AGREEMENT NO. CE 54/2014 (TP) URBAN DESIGN STUDY FOR THE NORTH AND HARBOURFRONT AREAS

Executive Summary

October 2019

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

TABLE OF CONTENT

1 INTRODUCTION ...... 1 1.1 Study Objectives and Key Tasks ...... 1 1.2 Study Area ...... 1 2 PUBLIC ENGAGEMENT ...... 2 2.1 Public Engagement Process ...... 2 3 REFINED URBAN DESIGN FRAMEWORK ...... 4 3.1 Design Vision and Positioning ...... 4 3.2 Urban Design Principles ...... 4 3.3 Refined Urban Design Framework Plan ...... 4 4 RECOMMENDED HARBOURFRONT ENHANCEMENT PROPOSALS ..... 5 4.1 Master Layout Plan ...... 5 4.2 Celebration Precinct ...... 5 4.3 Pierside Precinct ...... 5 4.4 Water Sports and Recreation Precinct ...... 6 4.5 Revitalised Typhoon Shelter Precinct ...... 6 4.6 East Coast Park Precinct ...... 7 4.7 Streetscape Enhancement Proposals ...... 7 4.8 Pedestrian Connectivity and Transport Arrangement ...... 7 4.9 Marine Supporting Facilities ...... 8 4.10 Landscape Planning Framework and Proposals ...... 9 4.11 Smart and Green City Design/Installations ...... 9 5 PLANNING AND DESIGN BRIEFS ...... 10 5.1 Objectives of the Planning and Design Briefs ...... 10 5.2 Contents of the Planning and Design Briefs ...... 10 6 IMPLEMENTATION ...... 11 6.1 Implementation Modes and Long-Term Management ...... 11 6.2 Implementation Programme ...... 11 6.3 Other Considerations ...... 11

October 2019 (i)

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

Figures

Figure 1.1 Study Area Figure 3.1 Refined Urban Design Framework Plan Figure 4.1 Recommended Master Layout Plan

October 2019 (ii)

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

1 INTRODUCTION

1.1 Study Objectives and Key Tasks

1.1.1 AECOM Asia Co. Ltd. was commissioned by the Planning Department (PlanD) to undertake the Urban Design Study for the Wan Chai North and North Point Harbourfront Areas – Feasibility Study (Agreement No. CE 54/2014 (TP) (herein referred as “the Study”). The overall objective of the Study is to work out a sustainable urban design framework (UDF) with harbourfront enhancement proposals (HEPs) to guide future implementation of the HEPs.

1.1.2 The Study has produced a refined Urban Design Framework Plan (UDFP), with HEPs for the five character precincts, namely the Celebration Precinct, the Pierside Precinct, the Water Sports and Recreation Precinct, the Revitalised Typhoon Shelter Precinct, and the East Coast Park Precinct. Broad assessment was carried out to establish the preliminary technical feasibility of the HEPs.

1.1.3 It should be highlighted that this study is by nature an urban design study. The study would provide an UDF to prepare for detailed design and engineering feasibility studies for individual works projects identified under the HEPs at implementation stage in future.

1.2 Study Area

1.2.1 The Study Area is located at the northern shore of Island, with a total land area of about 19 ha and water space of about 22 ha. The boundaries of the Study Area and the Area of Influence (AOI) are shown in Figure 1.1.

1.2.2 Details on existing baseline conditions and the statutory planning context are further elaborated in the Final Report. In formulating the urban design framework and design proposals, they are formulated based on, and therefore conform to the planning intentions and development restrictions of the respective land use zonings of the prevailing Wan Chai North and North Point Outline Zoning Plans (OZPs).

October 2019 1

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

2 PUBLIC ENGAGEMENT

2.1 Public Engagement Process

2.1.1 Public engagement (PE) was the backbone of this Study. Views and opinions from the public and relevant stakeholders were sought through a 2-staged public engagement exercise to identify their aspirations and key issues as the basis for formulation of the UDFP and HEPs. The following flow diagram illustrates the interrelationship between the study phases and the two stages of PE activities.

2.1.2 PE Stage 1 was conducted during the period between 15 June 2015 and 15 August 2015 to engage public on the UDF. During the two-month period, various PE events/activities including interviews with the major stakeholders, focus group meetings (FGMs), resident workshops, on-site public events were conducted and the Eastern and Councils (DCs) were also consulted. The public generally supported the study’s vision, the design themes of the five character precincts, and the UDF suggested by the Study.

2.1.3 PE Stage 2 was launched on 11 June 2016 and concluded on 20 August 2016, which aimed to engage public on the preliminary HEPs. During the PE2 period, various PE events/activities including design ideas competition, interviews with the major stakeholders, FGMs, public workshops, roving exhibition, on- site project display/exhibition, etc. were conducted and the Eastern and Wan Chai DCs were also consulted. The public had raised many comments and aspirations relating to the HEPs, such as provision of a continuous waterfront promenade, enhancement of the north-south connectivity, and providing more shading facilities, greenery and tree planting, continuous bicycle trail, pet facilities, etc.

October 2019 2

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

2.1.4 The Harbourfront Commission (HC) has been closely engaged during the course of the Study. The HC’s comments have been taken into consideration in formulating the UDF and HEPs. Apart from the HC, views and comments of different stakeholder groups such as professional institutes, green groups, water sports organisations and art groups were also sought during the public engagement.

October 2019 3

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

3 REFINED URBAN DESIGN FRAMEWORK

3.1 Design Vision and Positioning

3.1.1 The Wan Chai North and North Point harbourfront presents a rare opportunity to re-connect people to the water, to re-define the harbourfront with new programs to offer a unified, continuous, walkable journey for pedestrians, as well as to create spaces that are not purely infrastructural and functional, but for people to enjoy and experience. The vision for the “New Wan Chai North Point Harbourfront” is to develop:

“an urban harbourfront re-connecting people to the water”

3.1.2 The proposed design vision and positioning were widely discussed and deliberated in the PE process with positive responses from the community and therefore the Study adopts the vision and positioning in finalising the UDFP and the HEPs.

3.2 Urban Design Principles

3.2.1 With reference to the overall positioning and vision, a set of refined urban design principles have been derived to guide the formulation of the UDF and design strategies:

▪ to create more distinct identity, character and stronger sense of place for the harbourfront; ▪ to enhance vibrancy and attractiveness along the harbourfront through diverse activities, programs and facilities for public enjoyment; ▪ to enhance pedestrian connectivity between the hinterland and waterfront, and to ensure that the waterfront/ public space is continuous and enjoyable; ▪ to ensure design flexibility in the design proposals and promote shared use design; ▪ to promote design that will make full use of the blue and green resources and opportunities to re-connect people with the water and promote water-friendly culture; and to foster a green harbourfront; ▪ to introduce smart, green and sustainable design elements; and ▪ to respect local cultural and heritage identity to re-connect people to the unique history of the harbourfront area and the district.

3.3 Refined Urban Design Framework Plan

3.3.1 Taking into account the above urban design principles and public views/comments received during the public engagement process, the refined UDFP is formulated (see Figure 3.1).

October 2019 4

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

4 RECOMMENDED HARBOURFRONT ENHANCEMENT PROPOSALS

4.1 Master Layout Plan

4.1.1 Based on the refined UDFP and taking into account the views, comments, and ideas gathered from the public, HC and other stakeholders, the recommended HEPs have been formulated and incorporated into the latest Master Layout Plan (MLP) (see Figure 4.1). The following sections present the design concepts of the recommended HEPs by each character precinct. Details on the design proposals and key features of each character precinct are elaborated in detail in the Final Report.

4.2 Celebration Precinct

4.2.1 The HEPs of the Celebration Precinct are intended to give a facelift to enhance the area’s identity, ceremonial significance and enjoyment by the public. The design objective is to enhance the area as a place that both the locals and visitors can easily access to enjoy panoramic harbour views and as a solemn venue for official celebration/ceremonial events.

4.2.2 The Celebration Precinct, with a total area of around 2 ha, comprises three feature plazas, namely the “Celebration Plaza”, “City View Plaza” and “Sunset Plaza”. These pedestrian plaza spaces will be designed to facilitate holding of different official celebration/ceremonial events, festive gatherings, outdoor events, exhibitions, etc. to activate the public realm and synergise with the , Hong Kong Convention and Exhibition Centre (HKCEC) and nearby arts and cultural facilities (i.e. Hong Kong Arts Centre and Hong Kong Academy for Performing Arts).

4.3 Pierside Precinct

4.3.1 With a total area of around 4 ha, the Pierside Precinct will be one of the largest waterfront parks in Hong Kong. The design intention is to turn this piece of newly reclaimed land into an internationally-renowned harbourfront to showcase the vibrancy and dynamics of Hong Kong, and to offer diverse and round-the-clock experiences including outdoor performance, gourmet dining and other harbourfront events to the locals and visitors. The Harbour Performance Area and the Gourmet Dining Square are the major features in the Pierside Precinct.

4.3.2 Other key features of the precinct include flexible event space, thematic garden and interactive water features including dry music fountain and water play area for strengthening land-water interaction and contribute to a diverse landscape experience. In response to Wan Chai DC’s request, a pet playground is proposed at the eastern part of Pierside Precinct.

October 2019 5

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

4.4 Water Sports and Recreation Precinct

4.4.1 The design intention of the Water Sports and Recreation Precinct is to make full use of the water space offered by the Wan Chai ex-Public Cargo Working Area (ex-PCWA) to introduce water sports and recreational activities for public enjoyment near the harbour. The precinct, comprising a total land area of about 1.3 ha and water space of about 2.5 ha, is a public leisure ground setting around the Wan Chai ex-PCWA to showcase the new water play concepts and share use of various water-related activities, and to promote water-friendly culture to meet general public’s recreation needs. The whole precinct will adopt a flexible design to facilitate the hosting of local and international water sports events.

4.4.2 Two supporting buildings known as Harbour Recreation Annex and Harbour Education Annex are proposed for the provision of ancillary and supporting facilities for holding local and international water sports events. Harbour Steps, i.e. the step-down water edge without railing, along the western and southern edge of the inner basin are proposed. Other supporting facilities include landing steps, floating pontoons, and other pedestrian facilities.

4.4.3 To resolve the major public concerns on water safety and water quality, suitable wave attenuator and measures to enhance the near shore water quality have been considered in the Study. It is recommended that the actual wave attenuation and water quality improvement measures should be further considered and undertaken at implementation stage.

4.5 Revitalised Typhoon Shelter Precinct

4.5.1 The design intention of this precinct is to revitalise the Typhoon Shelter (CWBTS) and its promenade to echo with the presence of various cultural and historic elements (e.g. the typhoon shelter, Kellett Island, Noonday Gun, relocated Floating Tin Hau Temple, etc.) to optimise the use of the CWBTS for public enjoyment, and to make full use of the water space. The proposals also aim to enhance vibrancy of the precinct area. The harbourfront enhancement proposals will not affect the operation of the CWBTS.

4.5.2 Enhancement proposals at the Revitalised Typhoon Shelter Precinct mainly focus on improving the pedestrian environment of the existing promenade mainly through landscaping and streetscape enhancements to provide a pleasant promenade environment for public enjoyment. The Northern Breakwater is proposed to be enhanced by adding cantilevered viewing deck over the sloping section of the breakwater for public enjoyment of the panoramic view of the harbour from the typhoon shelter. Proper landing steps will be provided. Visitors could get access to the viewing deck using the sampan services.

October 2019 6

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

4.6 East Coast Park Precinct

4.6.1 The East Coast Park Precinct, with an area of about 5 ha, will offer a diverse range of activities to citizens of all ages and interests to engage with their public space to promote concepts of “well-being” and “healthy-living”. This precinct comprises two major zones. The south-western portion on ground level will be developed into a community park, known as the “Community Park Zone”. The north-eastern portion, which is located on the roof of the Central- Wan Chai Bypass Tunnel Portal, namely “Roof-top Landscaped Park Zone”, will be developed into a landscaped park for public enjoyment. Continuous pedestrian walkway and leisure bicycle trail will be provided along the waterfront and will extend eastwards to integrate with the bicycle trail on the proposed boardwalk underneath .

4.7 Streetscape Enhancement Proposals

4.7.1 In order to foster a more attractive walking environment to guide visitors to the waterfront, streetscape enhancement works are proposed to be undertaken along five major entrance corridors including Expo Drive East, Tonnochy Road near Hung Hing Road, Hung Hing Road near the Royal Hong Kong Yacht Club, Watson Road and Oil Street.

4.8 Pedestrian Connectivity and Transport Arrangement

4.8.1 A Comprehensive Connectivity Plan has been developed to illustrate the network of major existing, planned, proposed at-grade, elevated and underground pedestrian connections.

4.8.2 In terms of transport arrangement, the public generally agrees that the New Wan Chai North Point Harbourfront should be accessed by public transport, noting that the Wan Chai to North Point harbourfront areas are well served by public transport including railway (the existing Island Line, the future Shatin to Central Link (SCL), etc.), buses, mini-buses, taxis, ferries, etc. Access by private vehicles should be discouraged through minimal parking provision to alleviate the traffic congestion problems.

4.8.3 Traffic measures in support of the HEPs include:

▪ a small amount of car parking space provision within the Harbour Education Annex in support of the future water sports events is found to be feasible subject to detailed design; ▪ laybys, loading/unloading and pick-up/drop-off facilities have been designated along Expo Drive East, Hung Hing Road, and Victoria Park Road to facilitate the daily pickup/ drop-off and loading/ unloading activities; and ▪ two new coach parks have been planned at Convention Avenue and Wan Shing Street, accommodating a total of about 24 no. and 8 no. of coach parking spaces respectively.

October 2019 7

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

Bicycle Trail

4.8.4 In response to keen public aspirations for cycling activities within the harbourfront areas, it is the design intention to provide safe and comfortable cycling facilities and arrangements along the whole stretch of the Wan Chai to North Point harbourfront areas. Nevertheless, due to various site constraints such as insufficient width at certain parts of the existing harbourfront, provision of a continuous dedicated bicycle trail along the whole stretch of the harbourfront areas may not be feasible. The Study adopts a principle that wherever sufficient space along the harbourfront areas is available, a dedicated bicycle trail should be provided while share use arrangement should be adopted at the bottle-neck and congested pedestrian areas where all users including pedestrians and cyclists would need to share the waterfront space in a peaceful and mutual-respect manner.

4.8.5 Based on the above design principle, dedicated bicycle trails with a total length of about 1.6km will be designated. The shared use section is estimated to be around 1.8km long. It should be noted that the whole bicycle network along the harbourfront from Wan Chai to North Point is low speed and mainly for leisure purpose only.

4.8.6 To minimise the cyclists/pedestrians interface, suitable design measures (e.g. informative signage, suitable paving materials, etc.) should be provided to emphasise the “shared-use zone” to cyclists. Ancillary cycling facilities (e.g. bicycle racks and parking areas, rental facilities etc.) should be provided.

4.9 Marine Supporting Facilities

4.9.1 In order to achieve the Study’s vision to bring people closer to the water, various marine supporting facilities are proposed, such as Harbour Steps, landing steps, floating pontoons within the Water Sports and Recreation Precinct to facilitate land-water access and strengthen water-land interaction, as well as viewing decks over a breakwater within the Revitalised Typhoon Shelter Precinct to allow the public to get closer to the water.

4.9.2 Wave attenuation measures have been explored to address the wave issue within the Water Sports and Recreation Precinct to ensure water safety. Among various types of wave attenuation measures, floating modular wavebrake system is recommended, subject to further technical assessment and wave attenuation requirements pursuant to the specific activities to be carried out in the precinct at implementation stage.

October 2019 8

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

4.10 Landscape Planning Framework and Proposals

4.10.1 A broad-brush tree survey has been conducted to evaluate the existing locations and species of the tree groups within the AOI.

4.10.2 Based on the broad-brush tree survey, initial landscape proposals covering softscape and hardscape palettes and provision of landscape features with distinct planting themes, recommended tree/ planting species, hard landscape materials such as paving design, street furniture, etc. have been formulated and incorporated in the MLP of each of the character precincts. The Study adopts a general principle that the existing trees would be retained as far as practicable, subject to future waterfront design. However, since the HEPs are subject to detailed design and technical feasibility studies, more detailed tree investigation/landscaping proposals should be carried out at the implementation stage.

4.11 Smart and Green City Design/Installations

4.11.1 Smart, green and sustainable elements are incorporated into the recommended HEPs to optimise energy efficiency, environmental friendliness and liveability in various aspects.

October 2019 9

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

5 PLANNING AND DESIGN BRIEFS

5.1 Objectives of the Planning and Design Briefs

5.1.1 Based on the identified major urban design considerations, the refined UDFP and the recommended HEPs, a set of planning and design briefs has been formulated as the basis for the detailed design and engineering feasibility assessments of individual harbourfront enhancement projects at implementation stage, and to guide the future planning and implementation of the HEPs within the Wan Chai North and North Point harbourfront areas.

5.1.2 While the planning and design briefs are non-statutory, they have been formulated based on views and aspirations of the stakeholders and general public, and therefore, they should be observed by the implementation agents during the implementation stage. The Planning and Design Briefs conform to the development parameters as set out in the Approved Wan Chai North and North Point OZPs No. S/H25/4 and S/H8/26 respectively.

5.1.3 In order to allow sufficient design flexibility for detailed design at implementation stage, only broad and general planning and design requirements would be set out in the planning and design briefs.

5.2 Contents of the Planning and Design Briefs

5.2.1 A total of five planning and design briefs were prepared for the five respective character precincts. Content of the Planning and Design Brief for each precinct include:

▪ the background and planning context of the proposed Precinct and its surrounding (i.e. existing and planned land uses, accesses, connectivity, landscape planning framework, built form, air/visual corridors, etc.); ▪ the planning and urban design vision and objectives of the New Wan Chai North Point Harbourfront, as well as the urban design principles that provides for the foundation of the HEPs; ▪ the planning parameters and design requirements for the overall precinct and key features (i.e. building height and GFA restrictions, greening and shading ratio, connectivity, transport provision, air and view corridors, relevant facilities, utilities requirements, etc.); and ▪ a broad implementation framework and control mechanism of the relevant recommended HEPs.

October 2019 10

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

6 IMPLEMENTATION

6.1 Implementation Modes and Long-Term Management

6.1.1 As revealed in the public comments received in the two-stage PE, the conventional implementation modes and long-term management mechanisms for the harbourfront areas by the public sector are sometime considered conservative, subject to different limitations (e.g. resources and regulations) and may not be adaptive to changes nor meeting public aspirations. Considerations should therefore be given to explore alternative and innovative implementation modes and long-term management mechanisms such as public-private partnership, participation by non-governmental organisations, etc. to leverage on their creativity and expertise. In order to attract their participation, an important consideration is whether there is a viable business case for the projects; in other words, an implementation mode/mechanism to make the implementation and long-term management of the harbourfront areas self-sustainable financially would be pivotal. To realise such intention, increase in financial incentives such as relaxation of gross floor area and building height restrictions, increase in commercial elements, etc. would need to be explored at implementation stage as appropriate.

6.2 Implementation Programme

6.2.1 The implementation programme of the recommended HEPs would hinge on the release of the various works sites or works areas after the completion of the ongoing and planned/proposed major infrastructural projects/developments, including the ongoing Wan Chai Development Phase II, SCL, and the proposed North Island Line, convention facilities above Exhibition Centre Station and Wan Chai Government Towers redevelopment.

6.2.2 Notwithstanding the above, noting that the public is looking forward to early implementation of the HEPs, construction of two quick-win projects comprising two sections of waterfront promenades, i.e. one to the west of the HKCEC and the other one around the New Wan Chai Ferry Pier, commenced in 2019 for public enjoyment.

6.3 Other Considerations

Technical Feasibility

6.3.1 Broad technical assessments have been conducted for the recommended HEPs, which demonstrates that implementation of the HEPs is prima-facie technically feasible. However, it should be emphasised that detailed design and engineering feasibility studies including environmental reviews will have to be undertaken for individual harbourfront enhancement projects taking into account the latest circumstances before implementation.

October 2019 11

Agreement No. CE 54/2014 (TP) Executive Summary Urban Design Study for the Wan Chai North and North Point Harbourfront Areas

Protection of Harbour Ordinance

6.3.2 While the proposed harbourfront enhancements have avoided proposals with the Protection of Harbour Ordinance (PHO) implications, the proposed floating pontoon may have PHO implications. Besides, cantilevered boardwalk along the CWBTS promenade as advocated by many public members may also have implications for the PHO. Further study would be required in the detailed design and implementation stages to ensure compliance with the statutory requirements.

Water Quality

6.3.3 The degree of human contact with water, whether primary or secondary, will depend on the water quality. While the Government has ongoing initiatives, including the “Further Enhancing Quality of The Coastal Waters of ” of the Environmental Protection Department to explore practical options to effectively reduce nearshore pollution and enhance the quality of coastal water of the Victoria Harbour, the future implementation agents should also carry out separate water quality assessment during the detailed design and implementation stages to protect public health.

- End -

October 2019 12

O AO NN AN

O

VICTORIA HARBOUR

AON OA

N OA

CAUSEWAY BAY TYPHOON SHELTER N N

tt

O OA t t t

AN N .

N N OA ct

ONNON AN ONNO OA O OA A t

N OA t t A AO OA Ac AA OA 研究範圍 A OA t At A t O A c O AO NN AN t OA OA 考慮範圍 A OA

NN OA O

VICTORIA HARBOUR

AON OA

N OA

CAUSEWAY BAY TYPHOON SHELTER N N

tt

O OA t t t

AN N .

N N OA ct

ONNON AN ONNO OA O OA A t

N OA t t A AO OA Ac AA OA 研究範圍 A OA t At A t O A c t OA OA 考慮範圍 A OA

NN OA

Figure 圖 : 1.1 Study Area 研究範圍 Oct. 2019 N/A LEGEND 圖例 INCT REC Existing Major Open Space/ Recreation Facility P Character Precinct Proposed Water Taxi Route RK To North Point 主題區 現有主要休憩用地/康樂設施 擬議的水上的士連接路線 A Waterfront P 區 Planned Elevated Landscaped Deck Major Landmark Building Major View Corridor Towards Waterfront ST 題 往北角海濱 現有地標建築 A 主 已規劃的高架園景平台 通往海濱的主要景觀廊 園 New Open Space O Planned/Proposed Elevated Pedestrian Connection Existing / Committed Major Landmark Element C 公 新的休憩用地 T 岸 已規劃/擬議的高架行人連接 現有/已規劃的主要地標元素 S Potential Continuous Waterfront Linkage New Water-related Area and Typhoon Shelter A 東 Existing / Potential Point of Interest E 可能的連貫海濱連接 新「親水互動」區及避風塘 現有/可能的特色景點 Primary N-S Pedestrian Connection Promenade Area Existing / Proposed Landing Steps and Supporting Facility 主要南北向行人連接 海濱長廊 現有/擬議的登岸台階和配套設施 Secondary Pedestrian Connection Proposed Waterfront Commercial Site Existing / Under Construction / Proposed MTR Station 次要行人連接 擬議海濱商業設施 現有/正在興建/擬議的港鐵站 Oil Street Tertiary Pedestrian Connection Landscaped Roof over Tunnel Portal 輔助行人連接 隧道口上的景觀平台 LTER PRECINCT 油街 Oi! Major E-W Vehicular Connection SHE 油街實現 主要東西向道路連接 ON HO 區 Proposed Bicycle Trail (Low Speed) YP 題 擬議的單車徑 T 塘主 ED 風 Proposed Shared Use Promenade IS 避 by All Users including Cyclists L 力 A Watson Road T 活 擬議為各使用者包括單車使用者共享的海傍 I V FORTRESS HILL Existing Wan Chai Heritage Trail E STATION R 屈臣道 現有的灣仔歷史文物徑 港鐵炮台山站

Possible Connection (under separate study) Ferry to Tsim Sha Tsui N 可能的連接 (其他研究建議) EATIO PRECI 往尖沙咀渡輪 ECR NC PRECINCT R T ION & 題區 AT TS 樂主 BR R 康 E 題區 O 及 EL 典主 P 動 C 慶 RSIDE PRE S 運 Tin Hau E C 英皇道 PI INC R 上 Temple T E Gordon歌頓道 Road T 水 天后廟 Electric Road 直升機停機坪 碼頭畔 Helipad 輪 主 A 渡 題區

W

King’s Road

The Monument in Commemoration Royal Hong Kong of the Return of Hong Kong to China Golden Bauhinia 電氣道 Square Yacht Club 香港回歸祖國紀念碑 金紫荊廣場 香港遊艇會

New Pier (Harbour Cruise) Wan Chai 碼頭 Hong Kong (維港遊) Ferry Pier Noon Expo Dr. E To Central Waterfront Convention 新灣仔渡輪碼頭 Day Gun 往中環海濱 & Exhibition Centre 香港會議展覽中心 午炮 TIN HAU Police STATION 博覽道東 Officers’ Club PROPOSED Victoria Park 港鐵天后站 警官會所 CAUSEWAY BAY 維多利亞公園 NORTH STATION (INDICATIVE ONLY) EXHIBITION CENTRE Proposed Feature Bridge 擬議的銅鑼灣北站 STATION WITH 擬議特色天橋 (僅供參考) PUBLIC TRANSPORT Paterson Street INTERCHANGE 百德新街 Proposed Convention Facilities 會展站及公共 above Exhibition Centre Station 交通交匯處 高士威道 擬議的會展站 Percival Street 上蓋會議設施 Wan Chai 波斯富街 Sports Ground Gloucester Road Causeway Bay 港灣道 灣仔運動場 Canal Road East SOGO Sports Ground Harbour Road 崇光百貨 HK Academy 告士打道 Causeway Road 銅鑼灣運動場 for Performing Arts Proposed Convention 堅拿道東 Great 記利佐治街George Street 香港演藝學院 Hong Kong and Exhibition Facilities Hong Kong 擬議的會議及 Central Library Arts Centre Marsh Road CAUSEWAY BAY 希慎廣場 香港藝術中心 展覽設施 STATION 香港中央圖書館 Chinese Recreation Club 告士打道 馬師道 港鐵銅鑼灣站 中華遊樂會 Gloucester Road Kai Chiu啟超道 Road Stewart Road

Fleming Road Tonnochy Road

O'Brien Road Fenwick Street Fenwick

史釗域道

柯布連道 菲林明道 杜老誌道

分域街

Luard Road Luard 盧押道

Times Square WAN CHAI 時代廣場 STATION 軒尼詩道 港鐵灣仔站 Hennessy Road N Southorn Playground 修頓球場 莊士敦道 Johnston Road 0 50 125 250 500M

Figure 圖 : 3.1 Refined Urban Design Framework Plan 優化後的城市設計大綱圖 Oct. 2019 N/A Figure 圖 : 4.1 Recommended Master Layout Plan 擬議的總綱發展藍圖 Oct. 2019 N/A