4 Year Highway Investment Programme

Total Page:16

File Type:pdf, Size:1020Kb

4 Year Highway Investment Programme DELEGATED ITEM 4 YEAR HIGHWAY INVESTMENT PROGRAMME Report to the Executive Director, Economy, Place and Skills and Cabinet Member for Regeneration and Environment 21 July 2010 Officer Contact: Carol Brown Ext. 4452 Purpose of Report The purpose of this report is to seek approval for £10 million of Prudential borrowing to significantly improve the condition of the highway network. Resurfacing and reconstruction works will be carried out over a 4 year period starting with work on site in November 2010. Members are requested to identify the priorities over the 4 year programme. Executive Summary This report provides details of the works proposed to be undertaken utilising the £10 million of prudential borrowing. This will result in the network being brought up to the AGMA average and reduce the backlog by 25%. A list of the roads classified as Red and Amber is given and Members are requested to consider the priorities over the 4 year programme. Recommendations It is recommended that:- a) The prudential bid of £10m over 4 years is approved; b) The Leadership Group identify the priorities over the 4 year programme for classified roads; Page 1 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 c) Funding is delegated to the District Partnerships, by the allocation of £25,000 per ward from 2010/11, for the purpose of allocating spend to unclassified roads classed as red and amber. The priorities as identified by each District Partnership to be fed into the annual programme, and d) It is noted that that all works will be carried out either by the Economy, Place and Skills Directorate’s internal Highways Services Operations team or appointed term contractors using the new minor highways contract 2009-2012 or by contractors appointed following a tendering process, in accordance with the Council’s contract procedure rules. Page 2 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 EXECUTIVE DECISION RECORDING SYSTEM REFERENCE NO: 10080004 DELEGATED ITEM 4 YEAR HIGHWAY RESURFACING INVESTMENT PROGRAMME Report to the Executive Director, Economy, Place and Skills and Cabinet Member for Regeneration and Environment Portfolio Responsibility: Regeneration and Environment 1 Purpose of Report 1.1 The purpose of this report is to seek approval for £10 million of Prudential borrowing to significantly improve the condition of the highway network. Resurfacing and reconstruction works will be carried out over a 4 year period starting with work on site in November 2010. Members are requested to identify the priorities over the 4 year programme. 2 Executive Summary 2.1 This report provides details of the works proposed to be undertaken utilising the £10 million of prudential borrowing. This will result in the network being brought up to the AGMA average and reduce the backlog by 25%. A list of the roads classified as Red and Amber is given and Members are requested to consider the priorities over the 4 year programme. 3.0 Recommendations It is recommended that:- a) The prudential bid of £10m over 4 years is approved; b) The Leadership Group identify the priorities over the 4 year programme for classified roads; c) Funding is delegated to the District Partnerships, by the allocation of £25,000 per ward from 2010/11, for the purpose of allocating spend to unclassified roads classed as red and amber. The priorities as identified by each District Partnership to be fed into the annual programme, and d) It is noted that all works will be carried out either by the Economy, Place and Skills Directorate’s internal Highways Services Operations team or appointed term contractors using the new minor highways contract 2009-2012 or by contractors appointed following a tendering process, in accordance with the Council’s contract procedure rules. Page 3 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 4 Background 4.1 Over the last 30 years, investment in highway resurfacing and reconstruction has fallen to £1.3 million per annum under LTP (2). It is expected that no additional funding will result from the new LTP (3) which is due to start in April 2011 i.e. it will remain same at level £1.3 million 4.2 Due to revenue budgeting constraints there will be no spend allocated to highway structural maintenance in this financial year. 4.3 In 2007 Highways Services produced their first 5 year Transport asset management plan which includes all the highway related assets. This indicates an asset value of the highway network of circa £1billion. 4.4 Highway Services manage the 814 km of adopted highway which includes Classified Roads A class roads111km B class roads 33 km C class roads 34km Unclassified network 636km the authority also has 108km of back streets which are rear very narrow passages 4.5 The Authority is currently spending £1.7 million out of the Revenue maintenance budget on highway claims, emanating from slips, trips and falls, and pothole and carriageway defects. There was a significant increase in the number of claims following last winter. 4.6 The increased amount of damage to the network was also demonstrated with an increase in the number of pothole gangs to 6 to deal with volumes being reported earlier this year. Whilst this has been subsequently reduced to 2 gangs we are now experiencing a 2 day backlog. The original budget for potholing provides for 1 gang and whilst provision has been made available for 2 there is insufficient budget available to increase this over a sustained period. 4.7 The current revenue budget is now only sufficient to provide reactive and cyclic maintenance i.e. street lighting, potholing, gully cleansing, repairs requiring 7 day repair or less (Category 1 Safety Inspection Repairs) and winter maintenance. There is no funding for planned maintenance. 4.8 The programme of works has various links to the Corporate Plan (2009-2013) objectives and priorities. Improvements to the built environment. The main ones are listed below: Confident Place Priority 1.1: Safer Oldham Confident Place: Priority 1.2: Cleaner and greener Oldham Address of Choice Priority 3:3 Improving local amenities Services of Choice Priority 4.1: Accessible and responsive services Page 4 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 Services of Choice Priority 4.3: One place approach to service delivery 5 Current Position 5.1 The resurfacing of A Classified Roads supports the reduction of NI 168. Highway work on B and C, Classified Roads supports in the reduction of NI 169. The use of NI’s in this report is to provide a benchmarked position. TABLE 1 National Description Indicator NI 168 Percentage of principal roads that need repair that are A Class. NI 169 Percentage of non-principal roads requiring repair that are B and C Class highways. Local (Bv224b) Percentage of unclassified roads requiring repair. Local Percentage of (Category 1 and 2) footways requiring repair. Local Number of days required to repair a fault on the networks by OMBC on a street lighting column. Local Number of days required to repair a fault on the network that affects street lighting columns by the Distribution Network Operator (United Utilities Ltd). TABLE 2 below shows the national indicators and new local indicators. The figures indicate the percentage of carriageway that requires repair, classified as ‘red’ on a RAG Scale. The higher the figure the worse the condition. Performance Indicator NI NI NI 2007/08 2008/09 2009/2010 NI 168 10.8% 8% 8% NI 169 9% 7.8% 7% Local Unclassified 17% 21% 23% Local Footway Cat 1 & 2 35% 35% 34% With a capital allocation of only £1.3m to spend, we previously spent a further £1million from revenue but see paragraph 4.7, on the network the National indicators (red roads) remain steady and are now not improving, whilst unclassified roads are steadily deteriorating. More worrying is the condition of the roads that are currently not “red” but approaching that condition; those classed as “amber” which are deteriorating at a rate of 4% per annum. With this in mind and to make significant improvements in the condition of the network, additional investment will be required. Page 5 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 In terms of value for money the indicators show Oldham to be below average cost (Chart 1) in terms of investment. Whilst Table 3 and Chart 2 show Oldham’s current performance to be at or below average compared to other Metropolitan Councils. CHART 1 Revenue Cost Comparison 2007/8 Charts 2 and 3 indicate the condition against spend. Below the line indicates Value for money. In both cases Oldham demonstrates value for money. Chart 2 - NI168 – Percentage of A roads where maintenance should be considered plotted against £’s spent / head of population Highwys VFM Comparison - Met Councils 2007/08 70 60 50 40 30 £'s/head spent 20 10 0 Average (median) Calderdale Doncaster Kirklees Knowsley Liverpool Newcastle Oldham Rochdale Sunderland Wirral value Series1 38.04 43.54 30.24 36.93 58.06 43.14 49.71 34.73 42.23 56.31 19.81 Series2 11 6 2 4 1 10 6 11 10 2 4 % of A roads where maintenance should be considered Page 6 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 Chart 3 - NI 169 - Percentage of B and C roads where maintenance should be considered plotted against £’s spent / head of population Highways VFM Comparison - Met Councils 2007/08 70 60 50 40 30 £'s/head spent £'s/head 20 10 0 Average Calderdal Sunderlan Wolverha (median) Coventry Doncaster Kirklees Knowsley Liverpool Oldham Sandwell Stockport Wirral e d mpton value Series1 38.04 43.54 26.09 30.24 36.93 58.06 43.14 34.73 27.81 42.57 56.31 19.81 31.52 Series2 14.5 11 19 4 7 2 13 12 4 5 3 3 2 % of B & C Roads where maintenance should be considered Page 7 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 6 Options/Alternatives 6.1 Option 1- Do Nothing One option is to do nothing which would mean the 4% deterioration of the network would continue even with the spend of £1.3 million DfT capital LTP monies (on average over the last 3 years).
Recommended publications
  • 59 Bus Time Schedule & Line Route
    59 bus time schedule & line map 59 Manchester - Oldham View In Website Mode The 59 bus line (Manchester - Oldham) has 4 routes. For regular weekdays, their operation hours are: (1) Middleton: 5:24 PM (2) Oldham: 5:57 AM - 11:22 PM (3) Oldham Mumps: 12:10 AM - 7:52 PM (4) Piccadilly Gardens: 4:09 AM - 11:17 PM Use the Moovit App to ƒnd the closest 59 bus station near you and ƒnd out when is the next 59 bus arriving. Direction: Middleton 59 bus Time Schedule 26 stops Middleton Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 5:24 PM Oldham Mumps Interchange, Oldham Mumps Roscoe Street, Manchester Tuesday 5:24 PM The Link Centre, Oldham Wednesday 5:24 PM Greenhill, Manchester Thursday 5:24 PM St Mary's Way, Oldham Friday 5:24 PM Church Street, Manchester Saturday Not Operational Market, Oldham Oldham Bus Station, Oldham Cheapside, Manchester 59 bus Info Oldham College, Oldham Direction: Middleton Cannon Street, Manchester Stops: 26 Trip Duration: 34 min Westwood Metrolink Stop, Westwood Line Summary: Oldham Mumps Interchange, Bay Street, Manchester Oldham Mumps, The Link Centre, Oldham, St Mary's Way, Oldham, Market, Oldham, Oldham Bus Station, Featherstall Road North, Westwood Oldham, Oldham College, Oldham, Westwood Metrolink Stop, Westwood, Featherstall Road North, Lansdowne Road, Westwood Westwood, Lansdowne Road, Westwood, Chadderton Town Hall, Chadderton, Chadderton Chadderton Town Hall, Chadderton Precinct, Chadderton, Dalton Street, Chadderton, Broadway, Chadderton, Hunt Lane, Chadderton, Chadderton Precinct, Chadderton
    [Show full text]
  • Roadworks-Bulletin-8-June
    Roadworks and Closures expected expected restriction contractor reason Location start finish OLDHAM WAY,OLDHAM LANE CLOSURE Monday Friday Oldham New highway (From Prince Street To Lees Road) 30/03/2020 26/06/2020 (01617705116) installation works YORKSHIRE STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (Between Rhodes Bank And Union Street) 30/03/2020 26/06/2020 (01617705116) Works UNION STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (From Rhodes Bank To Prince Street) 30/03/2020 26/06/2020 (01617705116) Works PRINCE STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (Oldham Way To Union Street) 30/03/2020 26/06/2020 (01617705116) Works ABBEY HILLS ROAD,OLDHAM MULTI-WAY SIGNALS Monday Monday Oldham Highway Authority (Junction Of Lees New Road) 01/06/2020 08/06/2020 (0617704140) Works LEES NEW ROAD,OLDHAM MULTI-WAY SIGNALS Monday Monday Oldham Highway Authority (For A Distance Of 70M From Abbey Hills Road 01/06/2020 08/06/2020 (0617704140) Works In Each Dirction) MANCHESTER ROAD,OLDHAM LANE CLOSURE Thursday Wednesday Electricity North Works (Adj 459 Manchesterr Road) 11/06/2020 17/06/2020 West (0843 3113377 Streetw) MIDDLETON ROAD,CHADDERTON TWO-WAY SIGNALS Wednesday Tuesday Electricity North Works (From Middlewood Court To Nordens Street) Off Peak (9:30 - 15:30) 03/06/2020 16/06/2020 West () DELPH NEW ROAD,DELPH TWO-WAY SIGNALS Tuesday Monday United Utilities Works (Outside And Opposite 39) 02/06/2020 08/06/2020 Water Limited (0345 072 0829) WOOL ROAD,DOBCROSS TWO-WAY SIGNALS Friday Friday
    [Show full text]
  • Roadworks-Bulletin-15-June
    Roadworks and Closures expected expected restriction contractor reason Location start finish UNION STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (From Rhodes Bank To Prince Street) 30/03/2020 26/06/2020 (01617705116) Works OLDHAM WAY,OLDHAM LANE CLOSURE Monday Friday Oldham New highway (From Prince Street To Lees Road) 30/03/2020 26/06/2020 (01617705116) installation works YORKSHIRE STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (Between Rhodes Bank And Union Street) 30/03/2020 26/06/2020 (01617705116) Works OLDHAM WAY,OLDHAM ROAD CLOSURE Monday Friday Oldham Highway Authority (From Manchester Street Slip Road To Emmot 22/06/2020 30/10/2020 (01617704360) Works Way) OLDHAM WAY,OLDHAM ROAD CLOSURE Monday Friday Oldham Highway Authority (From King Street Slip Road To Manchester 22/06/2020 30/10/2020 (01617704360) Works Street) PRINCE STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (Oldham Way To Union Street) 30/03/2020 26/06/2020 (01617705116) Works MANCHESTER ROAD,OLDHAM LANE CLOSURE Monday Wednesday Cadent Gas Gas Works (Footway Outside 396) Off Peak (9:30 - 15:00) 22/06/2020 24/06/2020 Limited () MIDDLETON ROAD,CHADDERTON TWO-WAY SIGNALS Tuesday Tuesday Electricity North Works (From Middlewood Court To Nordens Street) Off Peak (9:30 - 15:30) 09/06/2020 16/06/2020 West (0843 3113377 Streetw) HOLLINS ROAD,OLDHAM ROAD CLOSURE Sunday Sunday United Utilities Works (Junction With School Road) 21/06/2020 21/06/2020 Water Limited (0345 072 0829) MANCHESTER ROAD,OLDHAM LANE CLOSURE Thursday
    [Show full text]
  • Oldham Borough Council in Exercise of Its Powers Under
    OLDHAM BOROUGH COUNCIL ROAD TRAFFIC REGULATION ACT 1984 OLDHAM BOROUGH COUNCIL (CHADDERTON AREA) CONSOLIDATION ORDER 2003 Oldham Borough Council in exercise of its powers under :- i) Section 1(1) of the Road Traffic Regulation Act 1984 (1984 c.27), ii) Section 2(1) to (3) of the Road Traffic Regulation Act 1984 (1984 c.27) as amended by Section 18 of the New Roads and Street Works Act 1991 (1991 c.22), iii) Section 4(2) of the Road Traffic Regulation Act 1984 (1984 c.27), iv) Section 32 of the Road Traffic Regulation Act 1984 (1984 c.27) as amended by Section 39 of the New Roads and Street Works Act 1991 (1991 c.22), v) Section 35 of the Road Traffic Regulation Act 1984 (1984 c.27) as amended by Sections 1 to 5 of the Parking Act 1989 (1989 c.16), and by Section 41 of the Road Traffic Act 1991 (1991 c.40), vi) Section 45 of the Road Traffic Regulation Act 1984 (1984 c.27) as amended by Section 44 of the New Roads and Street Works Act 1991 (1991 c.22), vii) Section 46 of the Road Traffic Regulation Act 1984 (1984 c.27) as amended by section 64 of the Road Traffic Act 1991 (1991 c.40), and Paragraph 1 of Schedule 2 of The Road Traffic (Permitted Parking Area and Special Parking Area) (Metropolitan Borough of Oldham) Order 2001 (S.I . 2001 No. 3058), viii) Section 49 of the Road Traffic Regulation Act 1984 (1984 c.27) as amended by paragraph 27 of Schedule 4 of the Road Traffic Act 1991 (1991 c.40), ix) Parts III and IV of Schedule 9 of the Road Traffic Regulation Act 1984 (1984 c.27), x) Section 101 of the Road Traffic Regulation Act 1984 (1984 c.27) as amended by Section 67 of the Road Traffic Act 1991 (1991 c.40), and Paragraph 7(3) of The Road Traffic (Permitted Parking Area and Special Parking Area) (Metropolitan Borough of Oldham) Order 2001 (S.I.
    [Show full text]
  • Roadworks-Bulletin-25-May
    Roadworks and Closures expected expected restriction contractor reason Location start finish PRINCE STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (Oldham Way To Union Street) 30/03/2020 26/06/2020 (01617705116) Works YORKSHIRE STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (Between Rhodes Bank And Union Street) 30/03/2020 26/06/2020 (01617705116) Works OLDHAM WAY,OLDHAM LANE CLOSURE Monday Friday Oldham New highway (From Prince Street To Lees Road) 30/03/2020 26/06/2020 (01617705116) installation works UNION STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (From Rhodes Bank To Prince Street) 30/03/2020 26/06/2020 (01617705116) Works HUDDERSFIELD ROAD,OLDHAM LANE CLOSURE Monday Wednesday Cadent Gas Lay new gas main (Outside 602) 01/06/2020 03/06/2020 Limited (01455 232822) LEES ROAD,OLDHAM STOP/GO BOARDS Wednesday Thursday Oldham Highway Authority (Junctions New Earth Street, Breeze Hill Road) 27/05/2020 28/05/2020 (01617701955) Works MANCHESTER STREET,OLDHAM LANE CLOSURE Friday Tuesday Oldham (01706 Street lighting (Col 36 (Opp Lee Street) To Col 55 (Jnc 22/05/2020 26/05/2020 704604) works Featherstall Rd S)) HUDDERSFIELD ROAD,OLDHAM LANE CLOSURE Thursday Friday Oldham New highway (Huddersfield Road/ Ripponden Road) Off Peak 14/05/2020 29/05/2020 (01617705116) installation works MANCHESTER ROAD,OLDHAM LANE CLOSURE Wednesday Friday Cadent Gas Gas Works (Footway Adjacent To Ralph Green Street) Off Peak (9:30 - 15:00) 27/05/2020 29/05/2020 Limited () HOLMFIRTH ROAD,GREENFIELD MULTI-WAY
    [Show full text]
  • North Chadderton Secondary School, Chadderton Hall Road, Chadderton
    Delegated Decision Proposed Waiting Restrictions, Bus Stop Clearways and School Keep Clears (No Stopping) - North Chadderton Secondary School, Chadderton Hall Road, Chadderton Report of: Deputy Chief Executive – People and Place Officer contact: Darryll Elwood – Technical Admin Traffic Ext. 1946 30 September 2020 Reason for Decision The purpose of this report is to consider the proposal to implement measures on Chadderton Hall Road, Chadderton, comprising waiting restrictions, bus stop clearways and school keep clears, associated with the North Chadderton Secondary School. Recommendation It is recommended that measures comprising of waiting restrictions, bus stop clearways and school keep clears (no stopping) be introduced on Chadderton Hall Road, Chadderton, in accordance with the schedules at the end of this report. Delegated Decision Proposed Waiting Restrictions, Bus Stop Clearways and School Keep Clears (No Stopping) - North Chadderton Secondary School, Chadderton Hall Road, Chadderton 1 Background 1.1 The Building Schools for the Future programme in Oldham includes the North Chadderton Secondary School site in Chadderton. 1.2 A review of parking issues associated with the college has been undertaken following the opening of the site in September 2012. The review has involved discussions with local residents and Ward Councillors. 1.3 Chadderton Hall Road (B6195) is a main distributor road connecting the A627M roundabout and Oldham Road/Middleton Road, serving North Chadderton Secondary School, St Matthew’s Primary and Infant Schools as well as a wider residential area and is also a bus route. 1.4 Along the frontage of the schools there is a need to ensure that obstructive parking does not occur as this poses significant risk to local school children attempting to cross the road, by protecting the existing bus stop lay-bys, school access points and preventing parking.
    [Show full text]
  • The Street Index for the Borough of Oldham
    The Street Index for the Borough of Oldham This lists in alphabetical order the names of streets known to Oldham Metropolitan Borough Council. The columns of the list show, from the left, the street reference number, the street name, the area and the Ordnance Survey map sheet within which at least some part of the street lies, the adoption status of the street and, occasionally, some other information to assist with locating the street. Key to the highway adoption status: Adopted means that the street is adopted by the Council for maintenance at the public expense. These are marked ‘A’. Unadopted means that the street is not accepted for maintenance at the public expense. Maintenance is the responsibility of the Street Managers (often the owners of adjacent land) and the Council will not usually know who these are. These are marked ‘U’. Part Adopted means that part of the length of the street is adopted and part is not. These are marked ‘P’. Section 38, Highways Act 1980, is when a third party has entered into an agreement with the Council to construct a highway, for the Council to adopt upon satisfactory completion of the works. These are marked ‘S’. Constructed under the Housing Act, Part 5 (1957) is when a highway has been constructed under this Act and is deemed to be adopted. These are marked ‘H’. The list includes names often used for a location within a street, for example a major property like the Spindles Shopping Centre or a general locality like Road End in Greenfield. These are marked ‘X’.
    [Show full text]
  • Locating Oldham Coalpits” British Mining No.73, NMRS, Pp.7-45
    BRITISH MINING No.73 MEMOIRS 2003 Fanning, G., 2003 “Locating Oldham Coalpits” British Mining No.73, NMRS, pp.7-45 Published by THE NORTHERN MINE RESEARCH SOCIETY KEIGHLEY U.K. © N.M.R.S. & The Author(s) 2003. ISSN 0309-2199 LOCATING OLDHAM COALPITS by I.G. Fanning Introduction In my earlier work, Oldham Coal (British Mining No.68), I tried to tell the history of the Oldham coal industry as accurately as possible from the few surviving documents. This history fell naturally into two parts, with the division falling about 1850. After 1850 it was reasonably easy to ascertain the locations of the collieries — after all, some of them survived into the 1950’s — but many of those worked before 1850 had vanished almost without trace. Due to editing constraints in BM68, it was not possible to include a chapter devoted to identifying the locations of these vanished enterprises. This information has now been compiled, together with the locations of later (i.e., post-1850) coalpits to form a separate paper which can be regarded as a supplement to the original work. Inevitably, there is some overlap between this Memoirs paper and BM68, but this is not very large. Anyone who found Oldham Coal interesting should find this memoir equally interesting, with a lot of new information. There will also be some people who found Oldham Coal a little boring, perhaps because of the amount of detail involved. Hopefully, these readers will find this document more interesting because it refers to areas of the town which they may know well and which are no longer industrial sites.
    [Show full text]
  • Local Government (Miscellaneous Provisions) Act 1982 Street Trading – Re-Designation of Streets
    LICENSING COMMITTEE Local Government (Miscellaneous Provisions) Act 1982 Street Trading – Re-designation of Streets Report of: Elaine McLean, Executive Director – Economy, Place and Skills Portfolio Holder : Councillor Jean Stretton 12 th June 2012 Officer Contact : Russell Williams, Senior Licensing Officer Ext. 3472 Purpose of Report The purpose of this report is to ask members to make a resolution re-designating certain streets, within the Borough of Oldham, from ‘Consent / Licensed’ streets to ‘Prohibited’ streets for the purpose of street trading. Recommendations Members are recommended to:- 1. note the report; and 2. taking into account any representations, implement the proposed resolution as presented at appendix II LICENSING 12 th June 2012 LOCAL GOVERNMENT (MISCELLANEOUS PROVISIONS) ACT 1982 STREET TRADING – REDESIGNATION OF STREETS 1 Background 1.1 Schedule 4 to the Local Government (Miscellaneous Provisions) Act 1982 enables a Local Authority to adopt a code for the regulation and control of street trading within its district. 1.2 Once Schedule 4 to the Act has been adopted by a Local Authority, the Act states that the Local Authority may, by way of a resolution, choose to designate any street within its area as a prohibited, licence or consent street. 1.3 In terms of definitions, broadly speaking a prohibited street means no street trading can take place, a licence street is more suitable to streets where the strict control of trading is needed i.e. town centre / district centres and a consent street are applicable to more infrequent types of trading, such as ice cream vans. 1.4 Before a resolution can be made the Local Authority must publish notice of its intentions to pass a resolution in at least one local newspaper.
    [Show full text]
  • Roadworks-Bulletin-1-June
    Roadworks and Closures expected expected restriction contractor reason Location start finish OLDHAM WAY,OLDHAM LANE CLOSURE Monday Friday Oldham New highway (From Prince Street To Lees Road) 30/03/2020 26/06/2020 (01617705116) installation works YORKSHIRE STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (Between Rhodes Bank And Union Street) 30/03/2020 26/06/2020 (01617705116) Works PRINCE STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (Oldham Way To Union Street) 30/03/2020 26/06/2020 (01617705116) Works UNION STREET,OLDHAM LANE CLOSURE Monday Friday Oldham Highway Authority (From Rhodes Bank To Prince Street) 30/03/2020 26/06/2020 (01617705116) Works MIDDLETON ROAD,CHADDERTON TWO-WAY SIGNALS Wednesday Tuesday Electricity North Works (From Middlewood Court To Nordens Street) Off Peak (9:30 - 15:30) 03/06/2020 16/06/2020 West () ABBEY HILLS ROAD,OLDHAM MULTI-WAY SIGNALS Monday Monday Oldham Highway Authority (Junction Of Lees New Road) 01/06/2020 08/06/2020 (0617704140) Works LEES NEW ROAD,OLDHAM MULTI-WAY SIGNALS Monday Monday Oldham Highway Authority (For A Distance Of 70M From Abbey Hills Road 01/06/2020 08/06/2020 (0617704140) Works In Each Dirction) BROADWAY,FAILSWORTH LANE CLOSURE Wednesday Wednesday Oldham (0161 Highway Authority (Full Length) Off Peak (9:30 - 15:30) 03/06/2020 03/06/2020 770 4110) Works HUDDERSFIELD ROAD,OLDHAM LANE CLOSURE Monday Wednesday Cadent Gas Lay new gas main (Outside 602) 01/06/2020 03/06/2020 Limited (01455 232822) ASHTON ROAD,OLDHAM LANE CLOSURE Wednesday Wednesday
    [Show full text]
  • APPLICATION REPORT - PA/049058/05 Planning Committee, 1 June, 2005
    APPLICATION REPORT - PA/049058/05 Planning Committee, 1 June, 2005 Registration Date: 17/03/2005 Ward: Chadderton Central Application Reference: PA/049058/05 Type of Application: Full Planning Permission Proposal: Erection of 54 no. apartments (1 and 2 bed) for independant and assisted living, including communial facilities, central plazza, general landsacaping and external recreation facilities Location: Land adjacent to Chadderton Total Care, off Nordens Street, Chadderton Case Officer: Matthew Lamb Applicant Chadderton Total Care Agent : THE SITE Land adjacent to Chadderton Total Care, off Nordens Street, Chadderton, Oldham THE PROPOSAL Chadderton Total Care is an existing nursing home located on land to the north of terraced properties on Middleton Road, Chadderton. It is currently accessed via Middlewood Green and Middlewood Court. The owners of the Chadderton Total Care site have recently purchased an adjoining piece of land to the east of the site which is accessed from Nordens Street/Moreton Street. This site comprises an existing single storey outbuilding (which is the subject of the application also under considerations this evening for a change of use to form an additional 30 bed unit for the care home – PA/048930/05), and vacant land, which was formerly occupied by United Utilities. The agent reports that it is proposed to develop a “care village” to supplement existing nursing facilities within the site. There will be a 30 bed dementia unit (which is assessed under PA/048930/05) and inter linked, but essentially independent development of 54 no. apartments. These will be for independent and assisted living and will be 1 and 2 bed.
    [Show full text]
  • The Street Index for the Borough of Oldham
    The Street Index for the Borough of Oldham This lists in alphabetical order the names of streets known to Oldham Metropolitan Borough Council. The columns of the list show, from the left, the street reference number, the street name, the area and the Ordnance Survey map sheet within which at least some part of the street lies, the adoption status of the street and, occasionally, some other information to assist with locating the street. The key to the highway adoption status is shown below: Adopted means that the street is adopted by the Council for maintenance at the public expense. These are marked ‘A’. Unadopted means that the street is not accepted for maintenance at the public expense. Maintenance is the responsibility of the Street Managers (often the owners of adjacent land) and the Council will not usually know who these are. These are marked ‘U’. Part Adopted means that part of the length of the street is adopted and part is not. These are marked ‘P’. Section 38, Highways Act 1980, is when a third party has entered into an agreement with the Council to construct a highway, for the Council to adopt upon satisfactory completion of the works. These are marked ‘S’. Constructed under the Housing Act, Part 5 (1957) is when a highway has been constructed under this Act and is deemed to be adopted. These are marked ‘H’. The list includes names often used for a location within a street, for example a major property like the Spindles Shopping Centre or a general locality like Road End in Greenfield.
    [Show full text]