EU 'Can Build 450GW Offshore by 2050'

Total Page:16

File Type:pdf, Size:1020Kb

EU 'Can Build 450GW Offshore by 2050' PRODUCED BY RECHARGE OFFICIAL SHOW DAILY FULL PROJECT LIFE CYCLE DAY DESIGN & EXECUTION SIMULATION SOLUTIONS ONE VISIT OUR STAND C2-A2 EU ‘can build 450GW offshore by 2050’ Ørsted plans ‘world first’ 5GW DARIUS SNIECKUS A fishing vessel sails past an offshore wind ffshore wind power could offshore wind farm carry Europe to carbon- energy island Oneutrality by mid-century, expanding to an installed base of ANDREW LEE 450GW and meeting 30% of the continent’s power demand — but Ørsted has unveiled plans for a to do so at lowest cost needs a 5GW offshore wind hub connecting “visionary” rethink of marine spatial Denmark, Poland, Sweden and planning, says a landmark report Germany, supporting large-scale published today by WindEurope. production of green hydrogen and The study, Our Energy, Our Future, creating what it called “the world’s shows that 85% of this capacity — first energy island” on Bornholm in around 380GW — could be built in the Baltic Sea. the North, Irish and Baltic Seas, with The global offshore wind leader the remaining 70GW generated in wants to kick-start the massive Southern European waters. cluster with a 1GW wind farm in “The EU says Europe needs at least the Rønne Banke zone southwest of ten times as much offshore wind 2040s,” stated WindEurope chief we get the maritime spatial planning Bornholm, one of the areas already as we have today to meet the 2050 executive Giles Dickson. right.” earmarked by Denmark for possible CONTINUED on Page 3 Cultura/Getty goal of decarbonising energy. The “The report shows that it is doable Marine usage rights will be “crucial” | IEA [International Energy Agency] and affordable. But three things need to the industry’s rapid development, believes offshore wind could become to happen: one, the offshore wind the report found, as shipping, fisheries VISIT RECHARGE the number-one source of power supply chain keeps growing; two, we and military activity currently rule out at Stand E-D20 Photograph Photograph generation in Europe in the early build the grid connections; and three, CONTINUED on Page 3 VISIT SHELL AT WINDEUROPE OFFSHORE 2019 STAND C2-B12 SHELL OMALA S5 WIND NEXT GENERATION GEARBOXVISIT OIL RECHARGE TECHNOLOGY WITH 10at YEAR Stand WARRANTYXxxxx … NOW CARBON NEUTRAL Join us at: WindEurope Offshore 2019 Booth C2-A30 26–28 November, Copenhagen Digital expertise that keeps your turbines turning, learning, and earning even more As a pioneer with an industry experience of nearly 40 years, we use a diverse set of digital tools supporting the service of your assets. Our cutting edge Model Based Diagnostics operates with 1.5 M individual digital models out of data from around 6 M sensors from turbines worldwide. With this ever-learning knowledge base our algorithms can filter out the costly false-positives and insignificant deviations. This reduces the site visits and thus generates a higher yield and a remarkable LCoE, with an average turbine availability of 97 % +. www.siemensgamesa.com SGRE digitally upscales turbine to 11MW ‘Rethink exclusion zones’ DARIUS SNIECKUS Morten Pilgaard Rasmussen to hit 450GW iemens Gamesa Renewable Energy (SGRE) has offshore by 2050 Sunveiled a digitally souped-up version of its recently CONTINUED from Page 1 launched 10MW SG10.0-193DD 60% of Europe’s northern seas to turbine, a 11MW model that uses offshore wind. the OEM’s ‘DD Flex’ technology Without these “exclusion suite to squeeze another 6-7% zones”, the region’s full potential annual energy production (AEP) of wind resource offshore could out of the ultra-large nameplate be developed at a much lower machine. overall levelised cost of energy The higher-rated unit, SG11.0- (LCOE), says the report, which was 193DD Flex, upscaled using ‘digital commissioned by WindEurope and twin’ modelling of forerunning written by UK-based renewables SGRE concepts, will employ consultant BVG Associates. intelligent control systems to tailor Opening these zones to offshore everything from rotor-yaw and before we engineered the 10MW.” out there [at sea], not just what is wind could lead to 248GW being blade-pitch to “using the whole The 11MW, like the 10MW, will written in an IEC [International built in the North Sea for less than turbine structure more efficiently” fly new-look carbon-reinforced Electrotechnical Commission] €50/MWh by 2050, with a further to run the turbine “closer to its 94-metre B94 blades powering a standard somewhere,” said 130MW at €50-65/MWh and 2GW limits”, SGRE chief technology direct-drive transmission system Rasmussen. “That gives a much for €65-80. However, if the zones officer Morten Pilgaard Rasmussen with beefed-up permanent magnet better understanding of how well remain in place, these figures fall to told Recharge. generator. The 10MW prototype we are utilising the technology by 112GW below €50/MWh; 264GW “This is a case of getting an extra is about to be erected in Osterild, better predicting loads today and at €50-65; and 4GW at €65-80. 10% [bigger nameplate] for minor Denmark, to begin a programme into the future, over a machine’s “With the current exclusion improvements that we could see of final tests before starting serial lifetime, in a safe way.” zones, almost three quarters of in our scoping out of this product, production. Rasmussen noted that the the future capacity cannot be built using readily available technologies “Using digital twins allows us to bringing the 11MW to market at a ‘very low’ LCOE,” said BVG for new model ‘in the making’. collect a huge amount of data form “doesn’t change our ambitions to Associates managing consultant “Some of the digital technologies our existing offshore fleet and feed move toward substantially higher Kate Freeman. “This report should that have made ‘Flex’ possible back design improvements that are ratings out int the mid-2020s”. be a wake-up call for policymakers have been in the works since a response to the actual conditions 10MW TURBINE: Page 6 and marine planners: the cheapest and most space-efficient way to build the 450GW is through the multiple use of the same maritime Energy island will connect Denmark and Poland space by different sectors.” Dickson added: “On maritime CONTINUED from Page 1 spatial planning, we need a future development. long-term approach with climate On Monday, Ørsted urged the priorities at its heart. And more Danish government to hold a multiple use, for example, allowing tender for developing Rønne Banke fishing in offshore wind farms.” as the next stage of its offshore The rate of build-out of offshore wind expansion programme, after wind needed to reach the 2050 the awarding of the Thor project, target would, in any scenario, tendering for which is currently require a “wartime campaign”, under way. Freeman said. Accelerating from Ørsted said such a tender, the annual 3GW being installed in conjunction with new now to over 20GW per year from interconnectors between Denmark for the Bornholm vision, but said needed to electrify transport and 2030 would need an ever-larger and Poland — as previously it could help Denmark meet 2030 heating in Denmark and the other supply chain and a capital spending proposed by Danish grid operator emissions goals. nations it serves, said Ørsted, rise from €6bn in 2020 to €45bn Energinet — would shift the Martin Neubert, chief executive citing EU estimates that 450GW of per year by 2030. agenda for offshore wind to one of Ørsted Offshore, said: “Offshore capacity will be needed. There will also need to be heavy based around clusters serving wind clusters with transmission Integrating the cluster with investment in grids to support multiple countries. to several countries are a necessity green hydrogen production would Europe’s offshore wind expansion The initial 1GW could later if we’re to realise offshore wind’s bring a further dimension by — by BVG Associates’ calculations SGRE | be expanded to 3-5GW, with enormous potential in making supplying clean fuel to help green climbing from €2bn next year to interconnection extended to Europe green.” hard-to-decarbonise sectors such €8bn annually by 2030, requiring Sweden and Germany, said Ørsted, The Bornholm cluster would help as heavy transport and aviation, it EU-wide co-operation and the Photograph Photograph which offered no specific timeline produce the vast levels of power added. development of meshed grids. rechargenews.com 3 RECHARGE | OFFICIAL EVENT DAILY WindFloat Atlantic MHI Vestas is towed out for its flagship deployment off set for Japan’s Portugal first large-scale offshore project ANDREW LEE MHI Vestas has confirmed it will supply its top-of-the-range V174-9.5MW turbines for the 220MW Hibikinada project being developed off Kitakyushu city, southwest Japan, by a consortium led by J-Power and regional utility Kyuden Mirai. Hibikinada is due for construction and operation as early as 2022, and is the first project to advance under Japanese Floating wind joins 10MW turbine reforms of regulations governing offshore wind operation off the country’s ports. era with MHI Vestas’ French win Kitakyushu municipal authorities in 2017 selected a consortium ANDREW LEE project, which is planned for also due to be commissioned at including utilities J-Power and deployment in 2022. the EDPR-led WindFloat Atlantic Kyuden Mirai to develop the near- loating wind joined the The Gulf of Lion project, also project off Portugal later this year. shore project. J-Power has said 10MW-turbine era in known as Leucate and led by WindEurope says 350MW of that Hibikinada will be “the first Fanother milestone for the European power giants Engie and floating capacity will be switched commercial scale offshore wind fast-emerging sector, as MHI EDPR, is one of four sanctioned on in Europe by 2021, led by a power project in Japan”.
Recommended publications
  • August Forecast Tnuos Tariffs
    Five-Year View of TNUoS Tariffs for 2021/22 to 2025/26 National Grid Electricity System Operator August 2020 Five-Year View of TNUoS Tariffs for 2021/22 to 2025/26 | Error! No text of specified style in document. 0 Contents Executive Summary ............................................................................................... 4 Forecast Approach ................................................................................................. 7 Generation tariffs ................................................................................................. 11 1. Generation tariffs summary ....................................................................................................... 12 2. Generation wider tariffs.............................................................................................................. 12 3. Changes to wider tariffs over the five-year period ..................................................................... 16 Onshore local tariffs for generation ...................................................................... 19 4. Onshore local substation tariffs ................................................................................................. 19 5. Onshore local circuit tariffs ........................................................................................................ 20 Offshore local tariffs for generation ...................................................................... 23 6. Offshore local generation tariffs ................................................................................................
    [Show full text]
  • 14 4 Mouchel Viking Peat Volumes and Reuse
    Viking Energy Partnership Viking Wind Farm Technical Appendix 14.4 Estimated Peat Extraction Volume and Potential Reuse Options March 2009 Viking Energy Partnership Mouchel Ltd The Gutters Hut Unit 11, Scion House North Ness Business Park Stirling University Innovation Park Lerwick Stirling Shetland FK9 4NF ZE1 0LZ Tel. 01786 449 131 Fax. 01786 449 852 Viking Energy Partnership Viking Estimated Peat Extraction Volume & Potential Reuse Options Signature FINAL ISSUE Name Date Prepared by Malcolm Macfie 04/03/2009 Checked by Stuart Bone 10/03/2009 Approved by Malcolm Macfie 12/03/2009 CONTENTS 1 INTRODUCTION................................................................................................................. 1 2 STAKEHOLDER INVOLVEMENT ..................................................................................... 2 3 ESTIMATION OF EXCAVATED PEAT VOLUMES .......................................................... 2 3.1 Access Tracks ............................................................................................................. 3 3.2 Turbine Bases ............................................................................................................. 5 3.3 Compounds ................................................................................................................. 6 3.4 Borrow Pits .................................................................................................................. 7 3.5 Substations .................................................................................................................
    [Show full text]
  • 1 Marine Scotland. Draft Sectoral Plan for Offshore Wind
    Marine Scotland. Draft Sectoral Plan for Offshore Wind (Dec 2019) Supplementary Advice to SNH Consultation Response (25 March 2020). SNH Assessment of Potential Seascape, Landscape and Visual Impacts and Provision of Design Guidance This document sets out SNH’s Landscape and Visual Impact appraisal of each of the Draft Plan Option (DPO) areas presented in the above consultation and the opportunities for mitigating these, through windfarm siting and design. Due to its size, we are submitting it separately from our main response to the draft Plan. We had hoped to be able to submit this earlier within the consultation period and apologise that this was delayed slightly. Our advice is in three parts: Part 1. Context and Approach taken to Assessment Part 2. DPO Assessment and Design Guidance Part 3. DPO Assessment and Design Guidance: Supporting Maps Should you wish to discuss any of the matters raised in our response we would be pleased to do so. Please contact George Lees at [email protected] / 01738 44417. PART 1. CONTEXT AND APPROACH TAKEN TO ASSESSMENT Background 1. In late spring 2018 SNH were invited to participate as part of a Project Steering group to input to the next Sectoral Plan for Offshore Wind Energy by Marine Scotland. SNH landscape advisors with Marine Energy team colleagues recognised this as a real opportunity to manage on-going, planned change from offshore wind at the strategic and regional level, to safeguard nationally important protected landscapes and distinctive coastal landscape character. It also reflected our ethos of encouraging well designed sustainable development of the right scale in the right place and as very much part of early engagement.
    [Show full text]
  • Appendix A14.6 SEMP TS3 (Addendum)
    TECHNICAL APPENDIX 14.6 VIKING WIND FARM ADDENDUM ENVIRONMENTAL STATEMENT SITE ENVIRONMENTAL MANAGEMENT PLAN (SEMP) TECHNICAL SCHEDULE No. 3 SITE WASTE MANAGEMENT PLAN (SWMP) Document Ref. TS3 Page i SITE ENVIRONMENTAL MANAGEMENT PLAN VIKING WIND FARM TECHNICAL SCHEDULE 3 SITE WASTE MANAGEMENT PLAN SEMP Version: 1.0 Rev No. Revision Description: Date : 0.0 Addendum ES, Appendix A14.6 Sept 2010 Name : Position : Signature : Prepared by : Jane MacDonald Environmental Manager SSE Renewables / Viking Checked by : Andrew Sloan Energy PM Reviewed by : Oliver Moffat BMT Cordah Comment : Document was also reviewed by all consultants involved in preparation of the Addendum ES. SEPA were also consulted and provided feedback which has been incorporated into this document. TECHNICAL APPENDIX 14.6 VIKING WIND FARM ADDENDUM ENVIRONMENTAL STATEMENT SITE ENVIRONMENTAL MANAGEMENT PLAN (SEMP) TECHNICAL SCHEDULE No. 3 SITE WASTE MANAGEMENT PLAN (SWMP) Document Ref. TS3 Page ii CONTENTS 1 INTRODUCTION................................................................................................. 1 1.1 Scope and Requirements ............................................................................ 1 1.2 Objectives .................................................................................................... 1 1.3 Reference Documentation ........................................................................... 2 2 SWMP MINIMUM REQUIREMENTS .................................................................. 4 2.1 Implementation of a SWMP ........................................................................
    [Show full text]
  • Sse Plc Sustainability Report 2020 Sustainability Report
    SSE PLC SUSTAINABILITY REPORT 2020 SUSTAINABILITY REPORT ABOUT THIS REPORT Contents SSE plc is a UK-listed energy company that operates throughout the UK Chief Executive’s Statement 2 and Ireland. The disclosure of SSE’s most material sustainability impacts is integrated throughout its Annual Report 2020. The Sustainability Report Our business model 4 aims to provide enhanced disclosure of SSE’s key policies, management Our purpose and strategy 4 and performance of its economic, social and environmental impacts. What we do and who we do it for 5 Sustainability approach and governance 6 SSE’s sustainability approach is aligned to the United Nations’ Sustainable Development Goals (SDGs). Identifying material issues 8 Reporting against the SDGs most material to SSE’s Emerging trends 8 business can be found on the following pages of this Working for and with stakeholders 10 report: Group Principal Risks 12 Global frameworks and partnerships 13 Aligning to the UN's SDGs 15 The scope of this report is generally focused on performance data for the financial year ending 31 March 2020. However, the period between Taking meaningful climate action 16 SSE’s year end and the publication of this report was dominated by the Embedding climate action 19 coronavirus emergency and therefore some activities during this period Measuring performance 22 have also been included. Climate-related financial disclosure 24 On occasion the report refers to activities of SSE’s joint ventures and Protecting the natural environment 32 in these instances it is made clear that this is the case. For a full list of Managing environmental impacts 32 SSE’s subsidiary undertakings, partnerships, joint ventures and associates, Using resources efficiently 34 please refer to pages 252 to 259 of SSE’s Annual Report 2020.
    [Show full text]
  • Forecast from 2016-17 to 2019-20
    Tariff Information Paper Forecast TNUoS tariffs from 2016/17 to 2019/20 This information paper provides a forecast of Transmission Network Use of System (TNUoS) tariffs from 2016/17 to 2019/20. These tariffs apply to generators and suppliers. This annual publication is intended to show how tariffs may evolve over the next five years. The forecast tariffs for 2016/17 will be refined throughout the year. 28 January 2015 Version 1.0 1 Contents 1. Executive Summary....................................................................................4 2. Five Year Tariff Forecast Tables ...............................................................5 2.1 Generation Tariffs ................................................................................. 5 2.2 Onshore Local Circuit Tariffs ..............................................................10 2.3 Onshore Local Substation Tariffs .......................................................12 Any Questions? 2.4 Offshore Local Tariffs .........................................................................12 2.5 Demand Tariffs ...................................................................................13 Contact: 3. Key Drivers for Tariff Changes................................................................14 Mary Owen 3.1 CMP213 (Project TransmiT)...............................................................14 Stuart Boyle 3.2 HVDC Circuits.....................................................................................14 3.3 Contracted Generation .......................................................................15
    [Show full text]
  • Transmission Networks Connections Update
    Transmission Networks Connections Update May 2015 SHE-T–TO SPT–TO NG–TO/SO SHE-T–TO SPT–TO NG–TO/SO Back to Contents TNCU – May 2015 Page 01 Contents Foreword ////////////////////////////////////////////////////////////////// 02 1. Introduction /////////////////////////////////////////////////////////// 03 2. Connection timescales ///////////////////////////////////////////// 04 Illustrative connection timescales /////////////////////////////////////// 04 Connections by area /////////////////////////////////////////////////////// 05 3. GB projects by year ///////////////////////////////////////////////// 06 Contracted overall position /////////////////////////////////////////////// 08 Renewable projects status by year ///////////////////////////////////// 10 Non-Renewable projects status by year – Excluding Nuclear /// 11 Non-Renewable projects status by year – Nuclear only ////////// 12 Interconnector projects status by year //////////////////////////////// 13 4. Additional data by transmission owner ///////////////////////// 14 National Grid Electricity Transmission plc //////////////////////////// 16 Scottish Hydro Electricity Transmission plc ////////////////////////// 18 Scottish Power Transmission Limited ///////////////////////////////// 20 5. Connection locations /////////////////////////////////////////////// 22 Northern Scotland projects map //////////////////////////////////////// 25 Southern Scotland projects map /////////////////////////////////////// 28 Northern England projects map /////////////////////////////////////////
    [Show full text]
  • Community Benefits from Offshore Renewable Energy Developments
    ScottIsh Government Good practIce prIncIples for CommunIty benefIts from Offshore renewable Energy developments 1 1 IntroductIon Scotland is estimated to have around a quarter of Europe’s potential offshore wind resources, and The Scottish Contents Government wishes to see communities across the country share in the benefits 1. Introduction 2. Principles from this rich natural resource. 3. Background 4. Designing a Community Benefit Package for Offshore Renewable Energy Projects The Scottish Government’s National Marine Plan While the majority of this document is intended to 5. Identification of Community (NMP) Renewables Policy 10 states that “Good be for developers of wind projects, it is proposed 6. Maximising Impact of Benefit Practice guidance for community benefit from that this document will be reviewed over the 7. Further Principles offshore wind and marine renewable energy coming years to incorporate guidance and good development should be followed by developers, practice for other offshore technologies. 8. Case Studies where appropriate”. This document looks at good 9. Further Reading practice in shaping and delivering community This document is split into definitions, context, 10. Glossary benefits from offshore renewable energy projects, good practice expectations and supplementary complementary to environmental, supply chain guidance for all involved. The intended readers of and other socio-economic benefits to Scotland. this document are developers, communities, local authorities and other stakeholders. When providing community benefits from offshore renewables, there are a number of factors to be The Scottish Government is committed to This document is available at: considered such as identifying the community, supporting the development of a successful www.localenergyscotland.org/goodpractice.
    [Show full text]
  • Tariff Information Paper
    Tariff Information Paper This information paper provides a forecast of Transmission Network Use of System (TNUoS) tariffs from 2017/18 to 2020/21. These tariffs apply to generators and suppliers. Together with the final tariffs for 2016/17 this publication shows how tariffs may evolve over the the next next five years. Forecast tariffs for 2017/18 will be refined throughout the year. 11 February 2016 Version 1.0 1 Contents 1. Executive Summary .................................................................................. 4 2. Tariff Forecast Tables ............................................................................... 5 2.1 Generator Wider Tariffs ....................................................................... 5 2.2 Summary of generator wider tariffs from 2016/17 to 2020/21 ........... 11 2.3 Onshore Local Circuit Tariffs ............................................................. 12 Any Questions? 2.4 Onshore Local Substation Tariffs ...................................................... 14 2.5 Offshore Local Tariffs ........................................................................ 14 Contact: 2.6 Small Generator Discount ................................................................. 15 Mary Owen 2.7 Demand Tariffs.................................................................................. 15 2.8 Summary of Demand Tariffs.............................................................. 16 Stuart Boyle 3. Key Drivers for Tariff Changes............................................................... 17
    [Show full text]
  • 2020 Routemap for Renewable Energy in Scotland – Update
    2020 ROUTEMAP FOR RENEWABLE ENERGY IN SCOTLAND – UPDATE 19 December 2013 1 Contents Ministerial Foreword 1. Deployment Update 2. Update on Cross Cutting Challenges European Policy Context Public Engagement Electricity Market Reform Grid Access, Reinforcement, and Charging Planning and Consents Finance Supply Chain Skills 3. Sectoral Routemap Updates Onshore Wind Offshore Wind Marine Renewables Hydropower Bioenergy and Energy from Waste Community and Locally Owned Renewables Microgeneration Solar Renewable Heat Sustainable Transport Agri-Renewables 4. Supporting and Emerging Technologies Energy Storage Hydrogen and Fuel Cells Geothermal 5. Equalities Monitoring Update 2 MINISTERIAL FOREWORD Renewable energy is a central element of our strategy for a successful Scotland. Scotland’s vast renewable energy resources create major job and investment opportunities and – as part of a wider, balanced energy mix - will deliver secure, low carbon and cost-effective energy supplies. The Scottish Government’s 2020 Routemap for Renewable Energy in Scotland, published in 2011, established a target for the equivalent of 100% of Scotland’s electricity demand to be supplied from renewable sources by 2020. After exceeding our interim target to meet 31% of electricity demand from renewables by 2011, we confirmed in the first annual update of the Routemap last year that we had set a new, more ambitious interim target for 50% by 2015. It is complemented by equally an important target for an increase in renewable heat generation, as well as an increase in community and local ownership of renewable energy schemes. As this second annual update to the Routemap makes clear, we continue to make excellent progress towards these targets.
    [Show full text]
  • University of Dundee DOCTOR of PHILOSOPHY Connecting the Dots
    University of Dundee DOCTOR OF PHILOSOPHY Connecting the dots A systemic approach to evaluating potential constraints to renewable electricity technology deployment to 2020 and beyond in the United Kingdom Wood, Geoffrey Craig Award date: 2013 Link to publication General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. • Users may download and print one copy of any publication from the public portal for the purpose of private study or research. • You may not further distribute the material or use it for any profit-making activity or commercial gain • You may freely distribute the URL identifying the publication in the public portal Take down policy If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim. Download date: 04. Oct. 2021 Connecting the dots: A systemic approach to evaluating potential constraints to renewable electricity technology deployment to 2020 and beyond in the United Kingdom Geoffrey Craig Wood A thesis submitted in partial fulfilment of the requirements for the degree of Doctor of Philosophy at the Centre for Energy Petroleum and Mineral Law and Policy (CEPMLP), University of Dundee September 2013 i Contents i Table of Contents iv List of Tables, Figures and Graphs vii List
    [Show full text]
  • SAFE ENERGY E-JOURNAL No.60
    No2NuclearPower SAFE ENERGY E-JOURNAL No.60 September 2013 The content of this e-journal was for the most part originally prepared for Nuclear Free Local Authorities and is reproduced, as adapted, with their permission but without liability for its contents. This briefing does not deal with the UK Government’s proposed new reactor programme. For an update on developments to do with new reactors see here: http://www.no2nuclearpower.org.uk/nuclearnews/NuClearNewsNo54.pdf If you would like to receive Daily Nuclear News updates by e-mail you can sign up here: http://www.no2nuclearpower.org.uk/mailing-lists/ 1 Climate Change It is clear the world is going to have to make some serious reductions in carbon emissions over the next 15 years to have any chance of avoiding dangerous climate change. 97% of climate scientists now agree that humans are causing global warming, so because this subject has such a huge impact on the nuclear debate it’s worth having a look at some of the numbers involved. (1) There are three important numbers (2) to look at: 2°C - every signatory to the UN Copenhagen Climate Talks in 2009 agreed that we must stop average global temperatures rising above this number. To have a reasonable chance of staying below 2°C we have to limit future emissions to 565 billion tons (Gigatonnes Gt). The problem is that we are releasing 30Gt every year, and this is going up at 3% a year. That means we have about 15 years before we reach the threshold. The number of tons of carbon in already proven fossil fuel reserves is 2795Gt - five times the amount needed to take us to 2°C warming.
    [Show full text]