Asia Brewery Project – Cabuyao, Laguna, Philippines

Total Page:16

File Type:pdf, Size:1020Kb

Asia Brewery Project – Cabuyao, Laguna, Philippines ASIA BREWERY PROJECT – CABUYAO, LAGUNA, PHILIPPINES CLIENT NAME: AB Nutribev Corp. PROJECT VALUE: USD 38 Million SERVICES PROVIDED: Master Planning , Turnkey Construction Management Serices & Concept Design Services including Architectural, Civil, Process & Packaging Integration for the Asia Brewery is a diversified beverage company of the LT Group Inc. Entire Facility Among its beverage products are beer, bottled water, iced tea drinks, sports drinks and alcohol mixes. In 2011, the company acquired Philippine distribution rights for Vitamilk soy milk from Thailand's Green Spot Company Ltd., with an option to manufacture the product under a joint- venture agreement given certain sales milestones, thus the establishment of AB Nutribev Corp. AB Nutribev Corporation selected Total Developpement and Management Inc. (TDM) to Engineering, Procurement and Construction Management (EpCM) for their brownfield soya-based ready-to-drink manufacturing plant. The manufacturing facility comprises a 30,000 sq.m facility, located in Cabuyao, Laguna, approximately 25kms. South of Manila. The facility is designed for the phased production expansion as follows: Phase 1: Consists of production, filling and warehousing capable of producing 31500 RGB bottles per hour 1 (product throughput 10,000LPH). Phase 2: The facility will be designed to allow for future expansion through the installation of additional processing equipment and 2 x additional filling lines up to 30,000LPH. The project included the preparation and development of detailed engineering design for the whole plant covering the architectural, civil/structural, mechanical, electrical controls and plumbing; together with the design coordination and integration of speciality process equipment. 305, 3/F One Corporate Plaza, 845 Arnaiz Ave. Makati City, Philippines ASIA BREWERY PROJECT – CABUYAO, LAGUNA, PHILIPPINES The project tender management based upon an agreed Work Breakdown Structure was completed in accordance with a fast track execution plan. This methodology was adopted to allow procurement of critical and early works packages in parallel with the engineering design development. CLIENT NAME: AB Nutribev Corp. Project Milestone Schedule Detailed Design: 31-Mar-15 PROJECT VALUE: Phase 1 (Early Work Packages) 07-May-15 USD 38 Million Phase 2 (Main Const’n Package) 19-Oct-15 Process Equipment 29-Feb-15 SERVICES PROVIDED: Utilities Equipment 27-Nov-15 Master Planning, Turnkey 1st Production Trial Complete 31-Jan-16 Construction Management Serices & Concept Design Services including Architectural, Civil, Process & Packaging Integration for the Entire Facility 305, 3/F One Corporate Plaza, 845 Arnaiz Ave. Makati City, Philippines .
Recommended publications
  • Dengue Outbreak Declared in Cavite
    Headline Dengue outbreak declared in Cavite MediaTitle Philippine Daily Inquirer(www.inquirer.net) Date 24 Jul 2019 Section NEWS Order Rank 1 Language English Journalist N/A Frequency Daily Dengue outbreak declared in Cavite SAN PEDRO CITY, Laguna, Philippines — The provincial health office in Cavite is proposing a year-round, government-led “search and destroy” campaign targeting breeding areas of mosquitoes, amid an outbreak of dengue in the province. Cavite, home to more than 3.6 million people, has recorded 4,225 suspected and confirmed dengue cases from Jan. 1, posting the highest number of patients in Calabarzon (Cavite, Laguna, Batangas, Rizal and Quezon) region. Last week, the provincial government, led by Gov. Juanito Victor Remulla, placed the province under a state of calamity to expedite the release of funds for the purchase of blood supply, intravenous fluids, diagnostic kits and other medical supplies for patients. Outbreak Twenty-two people had died in Cavite, the most recent a 32-year-old man from Dasmariñas City, said provincial health officer Nelson Soriano in a telephone interview on Tuesday. According to Soriano, between 15 and 20 people daily are being confined at General Emilio Aguinaldo Memorial Hospital, the provincial hospital in Trece Martires City, leaving some patients with “no choice but to stay on the hallways.” “You know what the problem is? This seems to be happening every year, as if people are not taking it seriously. That’s why we’re proposing to the provincial [board] to issue a resolution to make ‘search and destroy’ year-round and not only when there’s an outbreak,” he said.
    [Show full text]
  • Republic of the Philippines CIVIL WORKS BID-OUT City of Calamba
    FDP Form 10a - Bid Results on Civil Works Republic of the Philippines CIVIL WORKS BID-OUT BIDDING City of Calamba, Provice of Laguna 2nd Quarter, 2019 Approved Reference Winning Name and Bid Bidding Contract No. Name of Project Budget for Location No. Bidder Address Amount Date Duration Contract MC Dela Cruz Mr. Marcos C. Dela Cruz/6176 Construction of Multi-Purpose 1 I-2019-016 14,999,990.97 Barangay VII Enterprises & Gen. Bubukal, Sta. Cruz Laguna 14,995,535.31 06/20/2019 270cd Health Center (Ph. 4) Contractor Construction of Multi-Purpose BCA Construction Mr. Alberto D. Arenas/Lot 2 I-2019-014 79,996,111.20 Barangay Real 79,955,281.14 05/29/2019 300cd Building (Phase 2) Supply 8117-B Barangay Bigaa, City of Calamba Mr. Richard T. Perez/ #102 Construction of Multi-Purpose Riper Empire Trading 3 I-2019-013 3,147,784.55 Barangay II San Jose, Calamba City 3,143,757.09 05/06/2019 90cd Building & Construction Mr. Gerry D. Barangay 4 I-2019-012 Construction of Day Care Center 2,365,166.21 Gab-Zion Enterprises Salvador/Barangay Ibaba Sta. 2,359,400.93 04/22/2019 64cd Milagrosa Rosa City Mr. Gerry D. Barangay 5 I-2019-011 Construction of Day Care Center 2,325,936.61 Gab-Zion Enterprises Salvador/Barangay Ibaba Sta. 2,320,833.11 04/22/2019 64cd Bubuyan Rosa City Mr. Gerry D. 6 I-2019-009 Construction of Day Care Center 2,325,936.61 Barangay Masili Gab-Zion Enterprises Salvador/Barangay Ibaba Sta.
    [Show full text]
  • Tanduay Distillers, Inc
    G AINING MOMENTUM 11th Floor Unit 3 Bench Tower, 30th Street corner Rizal Drive Cresent Park West 5, Bonifacio Global City, Taguig City, Philippines ltg.com.ph G AINING MOMENTUM ANNUAL REPORT ANNUAL REPORT 2018 2018 Contents 2 Financial Highlights 3 Our Businesses at a Glance The LT Group Logo 4 Our Partnerships Strength and solidarity. This is the essence of the LT Group (LTG) logo. The 6 clean balance lines and curves are central elements -- a mystical Chairman’s Message symmetrical tree. Drawn in an Eastern-Oriental style, it gives hint to the 8 President’s Message Company’s Chinese heritage. 12 CFO’s Message Tree is life. Life is growth. Like a tree, a company with rm roots, properly 14 Asia Brewery, Inc. nurtured, will continuously grow and give value. 16 Eton Properties Philippines, Inc. The tree’s trunk is upright, and the branches spread out -- a symbolic 18 PMFTC Inc. consolidation of the subsidiaries and stakeholders within two circles, one for continuity, the outer one for solidarity. 24 Philippine National Bank 26 Tanduay Distillers, Inc. 28 Corporate Governance Report VISION 36 Corporate Social Responsibility To be a world-class conglomerate at the forefront of Philippine economic e Tan Yan Kee Foundation, Inc. growth, successfully maintaining a strong presence and dominant position in key Philippine industries while ensuring continuous benets to its Asia Brewery, Inc. consumers, communities, employees, business partnerts, and shareholders. Eton Properties Philippines, Inc. MISSION PMFTC Inc. Anchored to its Vision, the LT Group commits: Philippine National Bank To increase stockholder values through long-term growth in its major Tanduay Distillers, Inc.
    [Show full text]
  • Ordinance No. 2100-2017 Magilas Na Pamamahala
    ASSESSOR'S OFFICE CITY OF STA. ROSA Li',S1,0., tai By - 11I1^C 'M DA T Republic of the. Philippines CITY OF SANTA ROSA Province of Laguna OFFICE OF THE SANGGUNIANG PANLUNGSOD EXCERPT FROM THE MINUTES OF THE 49TH REGULAR SESSION OF SANGGUNIANG PANLUNGSOD OF CITY OF SANTA ROSA, LAGUNA HELD ON MONDAY, DECEMBER 11, 2017 AT THE SANGGUNIANG PANLUNGSOD SESSION HALL. Presents: 1. Hon. ARNOLD B. ARCILLAS - City Vice-Mayor, Presiding Officer 2. Hon. ROY M. GONZALES - SP Member 3. Hon. INA CLARIZA B. CARTAGENA - SP Member 4. Hon. SONIA U. ALGABRE - SP Member 5. Hon. RODRIGO B. MALAPITAN - SP Member 6. Hon. MARIEL C. CENDANA - SP Member 7. Hon. JOSE JOEL L. MLA - SP Member 8. Hon. WILFREDO A. CASTRO - SP Member 9. Hon. ANTONIO M. TUZON, Jr. - SP Member 10.Hon. ARTURO M. TIONGCO - SP Member 11.Hon. ERIC T. PUZON - SP Member 12.Hon. OSCAR G. ONG-IKO - SP Member, ABC President *************** ***** ORDINANCE NO. 2100-2017 (Authored by: Hon. INA CLARIZA B. CARTAGENA Sponsored by: The Committee on Ways and Means Seconded by: Hon. ROY M. GONZALES) AN ORDINANCE APPROVING THE REVISED SCHEDULE OF BASE UNIT MARKET VALUES OF REAL PROPERTIES WITHIN THE CITY OF SANTA ROSA, LAGUNA, PURSUANT TO THE PROVISIONS OF THE LOCAL GOVERNMENT CODE (R.A.7160) AND ITS IMPLEMENTING RULES AND REGULATIONS, SUBJECT TO ALL LEGAL LAWS RULES AND REGULATIONS. WHEREAS, Section 201 Republic Act No.7160, otherwise known as the Local Government Code of 1991, provides that "All Real Property, whether taxable or exempt, shall be appraised at current and fair market value prevailing in the locality where the property is situated".
    [Show full text]
  • San Cristobal Sub-Basin
    Table of Contents Volume 18. San Cristobal Sub-basin ................................................................................... 3 Geographic location ................................................................................................................ 3 Political and Administrative Boundary ..................................................................................... 4 Land Cover ............................................................................................................................. 5 Sub-basin Characterization and Properties............................................................................. 7 Drainage Network ............................................................................................................... 7 Sub-sub basin Properties .................................................................................................... 9 Water Quantity ......................................................................................................................10 Stream flows ......................................................................................................................10 Water Balance ...................................................................................................................11 LIST OF FIGURES Figure 18-1 Geographical Map ..................................................................................................................... 3 Figure 18-2 Political boundary map .............................................................................................................
    [Show full text]
  • DEPARTMENT of ENERGY LIST of REGISTERED COAL END-USERS As of 31 December 2017
    DEPARTMENT OF ENERGY LIST OF REGISTERED COAL END-USERS as of 31 December 2017 Certificate of Registration Name of Company Period of Validity Contact Person and Address No. Melvin U. Tan 27 July 2012 - 1 MEGA POLYGUMS CORPORATION CE-2012-07-0001 5th Flr., 926 Araneta Ave., Quezon City 26 July 2022 Tel Nos. 712-2631,712-1989 [email protected] Eduardo Santos SOLID DEVELOPMENT 27 July 2012 - 2 CE-2012-07-0002 Mataas na Parang, San Ildefonso, Bulacan CORPORATION 26 July 2022 Tel No. (044) 901-1393 Kian Go Tan 27 July 2012 - 3 DOWI HOSIERY Y MILLS CE-2012-07-0003 92 Rubbermaster Rd. Lingunan, Valenzuela City 26 July 2022 Tel Nos. 294-1228,278-7102 [email protected] Marianne Y. Tan PERMEX PRODUCER & EXPORTER 01 August 2012 - President 4 CE-2012-08-0004 CORPORATION 31 July 2022 4F Vermont Towers J. Nakpil St., Malate Manila Tel No. 524-5801 [email protected] Virginia Lumanog SVP-Finance MACRO INDUSTRIAL PACKAGING 09 August 2012 - Airstrip Road, Canlubang Industrial Estate, Canlubang, 5 CE-2012-07-0005 PRODUCTS CORPORATION 08 August 2022 Calamba City Laguna Tel No. 049-549-2886/87 fax 844-7796 [email protected],vl2mpc.com.ph Wu An Kang GOODFOUND CEMENT 09 August 2012 - 6 CE-2012-07-0006 Purok 3, Barangay Palanog, Camalig, Albay Tel Nos. 052-484- CORPORATION 08 August 2022 1322,052-484-135 Alvin Ryan Tan SLORD DEVELOPMENT 01 August 2012 - Plant Manager 7 CE-2012-08-0007 CORPORATION 31 July 2022 PFDA Navotas Fishport Complex, Navotas City Tel No. 281- 9453 Jennifer M.
    [Show full text]
  • Tanduay Distillers, Inc. and Subsidiaries Index to Financial Statements and Supplementary Schedules Sec Form 17-A
    COVER SHEET 1 5 1 0 9 6 SEC Registration Number T A N D U A Y D I S T I L L E R S , I N C . ( A W h o l l y O w n e d S u b s i d i a r y o f L T G r o u p , I n c . ) A N D S U B S I D I A R I E S (Company‘s Full Name) 3 4 8 J . N e p o m u c e n o S t . , S a n M i g u e l D i s t r i c t , M a n i l a (Business Address: No. Street City/Town/Province) NESTOR MENDONES 519-7981 (Contact Person) (Company Telephone Number) 1 2 3 1 17-A 0 5 0 4 Month Day (Form Type) Month Day (Calendar Year) (Annual Meeting) (Secondary License Type, If Applicable) SEC Dept. Requiring this Doc. Amended /Section Total Amount of Borrowings 8 Total No. of Stockholders Domestic Foreign To be accomplished by SEC Personnel concerned File Number LCU Document ID Cashier S T A M P S Remarks: Please use BLACK ink for scanning purposes. 1 SECURITIES AND EXCHANGE COMMISSION SEC FORM 17-A ANNUAL REPORT PURSUANT TO SECTION 17 OF THE SECURITIES REGULATION CODE AND SECTION 141 OF CORPORATION CODE OF THE PHILIPPINES 1. For the calendar year ended December 31, 2013 2. SEC Identification Number 151096 3. BIR Tax Identification No. 000-086-108-000 4.
    [Show full text]
  • Lions Clubs International
    GN1067D Lions Clubs International Clubs Missing a Current Year Club Officer (Only President, Secretary or Treasurer) as of June 30, 2009 District 301A2 District Club Club Name Title (Missing) District 301A2 23474 BATANGAS President District 301A2 23474 BATANGAS Secretary District 301A2 23474 BATANGAS Treasurer District 301A2 23475 BINAN President District 301A2 23475 BINAN Secretary District 301A2 23475 BINAN Treasurer District 301A2 23477 BULAN President District 301A2 23477 BULAN Secretary District 301A2 23477 BULAN Treasurer District 301A2 23478 CABUYAO President District 301A2 23478 CABUYAO Secretary District 301A2 23478 CABUYAO Treasurer District 301A2 23479 CALAMBA HOST President District 301A2 23479 CALAMBA HOST Secretary District 301A2 23479 CALAMBA HOST Treasurer District 301A2 23480 CAMARINES SUR President District 301A2 23480 CAMARINES SUR Secretary District 301A2 23480 CAMARINES SUR Treasurer District 301A2 23481 CAVITE CITY President District 301A2 23481 CAVITE CITY Secretary District 301A2 23481 CAVITE CITY Treasurer District 301A2 23482 DAET President District 301A2 23482 DAET Secretary District 301A2 23482 DAET Treasurer District 301A2 23484 IMUS President District 301A2 23484 IMUS Secretary District 301A2 23484 IMUS Treasurer District 301A2 23485 LAS PINAS HOST President District 301A2 23485 LAS PINAS HOST Secretary District 301A2 23485 LAS PINAS HOST Treasurer District 301A2 23488 LEGASPI CITY President District 301A2 23488 LEGASPI CITY Secretary District 301A2 23488 LEGASPI CITY Treasurer District 301A2 23492 MAKATI
    [Show full text]
  • EVALUATION of the RESILIENCY of the SILANG-SANTA ROSA SUBWATERSHED Laguna, Philippines
    Low Carbon Asia Research Network (LoCARNet) 4th Annual Meeting International Conference of Low Carbon Asia Positive Action from Asia – Towards COP21 and Beyond 11-13 October 2015 DoubleTree Hotel, Johor Bahru, Malaysia EVALUATION OF THE RESILIENCY of the SILANG-SANTA ROSA SUBWATERSHED Laguna, Philippines Damasa B. Magcale-Macandog1*, Isao Endo2, Satoshi Kojima2, Brian A. Johnson2, Milben A. Bragais1, Paula Beatrice M. Macandog1, Akio Onishi2,Henry Scheyvens2 and Linda C. Creencia3 1Institute of Biological Sciences, University of the Philippines Los Baños, College, Laguna 4031, Philippines 2Institute for Global Environmental Strategies, 2108-11 Kamiyamaguchi, Hayama, Kanagawa, 240-0115, Japan 3ENRO, Sta. Rosa City, Laguna, Philippines *Corresponding author’s email: [email protected] Study area: Silang-Santa Rosa Subwatershed Silang-Santa Rosa Subwatershed, Philippines Administrative Boundary Metro Manila Biñan, Laguna Santa Rosa City, Laguna Laguna Lake Cabuyao, Laguna Silang, Cavite Silang-Santa Rosa Sub-watershed traverses through the Municipality of Silang, Province of Cavite in the upstream and three cities of Laguna which is Biñan, Santa Rosa, and Cabuyao in the downstream area. Administrative Profile Municipality of Silang, Cavite: • it is a landlocked- first class municipality with 64 barangays and mainly depends on agricultural economy • it serves as a vital recharge area for the Watersheds of Laguna which drain to the Laguna Lake and adjacent towns of Cavite that drains into Manila Bay (WWF Hydrogeology study) City of Biñan,
    [Show full text]
  • Overlay of Economic Growth, Demographic Trends, and Physical Characteristics
    Chapter 3 Overlay of Economic Growth, Demographic Trends, and Physical Characteristics Political Subdivisions CALABARZON is composed of 5 provinces, namely: Batangas, Cavite, Laguna, Quezon and Rizal; 25 congressional districts; 19 cities; 123 municipalities; and 4,011 barangays. The increasing number of cities reflects the rapid urbanization taking place in many parts of the region. The politico- administrative subdivision of CALABARZON per province is presented in Table 3.1. Table 3.1 CALABARZON Politico-Administrative Subdivision, 2015 CONGRESSIONAL PROVINCE CITIES MUNICIPALITIES BARANGAYS DISTRICTS 2010 2015 2010 2015 2010 2015 2010 2015 Batangas 4 6 3 3 31 31 1,078 1,078 Cavite 7 7 4 7 19 16 829 829 Laguna 4 4 4 6 26 24 674 674 Quezon 4 4 2 2 39 39 1,242 1,242 Rizal 4 4 1 1 13 13 188 188 Total 23 25 14 19 128 123 4,011 4,011 Source: DILG IV-A Population and urbanization trends, transportation and settlements The population of CALABARZON in 2015 reached 14.4 million, which is higher than the NCR population by 1.53 million. With an annual growth rate of 2.58 percent between 2010 and 2015, the and NCR. The R , indicating its room for expansion. Urban-rural growth development shows that the Region has increasing urban population compared to rural population. From 1970 to 2010, the region posted increasing urban population with the Province of Rizal having the highest number of urban population among the provinces (Table 3.2). Table 3.2. Percentage Distribution of Urban-Rural Population, CALABARZON, 1970 to 2010 PROVINCE 1970 1980 1990
    [Show full text]
  • Pup Binan Laguna Courses Offered
    Pup Binan Laguna Courses Offered bivvies!Lifted Winton Absolutist arbitrating Peter verysometimes transcendentally retranslating while any Urson spanks remains colligating miasmic naively. and snafu. Commonable or pruned, Alan never kayaks any Southern technological institute of graduates of mabalacat, and provides high that can remember that studying in pup binan offered at the salaries at the admission process at what is used for feedback about this entrance test per Sudlong ng Bian is a PUP campus located in term city of Bian Laguna Philippines offering eleven 1 course one 3 diploma program and undergraduate. List of Academic Programs and Courses offered at Polytechnic. The course that we appreciate your education towards their official representatives from them attend for bloggers in part or. The closest stations to PUP Bian Campus are Bian Pnr is 2719 meters away 35 min walk South Luzon Expressway Bian City Manila is. Polytechnic University of the Philippines Binan PUP Binan is interim public external. Step out of life, philippines offer a must pass near pup binan same interest to another to engineering are. Pin on pure science graduate school id or you can offer a lot about application for honing my primary role is! Zapote 005 Miles Away Binan City hall 496 006 Miles Away Pup Bian. Ama computer building. Rosa and is led of having four 4 PUP campuses in the province of Laguna. So as the be ugly to offer comparable legal education within the reach all those desirous of becoming lawyers but are constrained. Mount carmel college? The course that can offer me with majors in binan is currently not work.
    [Show full text]
  • 11844016 03.Pdf
    Appendix 7.1 Hydrology A.1 Objectives and Work Flow Taking account of the goals of the recommended project, the objectives of the hydrological and hydraulic studies are set as follows: (i) To clarify the current conditions of river channel and riparian areas, where are subject to proposed road network (ii) To estimate the flood discharges of the rivers in various return periods through statistical approach at crossings along proposed road alignment (iii) To recommend betterment of drainage system along the proposed alignment, where deterioration of present drainage conditions due to implementation of the project is predicted, if any In order to accomplish the objectives above mentioned, the work flow of sectoral studies has been set up as follows: Collection of Data/ Information Hydrological and Setting of design parameters Verification of River Survey Hydraulic Analyses at crossing structures current river ・ Rainfall Analysis ・ Design High Water Level conditions Questionnaire Survey ・ Runoff Analysis ・ Design Flow Velocity, etc. Field Reconnaissance Figure A.1.1 General Work Flow of Hydrological Analysis A.2 Available Data, Maps and Documents (1) Topographic Maps Topographic maps of the Study Area were obtained from NAMRIA Map Sales Office in Fort Bonifacio, Manila. These maps of scale 1:50,000 and 1:10,000 were utilized to confirm the watershed boundaries of river basins and road crossings, which are concerned to the road/bridge design of three routes, i.e. CALA Expressway, North-South Road and Daang Hari Extension. The maps collected for the Study is schematically shown with index numbers in Figure A.2.1. On the other hand, the cross sections with 50 m intervals and plan along the proposed road alignment with 100 m wide became available exclusively for the present study together with the aerial photographs.
    [Show full text]