Ribbon Cutting Marks Phase 1 Completion of Muddy River Project Story on Page 4 YANKEE ENGINEER 2 May 2017 Yankee
Total Page:16
File Type:pdf, Size:1020Kb
Ribbon Cutting Marks Phase 1 Completion of Muddy River Project Story on Page 4 YANKEE ENGINEER 2 May 2017 Yankee Voices Col. Christopher Barron and Gov. Charlie Baker Unmanned Aircraft, Drones Prohibited on Corps of Engineers Corps of Engineers Federal Lands recreation areas by Timothy Dugan, Public Affairs Office open in May The use of unmanned aircraft systems (UAS), such as drones, are prohibited Most recreation areas at the on or above federal lands and waters managed by the New England District. This 31 federal flood risk management prohibition applies regardless of the location of the operator. reservoirs in New England Federal Aviation Administration definitions: An unmanned aircraft is a component operated by the New England of a UAS. It is defined by statute as an aircraft that is operated without the possibility District will open to the public of direct human intervention from within or on the aircraft (Public Law 112-95, in mid-to-late May 2017. Some Section 331(8)). U.S. Army Corps of Engineers Regulations 36 CFR 327.4b states: recreation areas in Connecticut “operation of aircraft on project lands at other than those designated by the District opened in late April. Commander is prohibited.” Persons found in violation of these regulations may be Most areas offer a wide-range subject to criminal or civil penalties pursuant to 36 C.F.R 327.25. of recreational opportunities, No areas within the New England District’s jurisdiction, including recreation sites, including picnicking, swimming, dams, reservoirs and the Cape Cod Canal, have been designated for drone use boating, fishing and hunting, by the District Commander. This also includes lands under lease agreements with while a few also provide facilities third parties, such as camp grounds and certain recreation areas. Any other UASs for overnight camping, according that are operating within New England District’s jurisdiction have been specifically to officials with the New England approved by the District Commander. District. Why are there no designated areas for drone operation within the New England For a free brochure about 2017 District’s jurisdiction? Corps recreational opportunities Safety – Drones pose a potential hazard to visitors due to malfunction or in New England, including negligent operation. directions to each site, write to Security – Drones could be used criminally against visitors or critical infrastructure. the New England District, U.S. Visitor experience – Drone noise and movements could pose a nuisance or Army Corps of Engineers, ATTN: privacy concern, and negatively impact the experience of other visitors. Public Affairs Office, 696 Virginia There are many other opportunities to enjoy recreation at federal reservoirs and Road, Concord, MA 01742-2751. the Cape Cod Canal in New England. Most areas feature small lakes with facilities For more information about Corps designed for day use such as picnicking, swimming, boating, fishing and hunting. of Engineers recreation and A few facilities have overnight camping. activities in New England visit the Most Army Corps-managed recreation areas are open from Memorial Day website at: www.nae.usace.army. weekend through mid-September. Beaches and boat ramps are available at many mil/Missions/Recreation.aspx. reservoirs in Massachusetts, Connecticut, New Hampshire and Vermont. For details (New England District press visit the District website at www.nae.usace.army.mil/ and select “recreation” and release) then your state and nearest location on the map. YANKEE ENGINEER is an authorized unofficial Army newspaper under provisions of AR 360-1 published monthly. Views and District Commander: Col. Christopher Barron opinions expressed are not necessarily those of the Department of the Army. Contributions from readers are solicited, but publica- Chief, Public Affairs: Larry B. Rosenberg tion depends on judgment of the editor. No payment will be made for contributions. Published by the Public Affairs Office, New Editor: Ann Marie R. Harvie England District, U.S. Army Corps of Engineers, 696 Virginia Road, Concord MA 01742-2751, 978-318-8777. Printed by the offset Media Relations Officer: Timothy J. Dugan method on recyclable paper by the Defense Printing Office in Philadelphia, Pa. Circulation 1600. The YANKEE ENGINEER Community Relations Advisor: Sally M. Rigione can be found on the World Wide Web at http://www.nae.usace.army.mil/news/yankee.htm. ON THE COVER: Officials cut the Web Content Manager: Edward Buczek ribbon on the first phase of the Muddy River Restoration Project in Boston, Massachusetts. Communications Specialist: Jess Levenson YANKEE ENGINEER May 2017 3 Artist’s rendition of the Hanscom Primary School. Drawing provided by J&J Contractors, Inc. Corps of Engineers awards contract to build new Primary School on Hanscom Air Force Base in Bedford by Timothy Dugan The project will include 21st Century school concepts Public Affairs Office such as learning neighborhoods, central hubs surrounded A new primary school will be constructed at the Hanscom by learning studios, flex labs, information center annex, Air Force Base in Bedford, Massachusetts under the terms of food service area, supply areas, specialist rooms, art room, a $36,957,000 contract issued recently by the New England music room, commons area for dining and social networking, District. Work will be accomplished by J&J Contractors, Inc. of therapy rooms, teacher work areas, counseling areas, Billerica, Massachusetts. Preliminary site work is scheduled storage, administrative offices and other required areas for to begin in May 2017. The project will take approximately 30 a fully functioning facility. months to complete. The contract was awarded on March 16. The project includes related infrastructure such “This project will consist of demolition of the existing as parking areas, mechanical rooms, delivery areas, primary school, the construction of a new primary school, and playgrounds, and site improvements such as signage, associated site work,” said Project Manager Robert Leitch. fencing, paving, landscaping, exterior lighting and utilities. The new primary school building will be constructed as an Phased construction will be required to accommodate this addition to the recently constructed Middle School building. project without interrupting school operations. Temporary The size of this multi-story structure will be approximately school facilities will be part of this project, as well as 80,000 square feet. The project will use clear span or similar deconstructing and restoring the temporary site after the construction methods to allow easier reconfiguration to meet Primary School construction has been completed. future educational needs. Near term flexibility and adaptability The Corps will manage the project and all work will be will be accommodated through the use of fully integrated accomplished under the supervision of a Corps’ Quality acoustical-rated, operable wall partitions which contribute Assurance Representative to assure compliance with contract to the engineered acoustical performance of the building. requirements. YANKEE ENGINEER 4 May 2017 Ribbon cutting marks Phase 1 completion of Muddy River Restoration project The simple act of cutting a ribbon marked the completion of the first phase of a significant restoration project in Boston. Col. Christopher Barron, New England District Commander, traveled to Emmanuel College in Boston, Massachusetts to join state and local officials for a ribbon cutting ceremony for the Justine Mee Liff Park, part of the Phase 1 completion of the Muddy River Flood Risk Management Project, Photo by Dialo Ferguson on April 21. The park is dedicated to Officials cut the ribbon marking the completion of Phase 1 of the Muddy River Restoration project. Justine Mee Liff, Boston’s first female pretty severe flooding and damage Family a piece of granite with an (former) Parks Commissioner, who was that occurred in past years along and engraved plaque, honoring Keegan’s a strong advocate for the restoration adjacent to the Muddy River and some long time service to the Corps. The project. of the tributaries of the area,” he said. piece of granite came from the granite Christopher Cook, Commissioner, “Our overall project objectives when façade of the new Riverway Culvert Boston Parks and Recreation, served we started out with this was to reduce headwall. as narrator for the event. He welcomed the flood risk and enhance the aquatic The Muddy River is a small the audience and introduced the habitats along the Muddy River. To do waterway located in the Boston speakers for the event. that, the team had to engage in some metropolitan area. Most of the 5.6 In between remarks, Cook revealed pretty imaginative engineering along square mile watershed is located in the a plaque dedicated to the late Mike the way.” city of Boston and the town of Brookline, Keegan, Project Manager of the Boston Mayor Martin Walsh said with a small portion located in the city of Muddy River project. The plaque will that the timing for the project was just Newton. The 3.5 mile long Muddy River be placed on a bench in the new park. right. “We’re in a special time right now flows through the heart of Frederick Law The significance of the bench and its where there really is an investment and Olmsted’s famed “Emerald Necklace,” location is that it was where Keegan a feel for open space and parks, not one of the most carefully crafted park used to begin his tours for those who just here in Boston but throughout the systems in America and the oldest were interested in the progress of Commonwealth of Massachusetts,” remaining linear urban park system in the construction project. Keegan’s he said. the United States. family, including his wife, Donna and Other speakers included Secretary The project will be completed in two children, Briana and Christopher; Matthew Beaton, Massachusetts two phases, with phase one already his Mom, Barbara; his sisters, Kathy, Executive Office of Energy and complete. Phase 1 is located from Barbara, and Jackie; and other family Environmental Affairs; Neil Wishinsky, Riverway to Avenue Louis Pasteur.