Temporary Traffic and Transport Arrangements in West Kowloon

Total Page:16

File Type:pdf, Size:1020Kb

Temporary Traffic and Transport Arrangements in West Kowloon TRANSPORT DEPARTMENT NOTICE Temporary Traffic and Transport Arrangements in West Kowloon Notice is hereby given that the following temporary traffic and transport arrangements will be implemented on 29 December 2019 (Sunday) to facilitate the footbridge erection works linking North West Kowloon Reclamation Site 6 and Hoi Ying Estate: I. ROAD CLOSURE The following road sections will be temporarily closed to all vehicular traffic between 0.30 am to 5.30 am on 29 December 2019 (Sunday): (i) Section of West Kowloon Highway between Lai Chi Kok Park and Jordan Road; (ii) Section of Lin Cheung Road between Lai Chi Kok Park and Nam Cheong Station; and (iii) Tsing Sha Highway eastbound near Ngong Shuen Chau Barracks. II. TRAFFIC DIVERSIONS (i) Vehicles on Tsing Kwai Highway eastbound heading for West Kowloon Highway eastbound or Lin Cheung Road eastbound will be diverted to Lai Po Road northbound, Sham Mong Road eastbound, Tonkin Street West southbound and Lin Cheung Road eastbound; (ii) Vehicles on Tsing Sha Highway eastbound or Container Port Road South eastbound heading for West Kowloon Highway eastbound or Lin Cheung Road eastbound will be diverted to Hing Wah Street West northbound, Sham Mong Road eastbound, Tonkin Street West southbound and Lin Cheung Road eastbound; (iii) Vehicles on Tsing Sha Highway southbound heading for Lin Cheung Road eastbound will be diverted to Hing Wah Street West northbound, 1 Sham Mong Road eastbound, Tonkin Street West southbound and Lin Cheung Road eastbound; (iv) Vehicles on West Kowloon Highway westbound or Lin Cheung Road westbound heading for Tsing Kwai Highway westbound will be diverted to Tonkin Street West northbound, Sham Mong Road westbound, Lai Po Road southbound and Lai Po Road westbound; (v) Vehicles on West Kowloon Highway westbound or Lin Cheung Road westbound heading for Tsing Sha Highway westbound will be diverted to Tonkin Street West northbound, Sham Mong Road westbound, Hing Wah Street West southbound and Container Port Road South southbound; (vi) Vehicles on Lin Cheung Road westbound heading for Tsing Sha Highway northbound will be diverted to Tonkin Street West northbound, Sham Mong Road westbound, Hing Wah Street West southbound and Lai Po Road northbound; (vii) Vehicles on Stonecutters Bridge or Container Port Road South eastbound heading for Tsing Sha Highway northbound will be diverted to Lai Po Road northbound; and (viii)Vehicles on Tsing Kwai Highway Roundabout heading for West Kowloon Highway eastbound or Lin Cheung Road eastbound will be diverted to Mei Ching Road westbound, Container Port Road South southbound, Hing Wah Street West northbound, Sham Mong Road eastbound, Tonkin Street West southbound and Lin Cheung Road eastbound. III. BUS DIVERSIONS The following bus routes will be temporarily diverted between 0.30 am to 8.00 am or earlier (subject to the works progress) on 29 December 2019 (Sunday): 2 Routes Direction Diversion before resuming original routeing CTB 962B, 962X, To Hong Kong via Tuen Mun Road, Tsuen 967, 969, 962N, Island Wan Road, Kwai N962 and N969 Chung Road, West Kowloon Corridor, Yan KMB 960, 961, 968 Cheung Road and Hoi and 978 Wang Road. To New Territories via Lai Cheung Road, West Kowloon Corridor, Kwai Chung Road, Tsuen Wan Road and Tuen Mun Road. CTB E11 and E11A To Airport via Lai Cheung Road, West Kowloon Corridor, Kwai Chung Road, Tsuen Wan Road, Tsing Tsuen Road and Tsing Yi North Coastal Road. CTB E11, E11A and To Hong Kong via Tsing Yi North Coastal NA21 Island / Kowloon Road, Tsing Tsuen Road, Tsuen Wan Road, Kwai Chung Road, West Kowloon Corridor, Yan Cheung Road and Hoi Wang Road. CTB 930, 930X and To Tsuen Wan via Lai Cheung Road, West N930 Kowloon Corridor, Kwai Chung Road and Tsuen KMB 934 Wan Road. 3 Routes Direction Diversion before resuming original routeing CTB 930, 930X and To Hong Kong via Kwai Chung Road, West N930 Island Kowloon Corridor. Yan Cheung Road and Hoi Wang Road. KMB / NWFB 948 To Tsing Yi via Lai Cheung Road, West Kowloon Corridor, Kwai Chung Road and Kwai Tsing Road. CTB A10, A11, A12 To Hong Kong via Tsing Yi North Coastal and NA11 Island Road, Tsing Tsuen Road, Tsuen Wan Road, Kwai Chung Road, West Kowloon Corridor, Yan Cheung Road and Hoi Wang Road. CTB A10, A11, To Airport via Lai Cheung Road, West A12, NA11 and Kowloon Corridor, Kwai NA12 Chung Road, Tsuen Wan Road, Tsing Tsuen Road and Tsing Yi North Coastal Road. CTB A22, E23, To Hong Kong via Tsing Yi North Coastal E23A, N11 and N23 Island / Kowloon Road, Tsing Tsuen Road, Tsuen Wan Road, Kwai Chung Road, West Kowloon Corridor, Yan Cheung Road, Hoi Wang Road and Jordan Road / Wui Man Road. To Airport / Tung via Jordan Road Roundabout, Chung Jordan Road eastbound, 4 Routes Direction Diversion before resuming original routeing Ferry Street northbound, West Kowloon Corridor, Kwai Chung Road, Tsuen Wan Road, Tsing Tsuen Road and Tsing Yi North Coastal Road. KMB 260X, 268B To Kowloon via Tuen Mun Road, Tsuen and 269B Wan Road, Kwai Chung Road, West Kowloon Corridor, Yan Cheung Road, Hoi Wang Road and Jordan Road / Wui Man Road. To New Territories via Jordan Road Roundabout, Jordan Road eastbound, Ferry Street northbound, West Kowloon Corridor, Kwai Chung Road, Tsuen Wan Road and Tuen Mun Road. KMB 41A To Kowloon via Lai Po Road northbound and Sham Mong Road eastbound. KMB 41A and To Tsing Yi via Tonkin Street West N41X northbound, Sham Mong Road westbound, Lai Po Road southbound and Lai Po Road westbound. KMB 280X, 286X, To Kowloon via Hing Wah Street West 287X and W3 northbound, Sham Mong Street eastbound and 5 Routes Direction Diversion before resuming original routeing Tonkin Street West southbound. KMB 270S, 280X, To New Territories via Tonkin Street West 286X, 287X, N283 northbound, Sham Mong and W3 Road westbound, Hing Wah Street West southbound and Lai Po Road northbound. KMB / NWFB 118 To Siu Sai Wan via Hing Wah Street West and N118 southbound, Hing Wah Street West northbound and Sham Mong Road eastbound. NWFB 701A To Hoi Ying Estate via Tonkin Street West northbound, Sham Mong Road westbound, Hing Wah Street West southbound and Hing Wah Street West northbound. ATTENTION AND APPEAL Appropriate traffic signs will be erected on site to guide motorists. Bus operators will also display notices to advise passengers of the above temporary arrangements. Members of the public who intend to go to the affected areas are advised to plan their journey early and allow more traveling time. In case of traffic congestion, motorists should exercise tolerance and patience, and follow instructions of the Police. Members of the public may call 1823 Call Centre, browse the website of 6 TD at www.td.gov.hk or make use the “HKeMobility” mobile application of TD to obtain information of the temporary traffic and transport arrangements. CHAN Mable Commissioner for Transport 7 .
Recommended publications
  • Branch List English
    Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre,
    [Show full text]
  • Islands District Council Traffic and Transport Committee Paper T&TC
    Islands District Council Traffic and Transport Committee Paper T&TC 41/2020 2020 Hong Kong Cyclothon 1. Objectives 1.1 The 2020 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 15 November 2020. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2020 Hong Kong Cyclothon, with the aim to obtain the District Council’s continuous support. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past years, the event attracted more than 20,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by the Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event.
    [Show full text]
  • M / SP / 14 / 173 Ser Res
    ¬½á W¤á 300 200 Sheung Fa Shan LIN FA SHAN Catchwater flW˘§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 173 Ser Res 200 w 200 SEE PLAN REF. No. M / SP / 14 / 173 NEEDLE HILL 532 FOR TSUEN WAN VILLAGE CLUSTER BOUNDARIES 500 è¦K 45 Catchwater fih 400 Catchwater 400 2 _ij 100 flW˘§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 172 The Cliveden The Cairnhill JUBILEE (SHING MUN) ROUTE RESERVOIR ê¶È¥ Catchwater «ø 314 Yuen Yuen 9 SEE PLAN REF. No. M / SP / 14 / 172 Institute M' y TWISK Wo Yi Hop 46 23 22 10 FOR TSUEN WAN VILLAGE CLUSTER BOUNDARIES Ser Res 11 SHING MUN ROAD 200 Catchwater 300 Ser Res 3.2.1 Á³z² GD„‹ HILLTOP ROAD ãÅF r ú¥OªÐ e flA Toll Gate t 474 a Kwong Pan Tin 12 w h San Tsuen D c ù t «ø“G a C ¥s 25 SHEK LUNG KUNG ƒ Po Kwong Yuen –‰ ú¥Oª LO WAI ROAD ¶´ú 5 Tso Kung Tam Kwong Pan Tin «ø Tsuen “T Fu Yung Shan ƒ SAMT¤¯· TUNG UK ROAD 5 Lo Wai 14 20 Sam Tung Uk fl” 22 ø–⁄ U¤á 315 24 Resite Village 300 Ha Fa Shan ROAD ¥—¥ H¶»H¶s s· CHUN Pak Tin Pa 8 Cheung Shan 100 fl” 19 San Tsuen YI PEI 400 fl´« TSUEN KING CIRCUIT San Tsuen 13 Estate 100 5 ROAD Allway Gardens flW˘ 100 3.2.2 fl”· SHAN 3 ROAD fi Tsuen Wan Centre FU YUNG SHING 25 ˦Lª MUN Ser Res 28 Chuk Lam Hoi Pa Resite Village ST Tsuen King Sim Yuen 252 ¤{ ON YIN Garden G¤@ G¤@« Ma Sim Pei Tsuen Łƒ… “T» Yi Pei Chun Lei Muk Shue 2 SHING MUN TUNNEL »­» 26 Sai Lau Kok Ser Res Ser Res CHEUNG PEI SHAN ROAD Estate w ¥—¥ Tsuen Heung Fan Liu fl MEI WAN STREET 21 Pak Tin Pa M©y© ROAD «ø“ ·wƒ Tsuen 12 MA SIM PAI Lower Shing Mun Ser Res 18 Village «ø“ flw… 7 TSUEN KING CIRCUIT A ⁄· fi¯ł «ø“ƒ¤ Tsuen Tak ¤{ 200 ½ Shing Mun Valley W¤ª Garden
    [Show full text]
  • 1 Introduction
    Agreement No. CE 80/2001 (DS) Mott Connell Ltd Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel Environmental Impact Assessment 1 INTRODUCTION 1.1 Background The Drainage Services Department (DSD) completed the “Stormwater Drainage Master Plan (DMP) Study in Tsuen Wan, Kwai Chung and Tsing Yi” in July 1999. In that Study it was identified that the drainage systems in Tsing Yi could meet the current flood protection standard in general, but not the drainage systems in Tsuen Wan and Kwai Chung. A series of drainage improvement works including the “Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel” (The Project) and the “Drainage Improvement in Tsuen Wan and Kwai Chung – Urban Drainage Improvement Works” were proposed, and subsequently DSD commissioned a Preliminary Project Feasibility Study (PPFS) for “Drainage Improvement in Tsuen Wan and Kwai Chung – Package A, Tsuen Wan Drainage Tunnel” which was completed in April 2000. The PPFS concluded that the construction of a tunnel of an internal diameter of 6.5m and length 5.35km should be implemented to alleviate the flooding risk in Tsuen Wan and Kwai Chung. At the end of October 2002, Mott Connell Limited (MCL) was commissioned by the Drainage Services Department under Agreement No. CE 80/2001 (DS) to carry out the investigation and preliminary design for the “Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel” (The Project). The primary objective of the Project is to develop an optimum preliminary design of the proposed tunnel and associated drainage structures based on the recommendations of the Preliminary Project Feasibility Study Report (PPFS), the Stormwater Drainage Master Plan Study in Tsuen Wan, Kwai Chung and Tsing Yi (DMP) and the results of the various investigations to be carried out under this Assignment.
    [Show full text]
  • Legislative Council Panels on Environmental Affairs, Transport, and Planning, Lands and Works
    CB(1)1807/01-02(01) LEGISLATIVE COUNCIL PANELS ON ENVIRONMENTAL AFFAIRS, TRANSPORT, AND PLANNING, LANDS AND WORKS An Update on Proposed Traffic Management Schemes PURPOSE This paper provides an update on the proposed traffic management schemes at five locations identified for trial to address traffic noise problems. BACKGROUND 2. At the meeting of the Joint Panels on Environmental Affairs, Transport, and Planning, Lands and Works held on 15 January 2002, Members noted that the Transport Department (TD) and the Environmental Protection Department (EPD) had completed traffic surveys and assessed the potential environmental benefits from implementing night-time traffic management measures at five locations identified for trial. The following schemes were proposed for consideration – (a) full closure of East Kowloon Corridor; (b) full closure of Kwai Chung Road Flyover outside Kwai Fong Estate; (c) full closure of Texaco Road Flyover in Tsuen Wan; (d) banning of goods vehicles over 5.5 tonnes along Ngan Shing Street in Shatin; and (e) banning of goods vehicles over 5.5 tonnes along Po Lam Road between Kowloon and Tseng Kwan O. 3. At the meeting, Members were also informed that consultations with the relevant District Councils and the transport trade on the proposed schemes were underway. The Administration undertook to provide Members with an update upon completion of the consultations. The consultation results and the proposed way forward for the five schemes are set out in the ensuing paragraphs. – 2 – ASSESSMENT OF THE TRAFFIC MANAGEMENT SCHEMES AND WAY FORWARD (a) Full closure of East Kowloon Corridor 4. For the purpose of alleviating night-time traffic noise from the East Kowloon Corridor (EKC), which connects Chatham Road North with Kai Tak Tunnel and spans over Kowloon City Road, it is proposed that the feasibility of closing the EKC completely to vehicular traffic at night time from 1:00 a.m.
    [Show full text]
  • New Territories
    Branch ATM District Branch / ATM Address Voice Navigation ATM 1009 Kwai Chung Road, Kwai Chung, New Kwai Chung Road Branch P P Territories 7-11 Shek Yi Road, Sheung Kwai Chung, New Sheung Kwai Chung Branch P P P Territories 192-194 Hing Fong Road, Kwai Chung, New Ha Kwai Chung Branch P P P Territories Shop 102, G/F Commercial Centre No.1, Cheung Hong Estate Commercial Cheung Hong Estate, 12 Ching Hong Road, P P P P Centre Branch Tsing Yi, New Territories A18-20, G/F Kwai Chung Plaza, 7-11 Kwai Foo Kwai Chung Plaza Branch P P Road, Kwai Chung, New Territories Shop No. 114D, G/F, Cheung Fat Plaza, Cheung Fat Estate Branch P P P P Cheung Fat Estate, Tsing Yi, New Territories Shop 260-265, Metroplaza, 223 Hing Fong Metroplaza Branch P P Road, Kwai Chung, New Territories 40 Kwai Cheong Road, Kwai Chung, New Kwai Cheong Road Branch P P P P Territories Shop 115, Maritime Square, Tsing Yi Island, Maritime Square Branch P P New Territories Maritime Square Wealth Management Shop 309A-B, Level 3, Maritime Square, Tsing P P P Centre Yi, New Territories ATM No.1 at Open Space Opposite to Shop No.114, LG1, Multi-storey Commercial /Car Shek Yam Shopping Centre Park Accommodation(also known as Shek Yam Shopping Centre), Shek Yam Estate, 120 Lei Muk Road, Kwai Chung, New Territories. Shop No.202, 2/F, Cheung Hong Shopping Cheung Hong Estate Centre No.2, Cheung Hong Estate, 12 Ching P Hong Road, Tsing Yi, New Territories Shop No.
    [Show full text]
  • Bank of China (Hong Kong)
    Bank of China (Hong Kong) Bank Branch Address 1. Central District Branch 2A Des Voeux Road Central, Hong Kong 2. Prince Edward Branch 774 Nathan Road, Kowloon 3. 194 Cheung Sha Wan Road 194-196 Cheung Sha Wan Road, Sham Shui Po, Branch Kowloon 4. Pak Tai Street Branch 4-6 Pak Tai Street, To Kwa Wan, Kowloon 5. Tsuen Wan Branch 297-299 Sha Tsui Road, Tsuen Wan, New Territories 6. Kwai Chung Road Branch 1009 Kwai Chung Road, Kwai Chung, New Territories 7. Sheung Kwai Chung 7-11 Shek Yi Road, Sheung Kwai Chung, New Branch Territories 8. Ha Kwai Chung Branch 192-194 Hing Fong Road, Kwai Chung, New Territories 9. Fuk Tsun Street Branch 32-40 Fuk Tsun Street, Tai Kok Tsui, Kowloon 10. Kwong Fuk Road Branch 40-50 Kwong Fuk Road, Tai Po Market, New Territories 11. Texaco Road Branch Shop A112, East Asia Gardens, 36 Texaco Road, Tsuen Wan, New Territories 12. Cheung Hong Estate 2 G/F, Commercial Centre, Cheung Hong Estate, Commercial Centre Branch Tsing Yi Island, New Territories 13. Kin Wing Street Branch 24-30 Kin Wing Street, Tuen Mun, New Territories 14. Choi Wan Estate Branch Shop Nos. A317 and A318, 3/F, Choi Wan Shopping Centre Phase II, No. 45 Clear Water Bay Road, Ngau Chi Wan, Kowloon 15. Lung Hang Estate Branch 103 Lung Hang Commercial Centre, Sha Tin, New Territories 16. Lei Cheng Uk Estate Shop 108, Lei Cheng Uk Commercial Centre, Lei Branch Cheng Uk Estate, Kowloon 17. Heng Fa Chuen Branch Shop 205-208, East Wing Shopping Centre, Heng Fa Chuen, Chai Wan, Hong Kong 18.
    [Show full text]
  • M / SP / 14 / 172 San Tsuen ¥S SHEK LUNG KUNG –‰ Ú¥Oª SEE PLAN REF
    200 451 è¦K Catchwater 400 303 fih 100 The Cairnhill 100 ROUTE 314 TWISK 80 200 Ser Res 80 100 Catchwater Ser Res TAI LAM CHUNG RESERVOIR ú¥OªÐ 474 flA Kwong Pan Tin flW˘§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 172 San Tsuen ¥s SHEK LUNG KUNG –‰ ú¥Oª SEE PLAN REF. No. M / SP / 14 / 172 Tso Kung Tam Kwong Pan Tin Tsuen “T FOR TSUEN WAN VILLAGE CLUSTER BOUNDARIES Fu Yung Shan fl” U¤á 315 80 j¤VÆ 300 Ha Fa Shan ¥—¥ flW˘ fl´« Pak Tin Pa TSUEN KING CIRCUIT San Tsuen 400 Allway Gardens 100 100 Tsuen Wan Centre fl”· 200 Tsuen King Garden ¤{ Ma Sim Pei Tsuen “T» ¥—¥ Pak Tin Pa fl Tsuen ·wƒ TSUEN KING CIRCUIT Adventist Hospital flw… A A ⁄· Tsuen Tak Garden Kam Fung r´º´s ½ Muk Min Ha Tsuen 200 259 Garden 200 Discovery Park ROUTE TWISK 300 A» 200 Summit C«s⁄‰⁄‚ CASTLE Terrace ã®W PEAK ROAD - TSUEN WAN CHAI WAN KOK _ b¥s D e NORTH Pun Shan Tsuen j ROAD HO ã®WÆ TAI C«fi Catchwater TSUEN WAN F¨L fi WAN ” fl CHAI WAN KOK STREET Fuk Loi Estate ñº¨· Tsuen Wan LineLuk Yeung 226 Catchwater HOI PA STREET Sun Chuen 3.3.5 TAI CHUNG ROAD TUEN MUN ROAD ¡º 200 SHA TSUI ROAD j¤ 300 oªa¬ Yau Kom Tau HOI SHING ROAD ½ CASTLE PEAK ROAD - TSUEN j¤e Village R˜« 8 HOI HING ROAD j¤VÆk¤ Ser Res ù Belvedere Garden flW Tai Lam Centre SAI LAU KOK j¤VÆg Ser Res for Women 100 flW˘ C Tai Lam Correctional 344 3.3.4 j¤F Institution M†§ s TAI HO ROAD ½ Tsing Fai Tong o“a‹Y New Village 1 fi‡ SHAM TSENG Yau Kom Tau ROAD flW˘ t¤s TSUEN WAN ê¶ `² w SETTLEMENT Treatment Works fl fi– Tsuen Wan HOI ON ROAD Yuen Tun Catchwater BASIN SHAM TSENG RÄ£³ A» Plaza W ³²w w… Lindo Green Greenview Court TSUEN WAN è¬w¼L MARKET
    [Show full text]
  • Extension of Statutory No-Smoking Areas at Bus Interchanges (Post-Version)” (Ref No: MD 305)
    W3C Text Description TV API - “Extension of Statutory No-smoking Areas at Bus Interchanges (Post-version)” (Ref No: MD 305) Extension of Statutory No-smoking Areas at Bus Interchanges [The screen shows in the morning, a young man waits in line for a bus at a bus interchange leading to tunnel.] [The scene changes. A young man enjoys music delightfully.] Super: Pleasant [The scene changes. A woman, waiting at the bus interchanges, smiles and takes a glance at somewhere far away.] Super: Smoke-free environment [The scene changes. A little girl holding hands with her mother, smiles happily while waiting for a bus.] Super: Everyone’s happy [The scene changes. A wide-shot of the bus interchange leading to a tunnel.] Voice-over To give passengers a better environment and cleaner air, 11 bus interchanges leading to expressways or tunnels have been designated as no-smoking areas Super: Eleven bus interchanges leading to expressways or tunnels have been designated as no-smoking areas Lion Rock Tunnel Tate’s Cairn Tunnel Cross-Harbour Tunnel Western Harbour Crossing Eastern Harbour Crossing Tai Lam Tunnel Shing Mun Tunnels Tsing Sha Highway Aberdeen Tunnel Lantau Toll Plaza Tuen Mun Road [The scene changes. At a corner of the bus interchange, a man who is about to light up a cigarette sees the “No Smoking” signage. He quickly puts his cigarette back to the packaging.] Voice-over: “No Smoking” signage is prominently displayed. Offenders are subject to a fixed penalty of $1,500. W3C Text Description TV API - “Extension of Statutory No-smoking Areas at Bus Interchanges (Post-version)” (Ref No: MD 305) Super: Offenders are subject to a fixed penalty of $1,500 [The scene changes.
    [Show full text]
  • 2018 Hong Kong Cyclothon 1. Objectives 2. Event Background
    Islands District Council Traffic and Transport Committee Document T&TC No. 20/2018 2018 Hong Kong Cyclothon 1. Objectives 1.1 The 2018 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 14 October 2018. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2018 Hong Kong Cyclothon. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past three years, the event attracted more than 13,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. Last year, over 51,000 visitors and locals alike flocked to watch the races in Tsim Sha Tsui. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride, Kids & Youth Rides and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event.
    [Show full text]
  • Destinations : Hong Tak Gardens - Kowloon City Ferry Pier
    Residents’ Service Route No. : NR751 Destinations : Hong Tak Gardens - Kowloon City Ferry Pier Routeing (Hong Tak Gardens - Kowloon City Ferry Pier) : via Shek Pai Tau Road, Ming Kum Road, Tsing Wun Road, Wong Chu Road, Tuen Mun Road, Tsuen Wan Road, Kwai Chung Road, Tsing Kwai Highway, West Kowloon Highway, Jordan Road, Gascoigne Road, Chatham Road South, Chatham Road North, underpass, Gillies Avenue South, Station Lane, Ma Tau Wai Road, To Kwa Wan Road and San Ma Tau Street. Stopping Places : Pick Up : No. 11 Shek Pai Tau Road (non- Set Down : 1. No. 100 Ma Tau Wai Road restricted area) San Ma Tau Street opposite L/P 2. no. AAA 6978-G Departure time : Mondays to Fridays (except Public Holidays) 1. 7.00 a.m. Routeing (Kowloon City Ferry Pier - Hong Tak Gardens) : via San Ma Tau Street, To Kwa Wan Road, Ma Tau Wai Road, Wuhu Street, Hung Hom Road, Princess Margaret Road Link, Gascoigne Road, West Kowloon Highway, Ngo Cheung Road, Tsing Kwai Highway, Cheung Tsing Tunnel, Cheung Tsing Highway, Tsing Long Highway, Tuen Mun Road, Tuen Hi Road, Tuen Mun Road, Tsing Tin Road, Tsun Wen Road, Shek Pai Tau Road. Stopping Places : Pick Up : 1. San Ma Tau Street opposite Set Down : 1. Tuen Hi Road outside Tuen Mun L/P no. AAA 6978-G Town Hall 2. No. 39 Ma Tau Wai Road 2. No. 11 Shek Pai Tau Road (non- restricted area) Departure time : Mondays to Fridays (except Public Holidays) 1. 6.00 p.m. 2. 6.20 p.m. Fare : $16.00 Name of the operator: King Network Limited Contact No.: 2452 0317 .
    [Show full text]
  • Bus Service Adjustment to Cope with the Road Closure of Hong Kong Marathon 2019
    Bus service adjustment to cope with the road closure of Hong Kong Marathon 2019 (1) Day-time bus service on 16 February 2019 (Saturday) [from about 11.15pm to last departure] A. Affected bus routes in Kowloon and New Territories Kowloon Motor Bus (KMB) Route Direction Diversion via 61X, 62X, 258D, Kowloon City Ferry / Lei Tuen Mun Road, Tsuen Wan Road, Kwai Chung Road 259D, 268C, 269C Yue Mun Estate / Lam Tin and Ching Cheung Road Station / Kwun Tong Ferry 68E, 279X Tsing Yi AR Station Tuen Mun Road, Tsuen Wan Road, Tsuen Tsing Interchange, Tsing Tsuen Road, Tsing Yi North Coastal Road and Cheung Tsing Highway 260X Hung Hom Station Tuen Mun Road, Tsuen Wan Road, Kwai Chung Road, Cheung Sha Wan Road, Lai Chi Kok Road, West Kowloon Corridor, Ferry Street, Canton Road, Wui Cheung Road and Wui Man Road 268B, 269B Hung Luen Road Tai Lam Tunnel, Tuen Mun Road, Tsuen Wan Road, Kwai Chung Road, Cheung Sha Wan Road, Lai Chi Kok Road, West Kowloon Corridor, Ferry Street, Canton Road, Wui Cheung Road and Wui Man Road B. Affected bus routes to/from Airport, HZMB Hong Kong Port and North Lantau Citybus (CTB) Route Direction Diversion via A10 Ap Lei Chau Northwest Tsing Yi Interchange, Tsing Yi North Coastal Road, Tsing Tsuen Road, Tsuen Wan Road, Kwai Chung Road, Lai Chi Kok Road, West Kowloon Corridor, Ferry Street, Gascoigne Road, Chatham Road South, Hong Chong Road, Cross Harbour Tunnel, Gloucester Road, Harcourt Road, Connaught Road Central, Flyover and Connaught Road West A11, E11, E11A North Point Ferry Pier / Northwest Tsing Yi Interchange,
    [Show full text]