Birds in Southern Öresund in Relation to the Wind Farm at Lillgrund

Total Page:16

File Type:pdf, Size:1020Kb

Birds in Southern Öresund in Relation to the Wind Farm at Lillgrund Birds in southern Öresund in relation to the wind farm at Lillgrund Final report of the monitoring program 2001-2011 Leif Nilsson & Martin Green Biologiska institutionen, Lunds Universitet Department of Biology, University of Lund, Lund, Sweden Lund 2011 Commissioned by Vattenfall Vindkraft AB Data Title: Birds in southern Öresund in relation to the windfarm at Lillgrund. Final report of the monitoring program 2001-2011. Authors: Leif Nilsson & Martin Green Institut Biologiska Institutionen, Lunds Universitet Publisher Biologiska Institutionen, Lunds Universitet Published November 2011 Download from http://www.vattenfall.se/sv/lillgrund-vindkraftpark.htm Number of pages 85 + Appendix 43 2 Contents Summary 4 Svensk sammanfattning 6 Introduction 13 Study area 14 Methods 16 Survey methods 16 Boat surveys 16 Aerial surveys 18 Analysis of survey data 20 Radar studies of bird migration 22 Results 25 Staging and wintering birds 25 Cormorant Phalacrocorax carbo 29 Long-tailed Duck Clangula hyemalis 35 Common Eider Somateria mollissima 41 Red-breasted Merganser Mergus serrator 48 Herring Gull Larus argentatus 54 Radar studies of bird migration 60 Spring- north-easterly directed migration 60 Spring- southerly directed migration 67 Autumn 70 Discussion 76 Staging and wintering birds 76 Migrating birds 79 Literature 83 Appendix 3 Summary This report presents the results of the monitoring programme for Lillgrund offshore wind farm. Base-line studies were undertaken during 2001-2006 (Green & Nilsson 2006, see also Nilsson 2001 for background information). According to the original plans the studies should be continued for three seasons after the wind farm was set in operation but due to problems with the data collection during cold periods this was extended to four seasons, i.e. 2007/09- 2010/11. Staging and wintering birds in the area were surveyed both from boat and from the air. Boat counts covered the area from the Öresund Bridge over Lillgrund to Bredgrund south of the wind farm. Aerial surveys covered a larger area from the bridge to the shallow areas south of the Falsterbo peninsula. The aim of the aerial surveys was to cover a larger area than the wind farm and its neighbourhood, and the areas south of Falsterbo were included as a reference area. In all 19 boat counts were made during 2001-2005, and 8 in 2007-2011, whereas five aerial surveys were undertaken in 2004 and 2006 and 15 in 2008-2011. The numbers of staging and wintering waterbirds showed a large variation between seasons and years both during the base-line studies and during the surveys after the establishment of the wind farm. This kind of variation is well-known from other surveys of seabirds in offshore waters. Three species of diving ducks dominated the bird fauna of the wider Lillgrund area: the Eider Somateria mollissima, the Red-breasted Merganser Mergus serrator and to a smaller extent the Long-tailed Duck Clangula hyemalis. Two other species occurred in larger numbers in the same area: Herring Gull Larus argentatus and Cormorant Phalacrocorax carbo. Other seabirds were only found in smaller numbers and the analysis was focused on the possible effects of the wind farm on the five mentioned species. The population of Red-breasted Merganser in the area is the largest concentration known from the country and the area is an internationally important wintering area with a large proportion of the entire Baltic (and Northwest European) population. Eiders winter in relatively large numbers in the southern Öresund and around Falsterbo (reference area). The species also has a large colony on Saltholm and the area is also much used as stopover area during spring migration. The third seaduck species, the Long-tailed Duck, occurs regularly in much smaller numbers, the main wintering area for this species is in the Baltic proper. The surveys did not show any larger changes in numbers of staging and wintering water birds in southern Öresund that could be related to the establishment of the wind farm. Locally, Long-tailed Ducks and Eiders were found to avoid the actual wind farm area at least initially. For Eiders there were signs of habituation, especially during the last study season. During the first three years with the farm in operation only single birds or small groups were seen in the wind farm area, but during the last surveys in 2011 larger flocks were recorded on the water within the wind farm. The patterns for Red-breasted Mergansers were less clear and numbers using the whole area were lower during the post- compared to the pre-construction period. Cormorants and Herring Gulls were seemingly not affected at all by the presence of the wind farm. For Herring Gulls an avoidance of the wind farm is implied by some of the results, but this is most likely not an effect of the wind farm as such but instead of the absence of fishing vessels within the wind farm in the post-construction period. The bird migration over the area was studied with surveillance radar. The radars used in this study cover birds migrating in flocks, but not birds migrating singly. Furthermore, the larger 4 the birds and/or the flocks, the better they are covered by these radars. This means that the migration patterns studied here mainly concern birds such as waterbirds and pigeons. Dense passerine migration is also covered during some days, but it is more uncertain to what extent the passage of for example raptors over the area is covered. In all, radar data were analysed for five spring seasons (2001 and 2005 pre-, 2008, 2009 and 2010 post-construction) and three autumn seasons (2001 pre- and 2008 and 2009 post-construction). No larger changes in the migration patterns were found, neither during spring and autumn nor during day and night, that could be related to the construction of the wind farm at Lillgrund. On the other hand the fraction passing over Lillgrund since the wind farm was established was only about 20 % of the proportion passing before the wind farm was built. We interpret this as that most birds avoid flying through the wind farm area. This avoidance reduces the risk for the birds to come into conflict with the wind farm. The collision risks are probably small, at least for the birds that can be followed by surveillance radar. We estimate that somewhere in the order of between 100 and a few hundred individual birds may collide with (and get killed by) the wind farm at Lillgrund. This is about a tenth of the numbers probably colliding with (and getting killed by) the nearby Öresund Bridge. 5 Svensk sammanfattning Södra Öresund är ett viktigt rastnings- och övervintringsområde för ett betydande antal vattenfåglar. Både Saltholm på den danska sidan och Falsterbo- Foteviken har utpekats som speciella fågelskyddsområden enligt EUs fågeldirektiv. Även andra delar av södra Öresund såsom Lommabukten och Lundåkrabukten är viktiga fågelområden med internationellt betydelsefulla koncentrationer av flera sjöfågelarter. Södra Öresund är också ett område där stora mängder med aktivt flyttande fåglar passerar både vår och höst (Alerstam 1978, 1990). Mot denna bakgrund var det naturligt att fåglar kom att inta en viktig del av miljökonsekvensstudierna när Lillgrunds vindkraftpark (Fig.1) planerades Nilsson 2001). I samband med parkens projektering igångsattes ett kontrollprogram för att utvärdera ev. påverkan från vindkraftparken på fågelfaunan i området. Kontrollprogrammet omfattade både rastande/övervintrande och flyttande fåglar i området. När det gällde rastande och övervintrande fåglar avsåg programmet att belysa om de olika fåglarnas utnyttjande av området, speciellt för födosök, skulle påverkas av vindkraftparken. När det gällde flyttande fåglar studerades de övergripande mönstren, speciellt mot bakgrunden att vindkraftverk i flyttningsstråk skulle kunna medföra risker för ökad mortalitet och/eller fungera som barriärer för de flyttande fåglarna. Kontrollprogrammet omfattade inventeringar av det möjliga påverkansområdet, här definierat som vattnen mellan Öresundsbron och Skanör samt ett referensområde söder om Falsterbo både före och efter uppförandet av vindkraftverken. I påverkansområdet genomfördes inventeringar både med flyg och med båt (se metoder). Båtinventeringarna var begränsade till offshore-områdena, medan flyglinjerna sträckte sig från stranden och utåt. I våra analyser har vi emellertid koncentrerat oss på de arter som förekommer i offshore-områdena. Flyttningen genom området studerades med hjälp av övervakningsradar. Under baslinjeundersökningarna genomfördes också visuella observationer över flyttfågelsträcket i området från närbelägna observationspunkter (Green & Nilsson 2006). Bakgrundsinformation över flyttfågelrörelserna i området återfinns också i rapporter från undersökningar kring Öresundsbron, strax norr om vindkraftparken (Nilsson et al. 2009, 2010). Baslinjestudierna (före uppförandet av vindkraftparken) genomfördes under 2001-2006 (rapporterade av Green & Nilsson 2006). Den andra fasen (efter uppförandet) påbörjades i december 2007 och var avsedd att genomföras under tre år, men perioden utsträcktes ytterligare ett år då vinterförhållandena under 2009/10 medförde att inventeringsprogrammet detta år inte kunde genomföras fullt ut enligt planerna. Denna rapport ger en analys av undersökningarna före och efter vindkraftparkens uppförande. För en omfattande dokumentation av fågelförhållandena före parkens uppförande hänvisas till Green & Nilsson (2006), se också Nilsson (2001) samt Nilsson et al. (2009, 2010). Undersökningsområde Undersökningsområdets läge i södra
Recommended publications
  • Modeling and Dynamic Analysis of Offshore Wind Farms in France: Impact on Power System Stability
    04/11/2011 Modeling and dynamic analysis of offshore wind farms in France: Impact on power system stability KTH Master Thesis report number Alexandre Henry Examiner at KTH Dr. Luigi Vanfretti Supervisors at KTH Dr. Luigi Vanfretti and Camille Hamon Supervisor at EDF Dr. Bayram Tounsi Laboratory Electric Power Systems School of Electrical Engineering KTH, Royal Institute of Technology Stockholm, November 2011 Accessibility : .. Front page Page I / III ... Modeling and dynamic analysis of offshore wind farms in France: Impact on KTH EPS power system stability - EDF R&D Abstract Alexandre Henry Page 1 / 90 KTH Master Thesis Modeling and dynamic analysis of offshore wind farms in France: Impact on KTH EPS power system stability - EDF R&D Nomenclature EWEA : European Wind Energy Association UK : United Kingdom EU : European union AC : Alternating current DC : Direct current HVAC : High Voltage Alternating Current HVDC : High Voltage Direct Current PCC : Point of Common Coupling TSO : Transmission System Operator RTE : Réseau de transport d’électricité (French TSO) XLPE : cross linked polythylene insulated VSC : Voltage source converter LCC : Line commutated converter FACTS : Flexible AC Transmission System SVC : Static Var Compensator DFIG : Double Fed Induction Generator MVAC : Medium Voltage Alternating Current ENTSO-E : European Network of Transmission System Operators for Electricity HFF : High Frequency Filter FRT : Fault Ride Through Alexandre Henry Page 2 / 90 KTH Master Thesis Modeling and dynamic analysis of offshore wind farms
    [Show full text]
  • High-Resolution CFD Modelling of Lillgrund Wind Farm
    International Conference on Renewable Energies and Power Quality (ICREPQ’13) Bilbao (Spain), 20th to 22th March, 2013 Renewable Energy and Power Quality Journal (RE&PQJ) ISSN 2172-038 X, No.11, March 2013 High-resolution CFD modelling of Lillgrund Wind farm A.C.W. Creech1, W.-G. Früh2 and A.E. Maguire3 1 Institute of Energy Systems, School of Engineering, University of Edinburgh Kings Buildings, Edinburgh EH9 3JL (UK) E-mail: [email protected] 2 Institute of Mechanical, Process and Energy Engineering, School of Physical Sciences and Engineering, Heriot-Watt University, Riccarton, Edinburgh EH14 4AS (UK) E-mail: [email protected] 3 Vattenfall United Kingdom, Research & Development New Renewables The Tun, Holyrood Road, Edinburgh EH8 8AE (UK) E-mail: [email protected] Abstract. We report on a fully dynamic simulation of key factor affecting the performance is that turbines in Vattenfall’s Lillgrund offshore Wind Farm, with a focus the array may be in the wakes of upstream turbines where on the wake effects of turbines on the performance of they experience substantially lower wind speeds than the individual turbines, and of the farm as a whole. upstream turbines [1]. Common approaches are Reynolds-Averaged Navier-Stokes (RANS) CFD or simpler flow modelling coupled with linear wake theory, The model uses a dynamic representation of a wind turbine such as Jensen’s Park model. However, it is recognised to simulate interaction between the wind and the turbine that the simple wake models lose accuracy when applied rotors, calculating the instantaneous power output and to multiple wakes interacting.
    [Show full text]
  • Lillgrund Wind Power Offshore
    LILLGRUND WIND POWER OFFSHORE 110 MW UNDER CONSTRUCTION IN SOUTHERN SWEDEN. Jeju, Korea, April 20, 2007 Kenneth Averstad, Vattenfall AB Wind Power, Sweden © Vattenfall AB 1 Agenda • Short presentation of my company Vattenfall AB and our wind power development activities. • Lillgrund Wind Power Offshore Project 110 MW. • Other Offshore Wind Projects under Development in Sweden. © Vattenfall AB Vattenfall AB's Electricity Generation About 160 TWh / year Finland 0,5 TWh Sweden 80 TWh 7 TWh Denmark 68 TWh 2,3 TWh Germany Poland © Vattenfall AB Vattenfall Nordic Wind Power 2007: 487 MW ; 1200 GWh/yr Denmark 406 WT, 309 MW, Sweden 62 WT, 750 GWh 54 MW, 120 GWh Finland 10 WT, 4 MW, 8 GWh England 30 WT, Poland 15 WT, 90 MW, 270 GWh 30 MW, 60 GWh Own and operate total: 523 wind turbines = Offices © Vattenfall AB Vattenfall’s Offshore Wind Power in Operation 2007 Horns Rev (60%), 360 GWh Utgrunden 1 + + Yttre Stengrund, Kentish Flats, 60 GWh 270 GWh Map from Vattenfall’s Corporate Social Responsibility Report (www.vattenfall.com) © Vattenfall AB Näsudden = Vattenfall’s O&M and Test Centre - since 1982 and prototype testing, for example: Nordic Windpower 2, 1000 kW Nordic Windpower 1, 1000 kW Näsudden 2, 3000 kW Located on the island Gotland in the Baltic Sea. © Vattenfall AB Näsudden 2, 3000 kW Gotland, Sweden 61.4 GWh WORLD RECORD Finally stopped January 9, 2007 at 02:29, after 61,469 generating hours since start March 14, 1993. Vibration alarms, low oil pressure in gear- box. Inspection showed severe damages in gearbox, many teeth in different gear- box steps have been damaged.
    [Show full text]
  • Offshore Wind Turbine Installation Analyses
    = Offshore Wind Turbine Transportation & Installation Analyses Planning Optimal Marine Operations for Offshore Wind Projects EMRE URAZ Master Thesis Visby, Sweden 2011 Offshore Wind Turbine Transportation & Installation Analyses Planning Optimal Marine Operations for Offshore Wind Projects Master Thesis by Emre URAZ Master Thesis written at Gotland University, June 2011, Department of Wind Energy Supervisor: Richard Koehler HGO, Department of Wind Energy Examiner: Dr. Bahri Uzunoğlu HGO, Department of Wind Energy Abstract Transportation and installation of offshore wind turbines (Tower, Nacelle and Rotor) is a complete process conducted over several phases, usually in sequence. There are several factors that can turn this process into a challenge. These factors can either be due to offshore site conditions or the technical limitations of the installation vessels. Each project has its own characteristic parameters and requires a unique optimum solution. This paper identifies the dynamics of the installation process and analyzes the effects of each phase on the progression of events. The challenges in wind turbine installations due to offshore environment were investigated, the effects of each were explained and their significances were stressed. Special installation vessels were examined and their technical specifications were analyzed in terms of working conditions, dimensions, service performances, and crane capacities as well as projecting future design trends. Several offshore wind farm projects were analyzed; their installation methods were specified, and compared to each other to determine advantages and disadvantages of different pre-assembly concepts. The durations of the sub-phases of the process were defined in terms of different variables such as site conditions and individual vessel performance. These definitions were used for making time estimations, and conducting further analyses regarding the effects of different site specific parameters on the overall project duration.
    [Show full text]
  • Offshore Wind Power Projects
    Offshore wind power projects Answers for energy. Offshore projects 1 Walney, UK, 2010–2011 10 Horns Rev II, DK, 2009 102 turbines 1) 91 turbines 1) 2 Burbo Banks, UK, 2007 11 Samsø, DK, 2000 25 turbines 10 turbines 3 Rhyl Flats, UK, 2009–2010 12 Middelgrunden, DK, 2000 25 turbines 1) 20 turbines 4 Lynn / Inner Dowsing, UK, 2008 13 Vindeby, DK, 1991 54 turbines 11 turbines 5 Sheringham Shoal, UK, 2011 14 Rødsand II, DK, 2010 88 turbines 1) 90 turbines 1) 6 Greater Gabbard, UK, 15 Lillgrund, SE, 2007 2010–2011, 140 turbines 1) 48 turbines 7 Gunfleet Sands, UK, 2009 16 Baltic I, DE, 2010 48 turbines 1) 21 turbines 1) 8 London Array, UK, 2012 17 Nysted/Rødstand, DK, 2003 175 turbines 1) 72 turbines 9 Hywind, NO, 2009 1) 1 turbine 1) Planned When it comes to offshore wind power, Siemens has not only supplied the world’s no supplier can match Siemens in first, but also the world’s largest offshore experience and stability. Siemens has projects. The 165-MW Nysted offshore a proven and unique offshore track wind farm has held the record as the record, ranging from the world’s first largest offshore project for several years offshore wind farm almost 20 yeas ago now. This record is expected to be broken to today’s largest offshore projects. All when the 200-MW Horns Rev II project projects have been delivered on time is commissioned. The 500-MW Greater and on budget, and have recorded Gabbard project, currently in progress in high availability.
    [Show full text]
  • Master's Thesis Template Word
    The challenges in installation of offshore wind farms A case of Lillgrund and Anholt wind farms Master’s thesis in Design and Construction Project Management ISSA IBRAHIM HABAKURAMA JOSEPH BALUKU Department of Civil and Environmental Engineering CHALMERS UNIVERSITY OF TECHNOLOGY Gothenburg, Sweden 2016 MASTER’S THESIS BOMX02-16-104 The challenges in installation of offshore wind farms A case of Lillgrund and Anholt wind farms Master’s Thesis in the Master’s Programme Design and Construction Project Management ISSA IBRAHIM HABAKURAMA JOSEPH BALUKU Department of Civil and Environmental Engineering Division of Construction Management Construction Management CHALMERS UNIVERSITY OF TECHNOLOGY Göteborg, Sweden 2016 The challenges in installation of offshore wind farms A case of Lillgrund and Anholt wind farms Master’s Thesis in the Master’s Programme Design and Construction Project Management ISSA IBRAHIM HABAKURAMA JOSEPH BALUKU © ISSA IBRAHIM HABAKURAMA, JOSEPH BALUKU 2016 Examensarbete BOMX02-16-104 / Institutionen för bygg- och miljöteknik, Chalmers tekniska högskola 2016 Department of Civil and Environmental Engineering Division of Construction Management Construction Management Chalmers University of Technology SE-412 96 Göteborg Sweden Telephone: + 46 (0)31-772 1000 Department of Civil and Environmental Engineering Göteborg, Sweden, 2016 I The challenges in installation of offshore wind farms A case of Lillgrund and Anholt wind farms Master’s thesis in the Master’s Programme Design and Construction Project Management ISSA IBRAHIM HABAKURAMA JOSEPH BALUKU Department of Civil and Environmental Engineering Division of Construction Management Construction Management Chalmers University of Technology ABSTRACT Wind energy is one of the rapidly growing sources of energy due low emissions resulting from its use.
    [Show full text]
  • A Preliminary Assessment of the Long-Term Prospects for Offshore Wind Farms in Maltese Territorial Waters Dane Orion Zammit James Madison University
    James Madison University JMU Scholarly Commons Masters Theses The Graduate School Fall 12-18-2010 A preliminary assessment of the long-term prospects for offshore wind farms in Maltese territorial waters Dane Orion Zammit James Madison University Follow this and additional works at: https://commons.lib.jmu.edu/master201019 Part of the Oil, Gas, and Energy Commons Recommended Citation Zammit, Dane Orion, "A preliminary assessment of the long-term prospects for offshore wind farms in Maltese territorial waters" (2010). Masters Theses. 435. https://commons.lib.jmu.edu/master201019/435 This Thesis is brought to you for free and open access by the The Graduate School at JMU Scholarly Commons. It has been accepted for inclusion in Masters Theses by an authorized administrator of JMU Scholarly Commons. For more information, please contact [email protected]. A Preliminary Assessment of the Long-Term Prospects for Offshore Wind Farms in Maltese Territorial Waters A dissertation presented in part fulfillment of the requirements for the Degree of Master of Science in Sustainable Environmental Resource Management By Dane Zammit November 2010 UNDER THE SUPERVISION OF Ing. Robert Farrugia Dr. Jonathan Miles Dr. Godwin Debono University of Malta – James Madison University ABSTRACT DANE ZAMMIT A PRELIMINARY ASSESSMENT OF THE LONG-TERM PROSPECTS FOR OFFSHORE WIND FARMS IN MALTESE TERRITORIAL WATERS Keywords: WIND; ENERGY; MALTA; OFFSHORE; VIABILITY; MARKET Almost all of Malta’s current interest in offshore wind development is focused on the development of an offshore wind farm at Sikka L-Bajda in northwest Malta by 2020, to help the country reach its mandated 2020 RES target.
    [Show full text]
  • Does North America's Renewable Energy Solution Lie Offshore?
    The Thanet Offshore Wind Farm is currently the largest offshore farm operating in the world (courtesy of Vattenfall). The Thanet project was completed in September 2010 and will boost offshore capacity by 30 percent (courtesy of Vattenfall). 24 powertransmissionengineering october 2010 www.powertransmission.com Coastal Question Marks DOES NORTH AMERICA’S RENEWABLE ENERGY SOLUTION LIE OFFSHORE? Matthew Jaster, Associate Editor ust off England’s southeast America. The catastrophic effects of the able energy initiatives, more needs to coast, more than 100 Vestas Gulf oil spill and the continual reliance be done. A recently released report, J V90 wind turbines are gen- on fossil fuels here in the United States “Untapped Wealth: The Potential of erating electricity equivalent suggest other energy options still need Offshore Energy to Deliver Clean, to the annual consumption of 200,000 to be explored. Affordable Energy and Jobs,” by British households. The Thanet Off- The Benefits Offshore Oceana, an international conservation shore Wind Farm, completed in According to the American Wind group, sees much more potential for this September 2010 by Vattenfall, the Energy Association (AWEA), offshore area of wind energy. fifth-largest generator of electricity wind turbines generate more power Jacqueline Savitz, Oceana senior in Europe, will provide a significant than their onshore counterparts thanks campaign director, recently said in increase of green energy to the U.K., to higher wind speeds and steadier Washington D.C. that “Harnessing boosting offshore wind capacity by 30 streams. Larger turbines are more fea- offshore wind power in Atlantic waters percent. It’s currently the largest off- sible offshore, capturing more wind is a much more cost-effective way to shore wind farm operating in the world.
    [Show full text]
  • Lillgrund Wind Farm Modelling and Reactive Power Control
    Kungliga Tekniska Högskolan Lillgrund Wind Farm Modelling and Reactive Power Control Isabelle Boulanger Master Thesis Stockholm 2009 Electrical Machines and Power Electronics, Power Systems Royal Institute of Technology SWEDEN Kungliga Tekniska Högskolan Kungliga Tekniska Högskolan Abstract The installation of wind power plant has significantly increased since several years due to the recent necessity of creating renewable and clean energy sources. Before the accomplishment of a wind power project many pre-studies are required in order to verify the possibility of integrating a wind power plant in the electrical network. The creation of models in different software and their simulation can bring the insurance of a secure operation that meets the numerous requirements imposed by the electrical system. Hence, this Master thesis work consists in the creation of a wind turbine model. This model represents the turbines installed at Lillgrund wind farm, the biggest wind power plant in Sweden. The objectives of this project are to first develop an accurate model of the wind turbines installed at Lillgrund wind farm and further to use it in different kinds of simulations. Those simulations test the wind turbine operating according to different control modes. Also, a power quality analysis is carried out studying in particular two power quality phenomena, namely, the response to voltage sags and the harmonic distortion. The model is created in the software PSCAD that enables the dynamic and static simulations of electromagnetic and electromechanical systems. The model of the wind turbine contains the electrical machine, the power electronics (converters), and the controls of the wind turbine. Especially, three different control modes, e.g., voltage control, reactive power control and power factor control, are implemented, tested and compared.
    [Show full text]
  • State of the Offshore Wind Industry in Northern Europe Lessons Learnt in the First Decade
    Ecofys Netherlands BV Kanaalweg 16-A P.O. Box 8408 NL-3503 RK Utrecht The Netherlands T +31 (0) 30 66 23 300 F +31 (0) 30 66 23 301 E [email protected] W www.ecofys.com State of the Offshore Wind Industry in Northern Europe Lessons Learnt in the First Decade 2011 Lead Authors: Frank Wiersma Jean Grassin Anthony Crockford Thomas Winkel Anna Ritzen Luuk Folkerts European Union The European Regional Development Fund State of the Offshore Wind Industry in Northern Europe Preface The past decade has seen the realisation of the first large-scale commercial offshore wind farms. As of 2010, 3 GW of installed capacity has been commissioned and numerous lessons have been learnt; however the true growth of the industry still lies ahead. The sum of national targets for the North Sea countries will exceed 35 GW of offshore wind capacity by 2020. The offshore wind sector is considered to be fundamental to the achievement of renewable energy targets in EU countries. The POWER cluster aims to tackle crucial challenges for the further development of offshore wind in Northern Europe by cooperating beyond borders and sector barriers. The POWER cluster has commissioned Ecofys to analyse the current state of the offshore wind industry in Northern Europe. This report is a literature and industry review that includes lessons learnt over the past decade, the issues that the industry currently faces and the requirements necessary for further development. It is intended for both public and private audiences and presents the opportunities and challenges that exist in offshore wind energy today.
    [Show full text]
  • High-Resolution CFD Modelling of Lillgrund Wind Farm
    Heriot-Watt University Research Gateway High-resolution CFD modelling of Lillgrund Wind farm Citation for published version: Creech, ACW, Fruh, W-G & Maguire, AE 2013, 'High-resolution CFD modelling of Lillgrund Wind farm', Paper presented at International Conference on Renewable Energies and Power Quality, Bilbao, Spain, 20/03/13 - 22/03/13. Link: Link to publication record in Heriot-Watt Research Portal Document Version: Peer reviewed version General rights Copyright for the publications made accessible via Heriot-Watt Research Portal is retained by the author(s) and / or other copyright owners and it is a condition of accessing these publications that users recognise and abide by the legal requirements associated with these rights. Take down policy Heriot-Watt University has made every reasonable effort to ensure that the content in Heriot-Watt Research Portal complies with UK legislation. If you believe that the public display of this file breaches copyright please contact [email protected] providing details, and we will remove access to the work immediately and investigate your claim. Download date: 02. Oct. 2021 International Conference on Renewable Energies and Power Quality (ICREPQ’13) Bilbao (Spain), 20th to 22th March, 2013 Renewable Energy and Power Quality Journal (RE&PQJ) ISSN 2172-038 X, No.11, March 2013 High-resolution CFD modelling of Lillgrund Wind farm A.C.W. Creech1, W.-G. Früh2 and A.E. Maguire3 1 Institute of Energy Systems, School of Engineering, University of Edinburgh Kings Buildings, Edinburgh EH9 3JL (UK) E-mail: [email protected] 2 Institute of Mechanical, Process and Energy Engineering, School of Physical Sciences and Engineering, Heriot-Watt University, Riccarton, Edinburgh EH14 4AS (UK) E-mail: [email protected] 3 Vattenfall United Kingdom, Research & Development New Renewables The Tun, Holyrood Road, Edinburgh EH8 8AE (UK) E-mail: [email protected] Abstract.
    [Show full text]
  • Wind Turbine Wakes and Wind Farm Wakes
    WIND TURBINE WAKES AND WIND FARM WAKES REPORT 2018:541 Wind Turbine Wakes and Wind Farm Wakes – what are todays model possibilities and accuracy? STEFAN IVANELL, KARL NILSSON, OLA ERIKSSON, STEFAN SÖDERBERG OCH INGEMAR CARLÉN ISBN 978-91-7673-541-1 | © Energiforsk November 2018 Energiforsk AB | Phone: 08-677 25 30 | E-mail: [email protected] | www.energiforsk.se WIND TURBINE WAKES AND WIND FARM WAKES Foreword Projektet “Wind turbine wakes and wind farm wakes” har finansierats av Energiforsk och Energimyndigheten genom programmet Vindforsk IV. Syftet har varit att utveckla metoder för att öka kunskapen om hur vindvakar påverkar omgivande vindkraftverk, såväl inom en park som mellan parker. Målet har varit att utveckla verktyg för att optimera utformningen av större vindparker och för att minska lasterna på vindkraftverken. Mikroskalesimuleringar har gjorts av befintliga vindkraftparker med goda resultat liksom mesoskalesimuleringar för att undersöka påverkan mellan stora vindkraftsanläggningar till havs. Med tanke på kommande etablering av mycket stora vindkraftparker, främst till havs, är forskningsområdet av stor vikt för framtida utbyggnad av vindkraft. Projektet har genomförts i en internationell samverkan och öppnat upp för kommande samarbete. Projektet har genomförts av Stefan Ivanell, projektledare, Uppsala Universitet tillsammans med Karl Nilsson och Ola Eriksson från Uppsala universitet, Stefan Söderberg från Weathertech Scandinavia och Ingemar Carlén från Teknikgruppen. Göran Dalén Ordförande, Vindforsk IV 3 WIND TURBINE WAKES AND WIND FARM WAKES Sammanfattning När ett vindkraftverk tar tillvara vindens rörelseenergi skapas en vak bakom det som kännetecknas av lägre vindhastighet och ökad turbulens. Jämfört med enstaka vindkraftverk så minskar produktionen och lastpåverkan ökar vid placering av vindkraftverk i grupper och vid placering av flera vindkraftparker i närheten av varandra.
    [Show full text]