Service. Further historic information can be found in the individual site management plans. 1858 A Royal Commission into housing recommended creating Battersea Park, Kennington Park, and Victoria Park in Hackney with formal and informal gardens as a way offering moral improvement to an area. Health was a matter of fresh air, exercise and diet, rather than one of medical resources. 1885 Battersea Vestry created Christchurch Gardens as ‘an outdoor drawing room’. The shelter and memorial were added after 1945. 1886 Waterman’s Green was created by the Metropolitan Board of Works as part of the approach to the new Putney Bridge when it was rebuilt in stone. It was not publicly accessible. 1888 Battersea Vestry owned the parish wharf and created Vicarage Gardens as a promenade, complete with ornamental urns on plinths along the river wall. During 1990s it was included in flood defence schemes. 1903 Leader’s Gardens and Coronation Gardens were created as public parks by private donation from two wealthy local individuals.
    [Show full text]
  • Tower Hamlets Local History Library Classification Scheme – 5Th Edition 2021
    Tower Hamlets Local History Library and Archives Tower Hamlets Local History Library Classification Scheme 5th Edition | 2021 Tower Hamlets Local History Library Classification Scheme – 5th Edition 2021 Contents 000 Geography and general works ............................................................... 5 Local places, notable passing events, royalty and the borough, world wars 100 Biography ................................................................................................ 7 Local people, collected biographies, lists of names 200 Religion, philosophy and ethics ............................................................ 7 Religious and ethical organisations, places of worship, religious life and education 300 Social sciences ..................................................................................... 11 Racism, women, LGBTQ+ people, politics, housing, employment, crime, customs 400 Ethnic groups, migrants, race relations ............................................. 19 Migration, ethnic groups and communities 500 Science .................................................................................................. 19 Physical geography, archaeology, environment, biology 600 Applied sciences ................................................................................... 19 Public health, medicine, business, shops, inns, markets, industries, manufactures 700 Arts and recreation ............................................................................... 24 Planning, parks, land and estates, fine arts,
    [Show full text]
  • Leven Road Poplar E14 0Ll
    - LEVEN ROAD POPLAR E14 0LL FLEXIBLE SHORT TERM STORAGE FACILITY TO LET - UP TO 111,358 SQ FT POPLAR BLACKWALL DLR CANARY DLR WHARF EAST INDIA DLR LANGDON PARK A13 DLR CANNING TOWN A12 BLACKWALL TUNNEL APPROACH STATION LEVEN ROAD A12 DESCRIPTION The unit is of brick construction and comprises a number of chambers throughout providing an ideal short term opportunity for a storage or distribution user. In addition, there is a substantial amount of Ground, First and Second floor office accommodation available. Further amenities are listed below: • Secure Gated Yard & Entrance • ‘Extensive Parking Facilities • 30m Yard Depth • 9m Clear Internal Height • Male & Female WCs • Ancillary Office Accommodation LOCATION Leven Road is located closely to the A12 Blackwell Tunnel Northern Approach and to the west of the River Lea at Bow Creek. The unit is well connected to a number of employment and residential hubs with Canning Town Station just 0.72 miles away to the South East and Canary Wharf 1.04 miles away to the North. CONNECTIVITY The site provides potential occupiers with great access to both employment and residential hubs and conveniently links the gateway between London City Airport and the wider Essex area to inner Central London. There is the additional benefit that goods transported via the River Thames to Northumberland Wharf, Orchard Wharf & Thames Wharf are all accessible in under 8 minutes providing an ideal location for storage/distribution facilities. As illustrated below, there are a number of rail and underground stations within
    [Show full text]
  • Port of London - River Thames
    Port of London - River Thames NOTICE TO MARINERS M54 of 2018 BATTERSEA REACH BATTERSEA RAIL BRIDGE ARCH CLOSURES Contractors working on behalf of Network Rail will be conducting inspection works on Battersea Rail Bridge on Sunday 26th August 2018. In order to accommodate these works, No.2 arch on Battersea Rail Bridge will be closed to navigation as follows: Works Start Works End Navigational Arch Information Date Time Date Time Closed to Navigation and 2 Sunday 26th August 01:00 Sunday 26th August 05:30 Local Traffic Control for Inspection Works Arches closed to navigation will be marked in accordance with the Port of London Authority Thames Byelaws 2012 namely: • By day, three red discs 0.6 metres in diameter at the points of an equilateral triangle with the apex downwards and the base horizontal • By night, three red lights in similar positions to the discs displayed by day Local Traffic Control will be undertaken from a PLA Harbour Service Launch in the vicinity of Battersea Rail Bridge for the duration of the closures in arch 2. All vessels intending to navigate between Albert Bridge and Wandsworth Bridge are to call ‘BATTERSEA CONTROL’ on VHF Channel 14 as follows: • Inbound at Albert Bridge • Outbound at Wandsworth Bridge • Prior to leaving a berth or mooring between Albert Bridge and Wandsworth Bridge All vessels are to navigate in this area with caution, maintaining a continuous watch on VHF Channel 14 and follow the instructions from the attending Harbour Service Launch exhibiting flashing blue lights. Further details will be broadcast by London VTS on VHF Channel Port of London Authority 6th August 2018 London River House, Royal Pier Road, BOB BAKER Gravesend, Kent DA12 2BG CHIEF HARBOUR MASTER EXPIRY DATE: 29th August 2018 TO RECEIVE FUTURE NOTICES TO MARINERS BY E-MAIL, PLEASE REGISTER VIA OUR WEBSITE www.pla.co.uk Telephone calls, VHF radio traffic, CCTV and radar traffic images may be recorded in the VTS Centres at Gravesend and Woolwich .
    [Show full text]
  • Herringbone Apartments
    HERRINGBONE APARTMENTS A SELECTION OF 1 & 2 BEDROOM SHARED OWNERSHIP HOMES ALL CHANGE THANKS TO THE POSSIBILITIES OF SHARED OWNERSHIP, A HOME IN WANDSWORTH’S COLOURFUL AND CONNECTED NEW COMMUNITY IS CLOSER THAN YOU THINK. Wandsworth Exchange offers first-time buyers a rare opportunity to get a foot on the ladder in one of London’s most desirable boroughs. This remarkable new collection of 1 & 2 bedroom Shared Ownership apartments combines an exceptional contemporary design and location with a close-knit community atmosphere and fantastic facilities. Shared Ownership is the smart and refreshingly affordable alternative to buying a home on the open market. Part-owning and part-renting offers long-term security and stability plus, in the case of Wandsworth Exchange, a chance to make yourself at home in the heart of a vibrant, well-connected and flourishing London neighbourhood. 04 View from Garratt Lane. Computer generated imageimagery is indicative only. 1 2 EVERYDAY LUXURY 3 A NEIGHBOURHOOD THAT OFFERS INDIVIDUALITY, AS WELL AS EVERYDAY CONVENIENCE. The Southside Shopping Centre, just minutes from your door, is great for those everyday essentials with a Waitrose supermarket, Planet Organic for a quick bite and interesting selection of health food, and it also has a good range of useful chain stores, restaurants and a cinema. The area is heaven for foodies, with great cafés and restaurants spanning cuisine from Indian street food to hip barbecue joints and laid-back brunch spots. Here you’ll find a wonderful, hard-to-replicate combination of original shops, and a local community-minded atmosphere, complemented by all the conveniences of big-city living.
    [Show full text]
  • Silvertown Tunnel from a Category a Tunnel to a Category E Tunnel
    Appendix 2: assessment of Transport for London’s reasons for changing the proposed Silvertown Tunnel from a category A tunnel to a category E tunnel Cost It has been advised by Transport for London that a category A tunnel would cost approximately £2.5 million more than a category E tunnel. This is considered to be a very small sum of money in the context of the cost of the scheme as a whole (nearly £1 000 million) and saving this sum appears to be a false economy given the benefits that would accrue from safely conveying dangerous goods across the River Thames without unnecessarily long routes via Central London. Concurrent Operation of the Blackwall and Silvertown Tunnels Transport for London’s position is that the shared Greenwich Peninsula approach road would increase the risk of vehicles conveying dangerous goods using the Blackwall Tunnel, which is an existing category E tunnel that is not capable of safely conveying dangerous goods. This does not seem to be a valid reason for designing the Silvertown Tunnel so as to also be incapable of safely conveying dangerous goods. The need to sign vehicles carrying dangerous goods away from the Blackwall Tunnel onto a diversion route is an existing situation. Currently the diversion is to Tower Bridge. A diversion to a category A Silvertown Tunnel would be a vastly shorter and less complicated diversion that would be much more likely to be complied with. The only operational situation when a category A Silvertown Tunnel would not represent a much less onerous diversion away from the Blackwall Tunnel would be when the Silvertown Tunnel was closed (for maintenance or because of an incident) but the Blackwall Tunnel remained open.
    [Show full text]
  • What Is the Silvertown Tunnel?
    What is the Silvertown Tunnel? The Silvertown Tunnel will be a new twin-bore tunnel providing a road link beneath the Thames from the Blackwall Tunnel Southern Approach on the Greenwich Peninsula to the Tidal Basin roundabout in the Royal Docks area. The Silvertown Tunnel alignment Our current estimate is that the tunnel will cost around £750m. Construction could start in late 2017 and the soonest that the tunnel could be open is 2021/2022. The section beneath the Thames will be built as a ‘bored’ tunnel, using a tunnel boring machine similar to those used to construct Crossrail. The sections either side of the river will be built using the ‘cut & cover’ technique, in which the ground is excavated, following which the tunnel is built and then covered over. The tunnels will be accessible to all motorised vehicles. There will be two traffic lanes in each direction, in a separate bore. One lane in each direction could be reserved for buses and HGVs. We will build new junctions to link the tunnels into the existing road network, and new portal buildings to house the infrastructure necessary to operate the tunnel, including ventilation equipment. Changes to the A102 Blackwall Tunnel Approach Road We would need to make a number of changes to the existing road network on the south side, on the immediate approach to the new tunnel. These changes are: • Widening the A102 Blackwall Tunnel Approach road in order to create new access routes to the Silvertown Tunnel portals. • Demolishing the existing footbridge over the A102 near the junction with Boord Street, to allow for the A102 Blackwall Tunnel Approach to be widened.
    [Show full text]
  • UK Jubilee Line Extension (JLE)
    UK Jubilee Line Extension (JLE) - 1 - This report was compiled by the OMEGA Centre, University College London. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. - 2 - CONTENTS A INTRODUCTION Type of Project Location Major Associated Developments Current Status B BACKGROUND TO PROJECT Principal Project Objectives Key Enabling Mechanisms and Timeline of Key Decisions Principal Organisations Involved • Central Government Bodies/Departments • Local Government • London Underground Limited • Olympia & York • The coordinating group • Contractors Planning and Environmental Regime • The JLE Planning Regime • The Environmental Statement • Project Environmental Policy & the Environmental Management System (EMS) • Archaeological Impact Assessment • Public Consultation • Ecological Mitigation • Regeneration Land Acquisition C PRINCIPAL PROJECT CHARACTERISTICS Route Description Main Termini and Intermediate Stations • Westminster
    [Show full text]
  • London's Street Family Chapters 3-3.1
    3. Case studies and priorities for street-types The following pages illustrate each of the street-types in greater detail. For each street-type, this chapter identifies the typical issues found in these locations, the different ingredients required for a successful street-type, and an aspirational view showing what a successful street of that type could look like. These are supported by case studies of locations within each street-type that these principles could be applied to. Case studies Typical issues Ingredients Aspirational view The purpose of these case studies was to inform the development of the street- types, including the specific interventions and broader measures required to achieve the emerging RTF vision. The challenges and recommendations identified are designed to illustrate the challenges of the relevant street-types, and the measures that would be of greatest benefit. The case studies are not intended to be a list of confirmed improvements to these roads and should not be treated as such. The case studies were chosen from the top two rows of the street family matrix. For street-types on the bottom row (local streets, town squares/streets, and city places), please refer to the ‘Better Streets Delivered’ supporting document for studies of how specific issues have been resolved at locations across London. The case studies that were chosen provide a spread of geographical locations, town centres, and anticipated challenges. A map of the case study locations and a table of the anticipated challenges at these locations are
    [Show full text]