Mepts Work Experience Role in Sl.No Project Location Client Epc Contractor Scope of Work / Service Year Project

Total Page:16

File Type:pdf, Size:1020Kb

Mepts Work Experience Role in Sl.No Project Location Client Epc Contractor Scope of Work / Service Year Project MEPTS WORK EXPERIENCE ROLE IN SL.NO PROJECT LOCATION CLIENT EPC CONTRACTOR SCOPE OF WORK / SERVICE YEAR PROJECT El Khomos Tripoli 34" Sub Tripoli Melita 34" Gas Pipeline & Melita 2007-2011 1. Libya - Punj Lloyd Ltd Dia Gas Pipeline Contractor Compression Facilities RT, UT, MPT. Completed China Petroleum Engineering & 48" Crude Oil Pipeline 390 Kms from Habshan to Abu Dhabi Crude Oil Sub 2008-Sep-2011 2. U.A.E. ADCO Construction Corporation Fujairah. RT, UT, MPT, DPT as per ADCO Project (ADCOP) Contractor Completed (CPECC) specifications. ADGAS LNG Plant Abu Dhabi Gas Liquefaction Co. 2009 3. U.A.E. Contractor ADGAS Ir-192 Gamma Ray Isotopes With Radiographers Project Ltd. (ADGAS) Completed OGD Sub 4. U.A.E. ADGAS Descon Engineering Radiography Work for ADGAS OGD Project 2009 Completed Project # 1314 Contractor RT, UT, MPT, DPT, HT, TOFD work at Main Oil Abu Dhabi Crude Oil – China Petroleum Engineering & 2009 – 2012 Sub Terminal (MOT) Station Piping job at Fujairah, Main 5. Main Oil Terminal U.A.E. ADCO Construction Corporation Completed Contractor Pump Station (MPS) at Habshan & Intermediate Station Piping (CPECC) Pump Station (IPS) at Sweihan. 2010-May-2011 South Oil Co. Project # Sub 6. UAE South Oil Co Radiography Work for Project # 1369 Completed 1369 Contractor Single Buoy Moorings Single Buoy International Metal & Sub Radiography Work for Rig # 1 – Project # 1335 2009 – 2010 7. Inc. (SBM) U.A.E. Moorings Inc. Construction Co. (IMCC) Contractor (TDS 2000 – 001 Semi Submersible Drilling Rig) Completed Project # 1335 Blue Water Energy Sub Blue Water Radiography Work for Rig # 2 – Project # 1340 8. Services U.A.E. 2009 – 2010 Contractor Energy (TDS 2000 – 002 Semi Submersible Drilling Rig) Project # 1340 Completed Single Buoy Moorings Radiography Work for Rig # 3 – Project # 1345 Sub Single Buoy 2009 – 2010 9. Inc. (SBM) U.A.E. Gulf Piping Company (GPC) (TDS 2500 – Dynamically Position Semi Contractor Moorings Inc. Completed Project # 1345 Submersible Drilling Rig) MEPTS WORK EXPERIENCE ROLE IN SL.NO PROJECT LOCATION CLIENT EPC CONTRACTOR SCOPE OF WORK / SERVICE YEAR PROJECT Supply Of NDE Level III Sub 2008 - 2010 10. Abu Dhabi Crude Oil U.A.E ADCO Germanischer Lloyd (GL) Personal Service Contractor Completed Iranian Offshore Oil Gulf Specialized Mechanical & Company (IOOC) Sub Iranian Offshore Radiography Work for Kharag Island Gas Gathering 2009 – 2010 11. U.A.E. Engineering Services Co. L.L.C Project # 1285 Contractor Oil Company & Nitrogen Gas Injection (NGI) Completed (GSME) Integrated Integrated Specialized Sub Specialized Gen. 2009 - April- 12. Gen. Contracting Co. U.A.E. Contracting Co. DPT, MPT Work 2011 Completed Contractor W.L.L .(ISCCO) W.L.L .(ISCCO) Link Middle East L.L.C. Samsung – Saif Bin Sub DPT, MPT Works for the Al Salaam Street Tunnel 2009 – April- 13. U.A.E. Samsung Darwish JV (SSBD JV) Contractor project. 2011 Completed Sub 2009 – April- 14. Schlumberger U.A.E. Schlumberger Schlumberger DPT, MPT Work Contractor 2011 Completed Radiography Work for Saudi Aramco 2010 – Sep- Sub Saudi Aramco 1. Product Qualification Record (PQR) 15. Project # 0806 U.A.E. 2011 Completed Contractor 2. Welder Qualification Test (WQT) 3. Welder Procedure Specification (WPS) Valentine Maritime Radiography Work for Oil & Natural Gas Sub Oil & Natural Gas 1. Product Qualification Record (PQR) 2010 – Sep- 16. Commission (ONGC) U.A.E. Contractor Commission 2. Welder Qualification Test (WQT) 2011 Completed Project # 0907 3. Welder Procedure Specification (WPS) RT, UT, MT, PT, PWHT & HT for: GASCO – Nitrogen Gas Sub 2010-May-2011 17. U.A.E. GASCO Punj Lloyd Ltd. the Nitrogen Gas Injection (Mixed Case) Project Injection Project Contractor Completed (NGI) MEPTS WORK EXPERIENCE ROLE IN SL.NO PROJECT LOCATION CLIENT EPC CONTRACTOR SCOPE OF WORK / SERVICE YEAR PROJECT ADCO – ASAB FFD Sub Petrofac International Ltd. NDT Level III Personnel for Radiograph Review, 2011-2013 18. U.A.E ADCO Project Contractor Reviewing AUT Interpretation and Procedure Completed GASCO - IGD Habshan Sub Radiography of Tie in Joints for the IGD Habshan 5 2010 U.A.E GASCO Punj Lloyd Ltd. 19. 5 Contractor Project Completed Inspection of Train 1&2, Inspection & NDT work for Process Piping Plant 2010 -2012 Plant 27 at ADGAS Abu Dhabi Gas Liquefaction Co. 20. U.A.E Contractor ADGAS Integrity RT,UT, LRUT, Visual Testing, Profile Completed Plant, Ltd. (ADGAS) RT…etc Das Island GASCO - ASAB 3 Oil Sub China Eleventh Chemical 2011-2012 21. U.A.E GASCO NDT & PWHT for GASCO ASAB 3 Project. Field Project Contractor Construction Co. Ltd (ELECO) Completed ADCOP Fire Water Back Up Sub ALSA Engineering & 2011 22. U.A.E ADCO NDT Services. Pipeline For Main Oil Contractor Construction Company L.L.C. Completed Terminal Fujairah Quality International Co. Ltd. 2011May Quality International 23. U.A.E Contractor AEGEAN FZC NDT Services Completed Co. Ltd. FZC In service Internal Inspection of Tanks with Intank 2011 -2012 ADGAS U.A.E Contractor ADGAS ADGAS 24. Robotic Technique. Completed MEPTS WORK EXPERIENCE ROLE IN SL.NO. PROJECT LOCATION CLIENT EPC CONTRACTOR SCOPE OF WORK / SERVICE YEAR PROJECT RUWAIS REFINERY SHAW Emirates Pipe EXPANSION 25. U.A.E. Contractor TAKREER Manufacturing L.L.C NDT Services 2011 In Progress PROJECT, TAKREER. ICAD-III, Abu Dhabi ICAD-III, Abu Dhabi Quality International HAMRIYAH Quality International Co. Ltd. 26. Co. Ltd. Contractor SAIPEM NDT & PWHT Services for Storage Tanks 2011-2012 FREE ZONE Quality International 2011 -2013 Quality International Co. Ltd. 27. Co. Ltd. FUJAIRAH Contractor AEGEAN NDT & PWHT Services Completed Inter Refinery Pipeline Sub 2012 -2014 28. U.A.E TAKREER Techno Engineering NDT Services Project-II Contractor Completed Sub 2011-2012 29. Borouge RUWAIS Borouge Ellimetal Phased Array inspection of Silo Contractor Completed Sub 30. SGD Package 4 UAE AL HOSN Samsung Engineering NDT Services 2012-2013 Contractor Sub 2012 -2014 31. SGD Package 1 UAE AL HOSN Punjlloyd NDT Services Contractor Completed GASCO-ASAB 3 Sub 32. UAE GASCO Technip Digitization of radiographic films and reports 2012 Completed Digitization of RT films Contractor RUWAIS REFINERY Sub C-Scan analysis and TOFD Inspection of HDT 2012 33. EXPANSION UAE TAKREER Velosi Inspection Services Contractor Separator and Stripper Overhead Separator Completed PROJECT, TAKREER. 2012 -2013 GASCO HRS Pipeline Sub 34. UAE GASCO Larsen and Toubro AUT, RT and Other NDT Services Completed Project Contractor Sub HORIZON 35 Falcon Phase I Project UAE Punj Lloyd NDT Services 2012 in Progress Contractor TERMINALS Sub South Pars Oil 36 SPD 14 Project IRAN OMC Ship Management AUT and other NDT Services (Offshore) 2012 in Progress Contractor Company Corrosion Mapping, Sub 2013 37 UAE GASCO Descon Engineering C-Scan analysis Pipeline GASCO Contractor Completed GDP Warranty 38 UAE Contractor TAKREER - Inspection and NDT Services 2013 Completed Shutdown Sub 2013 -2014 39 HMT Pipeline Project UAE GASCO Dodsal AUT, RT and Other NDT Services Contractor Completed MEPTS WORK EXPERIENCE ROLE IN SL.NO PROJECT LOCATION CLIENT EPC CONTRACTOR SCOPE OF WORK / SERVICE YEAR PROJECT Inter Refinery Pipeline Sub 40. U.A.E TAKREER RobStone NDT Services 2013 In Progress Project-II Contractor Inter Refinery Pipeline Sub 2013 -2014 41. U.A.E TAKREER Essar NDT Services Project-II Contractor Completed Sub 42. SGD Package 2 & 3 UAE Al HOSN Dodsal, Saipem AUT/PAUT NDT Services 2013 In Progress Contractor IRAQ Pipe Line Project Sub ALMCO (Al Iraq Al Muaser 43. (M-091 Zubair gathering IRAQ SAIPEM NDT Services 2013 In Progress Contractor Petroleum Service) System) Essar 16'' Condenstat Sub 44. UAE ESSAR GASCO AUT, RT and Other NDT Services 2014 In Progress Habshan Contractor Sub 45. AUDEX UAE Rotary Engg. RT and Other NDT Services 2014 In Progress Contractor Inspection of Bullet Surge Sub PAUT of The Modification Joint: Bullet Surge 46. UAE GASCO Litwin PEL 2014 Completed Nozzle Joint Contractor Nozzle SARB PACKAGE -3 Sub 46. UAE VM GULF VM GULF RT and Other NDT Services 2014 In Progress PROJECT Contractor ADCO Flow lines Project Sub 47. UAE ADCO Robt Stone RT and Other NDT Services 2014 In Progress Contractor New Abudhabi International Airport Sub Piping and Tanks RT,MPT,LPT,UT,PWHT, HT & 48. (ADIA) Aviation Fuel UAE TAKREER LARSEN & TOUBRO LIMITED 2014 In Progress Contractor PMI and other NDT Services. Depot Project No-5643 HABSHAN-5 Condensate Pipelines Project. Project Sub Piping and Pipelines RT,MPT,LPT,UT,PWHT, HT 49. UAE GASCO PETROJET 2014 In Progress No-5247 Contractor & PMI and other NDT Services. Construction of Flow Line and Well Heads Sub Piping and Pipelines RT,MPT,LPT,UT,PWHT, HT 50 Installation of Typical UAE ADCO GALFAR 2014 In Progress Contractor & PMI and other NDT Services. Work in ADCO’s Field MEPTS WORK EXPERIENCE ROLE IN SL.NO PROJECT LOCATION CLIENT EPC CONTRACTOR SCOPE OF WORK / SERVICE YEAR PROJECT EPC for new WAG wells & conversion of Existing Sub Piping and Pipelines RT,MPT,LPT,UT,PWHT, HT 51 Gas Injectors to WAGS UAE ADCO GALFAR 2014 In Progress Contractor & PMI and other NDT Services. Wells Meraasland CHW Sub 52 Pipelines & ETS UAE Meraas Amana Pipelines Construction Pipelines RT,MPT,LPT,UT and Other Services. 2014 In Progress Contractor NDT Services for ADCO Miscellaneous Sub Naser M. Al Baddah & partnet NDT Services RT,MPT,LPT,UT,PWHT and Other 53 Construction Works at UAE ADCO 2014 In Progress Contractor (NBTC) Services. NEB Field .
Recommended publications
  • Before the Emirates: an Archaeological and Historical Account of Developments in the Region C
    Before the Emirates: an Archaeological and Historical Account of Developments in the Region c. 5000 BC to 676 AD D.T. Potts Introduction In a little more than 40 years the territory of the former Trucial States and modern United Arab Emirates (UAE) has gone from being a blank on the archaeological map of Western Asia to being one of the most intensively studied regions in the entire area. The present chapter seeks to synthesize the data currently available which shed light on the lifestyles, industries and foreign relations of the earliest inhabitants of the UAE. Climate and Environment Within the confines of a relatively narrow area, the UAE straddles five different topographic zones. Moving from west to east, these are (1) the sandy Gulf coast and its intermittent sabkha; (2) the desert foreland; (3) the gravel plains of the interior; (4) the Hajar mountain range; and (5) the eastern mountain piedmont and coastal plain which represents the northern extension of the Batinah of Oman. Each of these zones is characterized by a wide range of exploitable natural resources (Table 1) capable of sustaining human groups practising a variety of different subsistence strategies, such as hunting, horticulture, agriculture and pastoralism. Tables 2–6 summarize the chronological distribution of those terrestrial faunal, avifaunal, floral, marine, and molluscan species which we know to have been exploited in antiquity, based on the study of faunal and botanical remains from excavated archaeological sites in the UAE. Unfortunately, at the time of writing the number of sites from which the inventories of faunal and botanical remains have been published remains minimal.
    [Show full text]
  • Middle East Rail Projects Report
    Middle East Rail Projects Report A must have guide for anyone looking to access the Middle East Rail industry created by Published: May 2013 www.terrapinn.com/merail Contents Investment Overview. .................................................... 2 Executive Summary ....................................................... 3 Saudi Arabia ................................................................... 4 Saudi Railway Company Interview .............................. 7 Qatar ............................................................................... 8 Qatar Rail Interview ....................................................... 10 United Arab Emirates .................................................... 11 Etihad Rail Interview ..................................................... 14 Iran .................................................................................. 16 Oman .............................................................................. 17 Bahrain. .......................................................................... 18 Kuwait. ............................................................................ 19 Top Influencers in Middle East Rail ............................. 20 Building for the future www.terrapinn.com/merail Investment, investment, investment! The Middle East is fast shedding the traditional image of rolling sand dunes and meandering camel rides and replacing it with gleaming golden metro stations and high speed trains powering through the desert. Within the next 10 years we will see a complete
    [Show full text]
  • Etihad Rail: National Railway Network, United Arab Emirates
    CASE STUDY Etihad Rail: National Railway Network, United Arab Emirates At a Glance This case study details the ongoing Etihad Rail National Railway Network Project in the United Arab Emirates (U.A.E.) requiring Intelligent Fire Protection. Mircom’s FleX-Net and Open Graphic Navigator (OpenGN) have been installed throughout phase one and will continue to be installed in upcoming phases as the construction progresses from Abu Dhabi through to Kuwait, Saudi Arabia, the rest of the U.A.E. and Oman. Mircom is very excited to be playing a role in the expansion of trade and transportation networks throughout the U.A.E. Safer • Smarter • More Livable Buildings Project Background The Etihad Rail National Railway Network is being phase one of the Etihad Railway is operational. built in phases to link the principal centres of Services between Habshan and Ruwais have been population and industry of the U.A.E. It will also form operational since 2013, with services from Shah a vital part of the planned Gulf Cooperation Council to Habshan to follow shortly. In the 14 buildings (GCC) Railway Network linking the six countries already constructed and operational, FleX-Net and of the GCC: The Kingdom of Bahrain, The State of OpenGN are working smoothly. Kuwait, Oman, Qatar, The Kingdom of Saudi Arabia and the U.A.E. The 1,200 km line, planned to be Challenge completed in 2018, will link major industrial zones, Since this was a new construction, the few cities and ports in the U.A.E., eventually connecting challenges that arose were addressed immediately.
    [Show full text]
  • List of References by Mbm
    LIST OF REFERENCES BY MBM RAISED FLOOR RAISED FLOOR- REFERENCES PROJECT NAME CLIENT CONTRACTOR MANUFACTURER YEAR ABU DHABI WATER & ELECTRICITY AL AIN GAS TURBINE HOUSE TARGET ENGG. CONST. CO. UNIFLAIR 1993 DEPT ABU DHABI WATER & ELECTRICITY ABU DHABI GAS TURBINE HOUSE TARGET ENGG. CONST. CO. UNIFLAIR 1993 DEPT MUSSAFAH OFFSHORE ADDCAP COSTAIN ENGG. & CONST. UNIFLAIR 1994 LNG PLANT, DAS ISLAND ADGAS C.C.I.C. UNIFLAIR 1994 RENOVATION OF VILLA IN ABU DHABI PRIVATE POLENSKY & ZOELLINER UNIFLAIR 1994 BLDG. FOR MR. HATHBOUR AL RUMAITHI D.S.S.C.B. RANYA CONTG. CO. UNIFLAIR 1994 MIRFA GAS PIPELINE ADCO DODSAL PRIVATE LTD. UNIFLAIR 1995 ABU DHABI INT'L AIRPORT ABU DHABI DUTY FREE DECO EMIRATES UNIFLAIR 1995 ABU DHABI INT'L AIRPORT, EXT. TO TRANSIT ABU DHABI DUTY FREE DECO EMIRATES UNIFLAIR 1995 HOTEL GA MUBARRAZ ISLAND ADNOC TARGET ENGG. CONST. UNIFLAIR 1995 RAS AL KHAIMAH CEMENT FACTORY RAS AL KHAIMAH CEMENT COSTAIN ENGG. & CONST. UNIFLAIR 1995 RENOVATION OF COMPLEX IN ABU DHABI MINISTRY OF INTERIOR AL MANSOURI 3 B UNIFLAIR 1995 31 December 2020 2 RAISED FLOOR- REFERENCES PROJECT NAME CLIENT CONTRACTOR MANUFACTURER YEAR W.E.D. GAS TURBINE PACKAGE AT AUH & AL AIN MARUBENI CORPORATION U.T.S. KENT UNIFLAIR 1995 ETISALAT TELECOM. BLDG. AT BARAHA, DUBAI ETISALAT UNITY CONTG. CO. UNIFLAIR 1995 ETISALAT TELECOM. BLDG.AT SHJ. IND. AREA ETISALAT UNITY CONTG. CO. UNIFLAIR 1995 NATIONAL BANK OF ABU DHABI NATIONAL BANK OF ABU DHABI A.C.C. UNIFLAIR 1995 ETISALAT TELECOM. & ADMIN. BLDG. , FUJAIRAH ETISALAT COSTAIN ABU DHABI CO. UNIFLAIR 1995 ETISALAT TELECOM. & ADMIN .BLDG., RAK ETISALAT COSTAIN ABU DHABI CO.
    [Show full text]
  • List of Pharmaceutical Providers Within UAE for Daman's Health Insurance Plans
    List of Pharmaceutical Providers within UAE for Daman ’s Health Insurance Plans (InsertDaman TitleProvider Here) Network - List of Pharmaceutical Providers within UAE for Daman’s Health Insurance Plans This document lists out the Pharmacies and Hospitals available in Daman’s Network, dispensing prescribed medicines, for Daman’s Health Insurance Plan (including Essential Benefits Plan, Classic, Care, Secure, Core, Select, Enhanced, Premier and CoGenio Plan) members. Daman also covers its members for other inpatient and outpatient services in its network of Health Service Providers (including hospitals, polyclinics, diagnostic centers, etc.). For more details on the other health service providers, please refer to the Provider Network Directory of your plan on our website www.damanhealth.ae or call us on the toll free number mentioned on your Daman Card. Edition: October 01, 2015 Exclusive 1 covers CoGenio, Premier, Premier DNE, Enhanced Platinum Plus, Select Platinum Plus, Enhanced Platinum, Select Platinum, Care Platinum DNE, Enhanced Gold Plus, Select Gold Plus, Enhanced Gold, Select Gold, Care Gold DNE Plans Comprehensive 2 covers Enhanced Silver Plus, Select Silver Plus, Enhanced Silver, Select Silver Plans Comprehensive 3 covers Enhanced Bronze, Select Bronze Plans Standard 2 covers Care Silver DNE Plan Standard 3 covers Care Bronze DNE Plan Essential 5 covers Core Silver, Secure Silver, Core Silver R, Secure Silver R, Core Bronze, Secure Bronze, Care Chrome DNE, Classic Chrome, Classic Bronze Plans 06 covers Classic Bronze
    [Show full text]
  • Of Abu Dhabi Emirate, United Arab Emirates MARINE and COASTAL ENVIRONMENTS of ABU DHABI EMIRATE, UNITED ARAB EMIRATES
    of Abu Dhabi Emirate, United Arab Emirates MARINE AND COASTAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES Page . II of Abu Dhabi Emirate, United Arab Emirates Page . III MARINE AND COASTAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES Page . IV MARINE AND COASTAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES H. H. Sheikh Khalifa bin Zayed Al Nahyan President of the United Arab Emirates Page . V MARINE AND COASTAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES Page . VI MARINE AND COASTAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES H. H. Sheikh Mohammed bin Zayed Al Nahyan Crown Prince of Abu Dhabi, Deputy Supreme Commander of the UAE Armed Forces Page . VII MARINE AND COASTAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES Page . VIII MARINE AND COASTAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES H. H. Sheikh Hamdan bin Zayed Al Nahyan Deputy Prime Minister Page . IX MARINE AND COASTAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES s\*?*c*i]j6.%;M"%&9+~)#"$*&ENL`\&]j6. =';78G=%1?%&'12= !"##$" 9<8*TPEg-782#,On%O)6=]KL %&'( )*+,-. 2#,On#X%3G=FON&$4#*.%&9+~)#"$*&XNL %?)#$*&E, &]1TL%&9+%?)':5=&4O`(.#`g-78 %!/ اﻷوراق اﻟﻘﻄﺎﻋﻴﺔ fJT=V-=>?#Fk9+*#$'&= /%*?%=*<(/8>OhT7.F 012(.%34#56.%-78&9+:;(<=>=?%@8'-/ABC $L#01i%;1&&!580.9,q@EN(c D)=EF%3G&H#I7='J=:KL)'MD*7.%&'-(8=';78G=NO D)$8P#"%;QI8ABCRI7S;<#D*T(8%.I7)=U%#$#VW'.X JG&Bls`ItuefJ%27=PE%u%;QI8)aEFD)$8%7iI=H*L YZZ[\&F]17^)#G=%;/;!N_-LNL`%3;%87VW'.X NL]17~Is%1=fq-L4"#%;M"~)#"G=,|2OJ*c*TLNLV(ItuG= )aE0@##`%;Kb&9+*c*T(`d_-8efJG=g-78012
    [Show full text]
  • Minimization of SO2 Emissions at ADGAS (Das Island, UAE): II- Impact on Air Quality
    Environ & m m en u ta le l o B r t i o e t P e f c h Abu-Eishah et al., J Pet Environ Biotechnol 2014, 5:2 o Journal of Petroleum & n l a o l n o r DOI: 10.4172/2157-7463.1000172 g u y o J ISSN: 2157-7463 Environmental Biotechnology Research Article Open Access Minimization of SO2 Emissions at ADGAS (Das Island, UAE): II- Impact on Air Quality Samir I Abu-Eishah1*, Haitham SA Babahar2 and Munjed Maraqa3 1Chemical & Petroleum Engineering Department, UAE University, Al Ain, UAE 2Process Engineer, ADGAS Co., P.O. Box 22994, Al Ain, UAE 3Civil & Environmental Engineering Department, UAE University, P.O. Box 17555, Al Ain, UAE Abstract In Part I of this work, two SO2 minimization schemes, namely, Fuel Gas Sweetening (FGS) and Seawater-Flue Gas Desulfurization (SW-FGD) schemes have been proposed to be implemented at the ADGAS plant (Das Island, UAE). The implementation of such schemes is expected to reduce the SO2 emissions by 77%. The FGS scheme is expected to reduce the H2S content in the fuel gas system by 94% and results in decreasing the total SO2 emissions due to fuel gas usage by 98%. The SW-FGD scheme is expected to reduce the SO2 emissions due to incomplete sulfur recovery by 99.5%. This work is based on on-site measurements and data collected from specific locations at the ADGAS plant and over the Das Island, UAE. These data were loaded into air dispersion model software (AERMOD 7, 2008) and simulated to predict future air quality on the Island.
    [Show full text]
  • Allen & Overy in the Middle East
    Allen & Overy in the Middle East 2019 allenovery.com 2 Allen & Overy in the Middle East | 2019 Clients praise the firm as “really cutting-edge in their approach. The quality of their work in many respects is unparalleled. It’s very good to have them working with you.” Chambers Global 2019 (Middle East Projects & Energy) “Allen & Overy LLP provides ‘excellent advice, combining technical expertise and commerciality’ .” Legal 500 2018 (UAE, Real Estate) “Allen & Overy LLP handles big-ticket deals across the UAE and the wider Middle East.” Legal 500 2017 (UAE) © Allen & Overy LLP 2019 3 Contents Covering your needs – Supporting you globally 4 Allen & Overy in the Middle East 6 Our regional presence 8 Independent market recognition 10 Awards 11 Sector expertise 13 Banking 14 Project finance 15 Financial services regulatory 17 Corporate and M&A 19 Telecommunications, Media and Technology 22 Equity capital markets 24 Debt capital markets 26 Industry recognition 28 Investment funds 32 Litigation and arbitration 34 Real estate and hospitality 36 Construction 39 Key contacts 41 allenovery.com 4 Allen & Overy in the Middle East | 2019 Covering your needs – Supporting you globally GLOBAL KEY FACTS 5,400 2,800 People Lawyers over firm Single global 40 over 550 Partners 1profit pool Offices of the top 100 public 83% companies assisted 30 worldwide in FY17 Countries (Forbes, May 2017) On average we advise our Top 50 clients in 74% 19% 19 of our work involved of AO’s work comes countries 2 or more offices from high growth markets Our lawyers were ranked
    [Show full text]
  • Planning Abu Dhabi: from Arish Village to a Global, Sustainable, Arab Capital City by Alamira Reem Bani Hashim a Dissertation S
    Planning Abu Dhabi: From Arish Village to a Global, Sustainable, Arab Capital City By Alamira Reem Bani Hashim A dissertation submitted in partial satisfaction of the requirements for the degree of Doctor of Philosophy in City and Regional Planning in the Graduate Division of the University of California, Berkeley Committee in charge: Professor Elizabeth S. Macdonald, Chair Professor Michael Southworth Professor Greig Crysler Summer 2015 © Alamira Reem Bani Hashim Abstract Planning Abu Dhabi: From Arish Village to a Global, Sustainable Arab Capital City by Alamira Reem Bani Hashim Doctor of Philosophy in City and Regional Planning University of California, Berkeley Professor Elizabeth S. Macdonald, Chair The overarching objective of this research project is to explore and document the urban history of Abu Dhabi, United Arab Emirates. It is organized as a comparative study of urban planning and design processes in Abu Dhabi during three major periods of the city’s development following the discovery of oil: (1) 1960-1966: Sheikh Shakhbut Bin Sultan Al Nahyan’s rule (2) 1966-2004: Sheikh Zayed Bin Sultan Al Nahyan’s rule; and (3) 2004-2013: Sheikh Khalifa Bin Zayed Al Nahyan’s rule. The intention of this study is to go beyond a typical historical narrative of sleepy village-turned-metropolis, to compare and contrast the different visions of each ruler and his approach to development; to investigate the role and influence of a complex network of actors, including planning institutions, architects, developers, construction companies and various government agencies; to examine the emergence and use of comprehensive development plans and the policies and values underlying them; as well as to understand the decision-making processes and design philosophies informing urban planning, in relation to the political and economic context of each period.
    [Show full text]
  • Terrestrial Environment of Abu Dhabi Emirate, United Arab Emirates
    of Abu Dhabi Emirate, United Arab Emirates TERRESTRIAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES of Abu Dhabi Emirate, United Arab Emirates TERRESTRIAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES Page . IV TERRESTRIAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES H. H. Sheikh Khalifa bin Zayed Al Nahyan President of the United Arab Emirates Page . V TERRESTRIAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES Page . VI TERRESTRIAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES H. H. Sheikh Mohammed bin Zayed Al Nahyan Crown Prince of Abu Dhabi, Deputy Supreme Commander of the UAE Armed Forces Page . VII TERRESTRIAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES Page . VIII TERRESTRIAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES H. H. Sheikh Hamdan bin Zayed Al Nahyan Deputy Prime Minister, Chairman, EAD Page . IX TERRESTRIAL ENVIRONMENTS OF ABU DHABI EMIRATE, UNITED ARAB EMIRATES · اﻟﺒﻴﺎﻧﺎت · ﺑﺸﻜﻞ ﻋﺎم، ﺗﻢ إﻋﺪاد اﻷوراق اﻟﻘﻄﺎﻋﻴﺔ اﻷﺻﻠﻴﺔ ﺑﺸﻜﻞ ﺟﺪﻳﺪ ﻗﺪم ﻓﻴﻬﺎ · اﻷدوات واﻷﺳﺎﻟﻴﺐ ﻣﺠﻤﻮﻋﺔ ﻗﻴﻤﺔ ﻣﻦ اﳌﻌﻠﻮﻣﺎت · اﻟﺘﻮﻋﻴﺔ · مل ﺗﺼﻞ ﻣﺸﺎرﻛﺔ اﻟﴩﻛﺎء واﻟﺠﻬﺎت اﳌﻌﻨﻴني إﱃ اﻟﺤﺪ اﳌﺨﻄﻂ ﻟﻪ · ﺑﻨﺎء اﻟﻘﺪرات · ﺗﻢ أﻋﺪاد اﻷوراق اﻟﻘﻄﺎﻋﻴﺔ ﺑﺪون دﻋﻢ ﻛﺎﰲ ﻣﻦ اﻟﻬﻴﺌﺔ أو اﻟﴩﻛﺎء واﻟﺠﻬﺎت ·اﻟﺴﻴﺎﺳﺔ اﳌﻌﻨﻴني، وﺑﺎﻟﺘﺎﱄ، ﻛﺎن ﻋﲆ ﻣﺆﻟﻒ اﻟﻮرﻗﺔ اﻟﻘﻄﺎﻋﻴﺔ ﺗﺤﻤﻞ ﻋﺐء إﻋﺪاد ورﻗﺔ اﻷوراق اﻟﻘﻄﺎﻋﻴﺔ ﻫﺬا اﻟﻘﻄﺎع ﰲ وﻗﺖ زﻣﻨﻲ ﻣﺤﺪود ﻧﻮﻋﺎ ﻣﺎ · ﰲ ﺑﻌﺾ اﻟﺤﺎﻻت ﻛﺎﻧﺖ اﻟﺒﻴﺎﻧﺎت اﳌﺴﺘﺨﺪﻣﺔ ﻗﺪميﺔ ﻧﺴﺒﻴﺎ ﺧﻼل اﻟﺴﻨﻮات اﳌﺎﺿﻴﺔ ﻗﺎﻣﺖ ﻣﺨﺘﻠﻒ اﻟﻘﻄﺎﻋﺎت اﳌﻌﻨﻴﺔ ﺑﺸﺆون اﻟﺒﻴﺌﺔ ﺑﺘﺠﻤﻴﻊ ﻛﻢ ﻣﻦ اﳌﻌﻠﻮﻣﺎت اﳌﺘﻨﻮﻋﺔ ﺑﻌﺪة ﺻﻮر ﺗﺼﻒ ﻣﺎ ﻫﻮ ﻣﻌﺮوف ﻋﻦ اﻟﺒﻴﺌﺔ ﰲ إﻣﺎرة · مل ﻳﺘﻢ إﺿﻔﺎء اﻟﻄﺎﺑﻊ اﳌﺆﺳﴘ ﻋﲆ ﻋﻤﻠﻴﺔ ﺟﻤﻊ اﻟﺒﻴﺎﻧﺎت وﺗﺒﺎدﻟﻬﺎ أﺑﻮﻇﺒﻲ ودوﻟﺔ اﻹﻣﺎرات اﻟﻌﺮﺑﻴﺔ اﳌﺘﺤﺪة واﻟﺨﻠﻴﺞ اﻟﻌﺮيب.
    [Show full text]
  • Abu Dhabi Report H22012
    Abu Dhabi Report H2 2012 “2012 was a pivotal year for the Abu Dhabi real estate market with the delivery of significant new developments which have raised the quality of living and working standards in the capital. The residential sub-sectors are now becoming more clearly defined by qualitative factors with tenants seeking value for money. In 2013 we expect to see a widening segregation in rental rates between the popular new developments, which, with occupancy levels rising, will be able to sustain rental levels and in some cases achieve growth, and the less popular older stock, that will continue to see rents come under downward pressure as landlords compete to maintain occupancy.“ Paul Maisfield, Associate Director & General Manager Abu Dhabi, Asteco Property Management Abu Dhabi Supply Estimates 2012 New Supply 2013 Scheduled New Supply Average Apartment Rental Rates (AED’000/pa) Apartments (in units) 9,000 12,000 Studio 1 BR 2 BR 3 BR Villas (in units) 6,000 5,000 From To From To From To From To Offices (in m2) 312,000 290,000 Marasy -- 87 110 135 170 185 237 Marina Square 55 65 75 85 110 130 140 180 Nation Towers - - 95 100 145 170 165 300 Reef Downtown - - 55 65 70 75 85 95 Residential Market Overview Rihan Heights -- 95 122 130 150 155 190 We estimate that approximately 15,000 new homes have been delivered to the Abu Dhabi market Saadiyat Beach Apartments -- 81 128 130 163 165 206 over the course of 2012, with a further 17,000 scheduled for completion in 2013.
    [Show full text]
  • (United Arab Emirates) Just a Quic
    Applied Geography 95 (2018) 88–100 Contents lists available at ScienceDirect Applied Geography journal homepage: www.elsevier.com/locate/apgeog A district and sector land-use and landscape analysis of urban sprawl in Al T Ain municipality (United Arab Emirates): Just a quick conversion from sand to a built-up environment? ∗ Sayed Adnan Sharafa, Pere Serrab, , David Sauríb a Department of Municipal Affairs, Al Ain City Municipality, United Arab Emirates b Department of Geography, Universitat Autònoma de Barcelona, Spain ABSTRACT Al Ain, located in the United Arab Emirates, is an example of medium-sized desert city with rapid urban growth guided by two master plans from the 1980s. The present study is an empirical contribution to analyse the spatial- temporal land-use and land-cover (LULC) dynamics from 1984 to 2014 applying three different tools: i) a Base Map of Al Ain Town Planning from 2014 combined with four Landsat images to extract the main LULC changes; ii) a landscape analysis using spatial metrics to determine processes of sprawl; iii) statistical analysis of census data at district scale to obtain a better understanding of changes. Results show an intensive urban sprawl mainly, between 1984 and 1990, with an increase in residential land and in services, very clear in the Western sector as proposed by the 1980s Master Plan. Urban compaction was observed in the Centre and Downtown sectors whereas in the Northern and Southern sectors the urban pattern was leapfrogging and associated to the main roads. Simultaneously, and as a particularity of Al Ain, an intensive process of agricultural sprawl occurred, mainly from 1990 to 2000.
    [Show full text]