Procurement Plan

I. General

Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan Original: August 19, 2016; Updated Procurement Plan, April 2017 2. Date of General Procurement Notice: Dec 24, 2015 3. Period covered by this procurement plan: The procurement period of project covered from August 2016 – December 2017

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Procurement Method Prior Review Threshold Comments Public Disclosure Authorized US$ 1. ICB Goods and Non-Consulting Above or equal to US$ All Services 2,000,000 2. NCB - Goods and Non-Consulting Below US$ 2,000,000 None Services 3. Shopping - Goods and Non-Consulting Below US$ 100,000 None Services 4. ICB (Works) Above US$ 10 million All 5. NCB (Works) Below US$ 10 million None 6. Shopping – (Works) Below US$ 100,000 None

2. Prequalification. Bidders for shall be prequalified in accordance with the provisions of

Public Disclosure Authorized paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines:

4. Reference to (if any) Project Operational/Procurement Manual: N/A at this stage

5. Any Other Special Procurement Arrangements: 5 ICB works packages are eligible to be financed under retroactive financing

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) Public Disclosure Authorized 1 2 3 4 5 6 7

Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 128.1 8 No Prior the ICB (Works) Summary of 1.8 1 No Prior the ICB (Goods) Summary of 19 3 No Post the NCB (Works) Summary of 4.8 1 No Prior the ICB (Non- Consultant Services) Summary of 0.27 1 No Post the Shopping (Goods)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) QCBS Above US$ 1,000,000 All 1. Competitive Methods (Firms) QCBS ≥ 300,000 - < 1,000,000 None 1. Competitive Methods (Firms) Below US$ 300,000 None CQS/FBS/LCS 2. Single Source (Firms) All All 3. Individual Above or equal to US$ All 200,000 4. Individual Below US$ 200,000 None

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. 3. Any Other Special Selection Arrangements: 5 QCBS works packages are eligible to be financed under retroactive financing

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 38.1 13 Prior number of contracts that will be let under QCBS Summary of 0.93 3 Prior CQS number of contracts that will be let under other methods Summary of 4.4 7 Prior number of contracts that will be let under ICS PROCUREMENT : Second Water Sector Institutional Development Project PLAN General Information

Country: Angola Bank’s Approval Date of the Original Procurement Plan: 2016-08-10 Revised Plan Date(s): (comma delineated, leave blank if none)2020-11-06 Project ID: P151224 GPN Date: 2017-08-07 Project Name: Second Water Sector Institutional Development Project Loan / Credit No: IBRD / 87020, / , COFN / C1560 Executing Agency(ies):National Directorate of Water

WORKS Procureme Bid Evaluation Activity Reference No. / Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH nt Process Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Amount qualification Document / Signed Contract No. Approach Process (Y/N) Risk Document Status Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion (US$) Documents Justification Type Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

1W3//DNA/16 / Rehabilitation and Design and construction of Open - Single Stage - One IBRD / 87020 Expansion of Water Supply Prior Request for Bids 8,096,602.85 Signed 2016-09-07 2016-11-02 2017-03-04 2016-11-06 2017-05-27 2017-02-21 2017-06-26 2017-04-18 2017-02-27 2017-06-20 2021-02-25 network and home International Envelope Production and Distribution connections in Malanje

2W3/DUNDO/DNA/16 / Rehabilitation and Design and construction of Open - Single Stage - One 12,836,980.8 IBRD / 87020 Expansion of Water Supply Prior Request for Bids Signed 2016-09-27 2017-04-14 2016-10-02 2017-04-19 2017-02-27 2017-06-23 2017-03-29 2017-09-26 2017-05-04 2017-10-26 2021-05-03 network and home International Envelope 5 Production and Distribution connections in Dundo

3W3//DNA/16 / Design and construction of Rehabilitation and Open - Single Stage - One 12,859,401.2 network and home IBRD / 87020 Expansion of Water Supply Prior Request for Bids Signed 2016-10-12 2016-12-19 2016-10-23 2017-01-17 2017-02-19 2017-03-22 2017-03-21 2017-09-15 2017-05-10 2017-11-07 2020-12-10 International Envelope 6 connection for peri-urban Production and Distribution

areas in Huambo

4W3/LUENA/DNA/16 / Rehabilitation and Design and construction of Open - Single Stage - One IBRD / 87020 Expansion of Water Supply Prior Request for Bids 9,849,128.19 Signed 2016-10-15 2017-03-29 2017-05-25 2017-03-30 2017-09-20 2017-06-09 2017-10-20 2017-09-14 2017-05-15 2017-10-30 2021-05-14 network and home International Envelope Production and Distribution connections in Luena

5W3/UIGE/DNA/16 / Design Rehabilitation and and construction of network Open - Single Stage - One 10,368,081.4 IBRD / 87020 Expansion of Water Supply Prior Request for Bids Signed 2016-11-14 2017-04-14 2016-11-19 2017-04-19 2017-03-01 2017-06-16 2017-03-31 2017-10-24 2017-05-19 2017-11-13 2021-05-18 and home connections in International Envelope 0 Production and Distribution Uige

7W3/KUITO/DNA/16 / Rehabilitation and Design and construction of Single Stage - One IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 4,071,186.08 Signed 2017-01-16 2017-06-01 2017-01-21 2017-06-01 2017-03-21 2017-07-19 2017-04-20 2017-10-11 2017-05-31 2017-11-16 2020-06-01 network and home Envelope Production and Distribution connections in Kuito

9W3/NDALATANDO/DNA/16 / Design and construction for Rehabilitation and refurbishment of the WTW, Open - Single Stage - One / Expansion of Water Supply Prior Request for Bids 0.00 Canceled 2017-05-11 2017-05-16 2017-07-17 2017-08-16 2017-09-28 2020-09-28 construction of distribution International Envelope Production and Distribution centers and 1.6 km trunk mains for Ndalatando

33W3-B/HUAMBO/DAS/17 / Rehabilitation and Construction of Network and IBRD / 87020 Expansion of Water Supply Prior Direct Selection Direct 5,827,776.58 Signed 2017-05-19 2017-05-24 2017-06-28 2017-07-12 2019-02-18 Home Connections for the Production and Distribution City of Huambo-Lot 2

13W3/KUITO/DNA/17 / Rehabilitation and Supply and installation of IBRD / 87020 Expansion of Water Supply Post Direct Selection Direct 0.00 Canceled 2017-09-01 2017-09-06 2017-10-11 2018-04-09 valves and fittings for Kuito Production and Distribution Water Supply System

Page 1 12W3/NDALATANDO/DNA/17 / Supply and installation of Rehabilitation and Single Stage - One bulk meters and valves for IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 0.00 Canceled 2017-09-12 2017-09-17 2017-10-29 2017-11-28 2018-01-02 2018-07-01 Envelope Ndalatando water supply Production and Distribution system

6W3-R/DAS/17 / Repairs to Rehabilitation and the Network and Home Single Stage - One IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 1,619,865.27 Signed 2018-10-22 2018-10-30 2018-10-27 2018-10-30 2018-12-08 2018-12-17 2019-01-07 2018-12-21 2019-02-11 2019-02-15 2019-08-10 Connections in the City of Envelope Production and Distribution Ndalatando

8W3/NDALATANDO/DNA/16 / Design and construction of a new water source, WTW, Rehabilitation and Open - Single Stage - One pumping station, raw water IBRD / 87020 Expansion of Water Supply Prior Request for Bids 0.00 Canceled 2018-05-28 2018-08-09 2018-08-12 2018-06-15 2018-09-03 2018-10-03 2018-11-26 2023-06-26 International Envelope pipeline, distribution centers Production and Distribution and trunk mains for Ndalatando

9W3//DNA/18 / Rehabilitation and Construction of Water Single Stage - One IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 1,795,215.05 Signed 2018-09-06 2019-03-17 2018-09-11 2019-03-29 2018-10-23 2019-05-14 2018-11-22 2019-06-14 2018-12-27 2019-08-12 2019-06-25 Production Boreholes in Envelope Production and Distribution Lubango

8W3A/NDALATANDO/DNA/18 / Design and construction of a new water source, WTW, Rehabilitation and Request for Open - 22,656,856.6 pumping station, raw water IBRD / 87020 Expansion of Water Supply Prior Multi Stage Signed 2018-07-10 2018-09-26 2018-10-05 2019-02-27 2018-10-05 2019-04-02 2018-07-25 2018-09-27 2018-12-24 2019-07-02 2019-04-22 2020-03-19 2019-05-27 2020-04-16 2020-11-17 Proposals International 8 pipeline, distribution centers Production and Distribution and trunk mains for Ndalatando

10W3/LUBANGO/DNA/16 / Rehabilitation and Open - Single Stage - One Design and Construction of IBRD / 87020 Expansion of Water Supply Prior Request for Bids 4,134,900.98 Signed 2018-12-12 2019-03-21 2018-12-17 2019-03-25 2019-03-07 2019-05-13 2019-04-06 2019-06-18 2019-05-11 2019-08-20 2021-04-30 International Envelope reservoirs in Lubango Production and Distribution

45W3/MALANJE/DNA/18 / Rehabilitation and Single Stage - One Repair works to connections IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 0.00 Canceled 2018-10-31 2018-11-05 2019-01-14 2019-02-13 2019-03-20 2020-03-14 Envelope in Malanje Production and Distribution

46W3/CUITO/DNA/18 / Rehabilitation and Pending Design and Construction of Single Stage - One COFN / C1560 Expansion of Water Supply Post Request for Bids Open - National 0.00 Implementat 2020-06-29 2020-07-04 2020-08-15 2020-09-14 2020-10-19 2022-04-12 Network and Household Envelope Production and Distribution ion Connections in Cuito-Phase 2

44W3/LUBANGO/DNA/18 / Rehabilitation and Under Design and Construction of Single Stage - One COFN / C1560 Expansion of Water Supply Post Request for Bids Open - National 0.00 Implementat 2020-04-16 2020-11-03 2020-04-21 2020-11-03 2020-06-02 2020-07-02 2020-08-06 2022-01-28 Network and Household Envelope Production and Distribution ion Connections in Lubango

6W3/NAMIBE/DNA/16 / Rehabilitation and Design and construction of Open - Single Stage - One COFN / C1560 Expansion of Water Supply Post Request for Bids 3,344,889.83 Signed 2019-05-23 2019-10-31 2019-05-28 2019-10-30 2019-09-10 2020-05-19 2019-10-10 2020-06-30 2019-11-16 2020-08-31 2023-11-10 network and home International Envelope Production and Distribution connections in Namibe

11W3/LUBANGO/DNA/16 / Rehabilitation and Pending Single Stage - One Design and construction of COFN / C1560 Expansion of Water Supply Post Request for Bids Open - National 0.00 Implementat 2020-10-30 2020-11-04 2020-12-16 2021-01-15 2021-02-19 2022-02-19 Envelope boreholes in Lubango Production and Distribution ion

74W3/UIGE/19 / Design and construction of a new water Rehabilitation and Under source, WTW, pumping Request for Open - COFN / C1560 Expansion of Water Supply Prior Multi Stage 0.00 Implementat 2019-07-25 2019-10-10 2019-10-20 2020-04-28 2019-10-20 2020-06-04 2019-08-09 2019-10-15 2020-01-08 2020-05-06 2020-06-10 2023-05-26 station, raw water pipeline, Proposals International Production and Distribution ion distribution centers and trunk mains for Uige

Page 2 14W3/NDALATANDO/DNA/20 / Design and Construction of the Expansion and Rehabilitation and Under Open - Single Stage - One Rehabilitation of the Existing COFN / C1560 Expansion of Water Supply Prior Request for Bids 0.00 Implementat 2020-05-25 2020-05-30 2020-07-11 2020-08-10 2020-09-14 2021-03-13 International Envelope Bulk Water Supply Production and Distribution ion

System of the city of Ndalatando

15W3/NDALATANDO/DNA/20 / Design and Construction of Rehabilitation and Under Open - Single Stage - One Network and home COFN / C1560 Expansion of Water Supply Prior Request for Bids 0.00 Implementat 2020-05-19 2020-08-12 2020-05-24 2020-08-25 2020-07-05 2020-08-04 2020-09-08 2021-03-07 International Envelope connections in Ndalatando Production and Distribution ion

Lot 2

16W3/UIGE/DNA/20 / Rehabilitation and Under Design and Construction of Open - Single Stage - One COFN / C1560 Expansion of Water Supply Prior Request for Bids 0.00 Implementat 2020-05-25 2020-07-21 2020-05-30 2020-07-27 2020-07-11 2020-08-10 2020-09-14 2021-03-13 Network and home International Envelope Production and Distribution ion connections in Uige

17W3/HUAMBO/DNA/20 / Rehabilitation and Pending Single Stage - One Remedial of Water Supply at COFN / C1560 Expansion of Water Supply Post Request for Bids Open - National 0.00 Implementat 2020-08-31 2020-09-05 2020-10-17 2020-11-16 2020-12-21 2021-06-19 Envelope Huambo Production and Distribution ion

18W3/DNA/20 / Remedial of Rehabilitation and Pending Water Supply Systems at Single Stage - One COFN / C1560 Expansion of Water Supply Post Request for Bids Open - National 0.00 Implementat 2020-09-14 2020-09-19 2020-10-31 2020-11-30 2021-01-04 2021-07-03 Uige, Malange, Lubango and Envelope Production and Distribution ion Cuito

GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

4G4/DNA/16 / Implementation of a Management and Request for Single Stage - One Financial Management / Post Limited 0.00 Canceled 2017-08-08 2017-10-03 2018-04-01 Engineering Support Quotations Envelope System (Primavera software)

47G1/CITIES/DNA/18 / Water Supply Institutional Single Stage - One Water meters, pipes valves IBRD / 87020 Strengthening and Capacity Prior Request for Bids Open - National 3,189,329.35 Signed 2018-07-20 2018-10-16 2018-07-25 2018-10-16 2018-09-05 2018-12-04 2018-10-05 2019-02-28 2018-11-09 2019-06-10 2019-05-08 Envelope and fittings for six cities Development

53G1/CITIES/DNA/18 / Water Supply Institutional Workstations and printers Single Stage - One IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 370,492.32 Signed 2018-05-30 2018-11-09 2018-06-04 2019-03-18 2018-07-19 2019-04-26 2018-08-18 2019-08-14 2018-09-22 2019-11-18 2019-03-21 for Utilities in Huila, Envelope Development Malanje and Cuanza Norte

2G4/DNA/16 / Computers Rehabilitation and Request for Single Stage - One and IT equipment for the IBRD / 87020 Expansion of Water Supply Post Limited 97,808.86 Signed 2019-02-17 2018-10-23 2019-04-14 2018-11-26 2019-10-11 Quotations Envelope Project Production and Distribution

3G4/DNA/16 / Furniture Management and Request for Single Stage - One IBRD / 87020 Post Limited 63,269.83 Signed 2019-03-05 2018-10-26 2019-04-30 2018-11-28 2019-10-27 shopping Engineering Support Quotations Envelope

71G3/UIGE/DNA/18 / Power Rehabilitation and Pending Request for Single Stage - One Transformer for Uige Water IBRD / 87020 Expansion of Water Supply Post Limited 0.00 Implementati 2019-01-28 2019-03-25 2019-09-21 Quotations Envelope Supply System Production and Distribution on

70CS2/INRH/18 / Purchase and installation of 15 remote satellite communication Single Stage - One COFN / C1560 Water Resource Management Post Request for Bids Open - National 0.00 Canceled 2020-05-13 2020-05-18 2020-06-29 2020-07-29 2020-09-02 2021-03-01 equipment and Envelope meteorological sensors for hydrometric stations

Page 3 1G4/DNA/16 / Education Water Supply Institutional Open - Single Stage - One and laboratory equipment for COFN / C1560 Strengthening and Capacity Post Request for Bids 0.00 Canceled 2020-09-01 2020-09-06 2020-10-18 2020-11-17 2021-01-15 2022-01-15 International Envelope Onga Zanga training center Development

48/G1/CITIES/DNA/18 / Water Supply Institutional Single Stage - One Workshop and maintenance IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 0.00 Canceled 2018-06-20 2018-06-25 2018-08-06 2018-09-05 2018-10-10 2019-04-08 Envelope equipment Development

5G4/DNA/20 / Procurement Management and Request for Single Stage - One of TOMPRO Accounting IBRD / 87020 Post Limited 51,203.21 Signed 2020-02-16 2020-03-10 2020-04-26 2020-05-25 2020-07-26 Engineering Support Quotations Envelope Software

6G4/UCP/20 / Procurement Water Supply Institutional of Computers for Young Request for Single Stage - One IBRD / 87020 Strengthening and Capacity Post Limited 49,820.29 Signed 2020-02-14 2020-03-11 2020-04-10 2020-04-15 2020-10-07 Professionals and FCMU Quotations Envelope Development Consultants

54G2/INRH/20 / Under Procurement of ArGis Single Stage - One COFN / C1560 Water Resource Management Post Request for Bids Open - National 76,393.65 Implementati 2020-03-02 2020-04-28 2020-03-07 2020-04-28 2020-04-18 2020-05-27 2020-05-18 2020-08-14 2020-06-22 2020-12-19 software license and Angola Envelope on Database

55G2/INRH/20 / Under Procurement of Hydrometric Single Stage - One COFN / C1560 Water Resource Management Post Request for Bids Open - National 584,755.61 Implementati 2020-03-02 2020-04-15 2020-03-09 2020-04-15 2020-04-20 2020-06-02 2020-05-20 2020-08-13 2020-06-24 2020-12-21 Equipment and Remote Envelope on Connection to the Database

7G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 4,786.20 Signed 2020-04-09 2020-04-08 2020-04-14 2020-04-13 2020-05-19 2020-04-15 2020-11-15 Procurement of Motorcycles Development

8G1/NDALATANDO/20 / Water Supply Institutional Pending Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 0.00 Implementati 2020-04-12 2020-04-17 2020-05-22 2020-11-18 Procurement of Health and Development on Safety Materials

9G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 8,263.12 Signed 2020-04-12 2020-06-02 2020-04-17 2020-06-02 2020-05-22 2020-06-11 2020-11-18 Operation and maintenance Development

10G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection 11,698.34 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-07 2020-05-07 2020-04-15 2020-11-03 Procurement of pumps, Development reservoirs and accessories

11G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 6,265.20 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-21 2020-05-22 2020-04-21 2020-11-18 Procurement of Chemicals Development

12G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 4,860.66 Signed 2020-04-12 2020-04-21 2020-04-17 2020-04-13 2020-05-22 2020-05-07 2020-11-18 Health and Safety Materials Development

13G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,392.88 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-16 2020-05-22 2020-04-16 2020-11-18 Health and Safety Materials Development

15G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 61,599.83 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-14 2020-05-22 2020-04-14 2020-11-18 Chemicals and laboratory Development reagents

16G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 10,460.36 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-14 2020-05-22 2020-04-17 2020-11-18 pumps, reservoirs and Development accessories

Page 4 17G1/BIE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 4,786.20 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-14 2020-05-22 2020-04-14 2020-11-18 motorcycles Development

18G1/BIE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,393.10 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-14 2020-05-22 2020-04-14 2020-11-18 Health and Safety Materials Development

20G1/BIE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection 40,662.76 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-15 2020-05-07 2020-04-15 2020-11-03 Chemicals Development

21G1/BIE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 47,363.00 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-12 2020-05-22 2020-04-17 2020-11-18 Pumps Development

22G1/MALANJE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 4,778.22 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-17 2020-05-22 2020-04-17 2020-11-18 of motorcycles Development

23G1/MALANJE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,515.11 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-17 2020-05-22 2020-04-17 2020-11-18 of Health and Safety Development Materials

25G1/MALANJE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection 12,548.89 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-17 2020-05-07 2020-04-20 2020-11-03 of Chemicals Development

26G1/MALANJE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 31,008.69 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-17 2020-05-22 2020-04-17 2020-11-18 of maintenance materials Development

27G1/HUAMBO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 4,804.80 Signed 2020-04-12 2020-04-08 2020-04-17 2020-05-12 2020-05-22 2020-05-18 2020-11-18 of motorcycles Development

32G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 4,804.80 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-13 2020-05-22 2020-04-15 2020-11-18 motorcycles Development

28G1/HUAMBO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,392.39 Signed 2020-04-12 2020-04-08 2020-04-17 2020-05-14 2020-05-22 2020-05-14 2020-11-18 of Health and Safety Development Materials

33G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,400.64 Signed 2020-04-12 2020-04-08 2020-04-17 2020-05-14 2020-05-22 2020-05-21 2020-11-18 Health and Safety Materials Development

30G1/HUAMBO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection 72,066.19 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-14 2020-05-07 2020-04-14 2020-11-03 of Chemicals Development

31G1/HUAMBO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 31,811.78 Signed 2020-04-12 2020-04-08 2020-04-17 2020-05-14 2020-05-22 2020-05-14 2020-11-18 of maintenance materials Development

36G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection 78,372.94 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-13 2020-05-07 2020-04-13 2020-11-03 pumps and spare parts Development

37G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection 63,210.84 Signed 2020-04-12 2020-04-08 2020-04-17 2020-04-13 2020-05-07 2020-04-13 2020-11-03 electrical repair materials Development

Page 5 56G2/INRH/20 / Pending Procurement of Angola COFN / C1560 Water Resource Management Prior Direct Selection Direct 0.00 Implementati 2020-05-04 2020-05-09 2020-06-13 2020-12-10 Database on

57G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 9,278.99 Signed 2020-05-18 2020-05-14 2020-05-23 2020-06-17 2020-06-27 2020-07-13 2020-12-24 Laboratory Reagents Development

58G1/UIGE/20 / Covid-19 Emergency – Procurement of Water Supply Institutional accessories and materials for COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 52,807.57 Signed 2020-05-18 2020-05-14 2020-05-23 2020-06-25 2020-06-27 2020-06-25 2020-12-24 the repair of water supply Development network

59G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 36,913.47 Signed 2020-05-19 2020-05-14 2020-05-24 2020-06-23 2020-06-28 2020-06-23 2020-12-25 Laboratory Reagents Development

60G1/HUILA/20 / Covid 19 Emergency - Procurement of Water Supply Institutional accessories and materials for COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 67,595.81 Signed 2020-05-20 2020-05-14 2020-05-25 2020-07-29 2020-06-29 2020-07-29 2020-12-26 the repair of water supply Development network

62G1/NAMIBE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 73,414.98 Signed 2020-05-19 2020-05-14 2020-05-24 2020-06-12 2020-06-28 2020-06-12 2020-12-25 of Chemicals for water Development treatment

63G1/NAMIBE/20 / Covid 19 Emergency - Procurement Water Supply Institutional of accessories and materials COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 76,091.19 Signed 2020-05-19 2020-05-14 2020-05-24 2020-07-29 2020-06-28 2020-07-29 2020-12-25 for the repair of water Development supply network

64G1/NAMIBE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 69,336.37 Signed 2020-05-19 2020-05-14 2020-05-24 2020-06-12 2020-06-28 2020-06-12 2020-12-25 of Laboratory reagents Development

65G1//20 / Covid-19 Water Supply Institutional Emergency – Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,174.75 Signed 2020-05-20 2020-05-14 2020-05-25 2020-04-24 2020-06-29 2020-06-12 2020-12-26 Health and Safety equipment Development

66G1/MOXICO/20 / Covid-19 Water Supply Institutional Pending Emergency – Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 0.00 Implementati 2020-05-20 2020-05-25 2020-06-29 2020-12-26 Motorcycles Development on

67G1/MOXICO/20 / Covid Water Supply Institutional Pending 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 0.00 Implementati 2020-05-21 2020-05-26 2020-06-30 2020-12-27 of chemicals for water Development on treatment

68G1/MOXICO/20 / Covid 19 Emergency - Procurement Water Supply Institutional of accessories and materials COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 18,156.05 Signed 2020-05-21 2020-05-14 2020-05-26 2020-06-25 2020-06-30 2020-06-25 2020-12-27 for the repair of water Development supply network

69G1/MOXICO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 19,947.88 Signed 2020-05-21 2020-05-14 2020-05-26 2020-06-12 2020-06-30 2020-06-12 2020-12-27 of an electric generator Development

70G1/MOXICO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 4,688.73 Signed 2020-05-21 2020-05-14 2020-05-26 2020-06-08 2020-06-30 2020-06-12 2020-12-27 of accessories for the Development existing generator

Page 6 NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

56NC1/UIGE/DNA/18 / Water Supply Institutional Open - Single Stage - Two Management Support IBRD / 87020 Strengthening and Capacity Prior Request for Bids 5,681,279.92 Signed 2018-06-01 2018-11-21 2018-08-17 2019-03-29 2018-08-17 2019-05-29 2018-06-06 2018-11-23 2018-10-26 2019-08-20 2019-01-08 2019-12-12 2019-02-12 2020-02-26 2022-02-11 International Envelope Services Contract for Uige Development

11CS1/DAS/18 / Operation Water Supply Institutional and Management of Kuito IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 1,209,504.20 Signed 2018-06-06 2018-06-12 2018-06-11 2018-07-01 2018-06-29 2018-12-28 and Kunje Water Supply Development System

93CS1/DAS/18 / Operation Water Supply Institutional and Management of Huambo IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 1,470,480.00 Signed 2018-06-06 2018-06-12 2018-06-11 2018-07-01 2018-06-29 2018-12-28 Water Supply System Development

20CS1/DAS/18 / Operation Water Supply Institutional and Management of Malanje IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 1,019,169.96 Signed 2018-06-06 2018-06-12 2018-06-11 2018-07-01 2018-06-18 2018-12-28 Water Supply System Development

94CS1/DAS/18 / Operation Water Supply Institutional and Management of Uige IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 1,202,407.00 Signed 2018-06-06 2018-06-13 2018-06-11 2018-07-01 2018-06-29 2018-12-28 Water Supply System Development

59CS1/DAS/15 / Operation Water Supply Institutional and Management of Lubango IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 2,200,875.50 Signed 2018-06-06 2018-06-12 2018-06-11 2018-07-01 2018-06-29 2018-12-28 Water Supply System Development

95CS1/DAS/18 / Operation Water Supply Institutional and Management of IBRD / 87020 Strengthening and Capacity Post Direct Selection Direct 1,180,071.55 Signed 2018-08-20 2018-04-03 2018-08-25 2018-07-23 2018-09-14 2018-08-21 2019-03-13 N´dalatando Water Supply Development System

58NC1/NDALATANDO/DNA/1 Water Supply Institutional 8 / Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 7,032,202.49 Signed 2019-05-02 2019-07-15 2019-05-07 2019-07-16 2019-06-18 2019-09-25 2019-08-31 2020-03-02 2019-10-05 2020-07-24 2024-09-08 Services Contract for International Envelope Development Ndalatando

1NC1/LUENA/DNA/16 / Water Supply Institutional Open - Single Stage - Two Management Contract for COFN / C1560 Strengthening and Capacity Post Request for Bids 938,762.16 Signed 2019-07-24 2019-06-12 2019-07-29 2019-06-12 2019-09-30 2019-08-12 2019-12-13 2019-09-04 2020-01-17 2019-12-09 2023-02-14 International Envelope Luena Development

54NC1/CUITO/DNA/18 / Water Supply Institutional Open - Single Stage - Two Management Support COFN / C1560 Strengthening and Capacity Prior Request for Bids 9,117,817.16 Signed 2019-05-06 2019-08-09 2019-05-11 2019-08-22 2019-06-22 2019-10-02 2019-09-04 2019-12-23 2019-10-09 2020-07-02 2024-09-12 International Envelope Services Contract for Cuito Development

55NC1/HUAMBO/DNA/18 / Water Supply Institutional Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 5,557,479.33 Signed 2019-05-13 2019-07-12 2019-05-18 2019-07-17 2019-06-29 2019-09-18 2019-09-11 2019-12-12 2019-10-16 2020-02-20 2024-09-19 Services Contract for International Envelope Development Huambo

57NC1/MALANJE/DNA/18 / Water Supply Institutional Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 6,718,801.92 Signed 2019-05-17 2019-06-18 2019-05-22 2019-06-19 2019-07-03 2019-09-11 2019-09-15 2019-12-12 2019-10-20 2020-05-28 2020-04-17 Services Contract for International Envelope Development Malanje

73NC1/LUBANGO/18 / Water Supply Institutional Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 0.00 Canceled 2019-06-03 2019-06-08 2019-07-20 2019-10-02 2019-11-06 2024-10-10 Services Contract for International Envelope Development Lubango

78NC1/HUILA/19 / Water Supply Institutional Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 6,311,159.00 Signed 2019-08-05 2019-08-16 2019-08-10 2019-08-22 2019-09-21 2019-10-16 2019-12-04 2020-03-09 2020-01-08 2020-07-30 2024-12-12 Services Contract for Huíla International Envelope Development Province

Page 7 Management and Request for Single Stage - One 103CS1/UCP/20 / Translator COFN / C1560 Post Limited 15,409.23 Signed 2020-05-29 2020-05-12 2020-07-24 2020-06-12 2021-07-04 Engineering Support Quotations Envelope

105CS3/NDALATANDO/20 / Rehabilitation and Demining of the sites for COFN / C1560 Expansion of Water Supply Post Direct Selection Direct 89.54 Signed 2020-07-26 2020-07-30 2020-07-31 2020-07-15 2020-09-04 2020-09-03 2021-03-03 the new bulk water supply Production and Distribution system in Ndalatando

56ANC1/UIGE/20 / Water Supply Institutional Pending Management Support IBRD / 87020 Strengthening and Capacity Post Direct Selection Direct 0.00 Implementati 2020-10-30 2020-11-04 2020-12-09 2021-06-07 Services for Uige Water and Development on Sanitation Utility

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

1CS3/DNA/16 / Design checking and works Rehabilitation and Quality And Cost- Open - Supervision of Network and IBRD / 87020 Expansion of Water Supply Prior 1,948,055.93 Signed 2016-08-16 2016-08-19 2016-09-06 2016-10-20 2016-09-06 2016-11-17 2016-10-20 2016-12-17 2017-01-18 2017-01-21 2017-04-11 2017-02-25 2017-04-17 2020-09-25 Based Selection International Home Connections for Production and Distribution

Peirurban areas of Malanje

2CS3/DNA/16 / Design Rehabilitation and checking and works Quality And Cost- Open - IBRD / 87020 Expansion of Water Supply Prior 2,409,375.00 Signed 2016-08-16 2016-08-15 2016-10-03 2016-08-22 2016-11-10 2016-11-08 2017-01-24 2016-12-19 2017-02-23 2017-04-17 2017-03-30 2017-08-02 2017-05-04 2017-08-07 2021-06-04 Supervision of Network and Based Selection International Production and Distribution Home Connections for Dundo

3CS3/DNA/16 / Design checking and works Rehabilitation and Quality And Cost- Open - Supervision of Network and IBRD / 87020 Expansion of Water Supply Prior 2,154,336.79 Under Review 2016-08-17 2016-08-15 2016-10-04 2016-08-23 2016-11-10 2016-11-08 2017-01-30 2016-12-16 2017-03-01 2017-01-18 2017-04-05 2017-04-18 2017-05-10 2017-04-24 2020-12-10 Based Selection International Home Connections for Production and Distribution

Huambo (1st phase)

4CS3/DNA/16 / Design Rehabilitation and checking and works Quality And Cost- Open - IBRD / 87020 Expansion of Water Supply Prior 1,686,971.28 Signed 2016-08-18 2016-08-13 2016-10-05 2016-08-22 2016-11-18 2016-11-08 2017-02-02 2016-12-15 2017-03-04 2017-02-08 2017-04-08 2017-05-30 2017-05-13 2017-06-05 2020-12-14 Supervision of Network and Based Selection International Production and Distribution Home Connections for Luena

5CS3/DNA/16 / Design Rehabilitation and checking and works Quality And Cost- Open - IBRD / 87020 Expansion of Water Supply Prior 2,239,126.00 Under Review 2016-08-19 2016-08-19 2016-10-06 2016-08-23 2016-11-19 2016-11-08 2017-02-08 2016-12-20 2017-03-10 2017-04-11 2017-04-14 2017-07-28 2017-05-19 2017-08-01 2020-12-21 Supervision of Network and Based Selection International Production and Distribution Home Connections for Uige

6CS3/DNA/16 / Design checking and works Rehabilitation and Quality And Cost- Open - Supervision of Network and IBRD / 87020 Expansion of Water Supply Prior 2,060,259.00 Signed 2016-08-20 2016-08-19 2016-10-07 2016-08-23 2016-11-20 2016-11-09 2017-02-14 2016-12-22 2017-03-16 2017-07-26 2017-04-20 2018-05-04 2017-05-25 2018-05-21 2020-12-25 Based Selection International Home Connections for Production and Distribution

Namibe

7CS3/DNA/16 / Design checking and works Rehabilitation and Quality And Cost- Open - Supervision of Network and IBRD / 87020 Expansion of Water Supply Prior 994,220.00 Signed 2016-08-21 2016-08-19 2016-10-08 2016-08-23 2016-11-21 2016-11-08 2017-02-20 2016-12-21 2017-03-22 2017-08-16 2017-04-26 2017-11-07 2017-05-31 2017-11-13 2020-12-28 Based Selection International Home Connections for Kuito Production and Distribution

(1st phase)

8CS3/NDALATANDO/DNA/16 / Design checking and works Rehabilitation and supervision for the Quality And Cost- Open - COFN / C1560 Expansion of Water Supply Prior 2,702,430.43 Signed 2017-02-01 2018-11-08 2017-02-22 2018-11-13 2017-04-07 2019-06-11 2017-06-05 2019-09-03 2017-07-05 2019-10-23 2017-08-09 2020-01-06 2017-09-13 2020-02-12 2020-09-14 construction of a new water Based Selection International Production and Distribution source and pipeline in Ndalatando

10CS3/LUBANGO/DNA/16 / Rehabilitation and Design checking and works Quality And Cost- Open - IBRD / 87020 Expansion of Water Supply Prior 736,287.70 Signed 2017-03-03 2018-05-04 2017-05-18 2018-05-14 2017-07-01 2018-12-12 2017-08-28 2019-02-19 2017-09-27 2019-04-12 2017-11-01 2019-06-10 2017-12-06 2019-06-27 2020-12-07 Supervision of Construction Based Selection International Production and Distribution of reservoirs in Lubango

Page 8 12CS2/INRH/DNA/16 / TA to develop Integrated Basin Quality And Cost- Open - / Water Resource Management Prior 0.00 Canceled 2017-09-01 2016-10-13 2017-11-03 2016-10-19 2017-12-17 2018-03-05 2018-04-04 2018-05-09 2018-06-13 2019-06-13 Management Plan for River Based Selection International Basins in

13CS2/INRH/DNA/16 / TA to develop Integrated Basin Quality And Cost- Open - / Water Resource Management Prior 0.00 Canceled 2017-02-03 2016-09-06 2017-04-24 2016-10-19 2017-06-07 2017-08-06 2017-09-05 2017-10-10 2017-11-14 2018-11-14 Management Plan for Keve e Based Selection International Longa Basins

14CS4/NAMIBE/DNA/16 / Management and Quality And Cost- Open - Salt water intrusion study / Post 0.00 Canceled 2017-06-01 2017-08-01 2017-09-14 2017-11-12 2017-12-12 2018-01-16 2018-09-20 2019-09-20 Engineering Support Based Selection International at Namibe

15CS1/IRSEA/DNA/16 / TA Water Supply Institutional Quality And Cost- Open - Water and Electricity IBRD / 87020 Strengthening and Capacity Prior 4,092,649.53 Signed 2017-02-08 2018-05-07 2017-04-27 2018-06-15 2017-06-10 2018-12-07 2017-08-09 2019-02-20 2017-09-08 2019-04-02 2017-10-13 2019-05-10 2017-11-17 2019-05-28 2020-12-17 Based Selection International Regulator (IRSEA) Development

16CS1/DNA/17 / External Management and Least Cost Open - IBRD / 87020 Post 64,705.88 Signed 2017-04-17 2017-04-01 2017-05-08 2017-05-10 2017-03-20 2017-06-07 2017-05-22 2017-07-07 2017-10-17 2017-08-11 2017-11-10 2017-09-15 2017-11-29 2021-09-14 Audit Engineering Support Selection International

35CS4/DNA/17 / Project Management and Least Cost Open - IBRD / 87020 Post 171,122.99 Signed 2017-10-18 2017-11-08 2017-11-14 2017-12-22 2017-12-21 2018-01-19 2018-01-31 2018-02-18 2018-03-25 2018-04-09 2018-04-29 2018-06-01 2021-04-13 Internal Audit Engineering Support Selection International

39CS1/DNA/17 / AUDIT OF FINANCIAL STATEMENTS Water Supply Institutional Least Cost Open - FOR SIX BENEFICIARY IBRD / 87020 Strengthening and Capacity Post 232,192.51 Signed 2018-01-24 2018-01-25 2018-02-14 2018-01-25 2018-04-06 2018-02-23 2018-05-04 2018-03-27 2018-06-03 2018-04-23 2018-07-08 2018-05-10 2018-08-12 2018-06-08 2021-09-10 Selection International WATER SUPPLY AND Development

SANITATION UTILITIES

42CS2/TA/INRH/17 / Technical Assistance to Quality And Cost- Open - IBRD / 87020 Water Resource Management Prior 1,904,569.06 Signed 2018-03-30 2018-06-05 2018-04-20 2018-06-13 2018-06-03 2018-11-30 2018-07-01 2019-02-18 2018-07-31 2019-05-30 2018-09-04 2019-08-06 2018-10-09 2019-08-26 2021-10-08 INRH (National Water Based Selection International Resources Institute)

49CS3/UIGE/DNA/18 / Rehabilitation and Environmental and Social Quality And Cost- IBRD / 87020 Expansion of Water Supply Post Open - National 117,948.37 Signed 2018-07-03 2018-11-20 2018-07-24 2018-12-10 2018-09-06 2019-03-26 2018-10-04 2019-05-23 2018-11-03 2019-05-31 2018-12-08 2019-07-11 2019-01-12 2019-08-26 2020-01-12 Impact Assessment for Uige Based Selection Production and Distribution Water Supply System

60CS1/DNA/18 / Review of Water Supply Institutional the Legal and Institutional Quality And Cost- Open - IBRD / 87020 Strengthening and Capacity Prior 540,132.05 Signed 2018-05-16 2018-05-14 2018-06-06 2018-06-14 2018-07-20 2019-01-16 2018-08-17 2019-03-21 2018-09-16 2019-06-18 2018-10-21 2019-08-09 2018-11-25 2019-09-02 2019-08-22 Frameworks of the Angola Based Selection International Development Water Sector

65CS1/IRSEA/18 / Water Supply Institutional Quality And Cost- Open - Under Consultancy for beneficiary IBRD / 87020 Strengthening and Capacity Post 0.00 2019-04-25 2020-06-08 2019-05-16 2020-06-13 2019-06-29 2020-10-06 2019-07-27 2019-08-26 2019-09-30 2019-11-04 2020-11-03 Based Selection International Implementation assessment Development

66CS1/IRSEA/18 / Consultancy for the design Water Supply Institutional Quality And Cost- Under and implementation of an IBRD / 87020 Strengthening and Capacity Post Open - National 0.00 2019-04-17 2018-12-10 2019-05-08 2019-06-21 2019-07-19 2019-08-18 2019-09-22 2019-10-27 2020-04-24 Based Selection Implementation information management Development system

67CS2/INRH/18 / Development of National Quality And Cost- IBRD / 87020 Water Resource Management Post Open - National 0.00 Canceled 2019-05-29 2019-06-19 2019-08-02 2019-08-30 2019-09-29 2019-11-03 2019-12-08 2020-06-05 Water Resources Information Based Selection and Use System

9CS3/NDALATANDO/DNA/16 / Design checking and works supervision for the Rehabilitation and Quality And Cost- Open - refurbishment of the / Expansion of Water Supply Prior 0.00 Canceled 2017-02-16 2017-03-09 2017-04-22 2017-06-20 2017-07-20 2017-08-24 2017-09-28 2020-09-28 Based Selection International treatment plant and Production and Distribution construction of distribution centers in Ndalatando

72CS4/UCP/18 / Support to Management and Least Cost the recruitment process of IBRD / 87020 Prior Open - National 503,072.65 Signed 2018-09-27 2018-11-19 2018-10-18 2018-12-03 2018-12-01 2019-03-26 2018-12-29 2019-05-06 2019-01-28 2019-06-10 2019-03-04 2019-07-07 2019-04-08 2019-08-02 2019-10-05 Engineering Support Selection young professionals

Page 9 64CS1/IRSEA/18 / Water Supply Institutional Quality And Cost- Consultancy for the baseline IBRD / 87020 Strengthening and Capacity Post Open - National 0.00 Canceled 2019-05-30 2019-06-20 2019-08-03 2019-08-31 2019-09-30 2019-11-04 2019-12-09 2020-06-06 Based Selection for the sector Development

50CS3/LUBANGO/DNA/18 / Design checking and works Rehabilitation and Quality And Cost- Open - Under Supervision of Network and COFN / C1560 Expansion of Water Supply Post 0.00 2020-01-03 2020-09-01 2020-02-02 2020-09-28 2020-03-02 2020-03-30 2020-04-29 2020-06-03 2020-07-08 2021-12-30 Based Selection International Implementation Home Connections for Production and Distribution

Lubango (1st phase)

52CS3/KUITO/DNA/18 / Design checking and works Rehabilitation and Quality And Cost- Open - Pending Supervision of Network and COFN / C1560 Expansion of Water Supply Post 0.00 2020-02-05 2020-02-26 2020-04-10 2020-05-08 2020-06-07 2020-07-12 2020-08-16 2021-08-16 Based Selection International Implementation Home Connections for Kuito Production and Distribution

(2nd phase)

51CS3/MALANJE/DNA/18 / Design Checking and Rehabilitation and Quality And Cost- Open - Supervision of Repairs to IBRD / 87020 Expansion of Water Supply Prior 0.00 Canceled 2018-07-27 2018-08-17 2018-09-30 2018-10-28 2018-11-27 2019-01-01 2019-02-05 2020-02-05 Based Selection International Household Connections at Production and Distribution

Malanje

69CS2/INRH/18 / Survey of water users and assessment Quality And Cost- Open - COFN / C1560 Water Resource Management Prior 0.00 Canceled 2020-03-20 2020-04-10 2020-05-24 2020-06-21 2020-07-21 2020-08-25 2020-09-29 2021-09-29 of volume of water demand Based Selection International in Cuanza river basin

68CS2/INRH/18 / Quality And Cost- Open - Development and Application COFN / C1560 Water Resource Management Prior 0.00 Canceled 2020-04-23 2020-05-14 2020-06-27 2020-07-25 2020-08-24 2020-09-28 2020-11-02 2021-11-02 Based Selection International of Water Rights

75CS3/UIGE/19 / Design checking and works Rehabilitation and Quality And Cost- Open - Under supervision for the COFN / C1560 Expansion of Water Supply Prior 0.00 2019-06-26 2019-10-08 2019-07-17 2019-10-09 2019-08-30 2020-01-28 2019-10-28 2020-05-19 2019-11-27 2020-06-30 2020-01-01 2020-02-05 2024-01-15 Based Selection International Implementation construction of a new bulk Production and Distribution water supply system at Uige

59CS3/LUBANGO/DNA/18 / Hydrogeological survey and Management and Quality And Cost- Open - prospection of new COFN / C1560 Prior 890,368.15 Signed 2018-05-24 2019-08-05 2018-06-14 2019-08-07 2018-07-28 2019-10-03 2018-08-25 2020-01-06 2018-09-24 2020-02-24 2018-10-29 2020-04-07 2018-12-03 2020-04-30 2019-12-03 Engineering Support Based Selection International production boreholes in

Lubango

76CS3/LUBANGO/18 / Consultancy Services for Rehabilitation and Consultant Environmental and Social Open - COFN / C1560 Expansion of Water Supply Post Qualification 180,599.43 Signed 2019-04-22 2019-04-18 2019-05-13 2019-05-03 2019-06-11 2019-06-24 2019-06-25 2019-08-28 2019-07-30 2019-11-04 2020-01-26 Impact Assessment for Water International Production and Distribution Selection Supply Reservoirs at Lubango

79CS1/UCP/19 / Water Supply Institutional Independent Verification Quality And Cost- Open - Under COFN / C1560 Strengthening and Capacity Prior 0.00 2019-08-25 2019-10-17 2019-09-15 2019-10-21 2019-10-29 2020-04-23 2019-11-26 2020-06-16 2019-12-26 2020-07-23 2020-01-30 2020-03-05 2025-02-07 Agent for the Management Based Selection International Implementation Development Contracts

84CS4/EPAL/19 / Management and Quality And Cost- Open - Under Independent Technical Audit COFN / C1560 Prior 0.00 2019-08-11 2019-08-16 2019-09-01 2020-04-13 2019-10-15 2020-08-26 2019-11-12 2020-10-26 2019-12-12 2020-01-16 2020-02-20 2023-02-19 Engineering Support Based Selection International Implementation of BITA Project

85CS4/EPAL/19 / Management and Quality And Cost- Open - Under Independent Safeguards COFN / C1560 Post 0.00 2019-08-11 2019-08-08 2019-09-01 2020-04-10 2019-10-15 2020-07-23 2019-11-12 2020-09-15 2019-12-12 2020-01-16 2020-02-20 2023-02-19 Engineering Support Based Selection International Implementation Auditor of BITA Project

73CS2/INRH/19 / Economic Quality And Cost- Open - and Financial Regime of the COFN / C1560 Water Resource Management Post 0.00 Canceled 2019-11-29 2019-12-20 2020-02-02 2020-03-01 2020-03-31 2020-05-05 2020-06-09 2020-12-09 Based Selection International Use of Water Resources

89CS1/UCP/19 / Technical Water Supply Institutional Quality And Cost- Open - Under Assistance to National Water COFN / C1560 Strengthening and Capacity Prior 0.00 2020-06-30 2020-07-21 2020-09-03 2020-10-01 2020-10-31 2020-12-05 2021-01-09 2021-01-19 Based Selection International Implementation Directorate (DNA) Development

Page 10 90CS1/IRSEA/19 / Analysis of alternatives to subsidise Water Supply Institutional Quality And Cost- Open - Under low income population and COFN / C1560 Strengthening and Capacity Post 0.00 2020-02-20 2019-11-26 2020-03-12 2020-01-21 2020-04-25 2020-04-22 2020-05-23 2020-06-18 2020-06-22 2020-08-17 2020-07-27 2020-08-31 2021-02-27 Based Selection International Implementation identification of potential Development beneficiaries

86CS5/UCP/19 / Sanitation Piloting Small-Scale Master Plans for Cuito, Quality And Cost- Open - Under COFN / C1560 Sanitation Service Delivery Prior 0.00 2019-10-30 2020-03-25 2019-11-20 2020-04-16 2020-01-03 2020-07-23 2020-01-31 2020-09-30 2020-03-01 2020-04-05 2020-05-10 2021-11-01 Dundo, Huambo, Luena Based Selection International Implementation in Peri-Urban Areas Moçamedes and N´dalatando

80CS1/UCP/19 / PPP Water Supply Institutional Quality And Cost- Open - Under Transaction Advisor for COFN / C1560 Strengthening and Capacity Prior 0.00 2019-12-02 2020-07-15 2019-12-23 2020-07-22 2020-02-20 2020-10-12 2020-03-19 2020-04-18 2020-05-23 2020-06-27 2021-06-27 Based Selection International Implementation Development

96CS3/UIGE/20 / Consultancy Services for Rehabilitation and Consultant Environmental and Social Open - Pending COFN / C1560 Expansion of Water Supply Post Qualification 0.00 2020-02-28 2020-03-20 2020-04-18 2020-05-02 2020-06-06 2020-12-03 Impact Assessment for International Implementation Production and Distribution Selection Ndalatando Bulk Water Supply

97CS2/INRH/20 / Development of Water Quality And Cost- Open - Under Resources Management Tools COFN / C1560 Water Resource Management Prior 0.00 2020-03-02 2020-04-21 2020-03-23 2020-04-22 2020-05-06 2020-06-03 2020-07-03 2020-08-07 2020-09-11 2021-09-11 Based Selection International Implementation and Information Management

System

98CS2/INRH/20 / Consultant for Elaboration of Quality And Cost- Open - Under COFN / C1560 Water Resource Management Prior 0.00 2020-03-02 2020-04-27 2020-03-23 2020-04-29 2020-05-06 2020-06-03 2020-07-03 2020-08-07 2020-09-11 2021-09-11 the National Water Based Selection International Implementation Resources Cadaster

99CS2/INRH/20 / Consultant for Implementation of the Quality And Cost- Pending COFN / C1560 Water Resource Management Prior Open - National 0.00 2020-03-02 2020-03-23 2020-05-06 2020-06-03 2020-07-03 2020-08-07 2020-09-11 2021-09-11 Economic and Financial Based Selection Implementation

Framework for the General Use of Water Resources

100CS3/NDLATANDO/DNA/20 / Design Checking and Works Supervision of the Rehabilitation and Quality And Cost- Open - Under Expansion and Rehabilitation COFN / C1560 Expansion of Water Supply Prior 0.00 2020-05-10 2020-04-29 2020-05-31 2020-05-04 2020-07-14 2020-07-29 2020-08-11 2020-10-29 2020-09-10 2020-10-15 2020-11-19 2021-11-19 Based Selection International Implementation of the Existing Mucari Bulk Production and Distribution

Water Supply System of the city of Ndalatando

101CS3/NDLATANDO/DNA/20 / Design Checking and Rehabilitation and Quality And Cost- Open - Under Works Supervision of the COFN / C1560 Expansion of Water Supply Prior 0.00 2020-05-11 2020-05-06 2020-06-01 2020-05-07 2020-07-15 2020-07-29 2020-08-12 2020-10-14 2020-09-11 2020-10-16 2020-11-20 2021-11-20 Based Selection International Implementation Network and home Production and Distribution connections in Ndalatando

102CS3/UIGE/DNA/20 / Design Checking and Works Rehabilitation and Quality And Cost- Open - Under Supervision of the Network COFN / C1560 Expansion of Water Supply Prior 0.00 2020-05-18 2020-05-07 2020-06-08 2020-05-14 2020-07-22 2020-07-29 2020-08-19 2020-10-16 2020-09-18 2020-10-23 2020-11-27 2021-11-27 Based Selection International Implementation and home connections in Production and Distribution

Uige - Lot 2

104CS3/INRH/20 / Development of Detailed Quality And Cost- Open - Under Inventory of Reservoirs and COFN / C1560 Water Resource Management Prior 0.00 2020-08-10 2020-08-03 2020-08-31 2020-08-07 2020-10-14 2020-11-11 2020-12-11 2021-01-15 2021-02-19 2022-02-19 Based Selection International Implementation Detailed Dam Safety

Assessment of Selected Dams

106CS3/DNA/20 / Rehabilitation and Consultant Infrastructure Surveys Water Pending COFN / C1560 Expansion of Water Supply Post Qualification Open - National 0.00 2020-09-06 2020-09-27 2020-11-10 2020-12-10 2021-01-14 2021-07-13 Supply Systems in 6 Implementation Production and Distribution Selection Provinces

Page 11 14ACS4/NAMIBE/19 / Groundwater Potential and Salinity Management in Management and Quality And Cost- Open - Under COFN / C1560 Prior 0.00 2020-09-28 2020-10-22 2020-11-28 2021-01-11 2021-03-11 2021-04-10 2021-05-15 2022-01-17 2023-07-19 Moçamedes Well Fields and Engineering Support Based Selection International Implementation associated Namibe Coastal Cities

39ACS1/DNA/20 / External Audit of the Financial Management and Least Cost Open - Pending Statements of Seven (7) IBRD / 87020 Post 0.00 2020-10-30 2020-11-20 2021-01-03 2021-01-31 2021-03-02 2021-04-06 2021-05-11 2024-05-10 Engineering Support Selection International Implementation Beneficiary Water Supply and Sanitation Utilities

16ACS1/DNA/20 / External Management and Least Cost Open - Pending Audit of the Financial IBRD / 87020 Post 0.00 2020-10-30 2020-11-20 2021-01-03 2021-01-31 2021-03-02 2021-04-06 2021-05-11 2024-05-10 Engineering Support Selection International Implementation Statements of the Project

INDIVIDUAL CONSULTANTS

Activity Reference No. / Invitation to Loan / Credit Market Actual Amount Draft Negotiated Description Component Review Type Method Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. Approach (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Individual 11CS4/DNA/16 / Management and / Prior Consultant Direct 0.00 Canceled 2017-02-23 2018-02-28 2017-03-05 2018-03-01 2017-03-26 2017-04-30 2018-04-30 Hydrogeology specialist Engineering Support Selection

Water Supply Institutional Individual 17CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 802,786.25 Signed 2017-04-17 2017-05-09 2017-06-03 2017-06-28 2017-06-17 2017-07-25 2017-06-27 2017-07-26 2017-12-24 FCMU Coordinator Development Selection

18CS4/DNA/17 / Senior Water Supply Institutional Individual Financial Management IBRD / 87020 Strengthening and Capacity Prior Consultant Open 809,328.48 Signed 2017-04-24 2017-05-10 2017-06-10 2017-06-28 2017-06-24 2017-07-26 2017-07-04 2017-06-28 2020-07-03 Specialist Development Selection

Water Supply Institutional Individual 19CS4/DNA/17 / Financial IBRD / 87020 Strengthening and Capacity Prior Consultant Open 515,059.06 Signed 2017-04-24 2017-05-09 2017-06-10 2017-06-24 2017-09-26 2017-07-04 2017-09-27 2020-07-03 Management Specialist-DNA Development Selection

Water Supply Institutional Individual 20CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 803,171.16 Signed 2017-04-28 2017-05-09 2017-06-14 2017-07-10 2017-06-28 2017-08-10 2017-07-08 2017-08-10 2020-07-07 Procurement Specialist Development Selection

Water Supply Institutional Individual 21CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 645,406.98 Terminated 2017-04-28 2017-05-09 2017-06-14 2017-09-20 2017-06-28 2017-10-30 2017-07-08 2017-11-03 2019-07-08 Procurement Specialist Development Selection

Water Supply Institutional Individual 22CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 405,940.19 Signed 2017-04-28 2017-05-09 2017-06-14 2017-07-12 2017-06-28 2017-08-10 2017-07-08 2017-08-10 2020-07-07 Procurement Specialist-DNA Development Selection

23CS4/DNA/17 / Water Water Supply Institutional Individual Utility Management IBRD / 87020 Strengthening and Capacity Prior Consultant Open 683,580.67 Signed 2017-07-21 2017-08-09 2017-09-15 2017-09-27 2017-10-06 2017-10-18 2017-11-10 2017-10-20 2019-05-04 Specialist Development Selection

Individual 26CS4/DNA/17 / Management and IBRD / 87020 Prior Consultant Open 211,571.46 Signed 2017-09-15 2017-09-12 2017-11-03 2017-11-24 2018-01-23 2017-12-29 2018-01-26 2020-12-28 Procurement officer (1) Engineering Support Selection

Individual 27CS4/DNA/17 / Management and IBRD / 87020 Prior Consultant Open 211,571.46 Signed 2017-09-15 2017-09-12 2017-11-03 2017-11-24 2018-01-25 2017-12-29 2018-01-26 2020-12-28 Procurement Officer (2) Engineering Support Selection

28CS4/DNA/17 / Individual Management and Design/Environmental Expert IBRD / 87020 Prior Consultant Open 592,846.42 Signed 2017-11-01 2017-09-25 2017-12-20 2018-03-07 2018-01-10 2018-05-04 2018-02-14 2018-05-07 2019-08-08 Engineering Support to Support DNA/FCMU Selection

Page 12 Individual 24CS4/DNA/17 / Senior Management and IBRD / 87020 Prior Consultant Open 589,780.01 Signed 2017-09-15 2017-09-11 2017-11-03 2017-11-24 2017-11-07 2017-12-29 2017-11-08 2019-12-29 Design Engineer Engineering Support Selection

Individual 25CS4/DNA/17 / Senior Management and IBRD / 87020 Prior Consultant Open 862,744.00 Signed 2017-12-08 2018-05-08 2018-01-26 2018-07-20 2018-02-16 2018-08-06 2018-03-23 2018-08-07 2020-03-22 Environmental Specialist Engineering Support Selection

29CS4/DNA/17 / Technical Individual Management and Assistance to support IBRD / 87020 Prior Consultant Open 574,577.39 Signed 2017-09-28 2017-09-12 2017-11-16 2017-10-23 2017-12-07 2018-02-20 2018-01-11 2018-02-21 2019-07-05 Engineering Support DNA/FCMU Selection

Individual 30CS4/DNA/17 / Project Management and IBRD / 87020 Prior Consultant Open 303,884.13 Signed 2017-10-20 2017-10-16 2017-12-08 2017-12-29 2018-08-06 2018-02-02 2018-08-07 2019-07-27 Accountant Engineering Support Selection

Individual 31CS4/DNA/17 / Financial Management and IBRD / 87020 Post Consultant Open 67,344.69 Signed 2017-10-20 2017-10-25 2017-12-08 2018-03-07 2017-12-29 2018-03-07 2018-02-02 2018-03-01 2019-07-27 Assistant (1) Engineering Support Selection

Individual 32CS4/DNA/17 / Financial Management and IBRD / 87020 Post Consultant Open 67,344.69 Signed 2017-10-20 2017-10-25 2017-12-08 2017-12-29 2018-03-13 2018-02-02 2018-03-01 2019-07-27 Assistant (2) Engineering Support Selection

Individual 33CS4/DNA/17 / MIS Management and Pending IBRD / 87020 Post Consultant Open 0.00 2017-11-30 2018-01-18 2018-02-08 2018-03-15 2018-06-13 Consultant Engineering Support Implementation Selection

34CS4/DNA/17 / Consultant to Support the Individual Management and Implementation of the IBRD / 87020 Post Consultant Direct 42,000.00 Signed 2017-11-30 2017-10-12 2017-12-10 2018-04-11 2017-12-31 2018-08-09 2018-02-04 2018-08-10 2018-08-03 Engineering Support Primavera Accounting Selection System

Rehabilitation and Individual 36CS4/DNA/17 / Monitoring IBRD / 87020 Expansion of Water Supply Prior Consultant Open 236,000.00 Signed 2018-05-24 2018-09-04 2018-07-12 2019-02-05 2018-08-02 2019-08-22 2018-09-06 2019-08-28 2019-03-05 Evaluation Specialist Production and Distribution Selection

Rehabilitation and Individual 37CS4/DNA/17 / Supervision IBRD / 87020 Expansion of Water Supply Prior Consultant Open 647,470.59 Signed 2018-06-03 2018-05-25 2018-07-22 2018-07-11 2018-08-12 2018-08-13 2018-09-16 2018-08-14 2021-08-31 Engineer Production and Distribution Selection

Rehabilitation and Individual 38CS4/DNA/17 / Senior Pending IBRD / 87020 Expansion of Water Supply Prior Consultant Open 0.00 2018-03-13 2018-05-01 2018-05-22 2018-06-26 2021-06-10 Environmental Specialist Implementation Production and Distribution Selection

40CS4/DNA/17 / Stakeholder Rehabilitation and Individual Engagement e Social IBRD / 87020 Expansion of Water Supply Prior Consultant Open 750,681.66 Signed 2018-04-20 2018-05-16 2018-06-08 2018-08-30 2018-06-29 2018-09-11 2018-08-03 2018-09-13 2020-07-23 Specialist Production and Distribution Selection

Individual 41CS4/DNA/17 / Information Management and IBRD / 87020 Prior Consultant Open 170,677.58 Signed 2018-01-08 2018-01-23 2018-02-26 2018-05-07 2018-03-19 2018-06-26 2018-04-23 2018-06-26 2021-04-07 Technology Engineering Support Selection

43CS1/IRSEA/18 / SHORT Water Supply Institutional Individual TERM TECHNICAL IBRD / 87020 Strengthening and Capacity Post Consultant Open 121,613.80 Signed 2018-03-19 2018-03-15 2018-04-28 2018-05-03 2018-05-08 2018-05-03 2018-05-18 2018-06-18 2018-11-14 ASSISTANCE TO IRSEA Development Selection

Individual 11ACS4/DNA/18 / Management and Under IBRD / 87020 Post Consultant Direct 276,428.51 2018-04-16 2018-06-27 2018-04-26 2018-07-17 2018-05-17 2018-09-10 2018-06-21 2018-09-10 2019-12-13 Hydrogeology specialist Engineering Support Implementation Selection

61CS4/DNA/18 / Consultant Individual to prepare the TORs for Management and IBRD / 87020 Post Consultant Open 0.00 Canceled 2018-07-02 2018-08-20 2018-09-10 2018-10-15 2019-01-13 the Updates of the Master Engineering Support Selection Plans in 9 Cities

Page 13 102CS2/DAS/18 / Short Individual Term Technical Assistance to IBRD / 87020 Water Resource Management Post Consultant Direct 104,762.41 Signed 2018-06-11 2018-06-29 2018-06-21 2018-06-13 2018-07-12 2018-07-16 2018-08-16 2018-07-16 2019-02-12 INRH Selection

52CS3/DAS/18 / DESIGN CHECKING AND WORK SUPERVISION OF Rehabilitation and NETWORK AND HOUSE IBRD / 87020 Expansion of Water Supply Prior Direct Selection Direct 867,067.03 Signed 2018-06-11 2018-06-14 2018-06-13 2018-06-19 2018-07-01 2018-06-29 2018-12-28 CONNECTIONS IN THE Production and Distribution CITY OF HUAMBO - LOT 2

Water Supply Institutional Individual 21ACS4/DNA/18 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Limited 683,681.52 Signed 2018-06-13 2018-06-27 2018-06-18 2018-07-09 2018-07-09 2018-08-20 2018-08-13 2018-08-21 2020-08-02 Procurement Specialist Development Selection

18ACS4/DNA/18 / SENIOR Water Supply Institutional Individual FINANCIAL MANAGEMENT IBRD / 87020 Strengthening and Capacity Prior Consultant Limited 701,993.30 Signed 2018-07-20 2018-07-19 2018-08-04 2018-08-20 2018-08-09 2018-09-26 2018-08-29 2018-09-27 2021-08-13 SPECIALIST Development Selection

Individual 63CS4/UCP/18 / Senior Management and IBRD / 87020 Prior Consultant Open 0.00 Canceled 2018-08-22 2018-08-14 2018-10-10 2019-03-18 2018-10-31 2018-12-05 2020-12-04 Sanitation Specialist Engineering Support Selection

Individual 77CS4/UCP/19 / Second Management and COFN / C1560 Prior Consultant Open 389,156.32 Signed 2019-06-28 2019-06-06 2019-08-16 2019-07-17 2019-09-06 2019-08-05 2019-10-11 2019-08-12 2021-10-10 Senior Works Supervisor Engineering Support Selection

Individual 82CS4/UCP/19 / Second Management and COFN / C1560 Prior Consultant Open 446,779.84 Signed 2019-09-16 2019-08-07 2019-11-04 2020-01-16 2019-11-25 2020-02-07 2019-12-30 2020-02-14 2021-12-29 Senior Design Engineer Engineering Support Selection

Rehabilitation and Individual 83CS3/UCP/19 / Dispute Under COFN / C1560 Expansion of Water Supply Prior Consultant Limited 0.00 2019-09-15 2019-09-20 2019-10-11 2019-11-15 2022-11-14 Board Member Implementation Production and Distribution Selection

81CS4/UCP/19 / Project Individual Management and Under Financial and Administrative COFN / C1560 Prior Consultant Open 0.00 2019-08-30 2019-08-05 2019-10-18 2019-11-08 2019-12-13 2021-12-12 Engineering Support Implementation Officer Selection

Rehabilitation and Individual 83ACS3/UCP/19 / Dispute COFN / C1560 Expansion of Water Supply Post Consultant Limited 0.00 Canceled 2019-10-30 2019-10-04 2019-11-04 2019-11-25 2019-12-30 2022-12-29 Board Member Production and Distribution Selection

Individual 20ACS4/UCP/19 / Senior Management and COFN / C1560 Prior Consultant Open 444,203.36 Signed 2019-10-04 2019-10-07 2019-11-20 2020-01-30 2019-12-04 2020-02-24 2019-12-14 2020-02-26 2021-12-13 Procurement Specialist Engineering Support Selection

Individual 63ACS4/UCP/19 / Sanitation Management and COFN / C1560 Prior Consultant Open 359,356.32 Signed 2019-10-04 2019-10-07 2019-11-22 2020-01-24 2019-12-13 2020-02-24 2020-01-17 2020-02-14 2022-01-16 Specialist Engineering Support Selection

Individual 88CS4/UCP/19 / Financial Management and COFN / C1560 Post Consultant Open 67,200.00 Signed 2019-11-19 2019-10-11 2020-01-07 2020-02-27 2020-01-28 2020-04-22 2020-03-03 2020-04-22 2021-08-25 Assistant (3) Engineering Support Selection

Water Supply Institutional Individual 22ACS4/DNA/17 / Under IBRD / 87020 Strengthening and Capacity Prior Consultant Open 0.00 2020-01-26 2020-02-11 2020-03-13 2020-04-14 2020-03-27 2020-05-04 2020-04-06 2021-01-31 Procurement Specialist DNA Implementation Development Selection

Individual 27ACS4/DNA/20 / Management and Under COFN / C1560 Prior Consultant Open 0.00 2020-08-17 2020-08-27 2020-10-05 2020-10-26 2020-11-30 2021-05-29 Procurement Officer Engineering Support Implementation Selection

Page 14