Temporary Traffic and Transport Arrangements in West Kowloon
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
Branch List English
Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre, -
Islands District Council Traffic and Transport Committee Paper T&TC
Islands District Council Traffic and Transport Committee Paper T&TC 41/2020 2020 Hong Kong Cyclothon 1. Objectives 1.1 The 2020 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 15 November 2020. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2020 Hong Kong Cyclothon, with the aim to obtain the District Council’s continuous support. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past years, the event attracted more than 20,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by the Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event. -
M / SP / 14 / 173 Ser Res
¬½á W¤á 300 200 Sheung Fa Shan LIN FA SHAN Catchwater flW˘§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 173 Ser Res 200 w 200 SEE PLAN REF. No. M / SP / 14 / 173 NEEDLE HILL 532 FOR TSUEN WAN VILLAGE CLUSTER BOUNDARIES 500 è¦K 45 Catchwater fih 400 Catchwater 400 2 _ij 100 flW˘§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 172 The Cliveden The Cairnhill JUBILEE (SHING MUN) ROUTE RESERVOIR ê¶È¥ Catchwater «ø 314 Yuen Yuen 9 SEE PLAN REF. No. M / SP / 14 / 172 Institute M' y TWISK Wo Yi Hop 46 23 22 10 FOR TSUEN WAN VILLAGE CLUSTER BOUNDARIES Ser Res 11 SHING MUN ROAD 200 Catchwater 300 Ser Res 3.2.1 Á³z² GD„‹ HILLTOP ROAD ãÅF r ú¥OªÐ e flA Toll Gate t 474 a Kwong Pan Tin 12 w h San Tsuen D c ù t «ø“G a C ¥s 25 SHEK LUNG KUNG ƒ Po Kwong Yuen –‰ ú¥Oª LO WAI ROAD ¶´ú 5 Tso Kung Tam Kwong Pan Tin «ø Tsuen “T Fu Yung Shan ƒ SAMT¤¯· TUNG UK ROAD 5 Lo Wai 14 20 Sam Tung Uk fl” 22 ø–⁄ U¤á 315 24 Resite Village 300 Ha Fa Shan ROAD ¥—¥ H¶»H¶s s· CHUN Pak Tin Pa 8 Cheung Shan 100 fl” 19 San Tsuen YI PEI 400 fl´« TSUEN KING CIRCUIT San Tsuen 13 Estate 100 5 ROAD Allway Gardens flW˘ 100 3.2.2 fl”· SHAN 3 ROAD fi Tsuen Wan Centre FU YUNG SHING 25 ˦Lª MUN Ser Res 28 Chuk Lam Hoi Pa Resite Village ST Tsuen King Sim Yuen 252 ¤{ ON YIN Garden G¤@ G¤@« Ma Sim Pei Tsuen Łƒ… “T» Yi Pei Chun Lei Muk Shue 2 SHING MUN TUNNEL »» 26 Sai Lau Kok Ser Res Ser Res CHEUNG PEI SHAN ROAD Estate w ¥—¥ Tsuen Heung Fan Liu fl MEI WAN STREET 21 Pak Tin Pa M©y© ROAD «ø“ ·wƒ Tsuen 12 MA SIM PAI Lower Shing Mun Ser Res 18 Village «ø“ flw… 7 TSUEN KING CIRCUIT A ⁄· fi¯ł «ø“ƒ¤ Tsuen Tak ¤{ 200 ½ Shing Mun Valley W¤ª Garden -
1 Introduction
Agreement No. CE 80/2001 (DS) Mott Connell Ltd Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel Environmental Impact Assessment 1 INTRODUCTION 1.1 Background The Drainage Services Department (DSD) completed the “Stormwater Drainage Master Plan (DMP) Study in Tsuen Wan, Kwai Chung and Tsing Yi” in July 1999. In that Study it was identified that the drainage systems in Tsing Yi could meet the current flood protection standard in general, but not the drainage systems in Tsuen Wan and Kwai Chung. A series of drainage improvement works including the “Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel” (The Project) and the “Drainage Improvement in Tsuen Wan and Kwai Chung – Urban Drainage Improvement Works” were proposed, and subsequently DSD commissioned a Preliminary Project Feasibility Study (PPFS) for “Drainage Improvement in Tsuen Wan and Kwai Chung – Package A, Tsuen Wan Drainage Tunnel” which was completed in April 2000. The PPFS concluded that the construction of a tunnel of an internal diameter of 6.5m and length 5.35km should be implemented to alleviate the flooding risk in Tsuen Wan and Kwai Chung. At the end of October 2002, Mott Connell Limited (MCL) was commissioned by the Drainage Services Department under Agreement No. CE 80/2001 (DS) to carry out the investigation and preliminary design for the “Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel” (The Project). The primary objective of the Project is to develop an optimum preliminary design of the proposed tunnel and associated drainage structures based on the recommendations of the Preliminary Project Feasibility Study Report (PPFS), the Stormwater Drainage Master Plan Study in Tsuen Wan, Kwai Chung and Tsing Yi (DMP) and the results of the various investigations to be carried out under this Assignment. -
Legislative Council Panels on Environmental Affairs, Transport, and Planning, Lands and Works
CB(1)1807/01-02(01) LEGISLATIVE COUNCIL PANELS ON ENVIRONMENTAL AFFAIRS, TRANSPORT, AND PLANNING, LANDS AND WORKS An Update on Proposed Traffic Management Schemes PURPOSE This paper provides an update on the proposed traffic management schemes at five locations identified for trial to address traffic noise problems. BACKGROUND 2. At the meeting of the Joint Panels on Environmental Affairs, Transport, and Planning, Lands and Works held on 15 January 2002, Members noted that the Transport Department (TD) and the Environmental Protection Department (EPD) had completed traffic surveys and assessed the potential environmental benefits from implementing night-time traffic management measures at five locations identified for trial. The following schemes were proposed for consideration – (a) full closure of East Kowloon Corridor; (b) full closure of Kwai Chung Road Flyover outside Kwai Fong Estate; (c) full closure of Texaco Road Flyover in Tsuen Wan; (d) banning of goods vehicles over 5.5 tonnes along Ngan Shing Street in Shatin; and (e) banning of goods vehicles over 5.5 tonnes along Po Lam Road between Kowloon and Tseng Kwan O. 3. At the meeting, Members were also informed that consultations with the relevant District Councils and the transport trade on the proposed schemes were underway. The Administration undertook to provide Members with an update upon completion of the consultations. The consultation results and the proposed way forward for the five schemes are set out in the ensuing paragraphs. – 2 – ASSESSMENT OF THE TRAFFIC MANAGEMENT SCHEMES AND WAY FORWARD (a) Full closure of East Kowloon Corridor 4. For the purpose of alleviating night-time traffic noise from the East Kowloon Corridor (EKC), which connects Chatham Road North with Kai Tak Tunnel and spans over Kowloon City Road, it is proposed that the feasibility of closing the EKC completely to vehicular traffic at night time from 1:00 a.m. -
New Territories
Branch ATM District Branch / ATM Address Voice Navigation ATM 1009 Kwai Chung Road, Kwai Chung, New Kwai Chung Road Branch P P Territories 7-11 Shek Yi Road, Sheung Kwai Chung, New Sheung Kwai Chung Branch P P P Territories 192-194 Hing Fong Road, Kwai Chung, New Ha Kwai Chung Branch P P P Territories Shop 102, G/F Commercial Centre No.1, Cheung Hong Estate Commercial Cheung Hong Estate, 12 Ching Hong Road, P P P P Centre Branch Tsing Yi, New Territories A18-20, G/F Kwai Chung Plaza, 7-11 Kwai Foo Kwai Chung Plaza Branch P P Road, Kwai Chung, New Territories Shop No. 114D, G/F, Cheung Fat Plaza, Cheung Fat Estate Branch P P P P Cheung Fat Estate, Tsing Yi, New Territories Shop 260-265, Metroplaza, 223 Hing Fong Metroplaza Branch P P Road, Kwai Chung, New Territories 40 Kwai Cheong Road, Kwai Chung, New Kwai Cheong Road Branch P P P P Territories Shop 115, Maritime Square, Tsing Yi Island, Maritime Square Branch P P New Territories Maritime Square Wealth Management Shop 309A-B, Level 3, Maritime Square, Tsing P P P Centre Yi, New Territories ATM No.1 at Open Space Opposite to Shop No.114, LG1, Multi-storey Commercial /Car Shek Yam Shopping Centre Park Accommodation(also known as Shek Yam Shopping Centre), Shek Yam Estate, 120 Lei Muk Road, Kwai Chung, New Territories. Shop No.202, 2/F, Cheung Hong Shopping Cheung Hong Estate Centre No.2, Cheung Hong Estate, 12 Ching P Hong Road, Tsing Yi, New Territories Shop No. -
Bank of China (Hong Kong)
Bank of China (Hong Kong) Bank Branch Address 1. Central District Branch 2A Des Voeux Road Central, Hong Kong 2. Prince Edward Branch 774 Nathan Road, Kowloon 3. 194 Cheung Sha Wan Road 194-196 Cheung Sha Wan Road, Sham Shui Po, Branch Kowloon 4. Pak Tai Street Branch 4-6 Pak Tai Street, To Kwa Wan, Kowloon 5. Tsuen Wan Branch 297-299 Sha Tsui Road, Tsuen Wan, New Territories 6. Kwai Chung Road Branch 1009 Kwai Chung Road, Kwai Chung, New Territories 7. Sheung Kwai Chung 7-11 Shek Yi Road, Sheung Kwai Chung, New Branch Territories 8. Ha Kwai Chung Branch 192-194 Hing Fong Road, Kwai Chung, New Territories 9. Fuk Tsun Street Branch 32-40 Fuk Tsun Street, Tai Kok Tsui, Kowloon 10. Kwong Fuk Road Branch 40-50 Kwong Fuk Road, Tai Po Market, New Territories 11. Texaco Road Branch Shop A112, East Asia Gardens, 36 Texaco Road, Tsuen Wan, New Territories 12. Cheung Hong Estate 2 G/F, Commercial Centre, Cheung Hong Estate, Commercial Centre Branch Tsing Yi Island, New Territories 13. Kin Wing Street Branch 24-30 Kin Wing Street, Tuen Mun, New Territories 14. Choi Wan Estate Branch Shop Nos. A317 and A318, 3/F, Choi Wan Shopping Centre Phase II, No. 45 Clear Water Bay Road, Ngau Chi Wan, Kowloon 15. Lung Hang Estate Branch 103 Lung Hang Commercial Centre, Sha Tin, New Territories 16. Lei Cheng Uk Estate Shop 108, Lei Cheng Uk Commercial Centre, Lei Branch Cheng Uk Estate, Kowloon 17. Heng Fa Chuen Branch Shop 205-208, East Wing Shopping Centre, Heng Fa Chuen, Chai Wan, Hong Kong 18. -