Provides This File for Download from Its Web Site for the Convenience of Users Only
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Project Descriptions for July 10, 2019 Board of Trustees Meeting Clean
Project Descriptions for July 10, 2019 Board of Trustees Meeting Clean Water Commitments Bourne CW-19-07 The project involves construction of a new 100,000 gpd package wastewater treatment facility with subsurface discharge on town-owned land. The plant is designed using MBR technology. A Groundwater Discharge Permit has been approved for the plant and discharge. Based on detailed site testing and groundwater modeling, treated effluent will move towards the Cape Cod Canal. Added capacity is needed to handle flows above the 200,000 gpd capacity owned by Bourne in the Wareham WWTF. That plant, where no added capacity is available for Bourne's use, discharges to the Agawam River. Existing sewer flows from a portion of Bourne's sewered area will be intercepted and re-directed to the new treatment plant, redirecting treated effluent away from the Agawam River. Fall River CW-18-38 The City of Fall River's WWTF is aging and requires rehabilitation/upgrade to maintain reliable operation and performance. Additionally, EPA has indicated its intent to include a nitrogen limit in the City's next NPDES permit. Mt. Hope Bay is listed as impaired; Fall River's wet weather discharges and operational SSOs contribute to its impairment. Recent air quality regulations (Title V) necessitated shut down of the WWTF incinerator. Liquid sludge is trucked off site for disposal, dramatically increasing disposal costs. Administrative facilities are ineffective and undersized for current needs. Site electrical and security issues will also be addressed. Norton CW-18-43 This project involves providing new sanitary sewers to reduce pollution caused from the failed and malfunctioning private onsite sewage disposal systems, and more specifically the already failed systems at the Woodland Meadows Elderly Housing development. -
River Herring Viewing Guide
Each spring, MILLIONS of river herring migrate into Massachusetts waters, returning to their place of birth to create a new generation! This guide offers information on fifteen of our states busiest fish passage locations. VIEWING GUIDE Life Cycle of a Herring Adults migrate upstream to FRESHWATER Egg laying (spawning) happens in the same river they hatched! Blueback Herring Spawn in late April through June when water temperatures reach 57ºF Surviving adults migrate downstream to SALTWATER Young fish stay in freshwater until they are mature enough Alewife to migrate to estuaries Spawn in late March to mid-May, when water temperatures reach 51ºF estuary, noun. [es·tu·ary] 1. a place where freshwater meets the ocean What is a “fish ladder”? By the numbers... There are 13 diadromous species in A manmade structure (which often resembles a Massachusetts, including river herring, ladder with steps) that allows fish swimming up- Rainbow Smelt American eels, and rainbow smelt! stream to get past barriers like dams, waterfalls, and locks. Smelt spawn at night in freshwater from early March through May. Mass DMF designs and installs eel ramps Female rainbow smelt can lay in coastal rivers to assist their upstream between 5,000 and 80,000 eggs! migrations. 9 have been installed in Massachusetts since 2007! Weir pools are made There are over 100 separate river up of a series of herring runs in Massachusetts! small pools of regular length to create a American Eel Since 2013, 23,500 river herring have long, sloping channel for The only catadromous fish in North been stocked throughout the region by fish to travel upstream. -
The Sudbury, Assabet and Concord Wild and Scenic River Conservation Plan
The Sudbury, Assabet and Concord Wild and Scenic River Conservation Plan 2019 Update The Sudbury, Assabet and Concord Wild and Scenic River Conservation Plan May 2019 Update Sudbury, Assabet and Concord Wild and Scenic River Stewardship Council c/o National Park Service 15 State St Boston, MA 02109 617-223-5049 TABLE OF CONTENTS Acknowledgements ........................................................................................................ 2 Map of the Watershed ................................................................................................... 3 I. Introduction ............................................................................................................. 4 History of the Wild and Scenic River Designation Management Principles of Partnership Wild and Scenic Rivers Achievements Resulting from Designation Changes in the Region Since 1996 Role of the River Stewardship Council Purpose and Process of the Update How to Use this Update II. The River Management Philosophy ........................................................................ 11 Goals of the Plan A watershed-wide Approach III. Updates to the Administrative Framework ............................................................. 13 IV. Threats to the Outstandingly Remarkable Resource Values .................................... 14 V. Resource Management .......................................................................................... 15 Overview Public and Private Lands Water Resources – Water Quality Water Resources – Water Quantity -
New Hampshire Fish and Game Department NEW HAMPSHIRE SALTWATER FISHING 2021 DIGEST
New Hampshire Fish and Game Department NEW HAMPSHIRE SALTWATER FISHING 2021 DIGEST Fish the Coast! The Official New Hampshire Digest of Regulations fishnh.com A Legacy of High Performance NEW! SARAGOSA SW REEL Infinity Drive Technology increases this reel’s winding torque under load compared to its TERAMAR XX SW RODS predecessor to give anglers a distinct advantage Shimano’s Spiral X and Hi-Power X technologies enhance power over hard fighting game fish. Combined with transmission through the rod blank for increased casting distance a battle-tested rigid HAGANE Body that won’t and lifting power as well as reduced blank twist during tough flex under immense loads and the battles. Whether fishing for stripers in the Northeast, reds in the HAGANE Gear to create eternally smooth reeling. Southeast or Southwest, or salmon on the West Coast, there is a Cross Carbon drag and X-Protect offer high-level Teramar XX rod to fit your fishing needs. water resistance to create long-lasting durability. No matter whether anglers are fishing inshore or offshore, jigging for bottom fish or casting baits at tailing fish, they can count on — just like they always have — the Saragosa SW to stay smooth no matter the conditions and perform when TREVALA PX RODS needed most. The bar is raised for saltwater spinning reels. Incorporates a redesigned rod blank with Shimano’s Hi-Power X reinforcing technology to increase overall strength and control while also enhancing rod twist resistance when jigging or fighting a fish. Save the date! FISHINGFEST® 2021 ~ April 1-4 Quality components for enhanced performance. -
2006 Conservation, Recreation, and Open Space Plan
May, 2006 TABLE OF CONTENTS SECTION 1 - PLAN SUMMARY................................................................................................... 1 A. Background...............................................................................................................................................................1 B. Features of the 2006 CROS Plan...............................................................................................................................1 SECTION 2 - INTRODUCTION .................................................................................................... 2 A. Statement of Purpose ................................................................................................................................................2 B. Planning Process and Public Participation ................................................................................................................2 SECTION 3 - COMMUNITY SETTING....................................................................................... 3 A. Regional Context.......................................................................................................................................................3 B. History of the Community........................................................................................................................................5 C. Population Characteristics........................................................................................................................................8 -
Concord River Diadromous Fish Restoration FEASIBILITY STUDY
Concord River Diadromous Fish Restoration FEASIBILITY STUDY Concord River, Massachusetts Talbot Mills Dam Centennial Falls Dam Middlesex Falls DRAFT REPORT FEBRUARY 2016 Prepared for: In partnership with: Prepared by: This page intentionally left blank. Executive Summary Concord River Diadromous Fish Restoration FEASIBILITY STUDY – DRAFT REPORT EXECUTIVE SUMMARY Project Purpose The purpose of this project is to evaluate the feasibility of restoring populations of diadromous fish to the Concord, Sudbury, and Assabet Rivers, collectively known as the SuAsCo Watershed. The primary impediment to fish passage in the Concord River is the Talbot Mills Dam in Billerica, Massachusetts. Prior to reaching the dam, fish must first navigate potential obstacles at the Essex Dam (an active hydro dam with a fish elevator and an eel ladder) on the Merrimack River in Lawrence, Middlesex Falls (a natural bedrock falls and remnants of a breached dam) on the Concord River in Lowell, and Centennial Falls Dam (a hydropower dam with a fish ladder), also on the Concord River in Lowell. Blueback herring Alewife American shad American eel Sea lamprey Species targeted for restoration include both species of river herring (blueback herring and alewife), American shad, American eel, and sea lamprey, all of which are diadromous fish that depend upon passage between marine and freshwater habitats to complete their life cycle. Reasons The impact of diadromous fish species extends for pursuing fish passage restoration in the far beyond the scope of a single restoration Concord River watershed include the importance and historical presence of the project, as they have a broad migratory range target species, the connectivity of and along the Atlantic coast and benefit commercial significant potential habitat within the and recreational fisheries of other species. -
Army Civil Works Program Fy 2020 Work Plan - Operation and Maintenance
ARMY CIVIL WORKS PROGRAM FY 2020 WORK PLAN - OPERATION AND MAINTENANCE STATEMENT OF STATEMENT OF ADDITIONAL LINE ITEM OF BUSINESS MANAGERS AND WORK STATE DIVISION PROJECT OR PROGRAM FY 2020 PBUD MANAGERS WORK PLAN ADDITIONAL FY2020 BUDGETED AMOUNT JUSTIFICATION FY 2020 ADDITIONAL FUNDING JUSTIFICATION PROGRAM PLAN TOTAL AMOUNT AMOUNT 1/ AMOUNT FUNDING 2/ 2/ Funds will be used for specific work activities including AK POD NHD ANCHORAGE HARBOR, AK $10,485,000 $9,685,000 $9,685,000 dredging. AK POD NHD AURORA HARBOR, AK $75,000 $0 Funds will be used for baling deck for debris removal; dam Funds will be used for commonly performed O&M work. outlet channel rock repairs; operations for recreation visitor ENS, FDRR, Funds will also be used for specific work activities including AK POD CHENA RIVER LAKES, AK $7,236,000 $7,236,000 $1,905,000 $9,141,000 6 assistance and public safety; south seepage collector channel; REC relocation of the debris baling area/construction of a baling asphalt roads repairs; and, improve seepage monitoring for deck ($1,800,000). Dam Safety Interim Risk Reduction measures. Funds will be used for specific work activities including AK POD NHS DILLINGHAM HARBOR, AK $875,000 $875,000 $875,000 dredging. Funds will be used for dredging environmental coordination AK POD NHS ELFIN COVE, AK $0 $0 $75,000 $75,000 5 and plans and specifications. Funds will be used for specific work activities including AK POD NHD HOMER HARBOR, AK $615,000 $615,000 $615,000 dredging. Funds are being used to inspect Federally constructed and locally maintained flood risk management projects with an emphasis on approximately 11,750 of Federally authorized AK POD FDRR INSPECTION OF COMPLETED WORKS, AK 3/ $200,000 $200,000 and locally maintained levee systems. -
Official List of Public Waters
Official List of Public Waters New Hampshire Department of Environmental Services Water Division Dam Bureau 29 Hazen Drive PO Box 95 Concord, NH 03302-0095 (603) 271-3406 https://www.des.nh.gov NH Official List of Public Waters Revision Date October 9, 2020 Robert R. Scott, Commissioner Thomas E. O’Donovan, Division Director OFFICIAL LIST OF PUBLIC WATERS Published Pursuant to RSA 271:20 II (effective June 26, 1990) IMPORTANT NOTE: Do not use this list for determining water bodies that are subject to the Comprehensive Shoreland Protection Act (CSPA). The CSPA list is available on the NHDES website. Public waters in New Hampshire are prescribed by common law as great ponds (natural waterbodies of 10 acres or more in size), public rivers and streams, and tidal waters. These common law public waters are held by the State in trust for the people of New Hampshire. The State holds the land underlying great ponds and tidal waters (including tidal rivers) in trust for the people of New Hampshire. Generally, but with some exceptions, private property owners hold title to the land underlying freshwater rivers and streams, and the State has an easement over this land for public purposes. Several New Hampshire statutes further define public waters as including artificial impoundments 10 acres or more in size, solely for the purpose of applying specific statutes. Most artificial impoundments were created by the construction of a dam, but some were created by actions such as dredging or as a result of urbanization (usually due to the effect of road crossings obstructing flow and increased runoff from the surrounding area). -
Annual Town Report
ANNUANNUALAL TOWNTOWN REPORTREPORT JJULYULY 1,1, 20182017 –– JUNEJUNE 30,30, 20192018 TOWN OF SOUTH HADLEY ANNUAL TOWN REPORT JULY 1, 2018 – JUNE 30, 2019 1 TABLE OF CONTENTS Annual Town Meeting Warrant 50 Appointed Officials for Fiscal Year 2019 6 Assessors 11 Bike/Walk Committee 12 Boards & Committees 8-9 Cable Studio 12 Canal Park Committee 13 Conservation Commission 14 Council on Aging 14 Directory and Calendar – Board Meetings, Officials, Services 4 Elected Officials – April 9, 2019 5 Emergency Management 18 Employee Gross Wages – Calendar Year 2019 31-39 Facts of Interest about South Hadley 3 Golf Commission 19 GROSouth Hadley (Community Garden) 19 Health Department 19 Human Resources 21 Inspection Services 21 Libraries 22 Master Plan Implementation Committee 23 Memoriam 9 National, State and County Officials 3 Planning Board 23 Police Department 24 Public Health Nurse 20 Public Works 15-18 Recreation Commission 25 Redevelopment Authority 25 Retirements 9 School Committee 28 School Superintendent 26 Selectboard 10 Special Town Meeting Warrant – May 8, 2019 79 Special Town Meeting Warrant – Nov. 20, 2019 82 Sustainability & Energy Commission 29 Town Accountant (Change in Fund Balance/Combined Balance Sheet) 40-44 Town Clerk 28 Town Election – April 9, 2019 45-49 Town Meeting Members – April 9, 2019 7 Treasurer / Collector 30 Zoning Board of Appeals 29 2 Population Facts of Interest about South Hadley Federal Census 2010-17,514 Federal Census 2000-17,196 South Hadley area was first part of Old Hadley. 2017 Local Census – 17,682 1675-1719 Individual grants of land were made by Hadley for Form of Government settlement south of the Mt. -
The Acushnet River Restoration Project: Restoring Diadromous Populations to a Superfund Site in Southeastern Massachusetts
Massachusetts Division of Marine Fisheries Technical Report TR-56 The Acushnet River Restoration Project: Restoring Diadromous Populations to a Superfund Site in Southeastern Massachusetts J.J. Sheppard1, S. Block2, H.L Becker3, and D. Quinn4 1Massachusetts Division of Marine Fisheries South Shore Field Station 1213 Purchase Street, 3rd Floor New Bedford, MA 02740 2National Oceanic and Atmospheric Administration Restoration Center 55 Great Republic Drive Gloucester, MA 01930 3EA Engineering, Science, and Technology, Inc 221 Sun Valley Boulevard, Suite D Lincoln, NE 68528 4DQ Engineering 11 Hickory Lane Walpole, MA 02081 Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs Department of Fish and Game Massachusetts Division of Marine Fisheries Technical Report Technical March 2014 Massachusetts Division of Marine Fisheries Technical Report Series Managing Editor: Michael P. Armstrong Technical and Copy Editor: Elaine Brewer The Massachusetts Division of Marine Fisheries Technical Reports present information and data pertinent to the management, biology and commercial and recreational fisheries of anadromous, estuarine, and marine organisms of the Commonwealth of Massachusetts and adjacent waters. The series presents information in a timely fashion that is of limited scope or is useful to a smaller, specific audience and therefore may not be appropriate for national or international journals. Included in this series are data summaries, reports of monitoring programs, and results of studies that are directed at specific management problems. All Reports in the series are available for download in PDF format at: http://www.mass.gov/eea/agencies/dfg/dmf/publications/technical.html or hard copies may be obtained from the Annisquam River Marine Fisheries Station, 30 Emerson Ave., Gloucester, MA 01930 USA (978-282-0308). -
Neighborhood Overviews
NEIGHBORHOOD OVERVIEWS (Sources: The following text is largely quoted from Leslie Donovan and Kim Withers Brengle, “A Preservation Plan for the City of Gloucester, Massachusetts,” 1990. Supplemental information was added from the Gloucester Development Team’s Land Marks; Architecture and Preservation in Gloucester, 1979; an unpublished manuscript, “Artists’ Communities in Gloucester, 1750-1948,” by Wendy Frontiero, 1998; and comments from the Gloucester Archives Committee.) CENTRAL GLOUCESTER Central Gloucester is roughly bounded by the Inner Harbor, the Annisquam River, and Route 128. This commercial and civic center of the City of Gloucester, located west of the inner harbor, is the nucleus of the Central Gloucester neighborhood and the City. The central business district runs along Main and Rogers Streets and is characterized by two- to four-story masonry structures. Immediately to the west is the civic center, which is composed of the City’s public buildings, by far the largest group of substantial buildings in Gloucester. The greatest concentration of industrial buildings is also found in Central Gloucester, located along the waterfront, near the commercial areas, and along Maplewood Avenue. Central Gloucester is extremely densely developed compared to the rest of Gloucester. Residential buildings are typically single-family and multi-family structures of wood-frame construction. A fishing colony established by the Dorchester Company at Stage Fort lasted only from 1623- 1626. It was not until the late 1630s that Cape Ann attracted a large enough number of permanent settlers to warrant incorporation as a town in 1642 under the Massachusetts Bay Colony. The name of the new town may have come from the recent birth of a new Duke of Gloucester. -
A. Geology, Soils and Topography Geology and Topography Glacial Deposits Formed the Shape of Cape Cod
Section IV: Environmental Inventory and Analysis A. Geology, Soils and Topography Geology and Topography Glacial deposits formed the shape of Cape Cod. Approximately 25,000 years ago the Canadian Ice Sheet reached its southernmost point at Martha’s Vineyard and Nantucket. Three lobes of ice covered Cape Cod: the Cape Cod Bay Lobe, the South Channel Lobe, and the Buzzards Bay Lobe. About 15,500 years ago the sheets of ice began retreating, depositing rock debris, known as drift, as they receded. Drift ranges from till, an unstratified mixture of fine to coarse material, to deposits sorted by the flow of water and spread across the landscape. The drift deposited by the ice created the major landscape forms found in Falmouth and the Cape: moraines, outwash plains, kames (knobs), and kettle holes. Moraines are terminal ridges that represent the edge of a glacier. As the glacier retreated, drift was churned up and deposited in a ridge. The Buzzards Bay Moraine runs northeast from the Elizabeth Islands through Woods Hole to Sandwich. Outwash plains slope gradually away Map 4-1: Geologic Map of Cape Cod from the Buzzards Bay Moraine to the sea (Figure 4- 1). They are formed by sand Lake deposits and gravel deposits left by water streaming out of the Younger ice-contact deposits melting glacial lobes. Kames and kettles are known as ice Younger outwash deposits contact features. Kames are knobs of drift deposits left by Moraine deposits debris once embedded in ice. Kettles are holes in the ground Older outwash deposits formed by large ice blocks.