Blackstone River Assessment of Water Quality, Ecological Health, and Ecological Risk through Data Collection and Modeling Quality Assurance Project Plan v2.0 2017 - 2019 Prepared for: Upper Blackstone Water Pollution Abatement District In cooperation by: The University of Massachusetts at Amherst CDM Smith Normandeau Associates February 16, 2018 QUALITY ASSURANCE PROJECT PLAN for Blackstone River Watershed Assessment Study Prepared by: CDM Smith, One Cambridge Place, 50 Hampshire Street, Cambridge, MA 02139 University of Massachusetts at Amherst, Massachusetts Water Resources Research Center, 250 Natural Resources Rd, Ag Engineering Room 209, UMass, Amherst, MA 01003 Normandeau Associates, 917 New Hampshire 12, Westmoreland, NH 03467 Date Prepared: March 21, 2017 Date Revised: August 15, 2017 Date Approved: February 14, 2018 APPROVED BY: UBWPAD Engineer-Director/Treasurer: ___________________________________________ Date:___________________ Karla Sangrey, P.E., UBWPAD Engineer-Director/Treasurer UBWPAD, 50 Route 20, Millbury, MA 01527 Tel: 508-755-1286, Fax: 508-755-1289 Email:
[email protected] Project Manager: ___________________________________________ Date:___________________ Kristina Masterson, P.E., CDM Smith One Cambridge Place 50 Hampshire Street Cambridge, MA 02139 Tel: 617-452-6284, Fax: 617-452-8284 Email:
[email protected] Monitoring Program Coordinator & Field Program Coordinator: ___________________________________________ Date:___________________ Paula Sturdevant Rees, Ph.D., UMass Massachusetts Water Resources