IADC/SPE 119570 Step-Change Improvements with Wired-Pipe

Total Page:16

File Type:pdf, Size:1020Kb

IADC/SPE 119570 Step-Change Improvements with Wired-Pipe IADC/SPE 119570 Step-Change Improvements with Wired-Pipe Telemetry Scott Allen, SPE, and Chris McCartney, SPE, Occidental Petroleum; Maximo Hernandez, SPE, and Michael Reeves, SPE, NOV IntelliServ; Azaad Baksh and Danial MacFarlane, Baker Hughes Downloaded from http://onepetro.org/spedc/proceedings-pdf/09dc/all-09dc/spe-119570-ms/1784944/spe-119570-ms.pdf by guest on 25 September 2021 Copyright 2009, SPE/IADC Drilling Conference and Exhibition This paper was prepared for presentation at the SPE/IADC Drilling Conference and Exhibition held in Amsterdam, The Netherlands, 17–19 March 2009. This paper was selected for presentation by an SPE/IADC program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Society of Petroleum Engineers or the International Association of Drilling Contractors and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers or the International Association of Drilling Contractors, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers or the International Association of Drilling Contractors is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE/IADC copyright. Abstract This paper describes the rationale, justification and benefits associated with the deployment of wired-pipe telemetry drillstrings at Occidental of Elk Hills, Inc. (OEHI) in Kern County, California. Recent technological advances in Measurement While Drilling (MWD) systems, Logging While Drilling (LWD) systems, and wired-pipe telemetry systems have overcome historical data bandwidth issues enabling real-time acquisition of critical data streams. These data sets include: continuous annular pressure for equivalent circulating density (ECD) management; vibration diagnostics for drilling optimization; instantaneous downlink commands to Rotary Steerable Systems (RSS) that aide in eliminating secondary non-productive time (NPT) and enhancing directional control; and memory quality formation evaluation measurements to improve reservoir navigation and wellbore placement. With this new wealth of data, onsite drilling personnel, geoscientists, and office engineering staff are able to make real-time decisions that serve to enhance wellbore quality and reduce overall costs. Utilizing wired-pipe to its full potential has helped to deliver an average drilling time savings of 10%. Introduction The benefits of drilling dynamics and formation evaluation from MWD and LWD tools are well known. However, these systems are impacted by bandwidth limitations which restrict the amount of data that can be transmitted to surface in real time. Recent advances in technology have addressed this issue. At the OEHI asset, Oxy and the service providers worked together to evaluate the application and benefits of deploying wired-pipe transmitted data in a land based environment. The technology was tested in combination with multiple downhole LWD and RSS tools. The system was tested in both a 5-in. tubular/mud-based and a 4-in. tubular/foam-based environment. Benefits in the Use of Wired-Pipe Telemetry One of the major challenges in a fast rate of penetration (ROP) drilling environment is transmitting all the required data to surface in a timely manner. When mud-pulse telemetry or electromagnetic data transmission is used, a large amount of this data is stored in memory and downloaded after the tool is tripped out of the hole. The drawback to this system is the lag time in receiving and processing the downhole measurements on the surface. As downhole acquisition technology continues to advance, these measurements are requiring additional bandwidth. This reduces the data density of mud-pulse telemetry points transmitted to surface while drilling, thus, making real-time interpretations and decisions challenging. In order to make an interpretation from a full data set, the operators must wait for the bottomhole assembly (BHA) to be tripped out of the hole and the memory data to be downloaded. 2 IADC/SPE 119570 In contrast, wired-pipe telemetry systems provide a bandwidth more than 1,000 times greater than conventional mud-pulse or electromagnetic telemetry systems. Data rates typically achieved with mud-pulse telemetry systems range from 3 to 40 bits per second (bps). In addition, these systems are affected by noise introduced by mud pumps, signal loss due to depth, fluid properties, and/or fluid flow rate since flow is required for transmission. Electromagnetic telemetry data rates range from 3 to 20 bps and these tools are limited in the vertical drilling distance since the signal attenuates heavily in certain formations. Because wired-pipe has a bandwidth of ~57,600 bps, the MWD/LWD personnel on location are able to configure downhole tools to transmit all acquired data through the network at the fastest possible update rates. Transfer of information to the surface can be reliably achieved at a fixed high-speed real-time transmission without being affected by depth, formation resistivity, fluid properties or flow rates. Hence, the drilling progress is optimized regardless of logging and steering requirements. Downloaded from http://onepetro.org/spedc/proceedings-pdf/09dc/all-09dc/spe-119570-ms/1784944/spe-119570-ms.pdf by guest on 25 September 2021 Full Telemetry Redundancy Within the wired-pipe telemetry configuration, the mud-pulse telemetry system serves as a backup should the wired-pipe system malfunction or fail. This redundancy ensures minimum data requirements are continually met and avoids NPT for equipment troubleshooting or repair. The wired-pipe network was fully operational for 87% of the time while it was being used at OEHI. The majority of the downtime experienced was due to learning curve related elements regarding pipe handling and installation resulting in damage to some of the components during the startup of the project. When the proper handling methods were used, the reliability of the system noticeably increased as shown in Fig. 1. Time distribution per well 250 5" String 4" String 200 150 Telemetry not required Actual Telemetry Hrs Telemetry Down Hrs NPT 100 Hours (Total (Total well hours) Hours 50 0 1234567891011121314151617 Well number Fig. 1—Telemetry use and reliability. Minimum NPT even when wired-pipe telemetry is unavailable. High-Speed Bi-Directional Communication The wired-pipe telemetry network enables concurrent high-speed transmission of data between the downhole tools and surface equipment. Thus, the control of the BHA while running RSS or other advanced services that require surface control are enhanced (i.e; formation pressure testing and seismic while drilling). Since there are no restrictions to when commands are sent to the downhole tools, the fully bi-directional nature of wired-pipe telemetry reduces NPT while improving control of all tools. This is in contrast to the downlink transmission process using mud-pulse telemetry systems that require several minutes to send commands to downhole tools. IADC/SPE 119570 3 The initial two (2) wells drilled with wired-pipe telemetry at OEHI realized a drilling time savings of 4 and 6.5 hours respectively (Fig. 2). These wells were drilled in 43.4 hours and 41.5 hours. A 10% time savings and reduced drilling costs significantly improved the project economics. Time No. of Downlink Time and Saved Well Downlinks Confirmation (hr:mm) (hr:mm) 25 bps Mud- Downloaded from http://onepetro.org/spedc/proceedings-pdf/09dc/all-09dc/spe-119570-ms/1784944/spe-119570-ms.pdf by guest on 25 September 2021 Pulse A 58 04:00 0 Telemetry B 71 04:15 0 C 54 03:45 0 Wired- 1 50 N/A 04:02 Pipe Telemetry 2 72 N/A 06:24 3 62 N/A 04:00 Fig. 2—Comparison of downlinking efficiency during the project (all the above wells were drilled in the same field). Wired-Pipe Telemetry Components & Handling The drillstring used for wired-pipe telemetry is similar to a conventional drillstring in functionality, handling, and specifications. The drillpipe is modified to accommodate an inductive coil in the secondary shoulders of the pin and box which allow for data transmission from one joint of drillpipe to the next. The coils at the end of each joint of pipe are connected via a high-strength, high-speed data transmission conductor cable embedded inside the tool joint that exits to the joint internal diameter at the connection upset. The conductor cable is under tension inside the pipe. Electrical continuity from the drillpipe to the BHA is achieved by using an interface sub; therefore, the system network allows bi-directional transmission to and from the downhole tools. Data boosters are embedded in pipe tool joints at ~1500 ft intervals (10-15 per well) to increase signal-to-noise ratio and ensure no data is lost. Also, the boosters are fitted with temperature and pressure sensors allowing for the ability to acquire measurements along the drillstring. On the surface, a data swivel mounted to the topdrive enables the extraction of data flow inside the drillpipe to the surface computers while the pipe is rotating. This system allows for full bi- directional communication at ~57,000 bps while drilling (Fig. 3). Tubular handling and care was of utmost importance since damage to connections could potentially harm the networking components. Proper training of rig personnel on double-shouldered connections was critical to the success of the project. Because tubular dimensions and specifications were the same as regular non-wired, double-shouldered connections, no additional safety hazards were identified with the use of the equipment involved. 4 IADC/SPE 119570 Top Drive Swivel Extracts the Signal on the Rig Telemetry Pipe Conveys the Telemetry Signal Downloaded from http://onepetro.org/spedc/proceedings-pdf/09dc/all-09dc/spe-119570-ms/1784944/spe-119570-ms.pdf by guest on 25 September 2021 DataLink Boosts the Signal, Wellbore Measurements Interface Sub Connects to MWD Tools Fig.
Recommended publications
  • Algeria Upstream OG Report.Pub
    ALGERIA UPSTREAM OIL & GAS REPORT Completed by: M. Smith, Sr. Commercial Officer, K. Achab, Sr. Commercial Specialist, and B. Olinger, Research Assistant Introduction Regulatory Environment Current Market Trends Technical Barriers to Trade and More Competitive Landscape Upcoming Events Best Prospects for U.S. Exporters Industry Resources Introduction Oil and gas have long been the backbone of the Algerian economy thanks to its vast oil and gas reserves, favorable geology, and new opportunities for both conventional and unconventional discovery/production. Unfortunately, the collapse in oil prices beginning in 2014 and the transition to spot market pricing for natural gas over the last three years revealed the weaknesses of this economic model. Because Algeria has not meaningfully diversified its economy since 2014, oil and gas production is even more essential than ever before to the government’s revenue base and political stability. Today’s conjoined global health and economic crises, coupled with persistent declining production levels, have therefore placed Algeria’s oil and gas industry, and the country, at a critical juncture where it requires ample foreign investment and effective technology transfer. One path to the future includes undertaking new oil and gas projects in partnership with international companies (large and small) to revitalize production. The other path, marked by inertia and institutional resistance to change, leads to oil and gas production levels in ten years that will be half of today's production levels. After two decades of autocracy, Algeria’s recent passage of a New Hydrocarbons Law seems to indicate that the country may choose the path of partnership by profoundly changing its tax and investment laws in the hydrocarbons sector to re-attract international oil companies.
    [Show full text]
  • Proceedings of the Sir Mark Oliphant International Frontiers of Science and Technology Australian Geothermal Energy Conference Record 2008/18 Gurgenci, H
    GEOSCIENCE AUSTRALIA Sir Mark Oliphant Conferences – International Frontiers of Science and Technology Proceedings of the Sir Mark Oliphant International Frontiers of Science and Technology Australian Geothermal Energy Conference Record 2008/18 Gurgenci, H. and Budd, A.R. APPLYING GEOSCIENCE TO AUSTRALIA’S MOST IMPORTANT CHALLENGES Proceedings of the Sir Mark Oliphant International Frontiers of Science and Technology Australian Geothermal Energy Conference GEOSCIENCE AUSTRALIA RECORD 2008/18 Edited by Hal Gurgenci 1 and Anthony Budd 2 1 Queensland Geothermal Energy Centre, The University of Queensland, St Lucia 4072 2 Geoscience Australia, GPO Box 378, Canberra, ACT 2601 Department of Resources, Energy and Tourism Minister for Resources and Energy: The Hon. Martin Ferguson, AM MP Secretary: Dr Peter Boxall Geoscience Australia Chief Executive Officer: Dr Neil Williams PSM © Commonwealth of Australia, 2008 This work is copyright. Apart from any fair dealings for the purpose of study, research, criticism, or review, as permitted under the Copyright Act 1968, no part may be reproduced by any process without written permission. Copyright is the responsibility of the Chief Executive Officer, Geoscience Australia. Requests and enquiries should be directed to the Chief Executive Officer, Geoscience Australia, GPO Box 378 Canberra ACT 2601. Geoscience Australia has tried to make the information in this product as accurate as possible. However, it does not guarantee that the information is totally accurate or complete. Therefore, you should not solely rely on this information when making a commercial decision. ISSN 1448-2177 ISBN 978 1 921498 19 0 GeoCat # 67255 Recommended bibliographic reference: Gurgenci, H. and Budd, A.R. (editors), 2008.
    [Show full text]
  • Status of Technology for Deep Borehole Disposal
    STATUS OF TECHNOLOGY FOR DEEP BOREHOLE DISPOSAL John Beswick EPS International Contract No NP 01185 April 2008 EPS International Contract No NP 01185 April 2008 Preface This report has been prepared by EPS International for the Nuclear Decommissioning Authority (NDA). However, the views expressed and the conclusions reached are those of the authors and do not necessarily represent those of the NDA. Conditions of publication This report is made available under the NDA Transparency Policy. In line with this policy, the NDA is seeking to make information on its activities readily available, and to enable interested parties to have access to and influence on its future programmes. The report may be freely used for non-commercial purposes. However, all commercial uses, including copying and re-publication, require permission from the NDA. All copyright, database rights and other intellectual property rights reside with the NDA. Applications for permission to use the report commercially should be made to the NDA Information Manager. Although great care has been taken to ensure the accuracy and completeness of the information contained in this publication, the NDA can not assume any responsibility for consequences that may arise from its use by other parties. © Nuclear Decommissioning Authority 2008. All rights reserved. Bibliography If you would like to see other reports available from NDA, a complete listing can be viewed at our website www.nda.gov.uk, or please write to the Library at the address below. Feedback Readers are invited to provide feedback to the NDA on the contents, clarity and presentation of this report and on the means of improving the range of NDA reports published.
    [Show full text]
  • On the Dynamic Effects During Under-Balanced Drilling Operations
    ON THE DYNAMIC EFFECTS DURING UNDERBALANCED DRILLING OPERATIONS AND THEIR PREVENTION Z. Wang, R. Rommetveit, RF-Rogaland Research; R. Maglione, Agip; A. Bijleveld, KSEPL, Shell; D. Gazaniol, Elf Aquitaine Production RF-- *\~IJois rbceiveo SEP 29 938 OSTt DISCLAIMER Portions of this document may be illegible electronic image products. Images are produced from the best available original document. ABSTRACTS In most underbalanced drilling (UBD) operations, the underbalanced condition must be generated artificially by injecting gas into the well. Due to the high compressibility nature of gaseous phase and interruptions to the system, the flowing system is a non-steady state one, especially when jointed pipes are used. This is experienced by the varying liquid and gas flow-out rates, and spikes in the bottomhole pressure. These dynamic pressures have been observed and documented in field UBD operations. This paper will first present an extensive examination of the dynamic effects during an underbalanced operation. The dynamic effects are often associated with drilling operations, like starting/stopping circulation, gas injection kick-in, changing fluids circulation rates, making connections, tripping, and deployment of BHA and downhole tools. Secondly, we discuss measures that are necessary to avoid the excessive peak loading of the surface facilities, the excessive wellhead pressures, and accidental overbalanced situations downhole. These are developed based on the field experience and simulation results from a dynamic underbalanced drilling simulator. We also demonstrate how a dynamic underbalanced drilling simulator can be used to improve the understanding of the physical process involved and be useful in designing operations. 1 - INTRODUCTION Underbalanced drilling has been used increasingly to address many field and operational problems during the last several years.
    [Show full text]
  • Underbalanced Drilling: Can It Solve the Economic, Environmental and Regulatory Taking Problems Associated with Fracking? 49 J
    UIC Law Review Volume 49 Issue 2 Article 7 Spring 2015 Underbalanced Drilling: Can it Solve the Economic, Environmental and Regulatory Taking Problems Associated with Fracking? 49 J. Marshall L. Rev. 511 (2015) Richard Roddewig W. James Hughes Follow this and additional works at: https://repository.law.uic.edu/lawreview Part of the Energy and Utilities Law Commons, Environmental Law Commons, and the Oil, Gas, and Mineral Law Commons Recommended Citation Richard J. Roddewig & W. James Hughes, Underbalanced Drilling: Can it Solve the Economic, Environmental and Regulatory Taking Problems Associated with Fracking? 49 J. Marshall L. Rev. 511 (2015) https://repository.law.uic.edu/lawreview/vol49/iss2/7 This Article is brought to you for free and open access by UIC Law Open Access Repository. It has been accepted for inclusion in UIC Law Review by an authorized administrator of UIC Law Open Access Repository. For more information, please contact [email protected]. UNDERBALANCED DRILLING: CAN IT SOLVE THE ECONOMIC, ENVIRONMENTAL AND REGULATORY TAKING PROBLEMS ASSOCIATED WITH FRACKING? RICHARD J. RODDEWIG, JD, MAI, CRE, FRICS & W. JAMES HUGHES* I. INTRODUCTION: HYDRAULIC FRACTURING AT THE CROSSROADS – THE CURRENT INTERPLAY OF ECONOMIC, ENVIRONMENTAL AND REGULATORY ISSUES CONFRONTING THE US OIL AND GAS INDUSTRY....................................511 A. Opposition to Fracking: Types and Causes of Concern .............................................................................525 B. The Industry and Regulatory Response to Fracking Opposition:
    [Show full text]
  • Companies Involved in Oilfield Services from Wikipedia, the Free Encyclopedia
    Companies Involved in Oilfield Services From Wikipedia, the free encyclopedia Diversified Oilfield Services Companies These companies deal in a wide range of oilfield services, allowing them access to markets ranging from seismic imaging to deep water oil exploration. Schlumberger Halliburton Baker Weatherford International Oilfield Equipment Companies These companies build rigs and supply hardware for rig upgrades and oilfield operations. Yantai Jereh Petroleum Equipment&Technologies Co., Ltd. National-Oilwell Varco FMC Technologies Cameron Corporation Weir SPM Oil & Gas Zhongman Petroleum & Natural Gas Corpration LappinTech LLC Dresser-Rand Group Inc. Oilfield Services Disposal Companies These companies provide saltwater disposal and transportation services for Oil & Gas.. Frontier Oilfield Services Inc. (FOSI) Oil Exploration and Production Services Contractors These companies deal in seismic imaging technology for oil and gas exploration. ION Geophysical Corporation CGG Veritas Brigham Exploration Company OYO Geospace These firms contract drilling rigs to oil and gas companies for both exploration and production. Transocean Diamond Offshore Drilling Noble Hercules Offshore Parker Drilling Company Pride International ENSCO International Atwood Oceanics Union Drilling Nabors Industries Grey Wolf Pioneer Drilling Co Patterson-UTI Energy Helmerich & Payne Rowan Companies Oil and Gas Pipeline Companies These companies build onshore pipelines to transport oil and gas between cities, states, and countries.
    [Show full text]
  • 2014 IADC Well Control Europe Conference & Exhibition
    2014 IADC Well Control Europe CONFERENCE & EXHIBITION 2-3 December 2014 Aberdeen Exhibition & Conference Center Aberdeen, United Kingdom The 2014 IADC Well Control Conference Europe will seek to examine the innovations that are Call For Abstracts shaping the future of well control, from technology to personnel competencies. This event will focus on timely technical presentations highlighting recent developments and innovations in technology, techniques, training, management systems, and a wide variety of other topics that affect well control. Presentations that pose provocative questions and prompt discussion are especially welcome. Presentations on the following topics are welcomed: • Case Histories • Oil Versus Gas Well Control • Emergency Preparedness • Deepwater and Ultra Deepwater Well Control • Well Design and Construction • Surface BOP Operations • Management Systems • Shallow Gas • Standard Operating Procedures • Diagnostic Logging Operations • Remote Monitoring • Underbalanced Operations and Managed • Training and Human Factors Pressure Drilling • Well Control Competencies • ERD/Directional Drilling, Multi-Laterals and Coal • Automated Well Control Seam Development • Regulatory Issues • Unconventional Situations, Casing Drilling, Monobores, etc. Authors are invited to submit proposals for presentations at the conference. For consideration, an abstract for each proposed paper must be submitted to IADC no later than 1st of May 2014. Authors of papers selected will receive confirmation letters and guidelines by begin June 2014. Please note that formal papers are encouraged, but are NOT required for this conference. Authors of selected presentations may be asked to participate in panel sessions, rather than regular technical sessions. Prior to paper proposal submission, management clearance must be obtained. Any issues concerning clearance should be outlined when the paper proposal is submitted.
    [Show full text]
  • Managed Pressure Drilling & Underbalanced Operations
    8-9 April 2014 • Hotel NH eurobuildiNg • MAdrid 2014 SPE/IADC Managed Pressure Drilling & Underbalanced Operations CONFERENCE & EXHIBITION www.pruitt.com TUESDAY, 8 APRIL 2014 12.00 Luncheon & Open Exhibition 07.00 Conference Registration, Coffee 13.30 MPD – Made Simple through Service & Open Exhibition Technology Madrid IV & Benelux Room Session Chair: John Kozicz, Technology Manager, Transocean 08.30 Welcome Opening & Introduction Simplicity of New System Opens Doors for Wide Use of MPD Helio Santos, President, Paul Sonnemann, Erdem Catak, Thomas Barbato, Safe- Madrid I-III Kick; Emmanuel Franco, Guilherme Vanni, Petrobras The simplicity of this new MPD system opens up the possibility of MPD being 09.00 Panel Session: On Your Mark, Get used on many more wells than with current MPD systems, as the rig crew will be Set, Train! able to do the many of the required tasks, with the user-friendly and straight- Moderator: Dan Munoz, Chairman, IADC Well Control forward approach of the system, reducing the number of people needed to run Committee; Director Special Projects (QHSE), Transocean an MPD job. In general, drilling rigs have remained unchanged for decades. With the Fit-for-Purpose Modeling for Automation of Underbalanced Drilling Operations Ulf Jakob Flø Aarsnes, PhD Student, Department of Engi- new technology today, crews from 20 years ago would struggle to adapt to neering Cybernetics, Norwegian University of Science and Technology; these changes. Automation controls are being utilized in place of the tra- Florent Di Melgio, MINES ParisTech; Ole Morten Aamoe, NTNU; Glenn Ole ditional manual controls, new methods of drilling are being advanced and Kaasa, Statoil AS (SPE/IADC 168955) the industry must hire, train and drive employees toward competency in a timely fashion, while minimizing costs and maximizing productivity.
    [Show full text]
  • 2012 Annual Global Energy Conference
    2012 Annual Global Energy Conference Jefferies 2012 Annual Global Energy Conference Table of Contents Public Company Profiles 4 Private Company Profiles 92 Jefferies Biographies 95 Important Disclosures 103 Jefferies 2012 Annual Global Energy Conference 2 Conference Notes Jefferies 2012 Annual Global Energy Conference 3 Public Company Profiles Jefferies 2012 Annual Global Energy Conference 4 Conference Notes Jefferies 2012 Annual Global Energy Conference 5 Anadarko Petroleum Company Ticker: APC Jefferies Rating: Buy Price: $70.38 (as of Nov 15, 2012) Price / Volume Graph Exchange: NYSE Jefferies Analyst: Subash Chandra Target Price: $96.00 Business Description Founded: 1959 Employees: 4,800 Location: The Woodlands, TX (United States) Anadarko Petroleum Corporation engages in the exploration, development, production, and marketing of natural gas, crude oil, condensate, and natural gas liquids(NGLs) in the United States, Algeria, and internationally. The company operates in three segments: Oil and Gas Exploration and Production; Midstream; and Marketing. The Oil and Gas Exploration and Production segment explores for and produces natural gas, crude oil, condensate, and NGLs. The Midstream segment provides gathering, processing, treating, and transportation services to Anadarko and third-party oil, natural-gas, and NGLs producers, as well as owns and operates gathering, processing, treating, and transportation systems in the United States. The Marketing segment sells oil, natural gas, and NGLs in the United States; and markets oil from Algeria,
    [Show full text]
  • 'Drill-In' Fluids and Drilling Practices Drilling More Productive, Less
    GRC Transactions, Vol. 40, 2016 ‘Drill-In’ Fluids and Drilling Practices Drilling More Productive, Less Costly Geothermal Wells John D. Tuttle and Renan Listi Sinclair Well Products & Services, Inc. [email protected][email protected] Keywords Drilling, drilling fluids, stability, production, formation damage, geothermal drilling, mud, inhibition, potassium, fluid loss ABSTRACT GRC presentations on drilling fluids and formation damage was presented in 2007 and 2010. This current paper exists as an update, and introduces some of the recent developments in geothermal drilling fluids and drilling practices, with specific emphasis on minimizing formation damage and optimizing well producibility, During the past numerous years since the previous paper presentations, mud additives and drilling operations have evolved, and geothermal drilling fluids programs have typically moved away from the conventional hi-temp claybased systems of the past, in favor of minimally-damaging ‘Drill-In’ fluids. These new fluids use little or no Bentonite and conventional LCM, providing benefits which may include enhanced lubricity, superior wellbore stability and inhibition, reduced potential for formation damage, and reduced stimulation requirements. Recent Geothermal Drilling Fluids and Drilling Operations Advancements Non-damaging fluids rheology modifiers (viscosifiers, suspension agents) Non-damaging sweep additives Use of inhibitive base fluids (supported with lab/field testing) Applied Hydraulics Increased mud pump (circulating) capacity Brief History of Geothermal Drilling Fluids As the renewable energy industry ‘gained steam’ and interest during the Arab Oil Embargo of the late ‘70s and early ‘80s, many large O&G companies (Chevron, Unocal, Mobil, Phillips, Occidental, etc) attempted a diversification into the geothermal industry. They brought conventional O&G drilling technologies and drilling fluids, and implemented limited research on high temp drilling fluids systems for this new application.
    [Show full text]
  • Guidelines for Fluid Selection for Underbalanced Drilling
    International Association of Drilling Contractors IADC UNDERBALANCED DRILLING COMMITTEE “Fluid Selection for Underbalanced Drilling Operations” presented at the UB Technology Conference 2001 by the Fluids Subcommittee Rosalvina Guimerans, PhD., Workover/ Production Fluids, PDVSA Fred Curtis, Global UBD Project Manager, Halliburton Robert Urbanowski, Engineering Manager, Grey Wolf Drilling Bill Wilson, Training Manger, Chevron Sid Ruiz (Chairman), Manager of Engineering, MI Initial fluid selection for underbalanced drilling operations is classified into five major fluid types based primarily equivalent circulating density (gas, mist, foam, gasified liquid, liquid). Further delineation within these groups is dependent upon considerations outlined in the IADC-UBO Classification System for Underbalanced Wells (Level 0,1,2,3,4,5) that further delineates selection based on well flow characteristics, well fluid type, surface operating pressure, fluid containment, well control, and applicable health, safety, and environmental issues. Final fluid selection for underbalanced drilling operations can be extremely complex. Key issues such as reservoir characteristics, geophysical characteristics, well fluid characteristics, well geometry, compatibility, hole cleaning, temperature stability, corrosion, drilling BHA, data transmission, surface fluid handling and separation, formation lithology, health and safety, environmental impact, fluid source availability, as well as the primary objective for drilling underbalanced all have to be taken into consideration
    [Show full text]
  • Call for Papers Submission Deadline Extended to 31 March 2019
    2020 Vision to Prosperity: A New Energy Era Emerges Call for Papers Submission Deadline Extended to 31 March 2019 13–15 January 2020 Dhahran EXPO Kingdom of Saudi Arabia go.iptcnet.org/submit 2 I iptcnet.org/20iptc LETTER FROM IPTC 2020 CONFERENCE PROGRAMME CHAIR Dear Colleagues, IPTC 2020 COMMITTEE CHAIRS AND CO-CHAIRS The International Petroleum Technology Conference (IPTC) will be coming for the first time to Saudi Arabia, an oasis of opportunities Executive Committee Chair and a land of a great energy vision. It will take place at the Dhahran Mohammed Y. Al-Qahtani, Saudi Aramco EXPO in Dhahran, from 13–15 January 2020, with Saudi Aramco serving as the Exclusive Host of the 12th edition of the event. Conference Programme Committee Chair Ali M. Al-Shahri, Saudi Aramco A reflection of the 2030 Saudi Prosperity Vision, the IPTC 2020 theme, Vision to Prosperity: A New Energy Era Emerges, Host Committee Co-Chairs highlights the continuous effort in the oil and gas industry to Pinar O. Yilmaz, ExxonMobil Exploration Co. make the new global, and Saudi energy vision a reality. The word Khalid A. Zainalabedin, Saudi Aramco ‘vision’ is tied to the new era of energy that relies on conventional AAPG Subcommittee Co-Chairs resources as well as unconventional resources, clean energy, and Anwar Al Beaiji, Saudi Aramco the 4th industrial revolution. El-Saied M. Hassan Felifel, Schlumberger On behalf of the IPTC Conference Programme Committee, it is our EAGE Subcommittee Co-Chairs pleasure to invite you to submit your abstract for consideration in Naim Al-Jabari, Xross Technology the IPTC 2020 technical programme.
    [Show full text]