Suggested Alternative Routes During Disruption
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
4203 SLT Brochure 6/21/04 19:08 Page 1
4203 SLT brochure 6/21/04 19:08 Page 1 South London Trams Transport for Everyone The case for extensions to Tramlink 4203 SLT brochure 6/21/04 19:09 Page 2 South London Trams Introduction South London Partnership Given the importance of good Tramlink is a highly successful integrated transport and the public transport system. It is is the strategic proven success of Tramlink reliable, frequent and fast, offers a partnership for south in the region, South London high degree of personal security, Partnership together with the is well used and highly regarded. London. It promotes London Borough of Lambeth has the interests of south established a dedicated lobby This document sets out the case group – South London Trams – for extensions to the tram London as a sub-region to promote extensions to the network in south London. in its own right and as a Tramlink network in south London, drawing on the major contributor to the widespread public and private development of London sector support for trams and as a world class city. extensions in south London. 4203 SLT brochure 6/21/04 19:09 Page 4 South London Trams Transport for Everyone No need for a ramp operated by the driver “Light rail delivers The introduction of Tramlink has The tram has also enabled Integration is key to Tramlink’s been hugely beneficial for its local previously isolated local residents success. Extending Tramlink fast, frequent and south London community. It serves to travel to jobs, training, leisure provides an opportunity for the reliable services and the whole of the community, with and cultural activities – giving wider south London community trams – unlike buses and trains – them a greater feeling of being to enjoy these benefits. -
Joint Performance Improvement Update
Joint Performance Improvement Update Period 1 (2018-19) This report gives progress on the joint improvement plan for Govia Thameslink Railway (GTR) and Network Rail with punctuality data by route, as well as the main operational issues in the period (there are 13, 4-week reporting periods per year), and planned customer improvements. PPM* statistics and delay responsibility by route – Period 1 (to 28 April 2018) Gatwick Express Great Northern Southern Thameslink *The public performance measure (PPM) data above shows the percentage of trains which arrive at their terminating station within five minutes of the planned arrival time. It combines figures for punctuality and reliability into a single performance measure. A summary of key issues affecting performance in this period In period 1, GTR’s PPM was 85.2% with the main incidents affecting performance being the emergency services dealing with incidents near South Croydon on 7 and 19 April, these services dealing with an incident near Cricklewood on 3 April, a track circuit failure near Hornsey on 19 April and a vehicle striking a bridge near East Croydon on 11 April. The PPM for each of the brands for this period was: Gatwick Express 79.01%, Great Northern 87.33%, Southern 83.49% and Thameslink 89.33%. Delivering improvements for passengers Thameslink Class 700s There are 71 class 700 trains in regular service between Brighton and London Bridge or Bedford; between Wimbledon, Sutton, St Albans and Luton; on the Sevenoaks route and between Horsham / Littlehampton and London. Performance Strategy Huge investment is being put into the railway which will ultimately deliver more capacity through new and longer trains at the end of the Thameslink programme in 2018, as well as a transformed station at London Bridge. -
Transport with So Many Ways to Get to and Around London, Doing Business Here Has Never Been Easier
Transport With so many ways to get to and around London, doing business here has never been easier First Capital Connect runs up to four trains an hour to Blackfriars/London Bridge. Fares from £8.90 single; journey time 35 mins. firstcapitalconnect.co.uk To London by coach There is an hourly coach service to Victoria Coach Station run by National Express Airport. Fares from £7.30 single; journey time 1 hour 20 mins. nationalexpress.com London Heathrow Airport T: +44 (0)844 335 1801 baa.com To London by Tube The Piccadilly line connects all five terminals with central London. Fares from £4 single (from £2.20 with an Oyster card); journey time about an hour. tfl.gov.uk/tube To London by rail The Heathrow Express runs four non- Greater London & airport locations stop trains an hour to and from London Paddington station. Fares from £16.50 single; journey time 15-20 mins. Transport for London (TfL) Travelcards are not valid This section details the various types Getting here on this service. of transport available in London, providing heathrowexpress.com information on how to get to the city On arrival from the airports, and how to get around Heathrow Connect runs between once in town. There are also listings for London City Airport Heathrow and Paddington via five stations transport companies, whether travelling T: +44 (0)20 7646 0088 in west London. Fares from £7.40 single. by road, rail, river, or even by bike or on londoncityairport.com Trains run every 30 mins; journey time foot. See the Transport & Sightseeing around 25 mins. -
London National Park City Week 2018
London National Park City Week 2018 Saturday 21 July – Sunday 29 July www.london.gov.uk/national-park-city-week Share your experiences using #NationalParkCity SATURDAY JULY 21 All day events InspiralLondon DayNight Trail Relay, 12 am – 12am Theme: Arts in Parks Meet at Kings Cross Square - Spindle Sculpture by Henry Moore - Start of InspiralLondon Metropolitan Trail, N1C 4DE (at midnight or join us along the route) Come and experience London as a National Park City day and night at this relay walk of InspiralLondon Metropolitan Trail. Join a team of artists and inspirallers as they walk non-stop for 48 hours to cover the first six parts of this 36- section walk. There are designated points where you can pick up the trail, with walks from one mile to eight miles plus. Visit InspiralLondon to find out more. The Crofton Park Railway Garden Sensory-Learning Themed Garden, 10am- 5:30pm Theme: Look & learn Crofton Park Railway Garden, Marnock Road, SE4 1AZ The railway garden opens its doors to showcase its plans for creating a 'sensory-learning' themed garden. Drop in at any time on the day to explore the garden, the landscaping plans, the various stalls or join one of the workshops. Free event, just turn up. Find out more on Crofton Park Railway Garden Brockley Tree Peaks Trail, 10am - 5:30pm Theme: Day walk & talk Crofton Park Railway Garden, Marnock Road, London, SE4 1AZ Collect your map and discount voucher before heading off to explore the wider Brockley area along a five-mile circular walk. The route will take you through the valley of the River Ravensbourne at Ladywell Fields and to the peaks of Blythe Hill Fields, Hilly Fields, One Tree Hill for the best views across London! You’ll find loads of great places to enjoy food and drink along the way and independent shops to explore (with some offering ten per cent for visitors on the day with your voucher). -
Govia Thameslink Railway
Autumn 2020 WE’RE WITH YOU FOR EVERY JOURNEY Looking ahead We’ve introduced lots of changes across our stations and trains to keep you safe – plus, find out the little things you can do to help protect yourself and others. Contents A welcome back We’re saying thanks to our to the railway railway and NHS heroes How we’re keeping you safe Protecting yourself and Get to know our on-board and in our stations others on your journey Customer Service Director What we’ve changed based on Three new tools to help colleague and student feedback you travel safely Our recent projects to Supporting vulnerable people The latest on our help the local community across our network station upgrade What this means Using our apps for a for you safer and quicker journey Where we’re investing Latest customer service and to help you on-time performance targets Autumn 2020 | 2 Hello from Patrick, our Chief Executive Officer On behalf of the whole team For our part, we are determined The next few months will almost at Southern, Gatwick Express, that everyone who would like to certainly have challenges of their Great Northern and Thameslink, travel is supported to do so. We own, but getting people back on I am delighted to welcome you have implemented an enhanced trains, buses and bikes and not back to the railway. cleaning regime, new smart stationary in cars in bumper-to- ticketing and even more ways bumper traffic, will be critical to To say this has been a challenging for passengers to access the our health and our future. -
Rail Accident Report
Rail Accident Report Fatal accident at Morden Hall Park footpath crossing 13 September 2008 Report 06/2009 March 2009 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2009 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Fatal accident at Morden Hall Park footpath crossing, 13 September 2008 Contents Introduction 5 Preface 5 Key definitions 5 The Accident 6 Summary of the accident 6 The parties involved 6 Location 7 External circumstances 11 The tram 11 The accident 11 Consequences of the accident 11 Events following the accident 12 The Investigation 13 Investigation process and sources of evidence 13 Key Information 14 Previous -
Tfl Interchange Signs Standard
Transport for London Interchange signs standard Issue 5 MAYOR OF LONDON Transport for London 1 Interchange signs standard Contents 1 Introduction 3 Directional signs and wayfinding principles 1.1 Types of interchange sign 3.1 Directional signing at Interchanges 1.2 Core network symbols 3.2 Directional signing to networks 1.3 Totem signs 3.3 Incorporating service information 1.3 Horizontal format 3.4 Wayfinding sequence 1.4 Network identification within interchanges 3.5 Accessible routes 1.5 Pictograms 3.6 Line diagrams – Priciples 3.7 Line diagrams – Line representation 3.8 Line diagrams – Symbology 3.9 Platform finders Specific networks : 2 3.10 Platform confirmation signs National Rail 2.1 3.11 Platform station names London Underground 2.2 3.12 Way out signs Docklands Light Railway 2.3 3.13 Multiple exits London Overground 2.4 3.14 Linking with Legible London London Buses 2.5 3.15 Exit guides 2.6 London Tramlink 3.16 Exit guides – Decision points 2.7 London Coach Stations 3.17 Exit guides on other networks 2.8 London River Services 3.18 Signing to bus services 2.9 Taxis 3.19 Signing to bus services – Route changes 2.10 Cycles 3.20 Viewing distances 3.21 Maintaining clear sightlines 4 References and contacts Interchange signing standard Issue 5 1 Introduction Contents Good signing and information ensure our customers can understand Londons extensive public transport system and can make journeys without undue difficulty and frustruation. At interchanges there may be several networks, operators and line identities which if displayed together without consideration may cause confusion for customers. -
Croydon Tramlink Derailment on 9 November 2016 1
Safety, Sustainability and Human Resources Panel Date: 17 November 2016 Item: Croydon Tramlink Derailment on 9 November 2016 1 Summary 1.1 This item will provide an update on the Croydon Tramlink derailment on 9 November 2016. 1.2 The incident occurred on the day of publication of the agenda and papers for this meeting and accordingly an update will be provided at the meeting. 2 Recommendation 2.1 The Panel is asked to note this paper. List of appendices to this report: Presentation on Croydon Tramlink Derailment List of Background Papers: None. Contact: Leon Daniels, Managing Director, Surface Transport Number: 020 3054 0180 Email: [email protected] 1 THURSDAY 17 NOVEMBER Croydon Tramlink derailment on 9 November 2016 2 CROYDON TRAMLINK DERAILMENT What happened At 06:07 on Wednesday 9 November, tram 2551 was travelling from New Addington to Sandilands As it came out of the tunnel section, it began to follow the turn in the track but as it did so it derailed and subsequently turned onto its right side Emergency services – London Ambulance Service, London Fire Brigade and British Transport Police – were contacted and responded swiftly Tragically, this resulted in seven fatalities and 51 injuries requiring hospital treatment Rails and electrical equipment in the area suffered significant infrastructure damage 3 CROYDON TRAMLINK DERAILMENT Location To Beckenham Junction/Elmers End Site of incident Sandilands tramstop Direction of travel To New Addington To Croydon/Wimbledon 4 CROYDON TRAMLINK DERAILMENT Our immediate response Following -
Passenger and Freight Rail Performance 2016-17 Q4
Passenger and Freight Rail Performance 2016 -17 Q4 Statistical Release Publication date: 11 May 2017 Next publication date: 21 September 2017 Background Rail passenger performance (Public Performance Measure) This release contains in 2016-17 (87.7%) was the lowest annual score recorded information on passenger and since 2005-06. freight rail performance in Great Britain with the latest quarterly Performance on the Thameslink, Southern and Great data referring to January, Northern (TSGN) franchise continued to deteriorate. Govia February and March 2017. Thameslink Railway recorded the franchise’s lowest annual All data in this release are performance score since the time series began in 2004-05. sourced from Network Rail. Passenger performance is Compared with assessed using two measures: PPM - 2016-17 Q4 2015-16 Public Performance Measure National (GB) 87.7% -1.4 pp (PPM) and Cancellations and Significant Lateness (CaSL). Regional and Scotland 91.3% 0.1 pp In addition to the PPM and London & South East 85.2% -2.6 pp CaSL data in this release, delay Long Distance 87.6% 0.0 pp minute data are published quarterly on the Data Portal. The proportion of trains cancelled or significantly late in The Freight Delivery Metric 2016-17 (3.8%) was the highest since 2002-03 (4.3%). (FDM) is the primary measure The London and South East sector recorded its highest of freight performance in Great CaSL rate (4.8%) since the time series began in 1997-98. Britain. Contents Compared with Public Performance Measure – 2 CaSL - 2016-17 Q4 2015-16 Cancellations and Significant National (GB) 3.8% 0.8 pp Lateness – 12 Thameslink, Southern and Great Regional and Scotland 2.3% 0.2 pp Northern – 21 Freight Delivery Metric – 23 London & South East 4.8% 1.3 pp Annexes – page 24 Long Distance 4.8% 0.2 pp Responsible Statistician: Abby Sneade (Tel: 020 7282 2022) Author: Tom Leveson Gower Public Enquiries: Email: [email protected] Media Enquiries: Tel: 020 7282 2094 Website: http://orr.gov.uk/statistics/published-stats/statistical-releases 1. -
Crossrail Environmental Statement 8A
Crossrail Environmental Statement Volume 8a Appendices Transport assessment: methodology and principal findings 8a If you would like information about Crossrail in your language, please contact Crossrail supplying your name and postal address and please state the language or format that you require. To request information about Crossrail contact details: in large print, Braille or audio cassette, Crossrail FREEPOST NAT6945 please contact Crossrail. London SW1H0BR Email: [email protected] Helpdesk: 0845 602 3813 (24-hours, 7-days a week) Crossrail Environmental Statement Volume 8A – Appendices Transport Assessment: Methodology and Principal Findings February 2005 This volume of the Transport Assessment Report is produced by Mott MacDonald – responsible for assessment of temporary impacts for the Central and Eastern route sections and for editing and co-ordination; Halcrow – responsible for assessment of permanent impacts route-wide; Scott Wilson – responsible for assessment of temporary impacts for the Western route section; and Faber Maunsell – responsible for assessment of temporary and permanent impacts in the Tottenham Court Road East station area, … working with the Crossrail Planning Team. Mott MacDonald St Anne House, 20–26 Wellesley Road, Croydon, Surrey CR9 2UL, United Kingdom www.mottmac.com Halcrow Group Limited Vineyard House, 44 Brook Green, Hammersmith, London W6 7BY, United Kingdom www.halcrow.com Scott Wilson 8 Greencoat Place, London SW1P 1PL, United Kingdom This document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of Mott MacDonald, Halcrow, Scott www.scottwilson.com Wilson and Faber Maunsell being obtained. -
London Trams Table of Contents
Rail Vehicle Accessibility: Exemption Application London Trams Table of Contents Foreword..............................................................................................................................3 Passenger Doorway Audible Warning Devices.................................................................4 Internal Passenger Information Displays ..........................................................................8 Handrail Clearances, Door Lighting, Floor Obstruction .................................................12 Page 2 of 17 Foreword The 24 Bombardier CR4000 trams entered service in 2000 at which time the Rail Vehicle Accessibility Regulations (RVAR) 1998 was in force, with the newer 12 Stadler Variobahn trams entering service in 2012, 2015 and 2016. RVAR 2010 came into force on 6th April 2010. The following year Transport for London (TfL) commissioned a review of the Bombardier CR4000 fleet against the Requirements of RVAR 2010. Since the 2011 review several work streams have been carried out to make modifications to the trams to address the areas of non-compliance. However due to the prioritisation of maintenance activities to ensure availability of the required number of trams to meet service each day and safety related works; all the necessary modifications to the trams have not taken place. Operating within tight budgetary constraints has also led to the de-scoping of works items, and often meant the non- availability of budget for works to take place. A further review against the Requirements was performed in August 2019, during which several of the open items on the Bombardier CR4000 were closed, with a few remaining non-compliant. A few instances of non-compliance were also noted on the newer Stadler Trams. Subsequently London Trams has compiled the following application for time limited and permanent exemptions against the remaining areas of non-compliance against the Requirements. Page 3 of 17 Passenger Doorway Audible Warning Devices 1. -
Suggested Alternative Routes During Disruption
Suggested alternative routes during disruption When Thameslink services from this station are subject to unplanned disruption, we have Issued Date: arranged for your ticket to be accepted as indicated below to get you to your destination May 2018 Suggested alternative route details from Wimbledon Chase Thameslink ticket holders To: Suggested routes: Bus 163/164 (from stop MT) to Wimbledon, then South Bus 163/164 (from stop MT) to Wimbledon, South Western Western Railway Trains to Vauxhall, then Victoria line to Railway Trains to Vauxhall, then Victoria line to Victoria, Euston, then West Midland Rail train to Bletchley, West then Green Line Coach 757 (from stop 11*) to Luton Midland Rail train to Bedford St Johns (not Sundays) or Hampton Hotel, then walk to Luton Airport Parkway station West Midland Rail train to Milton Keynes Central, then bus via adjoining footpath. Alternatively from Wimbledon, Bedford Luton Airport X5# (from stop Y4) to Bedford. Alternatively, South Western South Western Railway Trains to Vauxhall, then Victoria line Parkway Railway Trains from Wimbledon to Clapham Junction, then to King's Cross St Pancras, then Great Northern train to Southern train to Bletchley, then West Midland Rail train to Stevenage, then bus 100 (from stop N) to Luton Hampton Bedford St Johns (not Sundays) or Southern train to Milton Hotel, then walk to Luton Airport Parkway station via Keynes Central, then bus X5# (from stop Y4) to Bedford adjoining footpath. (* Stop 11 is opposite Victoria Station Bus 164 (from stop MH) to Rosehill Roundabout,