MINISTRY OF TRANSPORTS AND INFRASTRUCTURE

MAIN DATA ON PRIORITY PROJECTS WITH EUROPEAN FUNDING 07.03.2011 2

STRUCTURE OF THE PRESENTATION

1. ROADS a. HIGHWAYS b. BYPASSES c. EIB PROJECTS 2. RAILROADS a. CORIDOR IV b. TRAIN STATIONS 3. NAVAL 4. AVIATION 5. INTERMODAL 6. METRO 07.03.2011 3

VALUE OF THE PROJECTS LAUNCHED IN 2010-2011

SOP-T 1.Highways 2534 M EUR 288,8 km 2.Bypasses 539 M EUR 138,7 km 3.CFR – Corridor IV 1889 M EUR 166,3 km 4.CFR – Stations 227 M EUR 5.Aviation projects 150 M EUR 6.Intermodal projects 33 M EUR 7.Naval projects 200 M EUR

TOTAL 5.573 M EUR

IMPROVEMENT OF NATIONAL ROADS - EIB (V-VI) TOTAL 848,5 M EUR 943,3 KM 07.03.2011 4

[ roads ]

1.Highways 2534 M EUR 288,8 km 2.Bypasses 539 M EUR 138,7 km 3.CFR – Corridor IV 1889 M EUR 166,3 km 07.03.2011 5 HIGHWAYS (1/5)

Ra d a uti Prut D ARABANI 2 9A AUTOSTRAZI EXECUE8 5 TATEG e or g e Enesc uMa nole a sa HIGHWAYSE8 1 /E5 8 Ta rna FINALIZED AND IN OPERATION Ma re 2 9 29 C D O RO HO I HALMEU Sa p inta SIRET SAVENI 1C 19 Ra lo s Ung ure ni Liv a d a SIG HETU Vic o vu Sta nc a E Va rful 2 9B Pe te a 8 MARMATIEI 18 d e Sus RAD AUTI C im p ului Ste fa ne sti 1 1 C Va m a O AS Fe re sti CAMPIA TURZII - GILAU BO TO SANI D oro lf Suc e vita Ma rg ine a 29 D Se ini 1 8 2 2 9A 29 C SATU MARE Ma ra Length:VISEU D E S U S 51,5km Urzic e niE671 1C BAIA MARE Mo isei 17A 29 Ruta ni Highways finalized Va tra E E58 LEGENDA BAIA SPRIE Ilise sti 5 Ard ud Borsa Mo ld o vite i 8 19 C AREI E5 Sa c e l SUC EAVA 8 Total value: V a m236a 1MEuro Nic o la e Ba lc e sc u 1F 19A Sa tulung C irlib a b a 7 and in operation E67 1 Ro m uli E8 5 2 8B E81 Funding source:17D State Budget,G UR A HUMO RULUI Va le a lui Miha i So m c ul Ma re 1 8 7 6 C IMPULUNG Autostrazi executate Sup uru d e jo s E5 FALTIC ENI HIRLAU TUSNAD 1 C 17 C Ro d na Ia c ob e ni MO LD O VENESC C hiril Pra xia SC ULENI Ra sto c i out of which: 1 9B MARG HITA Sa rm a sa g C o sb uc SING EO RZ-BAI 1 7B E5 8 3 /E5 8 1H 8 NASAUD 1 VATRA Sa c ue ni SIMLEU 1 F E5 7 VATDO RN E I 45 MEuro Mo toc Rug inoa sa Po d u Ilo a ieEi5 8 19 Sup ia c u J IBO U Broste ni 15 C E5 83 SILVANIEI E 28A Surd uc 6 Vina to ri d e Ba c a u 1H G ilg a u 1 7D 5 28 7 PA SC ANI

1C 8 TIRG U 7 1 7C

Nusfa la u Tiha u 5 15B Strung a TIRG U FRUMO S 1 Biha ria ZALAU E Lands 50Borc aMEuroC ra c a o a ni NEAMT E6 0 1 7 Prund u Birg a ului Mic la use ni IASI 1H 8 1 Po ia na BUC IUM BO RS O RAD EA E D EJ BISTRITA La rg ului 28 1 Ro m a na si Sinm iha iu Alm a sului G HERLA D ob re ni Sa b a o a ni Ba ile Fe lix ALESD E60 15 2 4 28 D e d a BO RSEC 15C Le s 76 Zim b a r E576 15 15D RO MAN E5 8 1 D ra g e sti PIATRA NEAMT 1 1G 5 A 15 BIC AZ 15D Ina na Ra sc ruc i 1 TO PLITA 12C Ta rc a u E671 E79 12 ALBITA 1F NEG RESTI Vulture sti HUEDIN Ap a hid a C a m a ra su Ditra u 2 4B SALO NTA 1 6 La c u Rosu 15 15 D C o p a c e ni 1 6 REG HIN Po c o la C LUJ NAPO C A Dim b u J ose ni G HEO RG HIENI HUSI 7 9 2F VASLUI BEIUS E60 1 3B BUHUSI 24 B 1 5 12 Se c uie niD ra g om ire sti VARSAND SO VATA G him e s-Fa g e t Sind o m inic BAC AU C IMPIA TURZII TIRG U 12A C ra sna 79 A C HISINEU-C RIS TURDA Pra id Sc orte ni Buru MURES 13 A MO INESTI2 G Sirb i 2 4A Na d a b 79A Arie se ni INEU VASC AU NUC ET Alb a c E81 E60 C o rund Sa nd ule ni 1 5 C O MANESTI Lup sa 75 Ie rnut Sing e o rg iu 13 A E85 76 Ba la use ri VLAHITA D a rm a ne sti E574 E581 Lup e ni MIERC UREA C IUC Fa lc iu E671 Mira sla u TIRG U Zorle ni C IMPENI TIRNAVENI 1 3 O C NA BIRLAD Turnu 79A Virfurile ABRUD AIUD O D O RHEIU Sinm a rtin O NESTI 2 4A E6 8 1 4A SIG HISO ARA SEC UIESC SLANIC 12 B Po d u Turc u Murg e ni NAD LAC G ura hont C o zm e ni 11 A 7 4 Buc ium MO LD O VA 26 E79 Bla je l O ituz 11A 7 BRAD Te ius 14 DUMBRAVENI C e na d Pa ulis Buc e s 14B 0 BAILE TUSNAD 11 B ALBA IULIA 6 11 AD J UD ARAD E68 1 BLAJ MEDIAS E SINNIC O LAU C a p ruta C risc io r 14B C O PSA MIC A E581 6 69 LIPO VA 74 Bre tc u MARE Ving a ZLATNA RUPEA TIRG U E85 Lo vrin Axe nte Se ve r SEC UIESC Le p sa G a ra Be rhe c i O a nc e a O rtiso a ra Sa virsin 76 Hog hiz 1 2 2D 59C 7 ILIA 14 Vid ra 24 7 13 SFINTU MARASESTI Bile d So im us G HEO RG HE E574 E671 Fa g e t SEBES E81 TEC UC I J IMBO LIA E68 FAG ARAS Se rc a ia C a rp inis E6 73 SIMERIA Voila Re c i 2D C o sa va D EVA 5 7C 1 1 1 Fo lte sti 5 9A E7 0 68A 68B O RASTIE SIBIU 8 C hic his E6 E68 TIMISO ARA Sug a g 1 Sinc a C O DLEA Pre jm e r INTO RSATURA FO C SANI 2 6 HUNEDO ARA 1 /7 C irtiso a ra Ve c he Ha nu C o na c hi C ALAN Avrig 1 0 BUZAULUI LUG O J Ta lm a c iu 73A BRA SO V 25 66 Tuluc e sti 59B 59 VESTEM SAC ELE E81 Bile a La c RISNO V 58A 6 HATEG G ALATI 2B O TELU RO SU C irne sti 7 3A Siriu 2 Ind e p e nd e nta Voite g E79 Bra n C he ia 6 8 Pui 73 PRED EAL D ETA Sa rm ise g e tuza - PITESTINe ho iu BUCHARESTSe nd re ni - CERNAVODA 58B Be rzo via 66 1A RIMNIC U SARAT G a rva n C ARANSEBES Ruc a r 2B 58 Voine a sa E60 Ma ne c iu- 2 2 Ba lta Alb a BRAILA Sa c eni PETRO SANI 7A O b irsia Lo trului 7 E574 SINAIA Sm ird a n 2 2 Po ie na ri Length U n g u re n i 111 km Mo vLengthila La c u M A C IN IS A C C151EA km E70 BO C SA E URIC ANI 66A C IMPULUNG Sa ra t 7 7A 7 1 C iuta 1 0 Mire sii MO RAVITA RESITA 0 Ma la ia C O MARNIC C im p u BREZO I 7 C Funding source:C isla u State Budget FundingTra ia n source:E87 State Budget, lui Ne a g E79 67 A D om ne7st3iC Mo ro e ni VALENII TULC EA C a ra so va RIMNIC U Sc hitu Ve rne sti BUZAU Ia nc a 22D C a ta lo i NO VAC I G o le sti D E MUNTE FAUREI 2B 21 C e rna 5 7 66 Po lo vra c i VILC EA C URTEA FIENI C IMPINA Na lb a nt E7 0 G ra d ina ri 5 8 HO REZU 6 4 73C D E ARG ES 7 2A 2 B C ilib ia Horia EIB, ISPA Bum b esti- 22 J iu 6 7 Bud a u C o ste sti 22 A 6 Runc u 1B 22 D 57B ANINA Be ng e stiMa ld a re sti BAILE O C NELE E574 E577 1 PLO IESTI 2 C E87 67 C im p u Ma re G O VO RA MARI 7 C MIZIL O RAVITA 57 B E81 TIRG O VISTE Alb e sti Insura te i C iuc uro va 67 D 67D Sc oa rta Ba b e ni 7 3 7 2 Po g oa ne le To p o lo g 2 2D BABADAG BAIA D E ARAMA 6 7 TIRG U J IU TIRG U C ARBUNESTI D ra g om ire sti Bozo vic i Ia b la nita Pie p ta ni I.L.C a ra g ia le Ro hm a n Na id a s RO VINARI PITESTI 67 B 65 C 1D G IURG ENI 22 A C a ug a g ia So c o l 57 BAILE HERC ULANE 6 4 72 71 1 A Pe ste a na -J iu G ra d iste a D ob ro te a sa 7 E85 G riv ita 21A HIRSO VA 5 7A Po je ja na To p le ta 67B E60 Sc ra iu Flore sti MO TRU 79 Ve d e a C e rb u URZIC ENI Miha i E Hure za ni6 7B C O STESTI G AESTI C ring a si 2 C Vite a zu MO LD O VA NO UA O RSO VA 6 7 Broste ni G iule sti E70 TAND AREI E 6 6 65 A E60 E6 0 3B E60 70 6 7A TITU Am a ra D RO BETA D RAG ASANI E574 1 Ma lu 2A Fa c a e ni E87 Be rze a sc a Re d e a BUFTEA 2 TURNU SEVERIN O TO PENI SLO BO ZIA 2 A E7 7 1 Tinta re ni Bild a na7 E85 Sim ia n 6 Ba lc e sti 21 22 57 STREHAIA Pa sa re a 3 Le hliu 65 Ung he ni D ra g a lina A1 Bra ne sti Fund ule a 3A FETESTI C re ve d ia Ma re Le hliu 3A A2 Miha il 56B FILIASI 6 5C SLATINA G a ra D ra jna Kog a lnic e a nu C a p ul Mid ia E70 G a ne a sa BUBC UuRcESuTIresti Ste fa n Vo d a C ERNAVO D A 22 B VINJ U MARE Vla d Te p e s 21 22C NAVO DARI E79 BALS Brinc o ve ni C le ja ni 3 C uza Cernavoda Ad una tii4- Vod a O vid iu C O NSTANTA 6 5A 6 1 6 C o p a c e ni Bud e sti 3B Ba sa ra b i C RAIO VA Mina stire a 31 Ag ig e a 56A 64 G him p a ti C a lug a re ni C ALARASI C o rvin Pie tre ni 3 EFO RIE NO RD C ARAC AL D a ne a sa G re a c a O LTENITA Le u RO SIO RII D ra g a ne sti Vla sc a 5B E7 0 O strov Ba ne a sa C o b a d in 39 6 E70 DE VED E E675 EFO RIE SUD 56 Ro d o va n Sto e ne sti 41 C O STINESTI C e ta te E79 6 5 Am za c e a 6 D a ia NEPTUN 3 8 E87 J UPITER 55 ALEXAND RIA E85 Ma g la vit 54 Ne g ru vod a VENUS 6 5A G IURG IU SATURN E7 9 52 Sm ird ioa sa MANG ALIA C ALAFAT Ra st 55A C O RABIA D a b ule ni TURNU MAG URELE 51 5C Va m a Ve c he 54A Be c he t 5 4 51 A E7 0 E8 7 ZIMNIC EA E8 5 07.03.2011 6 HIGHWAYS (2/5) Highways under execution with completion in 2011-2012

SUPLACU de BARCAU - BORS Length: 64 km Highways under execution Total value : 963 MEuro Funding source: State Budget out of which: VAT 153 MEuro Total value: 2746 M EUR Lands 55 MEuro Total km: 243 km Under execution –Deadline 2012 Due on: 2011-2012 ARAD BYPASS MOARA VLASIEI - PLOIESTI Length: 12,3 km Lengthe: 42,5 km Total value: 173 MEuro Total value: 318,60 Meuro Funding souce: - EIB 76 MEuro C+M : 251,00 MEuro CERNAVODA - MEDGIDIA - CF 40 MEuro Lands: 17,00 MEuro Length: 19,3 km - StateBudget 57 MEuro Consultancy: 2,2 MEuro Total value: 211 MEuro Under execution –Deadline 2011 VAT: 48,4 MEuro Funding source: - CF 36 MEuro Funding source: State Budget - EIB 115 MEuro Under execution - Deadline 2012 ARAD - TIMISOARA - State Budget 60 MEuro Length: 32,2 km On going: 2011 Total value: 194 MEuro Funding source: - EIB 85 MEuro CONSTANTA BYPASS - CF 44 MEuro Length: 22,1 km - State Budget 65 MEuro Total value: 192 MEuro Under execution – Deadline 2011 Funding source: - CF 53 MEuro - ERDB 75 MEuro - State Budget 64 MEuro Under execution – Deadline 2011 BUCURESTI – MOARA VLASIEI Length: 19,5 km Total value: 492 Meuro C+M : 200,00 MEuro Lands: 291,00 MEuro Consultancy: 1,0 MEuro VAT: 38,2 MEuro MEDGIDIA - CONSTANTA Funding source: State Budget Length: 31,5 km Under execution: Deadline 2012 Total value: 203 MEuro Funding source: - CF 35 MEuro - EIB 111 MEuro - State Budget 58 MEuro On going 07.03.2011 7 HIGHWAYS (3/5)

Highways launched in 2010-2011

Total value: 2534 M EUR Total km: 288,8 km NADLAC – ARAD Length: 38,8 km Total value: 234 MEuro Funding source: - CF 9 MEuro ORASTIE – SIBIU and SEBES Bypass - State Budget 35 MEuro Length: 82 km ESTIMATED to be launched: 2011 Total value: 693 MEuro ESTIMATED to be finalized: 2013 Funding source: - CF 589 MEuro - State Budget 104 MEuro ESTIMATED to be launched: 2011 ESTIMATED to be finalized: 2013

DEVA – ORASTIE TIMISOARA - LUGOJ Length: 32,8 km Length: 35,6 km Total value: 365 MEuro Total value : 217 MEuro Funding source: ISPA 114 MEuro Funding source: - CF 184 MEuro - State Budget 251 MEuro - State Budget 33 MEuro ESTIMATED to be launched: 2011 ESTIMATED to be launched: 2011 ESTIMATED to be finalized: 2012 ESTIMATED to be finalized: 2013 LUGOJ – DEVA bridge project Length: 99,5 km Total value: 1.025 MEuro Funding source: - CF 871 MEuro - State Budget 154 MEuro ESTIMATED to be launched: 2011 ESTIMATED to be finalized LOT 1: 2013 LOT 2: 2015 LOT 3: 2015 07.03.2011 8 HIGHWAYS (4/5)

Highways under preparation

TARGU MURES – IASI - UNGHENI GILAU - MIHAILESTI Length: 307 km Highways under preparation Length: 25 km

CAMPIA TURZII – TARGU MURES MIHAILESTI - SUPLACU de Length: 36 km BARCAU Length: 74 km FOCSANI - ALBITA Length: 133 km FAGARAS – SIGHISOARA, 1B SIGHISOARA - TARGU MURES, 1C Length: 52 km Length: 56 km

BRASOV - FAGARAS 1A Length: 53 km

SIBIU - PITESTI Length: 116,6 km PLOIESTI - COMARNIC Length: 48,5 km

COMARNIC - BRASOV PLOIESTI – BUZAU - FOCSANI Length 55 km Length: 133 km

CONSTANTA – VAMA VECHE Length: 53 km 07.03.2011 9 HIGHWAYS (5/5)

Highways Construction Program Highways finalized and in operation Highways under execution Highways to be launched in 2010-2011 Highways under preparation 07.03.2011 10 BYPASSES(1/2)

Ra d a uti Prut DARABANI Bypasses launched in 201029 A -2011 VARIANTE DE OCOLIRE CU LANSARG e orgEe Ene sc uIN 2010 - 2011 Ma nole a sa E8 1 /E5 8 Ta rna E8 5 Ma re 2 9 2 9C D O RO HO I HALMEU Sa p inta SIRET SAVENI 1C 1 9 Ra lo s Ung ure ni Liv a d a SIG HETU Vic o vu Sta nc a E Va rful 2 9 B Pe te a 8 MARMATIEI 18 d e Sus RADAUTI C im p ului Ste fa ne sti 1 1C Va m a O AS Fe re sti BO TO SANI D oro lf Suc e vita Ma rg ine a 2 9 D Se ini 1 8 2 2 9 A 2 9C SATU MARE Ma ra VISEU DE SUS Urzic e niE6 71 1 C BAIA MARE Mo ise i 1 7A 2 9 Ruta ni Variante ocolitoare cu Va tra E E58 BAIA SPRIE Ilise sti 5 Ard ud Borsa Mo ld o vitei 8 Estimated deadline: 2013 1 9 C AREI E5 Sa c el SUC EAVA 8 Va m a 1 Nic o la e Ba lc e sc u 1 F 1 9A Sa tulung C irlib a b a 7 lansare in 2010 – 2011 E6 7 1 Ro m uli E85 28 B E8 1 17 D G URA HUMO RULUI Va le a lui Miha i So m c ul Ma re 18 76 C IMPULUNG TOTAL VALUE: 539,38 MEUR Sup uru d e jo s E5 FALTIC ENI HIRLAU Termen de finalizare: 2013 TUSNAD 1 C 1 7C Ro d na Ia c ob e ni BacauMO LD O VENE SBypassC C hiril Pra xia SC ULENI Ra sto c i 1 9B MARG HITA Sa rm a sa g C o sb uc SING EO RZ-BAI Value:1 7B 97 Mil. Eur E5T8 3o/Eta5 8l: 1H 8 NASAUD 1 VATRA LENGTH: 138,72 KM Sa c ue ni SIMLEU F E5 7 Mo toc Rug inoa sa E5 8 1 9 1 J IBO U DO RNEI Broste ni 1 5C Po d u Ilo a ie i Sup ia c u SILVANIEI E 28 A E5 83

6 Vina to ri d e Ba c a u 1 H Surd uc G ilg a u 17D 5 28 Valoare: 539,38 Mil. Euro 7 Funding source: FEDR+GOR PA SC ANI

1C 1 7 C 8 TIRG U 7

Nusfa la u Tiha u 5 1 5 B Strung a TIRG U FRUMO S 1 Biha ria ZALAU E Borc a C ra c a o a ni NEAMT E6 0 1 7 Prund u Birg a ului Mic la use ni IASI 1H 8 1 Po ia na BUC IUM Lungime: 138,72 km BO RS O RAD EA E Carei DBypassEJ BISTRITA Length: 30,8La rg ukmlui 2 8 1 Ro m a na si G HERLA D ob re ni Sa b a o a ni Ba ile Fe lix ALESD Sinm iha iu Alm a sului 1 5 24 E6 0 Value: 12,7 Mil. Eur EstimatedBO RSEC deadline: 20131 5C 28 Le s Zim b a r E5 76 D ed a 1 5 15 D RO MAN 76 D ra g esti E5 8 1 BIC AZ PIATRA NEAMT 1 Funding1 G source: FEDR+GOR5A 15 1 5D Ina na Ra sc ruc i 1 TO PLITA 1 2C Ta rc a u E6 71 E7 9 1 2 ALBITA 1 F NEG RESTI Vulture sti HUEDIN Length: A10,46p a hid a Ckma m a ra su D itra u 2 4B SALO NTA 1 6 La c u Rosu 15 1 5 D C o p a c e ni 16 REG HIN Po c o la C LUJ NAPO C A D im b u J oseni G HEO RG HIENI HUSI 79 Estimated deadline: 2013 2 F VASLUI BEIUS E60 1 3B BUHUSI 24 B 15 1 2 Se c uie niD ra g om iresti SacueniV ABypassRSAND SO VATA G him e s-Fa g e t Sind o m inic BAC AU C IMPIA TURZII TIRG U 1 2A C ra sna 79 A C HISINEU-C RIS TURDA Pra id Sc orte ni Value: 10,7 Mil. Eur Buru MURES 13 A MO INESTI2G Sirb i 24 A Na d a b 79A Arie se ni INEU VASC AU NUC ET Alb a c E8 1 E6 0 CTecucio rund Bypass Sa nd ule ni 1 5 C O MANESTI Funding source: FEDR+GOR Lup sa 75 Ie rnut Sing e o rg iu 13A E8 5 7 6 Ba la useri VLAHITA D a rm a ne sti E5 74 E5 81 Lup e ni TronsonM IIIERC UREA C IUC Fa lc iu E6 71 Mira sla u TIRG U Zorle ni Length: 7,62 km C IMPENI TIRNAVENI 13 O C NA BIRLAD Turnu 79 A Virfurile ABRUD AIUD O D O RHEIU Sinm a rtin O NESTI 2 4 A E6 8 1 4 A SIG HISO ARA Value:SEC UIESC 26 Mil. Eur SLANIC 1 2 B Po d u Turc u Murg e ni NAD LAC G ura hont C o zm e ni 1 1 A 7 4 Buc ium Bla je l MO LDO VA 2 6 Estimated 7deadline: 2013 E7 9 O ituz 1 1 A BRAD Te ius 1 4 DUMBRAVENI BAILE TUSNAD C e na d Pa ulis Buc e s 1 4 B Funding0 source: FEDR+GOR1 1 B ALBA IULIA 6 1 1 AD J UD ARAD E6 8 Tg. Mures Bypass1 BLAJ MEDIAS E SINNIC O LAU 14 B 6 9 LIPO VA C a p ruta C risc io r 74 C O PSA MIC A Bre tc u E5 81 MARE 6 ZLATNA Length:RUPEA 6,95 km E8 5 Lo vrin Ving a Value: 15,8 Mil. Eur Axe nte Se ve r TIRG U SEC UIESC G a ra Be rhe c i Sa virsin Le p sa O a nc e a 5 9 C O rtiso a ra 7 6 Hog hiz 1 2 2 D 7 ILIA 14 Estimated3 deadline: 2013 Vid ra 24 Funding source:7 FEDR+GOR 1 SFINTU MARASESTI Bile d So im us G HEO RG HE E574 E671 Fa g e t SEBES E8 1 TEC UC I J IMBO LIA E6 8 FAG ARAS Se rc a ia C a rp inis E673 Length:SIMERIA 36,2 km Voila Re c i 2 D C o sa va D EVA 5 7C 1 1 1 Fo lte sti 5 9A E70 6 8 A 68 B O RASTIE SIBIU 8 C hic his E6 E6 8 TIMISO ARA Sug a g 1 Sinc a C O DLEA Pre jm e r INTO RSATURA FO C SANI 26 HUNEDO ARA Estimated deadline: 20131 /7 C irtiso a ra Vec he Ha nu C o na c hi C ALAN Avrig 10 BUZAULUI LUG O J Ta lm a c iu 7 3A BRA SO V 2 5 6 6 Tuluc e sti 5 9B 5 9 VESTEM SAC ELE E81 Bile a La c RISNO V 5 8A 6 HATEG G ALATI 2 B O TELU RO SU C irne sti 7 3A Siriu 2 Ind e p e nd e nta Voite g E79 Bra n C he ia 68 Pui Brasov Bypass 7 3 PRED EAL D ETA Sa rm iseg e tuza Neho iu Se nd re ni 5 8 B Berzo via 66 1 A RIMNIC U SARAT G a rva n C ARANSEBES Ruc a r Bucharest ring road2B between A1 58 Value:V o in143,18e a sa Mil. Eur E6 0 Ma ne c iu- 2 2 Ba lta Alb a BRAILA Sa c e ni PETRO SANI 7 A O b irsia Lo trului 7 E574 SINAIA Sm ird a n 22 Po ie na ri Ung ure ni Mo vila La c u MAC IN ISAC C EA E7 0 BO C SA E URIC ANI 6 6 A C IMPULUNG Sa ra t 7 7A 7 1 C iuta 10 Mire sii MO RAVITA RESITA 0 FundingMa la i asource: FEDR+GOR C O MARNIC C im p u BREZO I 7 C C isla u Tra ia n E8 7 lui Ne a g E7 9 67 A Dom ne7st3iC Mo ro e ni VALENII TULC EA C a ra so va RIMNIC U Sc hitu Ve rne sti BUZAU DN7 andIa nc a between DN222 D -A2 C a ta lo i NO VACLength:I 18 km G o le sti D E MUNTE FAUREI 2 B 2 1 C e rna 5 7 6 6 Po lo vra c i VILC EA C URTEA FIENI C IMPINA Na lb a nt E7 0 G ra d ina ri 58 HO REZU 6 4 7 3 C D E ARG ES 7 2A 2 B C ilib ia Horia Bum b e sti- 22 J iu 6 7 Bud a u C o ste sti 2 2 A 6 Runc u Estimated deadline: 2013 1 B - Value: 140,5 Mil.Eur 2 2 D 57 B ANINA Be ng e stiMa ld a resti BAILE O C NELE E574 E5 77 1 PLO IESTI 2C E8 7 6 7 C im p u Ma re G O VO RA MARI 7C MIZIL O RAVITA 57 B E8 1 TIRG O VISTE Alb e sti Insura te i C iuc uro va 67D 6 7D Sc oa rta Ba b e ni 7 3 7 2 - Length:Po g oa ne le 20,2 km To p o lo g 22 D BABADAG BAIA DE ARAMA 6 7 TIRG U J IU TIRG U C ARBUNESTI Dra g om iresti Bozo vic i Ia b la nita Pie p ta ni I.L.C a ra g ia le Ro hm a n Na id a s RO VINARI PITESTI Craiova South East 6 7B 6 5C 1 D - Funding source:G IURG E NGoRI 22 A C a ug a g ia So c o l 57 BAILE HERC ULANE 6Alexandria4 Bypass 7 2 7 1 1A Pe ste a na -J iu G ra d iste a Dob ro te a sa 7 E8 5 G riv ita 2 1 A HIRSO VA 57A To p le ta 67 B E60 Po je ja na MO TRU 9 Ved e a C e rb u - Estimated deadline: 2013Sc ra iu Miha i Value: 19,1 Mil.F lEurore sti E7 Hure za ni C ring a si URZIC ENI Vite a zu MO LD O VA NO UA Broste ni 6 7B G iule sti Value: 23,6 Mil.C O ST EEurSTI E7 0 G AESTI 2 C TANDAREI O RSO VA 6 7 6 E60 E7 6 6 5 A E60 3 B E6 0 0 67 A TITU Am a ra Funding source:D RO FEDR+GORBETA D RAG ASANI E5 74 1 Ma lu 2 A Fa c a e ni E87 Be rze a sc a Funding source:Re d e aFEDR+GOR BUFTEA 2 TURNU SEVERIN O TO PENI SLO BO ZIA 2A E7 7 1 Tinta re ni Bild a na7 E8 5 Sim ia n 6 Ba lc e sti 21 22 Length:5 7 6,28 km STREHAIA Length: 13,28 km Pa sa re a 3 Le hliu 65 Ung he ni Dra g a lina A1 Bra ne sti Fund ule a 3 A FETESTI C re ve d ia Ma re Le hliu 3 A A2 Miha il Estimated deadline:5 6B 2013 FILIASI 65 C EstimatedSLATINA deadline: 2013 G a ra D ra jna Kog a lnic ea nu C a p ul Mid ia E70 G a ne a sa BUC URES TI Ste fa n Vo d a C ERNAVO D A 22 B VINJ U MARE Vla d Te p e s 21 22 C NAVO DARI E7 9 BALS Brinc o ve ni C le ja ni 3 C uza Ad una tii4- Vod a O vid iu C O NSTANTA 6 5 A 61 6 C o p a c e ni Bud esti 3B Ba sa ra b i Total value: 539,4 M EUR C RAIO VA Mina stire a 31 Ag ig e a 56A 6 4 G him p a ti C a lug a reni C ALARASI C o rvin Pie tre ni 3 EFO RIE NO RD C ARAC AL Da nea sa G re a c a O LTENITA Total km: 138,7 km Le u RO SIO RII D ra g a nesti Vla sc a 5B E70 O strov Ba ne a sa C o b a d in 39 6 E7 0 D E VEDE E675 EFO RIE SUD 5 6 Ro d o va n Sto e ne sti 41 C O STINESTI C e ta te E7 9 6 5 Am za c e a 6 D a ia NEPTUN Caracal Bypass 38 E87 J UPITER 5 5 ALEXANDRIA E8 5 Ma g la vit 54 Mihailesti Bypass Ne g ru vod a VENUS Value: 17,5 Mil. Eur 65 A G IURG IU SATURN E7 9 52 Sm ird ioa sa MANG ALIA C ALAFAT Ra st Value: 13,1Mil. Eur 55 A C O RABIA Funding source: FEDR+GOR D a b ule ni TURNU MAG URELE 51 5 C Va m a Ve c he 5 4 A Bec he t 5 4 51 A E7 0 Funding source: FEDR+GOR E8 7 Length: 10,35 km ZIMNIC EA E8 5 Estimated deadline: 2013 Length: 3,18 km Estimated deadline: 2013 07.03.2011 11 BYPASSES(2/2)

BY PASSES

Bypasses

- executed

- in execution

- to be launched in 2010-2011

- in preparation

SIBIU 07.03.2011 12 EIB PROJECTS (1/2)

NR1C, Satu Mare -Baia Mare si NR 19 Satu Mare – LIvada, Rehabilitation of National Roads NR 1C Livada - Halmeu Length: 76,60 km NR 18, Funding source EIB VI Baia Mare – Moisei - Iacobeni Value: 149,97 Mil. Lei Length: 197,53 km Total value: 848 M EUR Estimated deadline: 2013 NR 1C, Dej- Baia Mare Funding source EIB VI Total km: 943 km Length: 86,49 km Value: 955,27 Mil. Lei Funding source EIB VI Estimated deadline: 2013 Value: 240,94 Mil. Lei NR 76, Beius – Oradea Estimated deadline: 2013 Length: 50,73 km Projects financed by EIB Funding source EIB V to be launched in 2010-2011 Value: 193,23 Mil. Lei Under execution for 2011 Estimated deadline: 2013 NR 15 / NR 15A, Tg. Mues -Reghin – Saratel Estimated deadline: 2013 NR 76, Stei – Beius Length: 71,14 km Length: 31 km Funding source EIB VI NR 1H, Zalau –Rastoci Funding source EIB V Value: 460,20 Mil Lei Length: 53,37 km Value: 115,69 Mil. Lei (for the entire Lot E –EIB VI) Funding source EIB VI Estimated deadline: 2013 Estimated deadline: 2013 Value: 142,17 Mil. Lei Estimated deadline: 2013 Projects financed by EIB NR 76, Varfurile – Stei To be launched in 2011 Length: 33,31 km Funding source EIB V Estimated deadline: 2013 Value: 249,23 Mil. Lei NR 24, Crasna –Iasi Estimated deadline: 2013 Length: 77,45 km Funding source EIB VI Value: 314,93 Mil. Lei Estimated deadline: 2013

NR 76, Baia de Cris – Varfurile Length: 29,35 km Funding source EIB V NR 14, Sibiu –Sighisoara Value: 105,72 Mil. Lei Length: 79,77 Estimated deadline: 2013 Funding source EIB VI Value: 460,20 Mil Lei (for the entire Lot E – EIB VI) NR 76, Soimus – Baia de Cris Estimated deadline: 2013 Length: 40 km Funding source EIB V Value: 86,25 Mil. Lei Estimated deadline: 2013 NR 66, Bumbesti Jiu – Petrosani Length: 32,5 km Funding source EIB V Value: 138,91 Mil. Lei Estimated deadline: 2013

NR 56, Craiova – Galicia Mare Length: 47 km Funding source EIB V NR 56, Galicia Mare – Calafat Value: 280,81 Mil. Lei Length: 37,02 km Estimated deadline: 2013 Funding source EIB V Value: 128,17 Mil.Lei Estimated deadline: 2013 EIB PROJECTS (1/2)

Radauti Prut EIB PROJECTS NR1C, Satu Mare -Baia DARABANI Rehabilitation of National Roads financed29A by EIB Mare si NR 1C, Dej- Baia Mare George EnescuManoleasa E81/E58 Tarna E85 NR 19 Satu Mare – Length: 86,49 km NR 18, 29 (2/2) Mare Baia Mare – Moisei - Iacobeni NR 17,29C GuraDOROHOI Humorului - Suceava LIvada, HALMEUFinancing:Sapinta EIB VI SIRET SAVENI 1C 19 Ralos Ungureni NR 1C Livada - Halmeu Livada SIGHETU Length: 197,53Vicovu km Financing: EIB IV Stanca E Value: 240,94 Mil. Lei Varful 29B Petea 8 MARMATIEI 18 de Sus RADAUTI Cimpului Stefanesti Length: 76,60 km 1 1C Vama OAS Feresti Financing: EIB VI Reception:BOTOSANI 2009 National Roads Dorolf Sucevita Marginea 29D Financing: EIB VI Seini 18 Value: 955,27 Mil. Lei 2 29A 29C SATU MARE Mara VISEU DE SUS Value: 149,97 Mil. Lei UrziceniE671 1C BAIA MARE Moisei 17A 29NR Rutani17, Sadova – Gura Humorului Rehabilitation NR 19, Lim. Jud. Bihor Vatra E E58 19A BAIA SPRIE Ilisesti 5 Ardud Borsa Moldovitei 8 19 CAREI E5 Sacel SUCEAVA Length: 39 km – Satu Mare 8 Vama 1 Nicolae Balcescu 1F 19A Satulung 1C/Cluj – Livada Cirlibaba 7 Value:130,94 Mil. Lei Length: 52,16 km E671 Romuli E85 28B E81 17D GURA HUMORULUI Valea lui Mihai Somcul Mare 1C/Livada – Dej 18 76 CIMPULUNG Financing: NR IV Financing:: EIB VI Supuru de jos E5 FALTICENI HIRLAU TUSNAD 1C 17C Rodna Iacobeni MOLDOVENESC term: 2010 - in operation Value: 167,79 Mil. Lei 17/ Dej – Lim. Jud. Cluj/ BN Chiril Praxia SCULENI Rastoci 19B MARGHITA Sarmasag 17/Lim. Jud.Cosbuc Cluj/BN – BistritaSINGEORZ-BAI 17B 24E583/E58 1H 8 NASAUD 1 VATRA Sacueni SIMLEU 1F E5 Financing: EIB IV 7 DORNEI NR 17 Motoc Ruginoasa Podu IloaieiE58 NR 19, Oradea – Lim. 19 Supiacu JIBOU Brosteni 15C E583 SILVANIEI E 28A Vinatori Surduc 6 de Bacau 1H Gilgau 17D 5 17 Bistrita – Tureac – 2007 28 28

7 PASCANI

1C 17C 8 TIRGU Jud. Bihor Nusfalau 7

Tihau 5 15B Strunga TIRGU FRUMOS 1 Biharia ZALAU E Tureac –BorcaLim. Jud.Cracaoani BN/SVNEAMT - 2009 - in execution E60 1 7 Prundu Birgaului Miclauseni IASI Length: 70,04 km 1H 8 1 Poiana BUCIUM BORS ORADEA E DEJ BISTRITA Lim. Jud. BN/SVLargului – Iacobeni – 2008 28 Financing: EIB VI 1 Romanasi1F NR 1H, Zalau –Rastoci Sinmihaiu Almasului GHERLA Iacobeni – Sadova – 2009Dobreni Sabaoani Value:226,09 Mil. Lei Baile Felix ALESD E60 Length: 53,37 km 15 24 28 Deda BORSEC 15C 24 Les 76 Zimbar E576 15 Financing: EIB IV 15D ROMAN E581 NR 79, Arad – Dragesti Financing: EIB VI PIATRA NEAMT 1 1G 5A 15 BICAZ 15D - in execution Inana Rascruci 15A1 TOPLITA 12C Tarcau Oradea E671 E79 Value: 142,17 Mil. Lei 12 ALBITA 1F1F NEGRESTI Vulturesti Length: 103,6 km HUEDIN 1 Apahida Camarasu Ditrau 24B SALONTA 16 Lacu Rosu 15 15D in 2010 Financing: EIB VI Copaceni 16 REGHIN Pocola CLUJ NAPOCA Dimbu Joseni GHEORGHIENI HUSI Value:316,9 Mil. Lei 79 NR 76, EIBus – Oradea 2F VASLUI BEIUS E60 13B BUHUSI 24B Length: 50,73 km 15 NR 15 / NR 15A, 12 SecuieniDragomiresti VARSAND SOVATA Ghimes-Faget NR 76, Stei – EIBus Tg. Mures -Reghin – Sindominic BACAU Financing: EIB V CIMPIA TURZII TIRGU 12A Crasna 79A CHISINEU-CRIS TURDA Praid Scorteni - to be launched Length: 31 km Buru MURES 13A Saratel MOINESTI2G Sirbi 24A Nadab 79A Value:Arieseni 193,23 Mil. Lei Financing: EIB V INEU VASCAU NUCET Albac E81 E60 Length: 71,14Corund km Sanduleni NR 76, 15 COMANESTI NR 76, Varfurile – Stei Lupsa 75 Iernut15 Singeorgiu 13A E85 in 2011 Value: 115,69 Mil. Lei 76 Balauseri Financing: EIB VI VLAHITA Darmanesti E574 E581 Length: 33,31 km Soimus – Baia de Cris 13 Lupeni MIERCUREA CIUC NR 15 / NR 12, 2 NR 24, CrasnaFalciu –Iasi E671 Miraslau 13 Value: 460,20 Mil Lei TIRGU Zorleni CIMPENILength: 40 km 1 TIRNAVENI Reghin- ToplitaOCNA – Chichis BIRLADLength: 77,45 km Turnu Financing: EIB79A V Virfurile ABRUD AIUD ODORHEIU Sinmartin ONESTI 24A E68 14A (forSIGHISOARA entire E LotSECUIESC – EIB VI) SLANIC 12B Podu Turcu Murgeni NADLAC Value: 249,23 Mil. LeiGurahont Financing: EIB V Cozmeni Length: 242,95 km 11A Financing: EIB VI 74 Bucium Blajel MOLDOVA 26 7 E79 Oituz 11A BRADValue: 86,25 Mil. Lei Teius 14 DUMBRAVENI BAILE TUSNAD Financing: EIB VI Value: 314,93 Mil. Lei Cenad Paulis Buces 14B 0 11B ALBA IULIA 6 11 ADJUD ARAD E68 1 BLAJ MEDIAS E Value: 881,95 Mil. Lei SINNICOLAU 6 7 Capruta Criscior 14B COPSA MICA E581 6 69 LIPOVA 74 Bretcu MARE Vinga ZLATNA RUPEA TIRGU E85 Lovrin NR 76, Baia de Cris – Axente Sever SECUIESC 13 NR 14, SibiuLepsa –Sighisoara Gara Berheci Oancea 69Ortisoara Savirsin 76 Hoghiz 12 2D 59C Varfurile 7 ILIA 14 Vidra 24 77 13 SFINTU Length: 79,77 MARASESTI Bypass TECUCI Biled Length: 29,35 km Soimus GHEORGHE E574 E671 Faget SEBES E81 Financing: EIB VI TECUCI JIMBOLIA E68 FAGARASSercaia Carpinis Financing: EIB V E673 SIMERIA Voila Reci 2D Cosava DEVA 57C 1 11 Value: 460,20 Mil Lei Foltesti 59A E70 68A 68B ORASTIE SIBIU 8 Chichis Value: 105,72 Mil. Lei E6 E68 TIMISOARA NR 66, BaruSugag – Hateg 1 Sinca CODLEA Prejmer INTORSATURA(for entire E Lot– EIBFOCSANI VI) 26 HUNEDOARA 1/7 Cirtisoara Veche Hanu Conachi NR 66, Hateg – Simeria CALAN Avrig 10 BUZAULUI LUGOJ Length: 25,92 km Talmaciu 73A BRASOV 25 66 Tulucesti 59B 59 Length: 30,06 km Value: 49,89 Mil Lei VESTEM SACELE NR 1, Brasov - Sercaia E81 Bilea Lac RISNOV 2 58A 6 HATEG NR 1, 1 Length: 46,2 km GALATI 2B Value: 50,16 Mil Lei OTELU ROSU Cirnesti Financing: EIB IV 73A Siriu 2 Independenta Voiteg E79 Sercaia – Limita jud. BrasovBran Cheia Financing: EIB IV 68 Pui term: 2010 73 PREDEAL Value: 29,93 mil. Eur 2B DETA Sarmisegetuza Nehoiu Sendreni 58B Berzovia 66 Length: 41,13 km 1A RIMNICU SARAT Garvan term: 2010 CARANSEBES Rucar Financing: EIB V 2B 59 58 Voineasa E60 Maneciu- 22 Balta Alba BRAILA Saceni PETROSANI 7A Obirsia Lotrului 7 Value: 26,07E574 mil. Eur SINAIA Smirdan 22 NR 66, Petrosani – Baru 7 Poienari Ungureni Movila Lacu MACIN ISACCEA E70 BOCSA E URICANI 66A CIMPULUNG Sarat 7 7A Financing: EIB V 71 Ciuta 10 Miresii MORAVITA Length: 23 kmRESITA 0 Malaia COMARNIC Cimpu BREZOI 7C Cislau Traian E87 Value: 52, 89 Mil Lei lui Neag E79 67A Domnesti73C Moroeni VALENII TULCEA Carasova RIMNICU Schitu Vernesti BUZAU Ianca 22D Cataloi NOVACI NR 1, Lim. jud.SibiuGolesti - Vestem DE MUNTE FAUREI 2B 21 Cerna Financing:57 EIB IV 66 Polovraci VILCEA CURTEA FIENI CIMPINA Nalbant E70 Gradinari 58 NR 66, HOREZU 64 73C DE ARGES 72A 2B Cilibia Horia Bumbesti- Length: 35,16 km 22 term: 2010 Runcu Jiu 67 Budau Costesti 22A Rovinari6 – Bumbesti Jiu E574 1B 2 22D 57B ANINA BengestiMaldaresti BAILE OCNELE Value: 24,74 mil. Eur 2C E577 1 PLOIESTI MIZIL E87 Length: 44,6 km 67 Cimpu Mare GOVORA MARI 7CFinancing: EIB V Ciucurova ORAVITA 57B NR 66, E81 73 TIRGOVISTE Albesti Pogoanele Insuratei Value:128,4667D Mil. 67DLei Scoarta Babeni 7 72 Topolog 22D BABADAG BAIA DE ARAMA 67 TIRGU JIU TIRGU CARBUNESTI Dragomiresti Bozovici Iablanita Pieptani Bumbesti Jiu – Petrosani I.L.Caragiale Rohman Naidas Financing: EIB V ROVINARI PITESTI 67B 65C 1D GIURGENI 22A Caugagia Socol57 BAILE HERCULANE Length: 32,5 km64 72 71 1A Pesteana-Jiu Gradistea Dobroteasa 7 E85 Grivita 21A HIRSOVA 57A Topleta 67B 71 E60 Pojejana MOTRU 9 Financing: EIB V Vedea Cerbu Scraiu Mihai Floresti E7 Hurezani Cringasi URZICENI Viteazu MOLDOVA NOUA Brosteni 67B Giulesti COSTESTI E70 GAESTI 2C TANDAREI ORSOVA 67 6 Value: 138,91 Mil. Lei E60 E7 6 65A 1 E60 2A 3B E60 0 67A TITU Amara DROBETA DRAGASANI E574 1 Malu2A Facaeni E87 Berzeasca Redea BUFTEA 2 TURNU SEVERIN OTOPENI SLOBOZIA 2A E771 Tintareni Bildana77 E852 Simian 6 Balcesti 21 22 57 NRSTREHAIA 66, 65 Pasarea 3 Lehliu 65 Ungheni Dragalina A1 Branesti Fundulea 3A FETESTI Filiasi - Rovinari Crevedia Mare Lehliu 3A A2 Mihail 56B FILIASI 65C SLATINA Gara Drajna Kogalniceanu Capul Midia Length: 48,9 km E70 Ganeasa BUCURESTI Stefan Voda CERNAVODA 22B VINJU MARE Vlad Tepes 21 22C NAVODARI Value: Mil. Lei E79 BALS Brincoveni Clejani 3 Cuza21 Adunatii-4 Voda Ovidiu CONSTANTA Financing: EIB V 65A 61 6 Copaceni Budesti 3B Basarabi NR 56A, Bucura - Simian CRAIOVA Minastirea 22C 31 3B Agigea 56A 64 Ghimpati 5Calugareni CALARASI Corvin Pietreni Length: 34,14 km 3 EFORIE NORD CARACAL Daneasa Greaca OLTENITA Value: 25 Mil. Eur NRLeu 56, Craiova – Galicia Mare ROSIORII Draganesti Vlasca6 5B E70 Ostrov Baneasa Cobadin 39 6 E70 DE VEDE E675 EFORIE SUD Financing: EIB V 56 Rodovan Length:Stoenesti 47 km 41 COSTINESTI Cetate E79 6 5 Amzacea 39 Financing: EIB V 6 Daia NEPTUN 38 E87 JUPITER 55 ALEXANDRIA E85 Maglavit Value: 280,8154 Mil. Lei Negru voda VENUS 65A GIURGIU 38 SATURN NR 56A, Maglavit –BucuraE79 52 Smirdioasa MANGALIA CALAFAT Rast NR 56, Galicia Mare – Calafat Length: 45 km 55A CORABIA Length: 37,02Dabuleni km TURNU MAGURELE 51 5C Vama Veche Value: 32,5 Mil. Eur 54A Financing: BechetEIB V 54 51A E70 E87 Financing: EIB V Value: 128,17 Mil.Lei ZIMNICEA E85 07.03.2011 14

[ railroads]

1. CFR – Corridor IV 1889 M EUR 166,3 km 2. CFR – Stations 227 M EUR 21 stații 07.03.2011 15 CORRIDOR IV (1/4) 07.03.2011 16 CORIDOR 4 (2/4) 07.03.2011 17 CORRIDOR IV (3/4) 07.03.2011 18 CORRIDOR IV (4/4) 07.03.2011 19 STATIONS(1/3)

16 railway stations 176 MEUR 07.03.2011 20 STATIONS(2/3)

5 railway stations 51,7 MEUR 07.03.2011 21 STATIONS(3/3)

21 railway stations 227 MEUR 07.03.2011 22

[ naval ]

Projects value of 200 M EUR 07.03.2011 23

3. Naval transport infrastructure (1/3)

1. Finalization of the breakwater in the Port of Constantza

• Value: 144 M EUR

• Funding source: 69% EFRD / 31% state budget

• Estimated deadline: 2013

The execution of the last section of 1050 m, which is not finalized, will have as result: - the decrease of the waves propagation in the port to an acceptable level for safe operation of the ships, - the diminution of destructive effects of the waves over the emplacements inside the port - easy access of the ships to the port 07.03.2011 24

3. Naval transport infrastructure (2/3)

2. RoRIS (Romanian River Information System)

• Value: 15.8 M EUR

• Funding source: 75% FEDR / 25% state budget

• Estimated deadline: 2012

This system is the most complex project approached in in the field of Intelligent Naval Transport Systems. RoRIS transmits notices to skippers, transmits fairway data, offers information on ships voyages to the authorities, river traffic management, dangerous goods transport management and contributes to the avoidance of accidents. 07.03.2011 25

3. Naval transport infrastructure (3/3)

3. Road bridge at km 0+540 of the Danube – Black Sea Canal and adjoining works of road infrastructure and access to the Port of Constantza • Value: 35.6 M EUR

• Funding source: 69.3% FEDR / 30,7% state budget

• Estimated deadline: 2012

The works include the execution of a bridge over the Danube – Black Sea Canal, the execution of roads, platforms and adjoining level crossings to the bridge. This project is meant with the view to connect the Port of Constantza to the Bucharest – Constantza motorway and to make a direct link between the Northern and the Southern part of the Port of Constantza. 07.03.2011 26

[ aviation ]

Projects value of 150 M EUR 07.03.2011 27

4. Aviation infrastructure (1/2)

MTI has elaborated a transparent scheme of state aid, called ”Financing support for modernization and development of air transport infrastructure within the Sectoral Operational Program - Transport”

• beneficiaries of this scheme are all the airport administrations of the airports of D category of Romania, respectively the airports with an annual traffic under 1 million passengers • For the moment, there are 15 airports in compliance with this category • These airports cover the entire surface of Romania, excepting the area of Bucharest Municipality (where are under operation two airports with a traffic of more than 1 million of passengers/year). 07.03.2011 28

4. Aviation infrastructure (2/2)

The maximum estimated value of the eligible expenses funding which will be granted within the scheme of state aid, for the period, is of 150,5 M EUR

• Funding source: FEDR - 41 M EUR/national public funds – 109 M EUR. • The value of the project is between a minimum of 2 M EUR and a maximum of 40 M EUR; • At present, there is in the MTI a portfolio of projects concerning the outfit for airport infrastructure investment. The total value of these projects is of about 424 M EUR. 07.03.2011 29

[ intermodal ]

Projects value of 33 M EUR 07.03.2011 30

5. Intermodal (1/2)

The general target for the year 2020:

The intermodal transport should hold a rate of at least 40% of the volume of goods carried in intermodal transport units (ITU) in the territory of Romania. 07.03.2011 31

5. Intermodal (2/2)

Estimated budget 1 Development of the intermodal terminals 2011-2013 33 M EUR

Planning and preparation of masterplans for the Estimated budget modernization/development/construction of intermodal terminals foreseen for the period 2014-2020 2 4,7 M EUR TOTAL 37,7 M EUR 07.03.2011 32

[ metro ]

Projects value of 1840 M EUR METRO LINES (1/5)

METRO LINES IN OPERATION Total length - 69.9 km. double railway track Stations – 49 Passangers - about 630,000 / working day Line 1: Pantelimon - Republica – Nicolae Grigorescu – Eroilor – Gara de Nord – Total length – 31.1 km. double railway track (out of which 8.5 km. sharing with Line 3) Stations – 22 (out of which 7 sharing with Line 3) Line 2: Berceni – Pipera Total length - 18.7 km. double railway track Stations – 14 Line 3: Anghel Saligny – Nicolae Grigorescu – Eroilor – Preciziei Total length – 22.6 km. double railway track (out of which 8.5 km. sharing with Line 1) Stations –15 (out of which 7 sharing with Line 1) Line 4: Laminorului - Gara Progresu, Section Gara de Nord - 1 Mai Length – 3.7 km. double railway track Stations – 4 METRO LINES (2/5)

METRO LINES UNDER CONSTRUCTION

Line 4: Laminorului -Gara Progresu, Section 1 Mai – Parc Bazilescu Length – 2.6 km. double railway track Stations – 2 Estimated time for commissioning: 2011, 1st Semester METRO LINES (3/5)

PLANNED METRO LINES Line 5: Drumul Taberei – Pantelimon. Section Râul Doamnei - Eroilor Length – 6.2 km. double railway track Stations – 10 Financing - EIB loan and State Budget Estimated time for starting the works – 2011, 1st Quarter Estimated time for commissioning - 2015

Line 5: Drumul Taberei – Pantelimon. Section Hasdeu – Universitate - Pantelimon Length - 11 km. double railway track Stations – 17 Financing – in preparation

Line 6: Metro Line link to “Henri Coanda” – Otopeni International Airport Estimated length – 16 km. double railway track Estimated no. of stations – 19 Financing – JICA loan and State Budget Estimated time for starting the works – 2012 Estimated time for commissioning - 2017

Line 4: Laminorului - Gara Progresu, Section Parc Bazilescu – Lac Străuleşti Estimated length – 2 km. double railway track Estimated no. of stations – 2 Prefeasibility and Feasibility Studies – in preparation METRO LINES (4/5)

PROSPECTIVE METRO LINES

Line 7: Şos.Alexandriei – Rahova – Piaţa Unirii – Moşilor – Obor – Estimated length – 21 km. double railway track Estimated no. of stations – 31 Prefeasibility and Feasibility Studies – in preparation

Line 4: Laminorului - Gara Progresu, Section Gara de Nord - Gara Progresu Estimated length -15 km. double railway track Estimated no. of stations – 20 Prefeasibility and Feasibility Studies – in preparation METRO LINES (5/5)

PLANNED METRO LINES – Cost Estimation M4 – Gara de Nord – Gara Progresu Euro 950 mil. M5 – Drumul Taberei – Pantelimon Euro 1,700 mil. M6 – 1 Mai – Otopeni Euro 850 mil. M7 – Bragadiru – Voluntari Euro 1,900 mil. Southern Metro Half-Ring Euro 1,300 mil. Total Euro 6,700 mil.

EXTENSIONS TO METRO SYSTEM – Cost Estimation Pacii – Linia de Centura West Euro 250 mil. Laminorului – Mogosoaia Euro 290 mil.

METRO LINES Pipera - Tunari Euro 650 mil. Pantelimon - Cernica Euro 250 mil. Ghencea - Domnesti Euro 400 mil.

Total – estimation cost Euro 8,540 mil.

- Metro Lines in operation - Metro Lines under construction - Planned Metro Lines - Prospective Metro Lines 07.03.2011 38

THANK YOU!