Venting & Stationary Roof Windows (1983 to 2009)

Total Page:16

File Type:pdf, Size:1020Kb

Venting & Stationary Roof Windows (1983 to 2009) Venting & Stationary Roof Windows (1983 to 2009) Parts Catalog Main Menu Section TOC Search What’s in This Section Venting Roof Windows-RV (1992 to 2009) . Page 5 Parts Illustration . 5 Unit Sizes . 6 Sash . 7 Glass Size Table . 7 Illustration - Sash Assembly . 7 Sash Covers . 8 Sash . 8 Weatherstrip . 9 Insect Screens . 10 Insect Screens . 10 Insect Screen Parts . 10 Hardware . 11 Operator - Amerock / Roto . 11 Hardware . 12 Frames . 13 Frames . 13 Glass Retainers . 13 Frame Gaskets . 14 Venting/Tilting Roof Windows-RT (1992 to 1996) . Page 15 Parts Illustration . 15 Unit Sizes . 16 Sash . 17 Illustration - Sash Assembly . 18 Insect Screens . 19 Insect Screens . 19 Insect Screen Parts . 19 Hardware . 20 Operator - Amerock / Roto . 20 Hardware . 21 Frames . 22 Frames . 22 Frame Parts . 22 Venting Roof Windows-RW (1983 to 1993) . Page 23 Venting & Stationary Roof Windows (1983 to 2009) - 1 WINDOWS Parts Illustration . 23 Unit Sizes . 24 Sash . 25 Illustration - Sash Assembly . 25 Glass Size Table . 26 Illustration - Sash Cover . 27 Illustration - Covers, Retainers & Gaskets . 28 Illustration - Sash Hardware / Venting Roof Windows . 29 Insect Screens . 30 Insect Screens . 30 Frames . 31 Illustration - Frame Assembly . 31 Frame Parts . 32 (1983 to 1993) . 32 Stationary Roof Windows-RS (1991 to 2009) . Page 33 Parts Illustration . 33 Unit Sizes . 34 Sash . 35 Glass Size Table . 35 Illustration - Sash Assembly . 36 Sash . 36 Sash Covers . 37 Glass Retainers . 37 Weatherstrip . 37 Sash Parts . 38 Hardware . 39 Hardware . 39 Frames . ..
Recommended publications
  • Door/Window Sensor DMWD1
    Always Connected. Always Covered. Door/Window Sensor DMWD1 User Manual Preface As this is the full User Manual, a working knowledge of Z-Wave automation terminology and concepts will be assumed. If you are a basic user, please visit www.domeha.com for instructions. This manual will provide in-depth technical information about the Door/Window Sensor, especially in regards to its compli- ance to the Z-Wave standard (such as compatible Command Classes, Associa- tion Group capabilities, special features, and other information) that will help you maximize the utility of this product in your system. Door/Window Sensor Advanced User Manual Page 2 Preface Table of Contents Preface ................................................................................................................................. 2 Description & Features ..................................................................................................... 4 Specifications ..................................................................................................................... 5 Physical Characteristics ................................................................................................... 6 Inclusion & Exclusion ........................................................................................................ 7 Factory Reset & Misc. Functions ..................................................................................... 8 Physical Installation .........................................................................................................
    [Show full text]
  • BUILDING CONSTRUCTION NOTES.Pdf
    10/21/2014 BUILDING CONSTRUCTION RIO HONDO TRUCK ACADEMY Why do firefighters need to know about Building Construction???? We must understand Building Construction to help us understand the behavior of buildings under fire conditions. Having a fundamental knowledge of buildings is an essential component of the decisiondecision--makingmaking process in successful fireground operations. We have to realize that newer construction methods are not in harmony with fire suppression operations. According to NFPA 1001: Standard for FireFighter Professional Qualifications Firefighter 1 Level ––BasicBasic Construction of doors, windows, and walls and the operation of doors, windows, and locks ––IndicatorsIndicators of potential collapse or roof failure ––EffectsEffects of construction type and elapsed time under fire conditions on structural integrity 1 10/21/2014 NFPA 1001 Firefighter 2 Level ––DangerousDangerous building conditions created by fire and suppression activities ––IndicatorsIndicators of building collapse ––EffectsEffects of fire and suppression activities on wood, masonry, cast iron, steel, reinforced concrete, gypsum wallboard, glass and plaster on lath Money, Money, Money….. Everything comes down to MONEY, including building construction. As John Mittendorf says “ Although certain types of building construction are currently popular with architects, modern practices will be inevitably be replaced by newer, more efficient, more costcost--effectiveeffective methods ”” Considerations include: ––CostCost of Labor ––EquipmentEquipment
    [Show full text]
  • Geodesic Dome Roof
    GEODESIC DOME ROOF The HMT Geodesic Dome features a clear-span, all-aluminum, lightweight, corrosion-resistant structure which sets a new standard for performance in aluminum geodesic domes. HMT’s unique overlapping-panel design and attention to details at critical locations all result in a cost-effective solution that provides superior protection of your stored product. The HMT Geodesic Dome can be installed in-service and its superior design was developed under the guidance of API 650, appendix G and AWWA D-108. Key benefits: Key design features: The HMT Geodesic Dome’s advanced tBatten bar and gasket assembly completely technology provides excellent benefits. Here’s encapsulate panel edges for unparallelled how: sealing Most effective leak-protection solution— tOverlapping panels ensure additional Engineered for maximum weather-tightness for protection against weather both new tanks and retrofits tHub designed with three levels of sealing to Low maintenance — Aluminum alloys are ensure maximum leak protection corrosion resistant and don’t require painting like steel fixed roofs tHub can be easily removed for inspection or Emissions reduction — reduces wind-induced adjustment of IFR support chains vapor loss, aids in odor control and provides tOptions for fixed or sliding rim connections significant emission credits; for light products such as gasoline, a dome installed over an EFR tCan easily handle the weight of suspended can cut emissions by over 90% aluminum internal floating roofs In-service installation — Can be erected on tIndustry-leading 3D design software for the ground beside the tank or on an EFR and maximum accuracy and shorter design time lifted into place Custom engineered— To accommodate a wide range of spans and loading conditions Protecting your world, one tank at a time™ www.hmttank.com THE HMT GEODESIC DOME DESIGN HMT’s design incorporates features which dramatically Triple seal hub design improve upon existing technology.
    [Show full text]
  • Basic Technical Rules the Nubian Vault (Nv)
    PRODUCTION CENTRE INTERNATIONAL PROGRAMME BASIC TECHNICAL RULES v3 BASIC TECHNICAL RULES THE NUBIAN VAULT (NV) TECHNICAL CONCEPT THE NUBIAN VAULT ASSOCIATION (AVN) ADVICE TO MSA CLIENTS Version 3.0 SEASON 2013-2014 COUNTRY INTERNATIONAL Association « la Voûte Nubienne » - 7 rue Jean Jaurès – 34190 Ganges - France February 2015 www.lavoutenubienne.org / [email protected] / +33 (0)4 67 81 21 05 1/14 PRODUCTION CENTRE INTERNATIONAL PROGRAMME BASIC TECHNICAL RULES v3 CONTENTS CONTENTS.............................................................................................................2 1.AN ANCIENT TECHNIQUE, SIMPLIFIED, STANDARDISED & ADAPTED.........................3 2.MAIN FEATURES OF THE NV TECHNIQUE........................................................................4 3.THE MAIN STAGES OF NV CONSTRUCTION.....................................................................5 3.1.EXTRACTION, FABRICATION & TRANSPORT OF MATERIAL....................................5 3.2.CHOOSING THE SITE....................................................................................................5 3.3.MAIN STRUCTURAL WORKS........................................................................................6 3.3.1.Foundations........................................................................................................................................ 6 3.3.2.Load-bearing walls.............................................................................................................................. 7 3.3.3.Arches in load-bearing
    [Show full text]
  • Insulating Thatched Roofs This Guidance Note Has Been Prepared and Edited by David Pickles
    Energy Efficiency and Historic Buildings Insulating Thatched Roofs This guidance note has been prepared and edited by David Pickles. It forms one of a series of thirteen guidance notes covering the thermal upgrading of building elements such as roofs, walls and floors. First published by English Heritage March 2012. This edition (v1.1) published by Historic England April 2016. All images © Historic England unless otherwise stated. Illustrations drawn by Simon Revill. Our full range of guidance on energy efficiency can be found at: HistoricEngland.org.uk/energyefficiency Front cover: Thatch repairs in progress. © Philip White. Summary This guidance provides advice on the principles, risks, materials and methods for insulating thatched roofs. There are estimated to be about fifty thousand thatched buildings in England today, some of which retain thatch which is over six hundred years old. Thatching reflects strong vernacular traditions all over the country. Well-maintained thatch is a highly effective weatherproof coating as traditional deep thatched eaves will shed rainwater without the need for any down pipes or gutters. Locally grown thatch is a sustainable material, which has little impact on the environment throughout its life-cycle. It requires no chemicals to grow, can be harvested by hand or using traditional farm machinery, requires no mechanical processing and therefore has low embodied energy and can be fixed using hand tools. At the end of its life it can be composted and returned to the land. Thatch has a much greater insulating value than any other traditional roof covering. With the right choice of material and detailing, a well-maintained thatched roof will keep a building warm in winter and cool in summer and has the added advantage of being highly sound-proof.
    [Show full text]
  • Replacement Windows to Rooms Other Than Those Above Must Provide Ventilation of Not Less Than That REPLACEMENT Provided by the Original Windows
    Replacement windows to rooms other than those above must provide ventilation of not less than that REPLACEMENT provided by the original windows. WINDOWS (1 & 2 storey houses) 3. SAFETY FROM COLLISION This leaflet is designed to help you if you are Windows must not open over footpaths or any intending to replace windows in your home. There place to which the public has access, where they is no need to obtain a building warrant for these could form a hazard or obstruction. replacements, but the work you undertake must meet the requirements of the building regulations. 4. SAFETY GLASS The guidance in this leaflet will explain one way that this can be achieved but it is acceptable not to Glazing which is less than 800 mm above the floor follow this guidance as there are other ways of must be toughened or laminated. Alternatively, a meeting the building regulations. permanent barrier could be installed as described in item 7 below. This leaflet does not cover houses which have a floor level higher than 4.5 m above outside ground 5. MANUAL CONTROLS (eg HANDLES) level, and does not apply to flats or maisonettes. The guidance does not cover more complex work, The openable window or rooflight that provides such as where you intend to alter the structural natural ventilation should have controls for opening opening size in a wall. Such work will require a positioned at least 350mm from any internal corner, warrant and you should check with the Building projecting wall or similar obstruction and at a height Standards Department.
    [Show full text]
  • Replacing the Roof on Your Manufactured Or Mobile Home Protectmymanufacturedhome
    What You Should Know: Replacing the roof on your manufactured or mobile home ProtectMyManufacturedHome An alteration permit from the Washington State Department of Labor & Industries is required when you reroof a manufactured home. In some cases, plans for the work must also be submitted to L&I for approval prior to doing the work. L&I has a four-step process for home alterations. Here’s how: Step 1: See if you need to submit plans. You need to submit plans if: You are not removing the old shingles or roof covering before installing the new roofing. The new roof covering is heavier than the original. There are repairs to any roof framing, such as trusses or rafters. A second layer of sheathing or additional framing is added to the roof. Plans must be stamped by a Washington professional engineer (PE) or architect. When you reroof, you need to submit plans when buying a permit (see step 2). There is a fee for reviewing plans which is added to the permit. Get more information It usually takes two to three weeks to process plans and plans must be approved before proceeding with the work. Visit www.Lni.wa.gov/FAS You do not need to submit plans if: For structural issues, contact plan review at: 360-902-5218 You are removing the existing roofing and installing For general permit help, call customer new roofing of the same or lesser weight. service at: 360-902-5206 Existing roof sheathing may be removed and new roof Or email [email protected] sheathing used.
    [Show full text]
  • Window/Door Replacement Checklist and Schedule 2017 Florida Building Code
    TOWN OF SEWALL’S POINT BUILDING DEPARTMENT One S. Sewall’s Point Road Sewall’s Point, Florida 34996 Tel 772-287-2455 Fax 772-2204765 WINDOW/DOOR REPLACEMENT CHECKLIST AND SCHEDULE 2017 FLORIDA BUILDING CODE A document review will be performed on the following items prior to the submittal of a permit application. Failure to submit these items will result in the application package returned to the applicant until the deficient documents are included. This review sheet must accompany the application submittal. Please make sure you have ALL required copies before submitting permit application ____ _ 1 Copy Completed Permit Application ____ _ 1 Copy Window/Door Schedule ____ _ 1 Copy Manufacturer’s Florida Product Approval and Specifications ____ _ 1 Copy Floor Plan Sketch – Show location & ID number of each window/door. Must match window/door schedule. PLEASE NOTE: WINDOWS AND DOOR REPLACEMENT MUST COMPLY WITH 2017 FBC – EXISTING BUILDING 604.1 ALL NEW WINDOWS AND/OR DOORS WITH GLAZING MUST HAVE IMPACT PROTECTION (SHUTTERS OR IMPACT GLASS). IF SHUTTERS ARE USED, A SEPARATE SHUTTER PERMIT MUST BE ISSUED PRIOR TO FINAL INSPECTION OF THE WINDOW/DOOR REPLACEMENT PERMIT. PARTIAL WINDOW OR GLAZED DOOR REPLACEMENT THAT REPRESENTS LESS THAN 25% OF THE TOTAL GLAZED AREA OVER A 12 MONTH PERIOD IS EXEMPT FROM IMPACT PROTECTION REQUIREMENTS. Town of Sewall’s Point Date: ____________________ BUILDING PERMIT APPLICATION Permit Number: ________________ OWNER/LESSEE NAME: _________________________________________ Phone (Day) __________________ (Fax) ___________________
    [Show full text]
  • Installers' Handbook Preface
    HANDBOEK VOOR INSTALLATEURS Handboek voor de installatie van VELUX dakvensters Installers' handbook Preface The purpose of this handbook is to provide an overview of the installation of VELUX products. The handbook describes the various aspects of roof construction in association with VELUX roof windows and also provides advice and information on how to obtain the optimal installation. (Third edition, 2010) The VELUX system Chapter 1 2 3 4 5 6 7 8 Other products Chapter 9 Contents Planning Considerations before choosing roof window 5-13 1 Installation of a roof window Installation step by step 15-25 2 Integration – more windows Combination of more than one window 27-45 3 Special installation conditions Installation in various roof constructions 47-63 4 Special roofing materials Installation in various roof materials 65-81 5 Replacement / renovation Replacement of a roof window 83-93 6 Building physics Roof constructions (humidity, heat, sound etc) 95-109 7 Product information Short presentation of VELUX products 111-137 8 Other products Sun tunnel / Flat roof window / Solar hot water system 139-145 9 Contact VELUX Addresses / Advising / Service 146-147 List of telephone numbers 148 Size chart 151 Planning 1 The construction of the house 6-7 User requirements 8 Building regulations 9-13 VELUX 5 Planning 1 The construction of the house To be able to choose the right VELUX roof window for a given situ- ation, it is always recommended to start from the construction of the house, user requirements and current building regulations. Normally, a standard VELUX roof window can satisfy the basic requirements, but often choosing another window type or vari- ant and/or choosing accessories can optimise the function and increase the utility value of the window.
    [Show full text]
  • Glossary of Architectural Terms Apex
    Glossary of Architectural Terms Apex: The highest point or peak in the gable Column: A vertical, cylindrical or square front. supporting member, usually with a classical Arcade: A range of spaces supported on piers capital. or columns, generally standing away from a wall Coping: The capping member of a wall or and often supporting a roof or upper story. parapet. Arch: A curved construction that spans an Construction: The act of adding to a structure opening and supports the weight above it. or the erection of a new principal or accessory Awning: Any roof like structure made of cloth, structure to a property or site. metal, or other material attached to a building Cornice: The horizontal projecting part crowning and erected over a window, doorway, etc., in the wall of a building. such a manner as to permit its being raised or Course: A horizontal layer or row of stones retracted to a position against the building, when or bricks in a wall. This can be projected or not in use. recessed. The orientation of bricks can vary. Bay: A compartment projecting from an exterior Cupola: A small structure on top of a roof or wall containing a window or set of windows. building. Bay Window: A window projecting from the Decorative Windows: Historic windows that body of a building. A “squared bay” has sides at possess special architectural value, or contribute right angles to the building; a “slanted bay” has to the building’s historic, cultural, or aesthetic slanted sides, also called an “octagonal” bay. If character. Decorative windows are those with segmental or semicircular in plan, it is a “bow” leaded glass, art glass, stained glass, beveled window.
    [Show full text]
  • Top-Operated Centre-Pivot Polyurethane Roof Window GLU 0061
    Edition 2.0 – 05.04.2017 Product information Top-operated centre-pivot polyurethane roof window GLU 0061 Product description High quality moulded polyurethane with white lacquer finish Triple insulating glass unit with Uw 1.1 Top control bar for easy operation even with furniture under the window Integrated ventilation in top control bar and cleanable dust and insect filter Maintenance-free interior surface Maintenance-free exterior covers Roof pitch Can be installed in roof pitches between 15° and 90° Materials Polyurethane around a core of thermally modified timber Glass; float glass / strengthened glass / toughened glass Lacquered aluminium VELUX ThermoTechnology™ insulation Downloads For installation instructions, CAD drawings, 3D BIM objects, 3D GDL objects etc, please visit velux.bg. Certifications The VELUX product EUTR In compliance with the EU Timber factories guarantee Regulation (EUTR), EU regulation quality systems 995/2010 implementation process and environmental REACH We are aware of the REACH regulation management systems and acknowledge the obligations. No through appropriate products are obliged to be registered in accreditations ISO accordance to REACH and none of our 9001 and ISO 14001 products contain any Substances of Very High Concern. Available sizes and daylight area Lining measurements 472 550 660 mm 780 mm 942 mm 1140 mm 1340 mm Size Width (mm) mm mm GLU p CK-- 495 CK02 mm FK-- 605 78 7 (0.22) MK-- 725 GLU MK04 PK-- 887 m m SK-- 1085 78 9 (0.47) Size Height (mm) GLU GLU FK06 MK06 --02 719 m m --04 919 78 11 --06 1119 (0.47) (0.59) GLU GLU GLU GLU --08 1339 FK08 MK08 PK08 SK08 --10 1549 m 398 m 398 1 (0.58) (0.72) (0.92) (1.16) GLU MK10 1600mm (0.85) ( ) = Effective daylight area, m2 Top-operated centre-pivot roof windows make it possible to place furniture directly below the window without obstructing operation of the window.
    [Show full text]
  • Best Practices Single-Family Residences
    SITE PLANNING best practices single-family residences for aesthetic review by the city of coral gables board of architects 2018 1 SINGLE-FAMILY RESIDENCE BEST PRACTICES July 2018 table of contents 1. Purpose & Uses 2. Site Planning 3. Architecture 4. Checklist Purpose & Uses The purpose of the City of Coral Gables, Florida Zoning Code is to implement the Comprehensive Plan (CP) of the City pursuant to Chapter 163, Florida Statutes for the protection and promotion of the safety, health, comfort, morals, convenience, peace, prosperity, appearance and general welfare of the City and its inhabitants. ~ Zoning Code Section 1-103 Purpose of the City of Coral Gables Zoning Code PURPOSE & USE Single-Family Residential (SFR) District The Single-Family Residential (SFR) District is intended to accommodate low density, single-family dwelling units with adequate yards and open space that characterize the residential neighborhoods of the city. The city is unique not only in South Florida but in the country for its historic and archi- tectural treasures, its leafy canopy, and its well-defined and livable neighborhoods. These residential areas, with tree-lined streets and architecture of harmonious proportion and human scale, provide an oasis of charm and tranquility in the midst of an increasingly built-up metropolitan environment. The intent of the Single-Family Residential code is to protect the distinctive character of the city, while encouraging excellent architectural design that is responsible and responsive to the individual context of the city’s diverse neighborhoods. The single-family regulations, as well as the design and performance standards in the Zoning Code, seek to ensure that the renovation of residences as well as the building of residences is in accord with the civic pride and sense of stewardship felt by the citizens of Coral Gables.
    [Show full text]