Rd NOS. 18810069-18810082 and 18810087-18810089

Total Page:16

File Type:pdf, Size:1020Kb

Rd NOS. 18810069-18810082 and 18810087-18810089 Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NUEVA VIZCAYA 1ST DISTRICT ENGINEERING OFFICE \ REGIONAL OFRCE II Bayombong, Nueva Vizcaya BAC RESOLUTIOT{ NO. 4 S - 2018 RESOLUTION DECLARIITG FAILURE OF BTDDING FOR PROJECTS BEARING CONTRACT rD NOS. 18810069-18810082 AND 18810087-18810089 WHEREAS, this office posted the advertisement in the PhilGEPS, DPWH website and in a conspicuous place at the premises of the DPWH-NV 1st DEO for twenty-one (21) days the following projects: 1) 18810069: Construction of 2STY4CL Cablahan Elementary School, Ambaguio, Nueva Vizcaya 2) 18810070: Construction of 2STY4CL Daclig Elementary School, Ambaguio, Nueva Vizcaya 3) 18810071: Construction of 2STY4CL Singian ES, Bagabag, Nueva Vizcaya 4) 18810072: Construction of 2STY4CL Manamtam Elementary School, Bambang, Nueva Vizcaya 5) 18810073: Construction of 2STY4CL Dr. Candido V. Rosario Sr. Elementary School, Bayombong, Nueva Vizcaya 6) 18810074: Construction of 2STY4CL Busat ES, euezon, Nueva Vizcaya 7) 188i0075: Construction of 2STY4CL Casat NHS, Bayombong (Capital), Nueva Vizcaya B) 18810076: Construction of 2STY4CL Diadi NHS, Diadi, Nueva Vizcaya 9) 18810077: Construction of 2STY6CL Diadi Central School, Diadi, Nueva Vizcaya 10) 1BBI007B: Construction of 2STY4CL Masoc ES, Bayombong (Capital), Nueva Vizcaya 11) 18810079: Construction of 3STY9CL Solano South CS, Solano, Nueva Vizcaya 12) 18810080: Construction of 3STY6CL Bascaran ES, Bascaran, Solano, Nueva Vizcaya 13) 18810081: Construction of 2STY4CL Bambang CS SPED Center, Bambang, Nueva Vizcaya 14) 1BBI00B2: Construction of 2STY4CL Solano East CS, Solano, Nueva Vizcaya 15) 18810087: Construction of 2STY4CL Lactawan Elementary School, Solano, Nueva Vizcaya 16) 1BBI00BB: Construction of 4STY12CL Runruno National School, Quezon, Nueva Vizcaya 17) 18810089: Construction of 4STY12CL Bagabag NHS, Bagabag, Nueva Vizcaya WHEREAS, the submission and opening of bids was scheduled last March 15, 2018 for Contract ID Nos. 18810069-18810082 and March 22,20t8 for Contract ID Nos. 1BBI00B7-1BBI00B9; WHEREAS, as of this date, this office has not yet received any SARO for the said School Building projects; WHEREAS, information received from the Department of Education (DepEd) revealed that these projects will no longer be funded this year; NOW THEREFORE, we, the members of the Bids and Awards Committee (BAC) hereby RESOLVE as it is hereby RESOLVED: a) To declare failure of bidding of the aforementioned Contract ID Numbers in accordance with Section 4l.c.iii of the 2016 Revised Implementing Rules and Regulations of R.A. 9i84 and latest GPPB Issuances and we quote "If the source of funds for the project has been withheld or reduced through no fault of the Procuring Entity". b) To recommend for approval by the DISTRICT ENGINEER of the DPWH-NV lst DEO the foregoing. Let copies of this Resolution be posted at the PhilGEPS, DPWH website and in a conspicuous place at the premises of the DPWH-NV 1st DEO, Bayombong, Nueva Vizcaya. RESOLVED at DPWH - Nueva Vizcaya 1st DEO, Bayombong, Nueva Vizcaya this 23d day of July 2018. ROGEl.rKARATA vicefnlrman "=.#flroDrvrco, Regular Member z- VAIENZfNO B. SARET{O BAYATTI'Zq-4 F. MOLTNA Provisional Member Provisiorial Member-End IJser NPPnOVED By: RoDorFo rr. roffir" JR., cEo vr Distriq Engineer.
Recommended publications
  • FLORDEL~GECOBE, Phd, CESO VI Officer-In-Charge T~ Office of the Schools Division Superinj96o·+T>
    Republic of the Philippines DEPARTMENT OF EDUCATION Region 02, Cagayan Valley SCHOOLS DIVISION OFFICE OF NUEVA VIZCA YA DIVISION MEMORANDUM No. _ 9_Q_ _ _ s. 2 0 1 8 May 30,2018 ADMINISTRATION OF THE PHILIPPINE EDUCATIONAL PLACEMENT TEST To: PSDS School Heads, Public and Private Elementary Secondary Schools All Other Concerned 1. The Department of Education (DepEd), through the Bureau of Education Assessment (BEA) will administer the 2018 Philippine Educational Placement Test (PEPT), pursuant to DepEd Order No. 55, s. 2016 entitled Policy Guidelines on the Assessment of Student Learning for the K to 12 Basic education Program on June 2, 2018, Saturday from 7:00 onwards at Bayombong South Elementary School. 2. Relative to this, All School Heads concerned are requested to: • See the list of examiners attached for updating and verification purposes. • Instruct the concerned teachers to inform and remind the student examinees of the PEPT schedule of examination as well as the venue. They should be at the test venue before 7:00AM. They should bring along with them Pencil (Lead No.2), blank paper for computation/scratch and valid ID on the day of the test. 3. Orientation of the concerned room examiners will be on June 1, 2018 at the SDO Conference Hall from 8:00 AM onwards. 4. For information, guidance and immediate dissemination. FLORDEL~GECOBE, PhD, CESO VI Officer-in-Charge t~ Office of the Schools Division Superinj96o·+t> Inclosure As stated Reference: D.O. 55 s. 2016 To be indicated in the Perpetual Index under the following subjects: ASSESSMENT CURRICULUM STUDENTS TEST Email: nueva,,izcava.depedro2(a;gmail.com Website: www.deped-nv.com.ph Telefax: (078)392-0454 Mailing Address: Quezon Street, Brgy.
    [Show full text]
  • ~· A~~.CW-J FROM: Fr> RACHEL R
    lttpublit of tbt .t)btlipptntf Jetpartmtnt of Qfbucation Region II - Cagayan Valley Schools Division of Nueva Vizcaya UNNUMBERED MEMORANDUM TO: OIC, Assistant Schools Division Superintendent Chief, School Govemance and Operations Division Public Schools District Supervisors/District In-Charge Public Elementary and Secondary School Heads All others concemed ~· a~~.CW-J FROM: fr> RACHEL R. LLANA, PhD., CESO VI Assistant Schools Division Superintendent Officer In-Charge Office of the Schools Division Superintendent DATE: June 16, 2021 SUBJECT: NATIONAL ORIENTATION FOR THE IMPLEMENTATION OF INFRASTRUCTURE PROJECTS UNDER CY 2020 AND CY 2021 BEFF 1. In line with OUA Memorandum No. 00-0621-0075 dated June 3, 2021 on the National Orientation On The Implementation of Infrastructure Projects Under CY 2020 And CY 2021 Basic Education Facilities Fund (BEFF}, the following personnel of recipient schools are hereby advised to register online until June 17, 2021 with the herein link bit.ly/3ySTwZh: a. Principals/School Heads b. School Facilities Coordinators c. School Property Custodians d. Division Engineer e. Division Supply Officer 2. Attached are the Lists of Recipient Schools for the different Infrastructure Projects in our Division. 3. For any inquiries, please contact 09274406596 or coordinate with the Education Facilities Unit of SDO Nueva Vizcaya. 4. Wide dissemination of and immediate compliance to this memorandum is directed. a, Bayombong, Nueva Vizcaya 946 I Doc Code: I FM-OSDS-SDS-002 I Rev: I 00 As of: 10-15-2019 _ Page: _ 1 1\tpubltt of tbt .tlbffippintf J)epartment of Cfbucation Region II - Cagayan Valley Schools Division of Nueva Vizcaya LIST OF RECIPIENT SCHOOLS FOR CY 2021 BEFF REPAIR OF CLASSROOMS No.
    [Show full text]
  • Regional Disaster Risk Reduction and Management Council RAINFALL
    Regional Disaster Risk Reduction and Management Council June 13, 2021 RAINFALL ADVISORY RAINFALL ADVISORY No. 5 NL_PRSD – Benguet Radar DATE ISSUED June 13, 2021 TIME ISSUED 06:06 pm REGIONS Region 1, Region 2, CAR SUBJECT RAINFALL ADVISORY No. 5 NL_PRSD – Benguet Radar WEATHER SYSTEM Monsoon Trough EFFECTS Moderate to occasionally heavy rains are being experienced over portions of Ifugao (Banaue, Hungduan, and Tinoc), and Pangasinan (Agno, Aguilar, Anda, Bani, Bugallon, and Infanta) Meanwhile, light to moderate rains are being experienced over portions of Ifugao (Hingyon and Mayoyao), Nueva Vizcaya (Ambaguio, Kayapa, and Santa Fe), and Pangasinan (Mabini, Manaoag, Mapandan, Pozorrubio, San Fabian, San Jacinto, San Nicolas, and Sta Barbara) which may persist for 1-2 hours may affect nearby areas. RECOMMENDED All are advised to take precautionary measures against the impacts associated with these hazards. Residents along mountain slope are advised for possible landslides mudslides, rock slides and flash flood. Keep monitoring for updates. SOURCE DOST-PAGASA LINK https://www.facebook.com/PAGASA.DOST.GOV.PH/posts/3881685535274660 Concerned Regional and Local DRRMCs are advised to take appropriate actions and reminded to disseminate these through local/community leaders and local media. Emphasis should be on proactive actions: evacuation rather than rescue. Moreover, concerned offices are directed to reiterate the guidelines on personal protection and hygiene such as respiratory etiquette and hand hygiene, physical distancing, environmental, and food safety measures. Further, people living in the aforementioned areas are hereby advised to be on alert, take necessary precautions and follow the advise of their respective Local DRRMCs. Telefax: NDRRMC Operations Center: (+632) 8911-1406; 8912-2665; 8912-5668; Office of the Administrator (+632) 8912-2424 Email: [email protected] Websites: www.ocd.gov.ph; ndrrmc.gov.ph Powered by TCPDF (www.tcpdf.org).
    [Show full text]
  • Directory of Local Chief Executives and P/C/Mnaos Region 2
    Updated as of 12 January 2018 Directory of Local Chief Executives and P/C/MNAOs Region 2 Local Chief Executive PNAO/CNAO/MNAO Province of Cagayan GOVERNOR MANUEL N. MAMBA DR. CARLOS D. CORTINA III Provincial Capitol, Tuguegarao City Provincial Nutrition Action Officer Provincial Capitol, Cagayan 0917-587-8708 MAYOR EMMANUEL JESUS P. VARGAS MR. BRAULIO MANGUPAG Abulug, Cagayan Municipal Nutrition Action Officer 3517 862-1008/ 862-1002 0917-887-9992 [email protected] MAYOR CRISELDA I. ANTONIO MS. NORMA A. FENEQUITO Alcala, Cagayan Municipal Nutrition Action Officer 3506 824-8567 0917-895-4081 0917-393-4749 [email protected] MAYOR HARRY D. FLORIDA MS. FRANCES ANN SALUD Allacapan, Cagayan Municipal Nutrition Action Officer 3523 0918-391-0912 855-1006/ 855-1048/ 855-1033 [email protected] MAYOR NICANOR C. DE LEON MR. MARIO L. ABELLA Amulung, Cagayan Municipal Nutrition Action Officer 3505 0915-714-2757 824-8562 [email protected] MAYOR SHALIMAR D. TUMARU DR. MA. ROWENA B. GUZMAN Aparri, Cagayan Municipal Nutrition Action Officer 3515 0917-585-3471 822-8752/ 822-8694 [email protected] MAYOR LEONARDO PATTUNG MS. CLARA JAVIER Baggao, Cagayan Municipal Nutrition Action Officer 3506 0916-315-3832 824-8566/ 844-2186 [email protected] [email protected] MAYOR VICENTE G. UNITE DR. ARNOLD TALLA Ballesteros, Cagayan Municipal Nutrition Action Officer 3516 MAYOR LLOYD M. ANTIPORDA MS. MILDRED AGGASID Buguey, Cagayan Municipal Nutrition Action Officer 3511 MAYOR ALFONSO M. LLOPIS MS. MA. CLAIRE CAPA Calayan, Cagayan Municipal Nutrition Action Officer 3520 0920-560-8583 MAYOR ISIDRO T. CABADDU DR. DESIREE GRACIA BALAUITAN Camalaniugan, Cagayan MNAO 3510; 854-4904/ 854-2022/ 854-2051 Updated as of 12 January 2018 MAYOR CELIA T.
    [Show full text]
  • Province, City, Municipality Total and Barangay Population BATANES
    2010 Census of Population and Housing Batanes Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population BATANES 16,604 BASCO (Capital) 7,907 Ihubok II (Kayvaluganan) 2,103 Ihubok I (Kaychanarianan) 1,665 San Antonio 1,772 San Joaquin 392 Chanarian 334 Kayhuvokan 1,641 ITBAYAT 2,988 Raele 442 San Rafael (Idiang) 789 Santa Lucia (Kauhauhasan) 478 Santa Maria (Marapuy) 438 Santa Rosa (Kaynatuan) 841 IVANA 1,249 Radiwan 368 Salagao 319 San Vicente (Igang) 230 Tuhel (Pob.) 332 MAHATAO 1,583 Hanib 372 Kaumbakan 483 Panatayan 416 Uvoy (Pob.) 312 SABTANG 1,637 Chavayan 169 Malakdang (Pob.) 245 Nakanmuan 134 Savidug 190 Sinakan (Pob.) 552 Sumnanga 347 National Statistics Office 1 2010 Census of Population and Housing Batanes Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population UYUGAN 1,240 Kayvaluganan (Pob.) 324 Imnajbu 159 Itbud 463 Kayuganan (Pob.) 294 National Statistics Office 2 2010 Census of Population and Housing Cagayan Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population CAGAYAN 1,124,773 ABULUG 30,675 Alinunu 1,269 Bagu 1,774 Banguian 1,778 Calog Norte 934 Calog Sur 2,309 Canayun 1,328 Centro (Pob.) 2,400 Dana-Ili 1,201 Guiddam 3,084 Libertad 3,219 Lucban 2,646 Pinili 683 Santa Filomena 1,053 Santo Tomas 884 Siguiran 1,258 Simayung 1,321 Sirit 792 San Agustin 771 San Julian 627 Santa
    [Show full text]
  • Sitrep No.19 Re Preparedness Measures and Effects
    • Of which, a total of 105 families / 321 persons are being served inside 9 ECs. Note: Changes in figures are due to continuous assessment and validation of DSWD DROMIC. C. Casualties (TAB C) • A total of eleven (11) dead, two (2) injured and one (1) missing in regions CALABARZON and CAR. No significant update D. Damaged Houses (TAB D) • A total of 24,355 houses were damaged (21,798 partially / 2,557 totally) in Regions I, II, III, VIII, and CAR. E. Suspension of Classes and Work (TAB E) Suspension of Classes • A total of 593 cities / municipalities in Regions I, II, III, CALABARZON, V, CAR, and NCR have suspended classes due to TY “ROSITA”. • Of which, 359 cities / municipalities have suspended classes on 31 October 2018. Suspension of Work in Government • A total of 193 cities / municipalities have suspended work in government offices in Regions I, II, and CAR since 29 - 31 October 2018. No significant update F. Status of Lifelines 1. Status of Roads and Bridges (TAB F) • A total of one hundred six (106) road sections and ten (10) bridges were affected by TY “ROSITA” in Regions II, III, and CAR. Of which, twenty- seven (27) road sections in Regions II and CAR and one (1) bridge in Isabela and Kalinga are still rendered not passable. No significant update 2. Airports • A total of thirty-eight (38) domestic flights and six (6) international flights were cancelled due to TY “ROSITA”: FLIGHT NO. DESTINATION DATE DOMESTIC FLIGHTS - 38 M8 816 / 817 Manila-Basco-Manila 29 October 2018 M8 711 / 712 Manila-Busuanga-Manila 30 October 2018 5J
    [Show full text]
  • Final Report
    JAPAN INTERNATIONAL COOPERATION AGENCY DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS THE REPUBLIC OF THE PHILIPPINES THE FEASIBILITY STUDY OF THE FLOOD CONTROL PROJECT FOR THE LOWER CAGAYAN RIVER IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT VOLUME III-2 SUPPORTING REPORT ANNEX VII WATERSHED MANAGEMENT ANNEX VIII LAND USE ANNEX IX COST ESTIMATE ANNEX X PROJECT EVALUATION ANNEX XI INSTITUTION ANNEX XII TRANSFER OF TECHNOLOGY FEBRUARY 2002 NIPPON KOEI CO., LTD. NIKKEN Consultants, Inc. SSS JR 02- 07 List of Volumes Volume I : Executive Summary Volume II : Main Report Volume III-1 : Supporting Report Annex I : Socio-economy Annex II : Topography Annex III : Geology Annex IV : Meteo-hydrology Annex V : Environment Annex VI : Flood Control Volume III-2 : Supporting Report Annex VII : Watershed Management Annex VIII : Land Use Annex IX : Cost Estimate Annex X : Project Evaluation Annex XI : Institution Annex XII : Transfer of Technology Volume III-3 : Supporting Report Drawings Volume IV : Data Book The cost estimate is based on the price level and exchange rate of June 2001. The exchange rate is: US$1.00 = PHP50.0 = ¥120.0 Cagayan River N Basin PHILIPPINE SEA Babuyan Channel Apayao-Abulug ISIP Santa Ana Camalaniugan Dike LUZON SEA MabangucDike Aparri Agro-industry Development / Babuyan Channel by CEZA Catugan Dike Magapit PIS (CIADP) Lallo West PIP MINDANAO SEA Zinundungan IEP Lal-lo Dike Lal-lo KEY MAP Lasam Dike Evacuation System (FFWS, Magapit Gattaran Dike Alcala Amulung Nassiping PIP evacuation center), Resettlement, West PIP Dummon River Supporting Measures, CAGAYAN Reforestation, and Sabo Works Nassiping are also included in the Sto. Niño PIP Tupang Pared River Nassiping Dike Alcala Reviewed Master Plan.
    [Show full text]
  • FLORDEL~GECOBE, Phd., CESO VI Officer in Charge (V Office of the Schoo~ Division Superintendent
    Republic of the Philippines DEPARTMENT OF EDUCATION Region 02, Cagayan Valley SCHOOLS DIVISION OFFICE OF NUEVA VIZCAYA DIVISION MEMORANDUM l SCHOOLS DIVISION NUEVA VIZCAYA TO :Public Schools District Supervisors/Die's Public Elementary and Secondary School Heads All Others Concerned FROM : FLORDEL~GECOBE, PhD., CESO VI Officer In Charge (V Office of the Schoo~ Division Superintendent DATE : August 30, 2018 SUBJECT : RELEASE/ISSUANCE OF APPROVED APPOINTMENTS OF TEACHERS 1. For the information and guidance ofall concerned, the release/issuance ofappointments of Teachers is scheduled on Friday, August 31, 2018, 8:00 o'clock in the morning at NVGCHS gymnasium, Bayombong, Nueva Vizcaya. 2. Inclosure to this memo is the list of approved appointments. All concerned teachers are advised to report to this office with approved authority to travel from their school heads. 3. Please advise the Teachers concerned to make Instructional Plan for their classes. 4. For information, dissemination and compliance. Email: nuevavizcaya.depedro2@gmaiL com Website: www.deped-nv.com.ph Telefax: (078)392-0454 Mailing Address: Quezon Street, Brgy. Don Domingo Maddela Tnmk lines: (078)392-0381, (078)392-0351, 09171589946 Bayombong, Nueva Vizcaya, 3700 Phils. Enclosure to Division Memorandum entitled "Release/Issuance of Approved Appointments of Teachers" LIST OF APPROVED APPOINTMENTS NAME DISTRICT/SCHOOL 1. AGONOY, MARIA AURORA P. SAWMILL ES/VILLAVERDE 2. AGUIRRE, VICENTE S. SANSING ES/BAYOMBONG I 3. ALMENDRA, ARNEL A. DR. CANDIDO V. ROSARIO/BAYOMBONG I 4. ALONZO, ROXANNE GAYL D. TUTONG ES/QUEZON 5. ASIM, ROSALINA P. ATAN ES/QUEZON 6. BALANAG, ARL YN R. ARITAO CS/ARITAO I 7. BALANGAN, CAROLINA B.
    [Show full text]
  • Committee Report No
    Republic of the Philippines May 21, 2021 HOUSE OF REPRESENTATIVES 4:15 pm Quezon City EIGHTEENTH CONGRESS Second Regular Session COMMITTEE REPORT NO. ______976 Submitted by the Committee on Public Works and Highways and the Committee on Appropriations on ____________May 21, 2021 Re : House Bill No. ___________9391 Recommending its approval in substitution of House Bill No. 6461 Sponsors : Representatives Eleandro Jesus F. Madrona, Eric Go Yap and Luisa Lloren Cuaresma Mr. Speaker: The Committee on Public Works and Highways and the Committee on Appropriations to which was referred House Bill No. 6461, introduced by Representative Luisa Lloren Cuaresma, entitled: “AN ACT RECONSTITUTING THE FIRST AND SECOND DISTRICT ENGINEERING OFFICE IN THE PROVINCE OF NUEVA VISCAYA INTO THREE DISTRICT ENGINEERING OFFICES AND APPROPRIATING FUNDS THEREFOR” have considered the same and recommend the approval of attached House Bill No.___________,9391 entitled: “AN ACT RECONSTITUTING THE NUEVA VISCAYA DISTRICT ENGINEERING OFFICE IN THE PROVINCE OF NUEVA VISCAYA INTO THREE SEPARATE DISTRICT ENGINEERING OFFICES, AND APPRORIATING FUNDS THEREFOR” in substitution of House Bill No. 6461 with Representatives Luisa Lloren Cuaresma, Eleandro Jesus F. Madrona and Eric Go. Yap as authors thereof. Respectfully submitted, ERIC GO YAP ELEANDRO JESUS F. MADRONA Chairman Chairman Committee on Appropriations Committee on Public Works and Highways THE HONORABLE SPEAKER HOUSE OF REPRESENTATIVES Quezon City Republic of the Philippines HOUSE OF REPRESENTATIVES Quezon City EIGHTEENTH
    [Show full text]
  • Annex Viii : Land Use the Feasibility Study of the Flood Control Project for the Lower Cagayan River in the Republic of the Philippines
    The Feasibility Study of the Flood Control Project for the Lower Cagayan River in the Republic of the Philippines Final Report Supporting Report ANNEX VIII : LAND USE THE FEASIBILITY STUDY OF THE FLOOD CONTROL PROJECT FOR THE LOWER CAGAYAN RIVER IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT Volume III-2 SUPPORTING REPORT ANNEX VIII LAND USE Table of Contents Page PART-1 GENERAL CHAPTER 1 GENERAL ........................................................................................ VIII-1 CHAPTER 2 PRESENT LAND USE...................................................................... VIII-2 2.1 Land Classification.......................................................................................... VIII-2 2.2 Present Land Use............................................................................................. VIII-3 2.3 Problems in Land Use...................................................................................... VIII-5 CHAPTER 3 PRESENT CONDITION OF AGRICULTURE.................................. VIII-8 3.1 Present Agricultural Farming Practice.............................................................. VIII-8 3.2 Problems in Farming ....................................................................................... VIII-17 3.3 Poverty in Rural Area ...................................................................................... VIII-19 3.4 Existing Land Use Plan ................................................................................... VIII-22 PART II REVIEW OF 1987 MASTER PLAN CHAPTER 4
    [Show full text]
  • The Magat Watershed Experience Dulce D
    Philippine Institute for Development Studies Surian sa mga Pag-aaral Pangkaunlaran ng Pilipinas Realities of the Watershed Management Approach: The Magat Watershed Experience Dulce D. Elazegui and Edwin A. Combalicer DISCUSSION PAPER SERIES NO. 2004-21 The PIDS Discussion Paper Series constitutes studies that are preliminary and subject to further revisions. They are be- ing circulated in a limited number of cop- ies only for purposes of soliciting com- ments and suggestions for further refine- ments. The studies under the Series are unedited and unreviewed. The views and opinions expressed are those of the author(s) and do not neces- sarily reflect those of the Institute. Not for quotation without permission from the author(s) and the Institute. July 2004 For comments, suggestions or further inquiries please contact: The Research Information Staff, Philippine Institute for Development Studies 3rd Floor, NEDA sa Makati Building, 106 Amorsolo Street, Legaspi Village, Makati City, Philippines Tel Nos: 8924059 and 8935705; Fax No: 8939589; E-mail: [email protected] Or visit our website at http://www.pids.gov.ph Abstract This paper aims to showcase the experience of the Magat watershed in the implementation of the watershed management approach. Magat watershed was declared as a forest-reservation area through Proclamation No. 573 on June 26, 1969 because of its great importance to human survival and environmental balance in the region. The Magat case demonstrates the important role that ‘champions’ like the local government unit (LGU) could play in managing the country’s watersheds. With the Nueva Viscaya province constituting 97% of the Magat watershed, the provincial government was committed to provide a strong management support system to the watershed.
    [Show full text]
  • (18-30) Mm Dd Yyy (M/F) Barangay Municipality Province Mm/Dd/Yyy No
    DEPARTMENT OF LABOR AND EMPLOYMENT Regional Office No.2 GOVERNMENT INTERSHIP PROGRAM (GIP) Province of Nueva Vizcaya OSEC -FMS-Form No. 4 Lone District LIST OF BENEFICIARIES Continuing Fund NO. Name of Beneficiaries Age Birthdate Sex Address Highest Educational Date Started Contact Office/Place Proponent Attainment(HS/Col/ Col Surname First Name Middle Name (18-30) dd yyy (M/F) Barangay Municipality Province mm/dd/yyy No. of Assignment (LGU/PG/NGA/PE) mm Level/Voc) 1 Albano Aprille Joy S. 21 10 6 1997 F Kayapa Proper West Kayapa Nueva Vizcaya College Graduate 5/27/2019 9288451183 LGU-Kayapa DOLE 2 Aguilar Joanna Grace M. 21 10 7 1997 F Villa Flores Santa Fe Nueva Vizcaya College Graduate 5/27/2019 9123041671 Mun. Treas. Office-Santa.Fe DOLE 3 Andante Jeric Cyril D. 19 5 14 1999 M Lublub Alfonso Castaneda Nueva Vizcaya Tech Voc. 5/27/2019 9098108314 Peso Alfonso Castaneda DOLE 4 Antonio Ma. Virginia Rosario A. 23 9 7 1995 F La Torre South Bayombong Nueva Vizcaya College Graduate 5/27/2019 93588550318 Water works PG DOLE 5 Arevalo Diana Grace C. 27 4 8 1992 F Villaros Bagabag Nueva Vizcaya College Level 5/27/2019 9354261891 PESO-Bagabag DOLE 6 Bagaoisan Ramil R. 25 11 10 1993 M Palabotan Dupax Del Sur Nueva Vizcaya College Graduate 5/27/2019 9500923286 LGU Dupax Del Sur DOLE 7 Balicag Christine Joy P. 19 8 5 1999 F Poblacion Kasibu Nueva Vizcaya College Graduate 5/27/2019 9061745151 LGU-Kasibu DOLE 8 Balinggan Danicel L. 20 01 14 1999 M Poblacion Ambaguio Nueva Vizcaya College Graduate 6/17/2019 9973003872 PESO- Ambaguio DOLE 9 Bayle Roger JR.
    [Show full text]