Can You Find out Where the Biggest Biomass Plant in the UK

Total Page:16

File Type:pdf, Size:1020Kb

Can You Find out Where the Biggest Biomass Plant in the UK Can you find out Can you find out how much a where the biggest biomass boiler What types of materials can be biomass plant in the costs? used as fuel for UK is? ………….……. biomass energy? ………….……. ………….……. What are the pros (✓)of using biomass What are the cons for power? (X) of using biomass 1. for power? 2. 1. 3. 2. 3. Follow this link for more information on biomass energy: http://thaibiogasgen.blogspot.com/2012/03/thai-biogas-generator-biomass.html How can engineers help solve Covid-19? Could an engineer be Could they help Prime Minister? support the NHS? ……………..………. ……………..………. Can they help prevent another Can engineers outbreak? help with industry? …………….... ……….……….. Can you find out how much solar panels Can you find out Can you find out cost? where the biggest where the biggest solar farm in the UK is? ……………………. solar farm in the world is? ……………………..... ……………………. What are the pros What are the cons (✓)of using the sun (X) of using the sun for power? for power? 1. 1. 2. 2. 3. 3. Follow this link for more information on solar power: http://www.greenenergyoptions.com.au/solar-panel-ingredients/ Can you find out how Can you find out much wind turbines where the biggest cost? Can you find out wind farm in the UK where the biggest is? ……………..………. wind farm in the world is? ……………….……. ………………..…… What are the pros (✓)of using wind for What are the cons power? (X) of using wind for power? 1. 1. 2. 2. 3. 3. Follow this link for more information on wind power: http://www.wind-science.org/iresen/page/wind-turbine-manufacturing.html Tidal Power Information Sheet Tidal energy is produced by the surge of ocean waters during the rise and fall of tides. Tidal energy is a renewable source of energy. Tidal energy production is still very new and only a small amount of power has been produced so far. There are very few commercial-sized tidal power plants operating in the world. The first was located in La Rance, France. In Wales, there are currently 2 potential sites for Tidal energy plants; Swansea Bay and the Severn Estuary. Swansea Bay Tidal Lagoon will be the world’s first tidal lagoon power plant. A tidal lagoon is a ‘U’ shaped breakwater, built out from the coast which has a bank of hydro turbines in it. This generates electricity when the tide comes in and when it goes out, four times a day, every day. Due to the incredible tides on the West Coast of Britain, by keeping the turbine gates shut for just three hours, there is already a 4m height difference in water between the inside and the outside of the lagoon. Power is then generated as the water rushes through 60m long draft tubes, rotating the 7.2m diameter hydro turbines. Tidal Power Worksheet Do you think Wales is a good place to build Explain in a few a tidal power plant? sentences how a tidal Why? Are there any tidal power plant works? …………… projects currently operating in the UK? ……………. …………… What are the pros What are the cons ( of using tidal ✓) (X) of using tidal power? power? 1. 1. 2. 2. 3. 3. Hydropower – Using Pumped Storage at Electric Mountain Information Sheet (Dinorwig Power Station) Diagram of pumped storage at Dinorwig Power Station Dinorwig Power Station, located in Llanberis, uses the stored potential gravitational energy of water in a reservoir. When the National Grid needs to increase the amount of electricity being generated, Dinorwig can send water from Marchlyn Mawr reservoir at the top of the mountain rushing down over hydroelectric turbines and into Llyn Peris reservoir at the bottom. This can generate electricity in under 20 seconds! To return the water to Marchlyn Mawr reservoir again, the turbines are reversed so that they act as pumps, pumping the water uphill. The power station does this at night, when the demand for electricity is much lower, and cheaper. The reservoirs are filled with rainwater, which there is a good supply of in North Wales! Hydropower – Using Pumped Storage at Electric Mountain Worksheet (Dinorwig Power Station) Why is Electric Mountain classed as Why does Electric a renewable energy Mountain pump water power station? Can you give a brief back to the top explanation of how reservoir at night? …………… Electric Mountain generates electricity? ……………. …………… What are the pros ( of using hydro What are the cons (X) ✓) power? of using hydro 1. power? 2. 1. 3. 2. 3. Follow this link for more information on hydro power: Electric Mountain Website, Pros and Cons.
Recommended publications
  • 4 Project Description
    Glyn Rhonwy Pumped Storage 6.02 Environmental Statement Development Consent Order Volume 2 4 PROJECT DESCRIPTION 4.1 Introduction ................................................................................................... 1 4.2 Development Description ............................................................................. 1 4.3 Description and Construction of the Reservoirs ........................................ 3 4.4 Description and Construction of the Penstock and Tailrace .................. 11 4.5 Description and Construction of the Power House.................................. 14 4.6 Description and Construction of the Spillway Infrastructure and Pumping Station .......................................................................................... 17 4.7 Electrical Connection.................................................................................. 22 4.8 Drainage Works to Q5 ................................................................................. 23 4.9 Permanent Excess Slate Mounds .............................................................. 24 4.10 Permanent and Temporary Access ........................................................... 25 4.11 Construction Phase .................................................................................... 26 4.12 Operational Phase ....................................................................................... 34 4.13 Decommissioning ....................................................................................... 40 4.14 References ..................................................................................................
    [Show full text]
  • Weatherman Walking Llanberis Walk
    bbc.co.uk/weathermanwalking © 2013 Weatherman Walking Llanberis Walk Approximate distance: 4 miles For this walk we’ve included OS map coordinates as an option, should you wish to follow them. OS Explorer Map: OL17 5 6 4 8 3 10 9 1 Start End 2 N W E S Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right 2009.All rights reserved. Ordnance Survey Licence number 100019855 The Weatherman Walking maps are intended as a guide to help you walk the route. We recommend using an OS map of the area in conjunction with this guide. Routes and conditions may have changed since this guide was written. The BBC takes no responsibility for any accident or injury that may occur while following the route. Always wear appropriate clothing and 1 footwear and check weather conditions before heading out. bbc.co.uk/weathermanwalking © 2013 Weatherman Walking Llanberis Walk Walking information 1. Llanberis Lake Railway station (SH 58210 59879) The walk begins outside the Llanberis Lake Railway station and not at the popular Snowdonia Mountain Railway which is a little further along the A4086 towards the town centre. There is plenty of parking in and around the town near the Snowdon Mountain Railway and opposite Dolbadarn Castle. To begin the walk, follow the signs for Dolbadarn Castle and the National Slate Museum and opposite a car park turn right. Cross a large slate footbridge over the River Hwch and follow a winding track up through the woods to the castle. 2. Dolbadarn Castle (SH 58600 59792) The castle overlooking Llyn Peris was built by the Welsh prince Llewellyn the Great during the early 13th century, to protect and control the Llanberis Pass - a strategic location, protecting trade and military routes into north and south Wales.
    [Show full text]
  • Water Framework Directive) (England and Wales) Directions 2009
    The River Basin Districts Typology, Standards and Groundwater threshold values (Water Framework Directive) (England and Wales) Directions 2009 The Secretary of State and the Welsh Ministers, with the agreement of the Secretary of State to the extent that there is any effect in England or those parts of Wales that are within the catchment areas of the rivers Dee, Wye and Severn, in exercise of the powers conferred by section 40(2) of the Environment Act 1995(a) and now vested in them(b), and having consulted the Environment Agency, hereby give the following Directions to the Environment Agency for the implementation of Directive 2000/60/EC of the European Parliament and of the Council establishing a framework for Community action in the field of water policy(c): Citation and commencement and extent 1.—(1) These Directions may be cited as the River Basin Districts Typology, Standards and Groundwater threshold values (Water Framework Directive) (England and Wales) Direction 2009 and shall come into force on 22nd December 2009. Interpretation 2.—(1) In these Directions— ―the Agency‖ means the Environment Agency; ―the Groundwater Directive‖ means Directive 2006/118/EC of the European Parliament and of the Council on the protection of groundwater against pollution and deterioration(d); ―the Priority Substances Directive‖ means Directive 2008/105/EC of the European Parliament and of the Council on environmental quality standards in the field of water policy(e); ―threshold value‖ has the same meaning as in the Groundwater Directive; and ―the Directive‖ means Directive 2000/60/EC of the European Parliament and of the Council of 23rd October 2000 establishing a framework for Community action in the field of water policy.
    [Show full text]
  • Press Release 4Th May 2018
    Press release 4th May 2018 Electric Mountain Visitor Centre Holds Public Exhibition for Refurbishment Plans First Hydro Company, the owner of the Electric Mountain Visitor Centre, has outlined its plans to refurbish the centre in Llanberis. The proposals were presented at a public exhibition held at the Electric Mountain Visitor Centre on 17th April. Local residents and other stakeholders were invited to view information on the proposals, meet representatives of First Hydro and ask questions about the project. First Hydro, which is 75% owned by ENGIE and 25% owned by Brookfield Renewable Partners, operates the Dinorwig Power Station (1,728 MW) and Ffestiniog Power Station (360 MW), as well as the Visitor Centre. John Armstrong, First Hydro Station Manager, said: ‘We were delighted to present our plans for the refurbishment of the Electric Mountain Visitor Centre to the local community. The aim of the new building is to deliver an engaging and attractive visitor experience, providing user- friendly resources that will appeal to tourist and education visitors alike. There will also be much- improved facilities for the community to use. Drawing on ENGIE’s regeneration capabilities, the new building will be sustainably designed, energy efficient and in keeping with the local environment and landscape. We look forward to continuing our public engagement through the construction process and beyond.’ A planning application has been submitted to Gwynedd Council, and the refurbishment work will commence once planning permission has been granted. It is anticipated that the construction of the new centre will take between 12 and 18 months. Last year ENGIE also announced plans to invest £50 million in a refurbishment of two units of the Ffestiniog Power Station, to extend the life of the units by a further 20 years.
    [Show full text]
  • Historic Need Case (2016)
    DOCUMENT 9.7.3 Historic Need Case (2016) National Grid (North Wales Connection Project) Regulation 5(2)(q) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 First published October 2016 Application Reference EN020015 September 2018 North Wales Connections Project Project Need Case National Grid National Grid House Warwick Technology Park Gallows Hill Warwick October 2016 CV34 6DA Table of Contents 1 Introduction ............................................................................................ 1 2 Background ............................................................................................ 3 3 Existing Transmission System in North Wales .................................................. 9 4 Customer Requirements .......................................................................... 16 5 Need for Transmission System reinforcement in North Wales .............................. 19 6 Conclusions ......................................................................................... 25 Appendix A – Summary of National Grid Legal Obligations ....................................... 26 Appendix B – Transmission System Analysis Principles ........................................... 29 Glossary of Terms and Abbreviations ................................................................. 44 Page i Page ii 1 Introduction 1.1 This Report (the “2016 Need Case”) updates the assessment of the capacity requirements for the electricity transmission system in North Wales. The assessment
    [Show full text]
  • Know Your River – Seiont, Gwyrfai & Llyfni
    Know Your River – Seiont, Gwyrfai & Llyfni Salmon & Sea Trout Catchment Summary Introduction This report describes the status of the salmon and sea trout populations in the Seiont catchment. Bringing together data from rod catches, stock assessments and juvenile monitoring, it will describe the factors limiting the populations and set out the challenges faced in the catchment. Action tables set out habitat improvements to restore freshwater productivity of salmon and sea trout populations. These tables also include some work which will be carried out by our partner organisations, not just Natural Resources Wales (NRW). NRW has a duty, defined in the Environment (Wales) Act 2016 to have Sustainable Management of Natural Resources (SMNR) at the core of everything that we do. By applying the principles of SMNR in all of our activities - from agriculture, forestry and flood defence to development planning - we are undertaking catchment-wide initiatives that will deliver for fish stock improvements. Our reports highlight the importance of considering the whole catchment when identifying and addressing fisheries issues; and of working with partners. NRW is committed to reporting on the status of salmon stocks in all of our principal salmon rivers for the Salmon Action Plans and condition assessments under the Habitats Directive in SAC rivers; all fish species in all of our rivers are reported for the Water Framework Directive (WFD). This report will fulfil these commitments and provide an informative and useful summary of stock status and remedial work planned, for our customers, specifically anglers, fishery and land owners; as well as our partners. Catchment The Seiont catchment, covering an area of 84.1 km2, drains an extensively slate-mined upland area and lowland brown earth.
    [Show full text]
  • Snowdonia & the Llŷn
    © Lonely Planet Publications Pty Ltd SNOWDONIA & THE LLŶN 3 PERFECT DAYS DAY 1 // CONQUER THE MOUNTAIN Check the weather forecast before making an assault on Snowdon (p226). If you’re fit, catch the Snowdon Sherpa bus to Pen-y-Pass and take the Pyg Track (p227). Time your descent via the Rhyd Ddu Path to catch the Welsh Highland Railway (p244) back to Caernarfon. If you’re not up for climbing, head to Llanberis and take the Snowdon Mountain Railway (p227). You’ll be up and down the mountain in 2½ hours, leaving plenty of time to check out the National Slate Museum (p230) and Dolbadarn Castle (p231) before stocking up on mead at Snowdon Honey Farm (p231). Head to Caer- narfon and watch the sunset over the Menai Strait from beside the city walls before dining at the Black Boy Inn (p235). DAY 2 // BE A PILGRIM Spend the morning exploring Caernarfon Castle (p233) before heading for the Llŷ n Peninsula. Ideally you’ll have prebooked a boat to Bardsey but if they’re not running, make do with gazing at the island from Braich-y-Pwll (p239). Abersoch (p241), Cric- cieth (p243) and Porthmadog (p244) are good places to stop for the night, but Harlech (p218) has the best restaurants – along with another World Heritage castle. DAY 3 // A SCENIC OVERLOAD Wherever you ended up, take the scenic A498 through the Pass of Aberglaslyn and back into the national park. Spend the day pottering along the route between Beddge- lert (p228) and Betws-y-Coed (p222), stopping at the lakes, lookouts and falls.
    [Show full text]
  • A Study of Hydroelectric Power: from a Global Perspective to a Local Application
    A Study of Hydroelectric Power: From a Global Perspective to a Local Application Prepared by: Duane Castaldi Eric Chastain Morgan Windram Lauren Ziatyk Prepared for the 2003 Center for Advanced Undergraduate Studies and Experience From Industrial Revolution to Industrial Ecology: Energy and Society College of Earth and Mineral Sciences The Pennsylvania State University ABSTRACT As energy becomes the current catchphrase in business, industry, and society, energy alternatives are becoming increasingly popular. Hydroelectricity exists as one option to meet the growing demand for energy and is discussed in this paper. Numerous consideration factors exist when building hydropower plants; whether the concerns are global or local, each has been measured when discussing this renewable energy source. From environmental and economic costs of constructing such plants to proposing the addition of hydropower generating capabilities in Pennsylvania, the authors have used personal experience from field studies and intensive research to cover the topic of hydroelecticity. Hydroelectric Power 2 CAUSE 2003 TABLE OF CONTENTS ABSTRACT 2 INTRODUCTION 3 Research Expedition Sites 5 Scope of Project 6 ENVIRONMENTAL EFFECTS 7 Physical 7 Biological 10 Flora 10 Fauna 11 Humans 13 ECONOMIC ASPECTS OF HYDROPOWER 14 Global Hydropower Economics 15 Local Hydropower Economics 16 Flat Rock Dam Hydropower Economics 17 BUILDING A HYDROPOWER PLANT 19 Consideration Factors 20 Construction 21 Plant Specifications 22 Intake 24 Penstock 25 Turbines 25 Generator, Transformers, and Electricity Generation 26 Development Configuration 27 CONCLUSION 28 WORKS CITED 29 Hydroelectric Power 3 CAUSE 2003 INTRODUCTION Hydroelectric power captures the energy released from falling water. In the most simplistic terms, water falls due to gravity, which causes kinetic energy to be converted into mechanical energy, which in turn can be converted into a useable form of electrical energy.
    [Show full text]
  • Regulation of the Uk Electricity Industry
    INDUSTRY BRIEF REGULATION OF THE UK ELECTRICITY INDUSTRY 2002 edition Gillian Simmonds REGULATION OF THE UK ELECTRICITY INDUSTRY 2002 edition CRI Industry Brief Gillian Simmonds Desktop published by Jan Marchant © The University of Bath All rights reserved ISBN PREFACE The CRI is pleased to publish the 2002 edition of its industry brief on the Regulation of the UK Electricity Industry, having updated it for developments since the 1998 edition. It has been prepared by Gillian Simmonds, a Research Officer at the CRI, and supersedes the first edition which was prepared by Carole Hicks, then a Research Officer at the CRI. The brief is part of a set of CRI industry briefs for the utilities and network industries, covering water, energy, transport and communications. The structure and regulation of the electricity industry has changed considerably since 1998, including developments such as the new electricity trading arrangements (NETA), competition in electricity supply and the Utilities Act 2000, which created, amongst other things, separate, independent arrangements for consumer representation (energywatch) and the Gas and Electricity Markets Authority (the ‘Authority’), which took over the powers and duties of the Director General. The new 2002 edition is, therefore, substantially a new document, rather than a ‘revision’. The CRI would welcome comments on the Brief, which can be taken into account as CRI Industry Briefs have to be updated from time to time in line with developments in the Industry, and will be published as a ‘revised’ or subsequent ‘edition’. Comments should be addressed to: Peter Vass Director – CRI School of Management University of Bath Bath, BA2 7AY The CRI publishes work on regulation by a wide variety of authors, covering a range of regulatory topics and disciplines, in its International, Occasional and Technical Paper series.
    [Show full text]
  • Year 7 Instructions Approximately 3 Lessons Tasks – Answer in Your Book
    Year 7 instructions approximately 3 lessons Do your best! Tasks – answer in your book Page 1 Title: Non-renewable energy: fossil fuels Read the information. Create a poster to either show the advantages of fossil fuels OR the disadvantages of fossil fuels. Page 2 Title: Non-renewable energy: nuclear power Read the page. Create a mind map of the advantages and disadvantages of nuclear power. Also include facts about the case study – Chernobyl. Page 3 Title: Renewable energy Read the page. Choose one of the examples of renewable energy. Create an information leaflet about this. Page 4 Title: The future of energy production & Page 5 Hydroelectric power in Snowdonia Read the pages and answer the following questions: 1. What fuel are they hoping to use for cars and where will this fuel come from? 2. What is energy insecurity? 3. One way that the government can close the gap between energy supply and demand is… 4. What is a good environment to create hydroelectric power? 5. How is hydroelectric power generated in Cwn Dyli? 6. How does the power station at Dinorwig work? You can include a diagram. Energy Page 1 Non-renewable energy: fossil fuels Oil and gas were formed from the remains of animals and plants that lived millions of years ago in the sea. These remains were covered by layers of sand and silt. Heat and pressure from the Earth's core turned them into oil and gas. The oil and gas were trapped between layers of impermeable rocks. Coal was formed from dead plants about 300 million years ago.
    [Show full text]
  • Distributed Generation and Demand Study -Technology Growth Scenarios to 2030 South Wales Licence Area September 2016
    Distributed generation and demand study -Technology growth scenarios to 2030 South Wales licence area September 2016 Version: Final Regen SW, The Innovation Centre, Rennes Drive, Exeter, EX4 4RN T +44 (0)1392 494399 E [email protected] W http://www.regensw.co.uk Registered in England No: 04554636 This report was produced for Western Power Distribution Issue date September 2016 Version Final Cheryl Hiles, Hazel Williams, Johnny Written by: Gowdy and Joel Venn Approved by: Cheryl Hiles Regen SW, The Innovation Centre, Rennes Drive, Exeter, EX4 4RN T +44 (0)1392 494399 E [email protected] W www.regensw.co.uk Registered in England No: 04554636 All rights reserved. No part of this document may be reproduced or published in any way (including online) without the prior permission of Regen SW Confidential – Final Page 2 Regen SW 2016 Table of Contents 1 EXECUTIVE SUMMARY ............................................................................................................................... 5 CONTEXT ..................................................................................................................................................... 5 STRATEGIC NETWORK INVESTMENT ................................................................................................................... 5 OBJECTIVE AND METHODOLOGY ...................................................................................................................... 6 RESULTS .....................................................................................................................................................
    [Show full text]
  • Energy Storage in the UK an Overview
    Energy Storage in the UK An Overview 2nd Edition A Renewable Energy Association Publication www.r-e-a.net Published Autumn 2016 Table of Contents Section 1 Introduction 4 Section 2 Energy Storage Technologies 6 2.1 Mechanical storage 6 2.1.1 Pumped hydro storage 6 2.1.2 Compressed air energy storage 7 2.1.3 Flywheels 8 2.2 Electrochemical energy storage (batteries) 9 2.2.1 Conventional batteries 9 2.2.2 High temperature batteries 9 2.2.3 Flow batteries 10 2.3 Chemical energy storage 11 2.3.1 Hydrogen (H2) 12 2.3.2 Synthetic natural gas (SNG) 12 2.4 High temperature thermal energy storage 12 2.4.1 Thermal energy storage (TES) 12 2.4.2 Sensible heat storage 12 2.4.3 Latent heat storage 12 2.4.4 Thermo-chemical storage 13 2.4.5 High temperature thermal energy storage 13 2.4.6 Pumped heat electrical storage 13 2.4.7 Liquid air energy storage (LAES) 13 2.5 Electromagnetic storage 14 2.5.1 Capacitors 14 2.5.2 Superconducting magnetic energy storage (SMES) 15 Section 3 Energy Storage Today 17 3.1 Energy storage policies internationally 17 3.2 UK energy storage projects 20 3.3 DNO Low Carbon Network Fund energy storage projects 23 Section 4 Industry Interviews 23 Section 5 Conclusions 26 References 27 Annexes 29 3 Section 1 - Introduction The energy storage market has moved on since the first version of this REA report was published in autumn 2015, but the underlying drivers remain unchanged - a significant increase in renewable energy supplies amid growing demand for energy.
    [Show full text]