The purpose of this report is to seek approval for £10 million of Prudential borrowing to significantly improve the condition of the highway network. Resurfacing and reconstruction works will be carried out over a 4 year period starting with work on site in November 2010. Members are requested to identify the priorities over the 4 year programme.

Executive Summary

This report provides details of the works proposed to be undertaken utilising the £10 million of prudential borrowing. This will result in the network being brought up to the AGMA average and reduce the backlog by 25%. A list of the roads classified as Red and Amber is given and Members are requested to consider the priorities over the 4 year programme.

Recommendations It is recommended that:-

a) The prudential bid of £10m over 4 years is approved; b) The Leadership Group identify the priorities over the 4 year programme for classified roads;

Page 1 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 c) Funding is delegated to the District Partnerships, by the allocation of £25,000 per ward from 2010/11, for the purpose of allocating spend to unclassified roads classed as red and amber. The priorities as identified by each District Partnership to be fed into the annual programme, and d) It is noted that that all works will be carried out either by the Economy, Place and Skills Directorate’s internal Highways Services Operations team or appointed term contractors using the new minor highways contract 2009-2012 or by contractors appointed following a tendering process, in accordance with the Council’s contract procedure rules.

Page 2 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 EXECUTIVE DECISION RECORDING SYSTEM REFERENCE NO: 10080004

DELEGATED ITEM

4 YEAR HIGHWAY RESURFACING INVESTMENT PROGRAMME

Report to the Executive Director, Economy, Place and Skills and Cabinet Member for Regeneration and Environment

Portfolio Responsibility: Regeneration and Environment

1 Purpose of Report

1.1 The purpose of this report is to seek approval for £10 million of Prudential borrowing to significantly improve the condition of the highway network. Resurfacing and reconstruction works will be carried out over a 4 year period starting with work on site in November 2010. Members are requested to identify the priorities over the 4 year programme.

2 Executive Summary

2.1 This report provides details of the works proposed to be undertaken utilising the £10 million of prudential borrowing. This will result in the network being brought up to the AGMA average and reduce the backlog by 25%. A list of the roads classified as Red and Amber is given and Members are requested to consider the priorities over the 4 year programme.

3.0 Recommendations It is recommended that:-

a) The prudential bid of £10m over 4 years is approved; b) The Leadership Group identify the priorities over the 4 year programme for classified roads; c) Funding is delegated to the District Partnerships, by the allocation of £25,000 per ward from 2010/11, for the purpose of allocating spend to unclassified roads classed as red and amber. The priorities as identified by each District Partnership to be fed into the annual programme, and d) It is noted that all works will be carried out either by the Economy, Place and Skills Directorate’s internal Highways Services Operations team or appointed term contractors using the new minor highways contract 2009-2012 or by contractors appointed following a tendering process, in accordance with the Council’s contract procedure rules.

Page 3 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010

4 Background

4.1 Over the last 30 years, investment in highway resurfacing and reconstruction has fallen to £1.3 million per annum under LTP (2). It is expected that no additional funding will result from the new LTP (3) which is due to start in April 2011 i.e. it will remain same at level £1.3 million

4.2 Due to revenue budgeting constraints there will be no spend allocated to highway structural maintenance in this financial year.

4.3 In 2007 Highways Services produced their first 5 year Transport asset management plan which includes all the highway related assets. This indicates an asset value of the highway network of circa £1billion.

4.4 Highway Services manage the 814 km of adopted highway which includes Classified Roads A class roads111km B class roads 33 km C class roads 34km

Unclassified network 636km the authority also has 108km of back streets which are rear very narrow passages

4.5 The Authority is currently spending £1.7 million out of the Revenue maintenance budget on highway claims, emanating from slips, trips and falls, and pothole and carriageway defects. There was a significant increase in the number of claims following last winter.

4.6 The increased amount of damage to the network was also demonstrated with an increase in the number of pothole gangs to 6 to deal with volumes being reported earlier this year. Whilst this has been subsequently reduced to 2 gangs we are now experiencing a 2 day backlog. The original budget for potholing provides for 1 gang and whilst provision has been made available for 2 there is insufficient budget available to increase this over a sustained period.

4.7 The current revenue budget is now only sufficient to provide reactive and cyclic maintenance i.e. street lighting, potholing, gully cleansing, repairs requiring 7 day repair or less (Category 1 Safety Inspection Repairs) and winter maintenance. There is no funding for planned maintenance.

4.8 The programme of works has various links to the Corporate Plan (2009-2013) objectives and priorities. Improvements to the built environment. The main ones are listed below: Confident Place Priority 1.1: Safer Confident Place: Priority 1.2: Cleaner and greener Oldham Address of Choice Priority 3:3 Improving local amenities Services of Choice Priority 4.1: Accessible and responsive services

Page 4 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 Services of Choice Priority 4.3: One place approach to service delivery

5 Current Position

5.1 The resurfacing of A Classified Roads supports the reduction of NI 168. Highway work on B and C, Classified Roads supports in the reduction of NI 169. The use of NI’s in this report is to provide a benchmarked position.

TABLE 1

National Description Indicator NI 168 Percentage of principal roads that need repair that are A Class. NI 169 Percentage of non-principal roads requiring repair that are B and C Class highways. Local (Bv224b) Percentage of unclassified roads requiring repair. Local Percentage of (Category 1 and 2) footways requiring repair. Local Number of days required to repair a fault on the networks by OMBC on a street lighting column. Local Number of days required to repair a fault on the network that affects street lighting columns by the Distribution Network Operator (United Utilities Ltd).

TABLE 2 below shows the national indicators and new local indicators. The figures indicate the percentage of carriageway that requires repair, classified as ‘red’ on a RAG Scale. The higher the figure the worse the condition.

Performance Indicator NI NI NI 2007/08 2008/09 2009/2010 NI 168 10.8% 8% 8% NI 169 9% 7.8% 7% Local Unclassified 17% 21% 23% Local Footway Cat 1 & 2 35% 35% 34%

With a capital allocation of only £1.3m to spend, we previously spent a further £1million from revenue but see paragraph 4.7, on the network the National indicators (red roads) remain steady and are now not improving, whilst unclassified roads are steadily deteriorating. More worrying is the condition of the roads that are currently not “red” but approaching that condition; those classed as “amber” which are deteriorating at a rate of 4% per annum. With this in mind and to make significant improvements in the condition of the network, additional investment will be required.

Page 5 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 In terms of value for money the indicators show Oldham to be below average cost (Chart 1) in terms of investment. Whilst Table 3 and Chart 2 show Oldham’s current performance to be at or below average compared to other Metropolitan Councils.

CHART 1 Revenue Cost Comparison 2007/8

Charts 2 and 3 indicate the condition against spend. Below the line indicates Value for money. In both cases Oldham demonstrates value for money.

Chart 2 - NI168 – Percentage of A roads where maintenance should be considered plotted against £’s spent / head of population

Highwys VFM Comparison - Met Councils 2007/08

70

60

50

40

30 £'s/head spent

20

10

0 Average (median) Calderdale Doncaster Kirklees Knowsley Liverpool Newcastle Oldham Sunderland Wirral value Series1 38.04 43.54 30.24 36.93 58.06 43.14 49.71 34.73 42.23 56.31 19.81 Series2 11 6 2 4 1 10 6 11 10 2 4 % of A roads where maintenance should be considered

Page 6 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 Chart 3 - NI 169 - Percentage of B and C roads where maintenance should be considered plotted against £’s spent / head of population

Highways VFM Comparison - Met Councils 2007/08

70

60

50

40

30 £'s/head spent £'s/head

20

10

0 Average Calderdal Sunderlan Wolverha (median) Coventry Doncaster Kirklees Knowsley Liverpool Oldham Sandwell Stockport Wirral e d mpton value Series1 38.04 43.54 26.09 30.24 36.93 58.06 43.14 34.73 27.81 42.57 56.31 19.81 31.52 Series2 14.5 11 19 4 7 2 13 12 4 5 3 3 2 % of B & C Roads where maintenance should be considered

Page 7 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME JULY 2010 6 Options/Alternatives

6.1 Option 1- Do Nothing One option is to do nothing which would mean the 4% deterioration of the network would continue even with the spend of £1.3 million DfT capital LTP monies (on average over the last 3 years). Chart 4 shows a graph of spends against deterioration of the whole network (both amber and red) from 39% in 2010, to 64% by 2015.

With the revenue budgets being limited the number of potholes, slips, trips and fall, and vehicle damage would increase and therefore increased revenue budget spend on insurance claims. This would also lead to an increase in the number of complaints by users of the highways.

CHART 4 Current spend (£1.3m) against deterioration (i.e. no additional monies spent on network).

Chart 4 - Red And Amber Failures, A , B and C roads

100.00%

80.00%

red 60.00% percentage of Amber deterioration

40.00%

20.00%

0.00% 2010 2011 2012 2013 2014 2015

6.2 Option 2 - To remove backlog

6.2.1 The table below shows the amount of monies needed to removing the backlog. Costs for reducing all red roads to AGMA average and resurface all amber roads, as well as resurfacing of 35% footways across the Borough. The table below costs out the amount of additional capital monies required to remove the backlog on the network circa £60m.

TABLE 4

ROAD DESCRIPTION LENGTH OF COSTS CARRIAGEWAY REQUIRING WORKS RED A ROADS 2.2 KM 388,500.00 RED B AND C ROADS 6.6KM 115,500.00 RED UNCLASSIFIED 31.8 KM 4,350,000.00 ROADS

THIN SURFACING/skid 1,00,000.00 resistance improvement SUB TOTAL 4,854,000.00 AMBER A ROAD 27.75KM 2,428,125.00 AMBER B AND C ROAD 16.5 KM 1,443750,00 AMBER UNCLASSIFIED 226 KM 24,170,775.00 ROAD SUB TOTAL FOOTWAYS 28,000,000 TOTAL 59,452,900.00

Page 9 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 6.3 Option 3 - Spend an additional 10 million on network improvements

A more realistic option would be to spend £10 million over 4 years to bring the network up to a steady state and improve the ABC network to the AGMA average and reduce the backlog by 25%.

Table 5 below shows the splits and improvement to network if an additional £10 million is to be spent on improvements to the highway network. This would give a £15.2m investment in total when the £1.3m per year is included from the existing capital allocation.

TABLE 5 split of monies including the £1.3m existing capital allocations

ROAD DESCRIPTION LENGTH OF COSTS CARRIAGEWAY REQUIRING WORKS RED A ROADS 2.2 KM 388,500.00 RED B AND C ROADS 6.6KM 115,500.00 RED UNCLASSIFIED 31.8 KM 4,350,000.00 ROADS

THIN SURFACING/skid 1,000,000.00 resistance improvement RED ROADS SUB TOTAL 4,854,000.00

AMBER A ROAD 6.8KM 2,428,125.00

AMBER B AND C ROAD 4.1KM 1,443,750.00

AMBER UNCLASSIFIED 56KM 5,274,125.00 ROAD AMBER ROADS SUB TOTAL 9,146,000 .00 FOOTWAYS 2,200,000.00 TOTAL 15,200,000.00

Page 10 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010

7 Preferred Option 3 - to spend an additional £10 million on highway improvements

7.1 Doing nothing is not an option. Whilst Option 2 is the ultimate which no Authority works to, on the basis that it is accepted that there should always be an element of repair. The top quartile figures would indicate 3/4%. The best Authority in the country – Cornwall is at 2/3%

7.2 It is acknowledged that the Authority cannot afford to spend £60 Million on its highway network over a 4 year period, one of the major problems being congestion and disruption on the network whilst carrying out such a programme. An annual spend of £4.3 million is more realistic and is manageable from the Highway Authority and Traffic Management aspect.

7.3 Preferred option is to spend £15.2 million in total on improving the network (prudential bid of 10 million in addition to the existing £1.3 million per annum of capital monies).

7.4 The monies would be spent on the basis of £2.3 million in the first year and then £4.3 m per over the remaining 3 years of the programme. The allocation of monies is set out in 9.1.

8 Consultation/Allocation of monies

8.1 Appendices A-C list the roads identified as in need of repair taking into consideration the following information:

8.1.1 The road condition information (SCANNER) for the A,B,C roads. SCANNER is an automatic survey which picks up to 60 different road criteria. The major criteria used are to determine if a road is red, or amber are: wheel track deformation; cracking which is picked up every metre; cross section; undulation in vertical alignment; local depressions; level of covers in the carriageway, and conditions around the cover. Listed in Appendix A (RED) and B (AMBER) are roads which condition surveys have shown as requiring intervention. A map is provided to aid the decision making process at Appendix D.

8.1.2 Course visual inspections are carried out on the unclassified network by members of the assets team. The inspection gives a listing of carriageways which have 75% defects along the length of the road. This list in alphabetical order is shown in Appendix C. The list will then be split into District Partnership areas for their consideration and prioritisation.

8.1.3 The number of requests from members of the public/elected members and number of times pothole mole has been requested on the road will be taken in to consideration when deciding which of the unclassified roads are resurfaced together with a visual inspection undertaken by the Highways Team.

Page 11 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010

8.2 It is estimated that the funding to be made available will enable the condition of approximately 50% of the listed roads on the attached schedules to be addressed. Members are therefore requested to : a) Examine the roads as identified in the Appendices and identify the 50% to be placed within the programme; and b) Subsequently identify the year of the programme in which they are to be placed (i.e. years 1-4). The following quick wins are suggested for the first year: Road Middleton Road Ripponden Road

8.3 Upon deciding the prioritisation, the considerations as given below will then be applied and should this have any adverse impact on the programme it is proposed that this will be referred back to the Executive Member, Regeneration and Environment for further consideration.

8.3.1 To enable best value for the money provided the programme needs to be determined so as to enable the maximum use of resources on site and support the logistics in terms of the use of plant and equipment.

8.3.2 To minimise disruption to service users through road closures consideration need to be given to the provision of other available routes.

8.3.3 The work programme to be assessed against the work of other utility companies, Unity Retaining Walls Project and the Safe Routes to Schools Project to ensure against any conflict. This information will also be used to ensure, so far as is reasonably practical, that the work done to improve the road surface is not subject to disruption for as long a period as possible after completion.

8.4 Following the recent investment in the cleaning of road gullies it has become apparent that a large number need digging out and the gulley pots replacing. It is proposed that wherever the full road surface is removed and replaced as the most appropriate solution defective gulley pots will also be replaced to co ordinate the 2 activities and provides a more sustainable improvement.

Page 12 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 9 Financial Implications

9.1 Spending profile

Year 2010/2011 2011/2012 2012/2013 2013/2014 Extra 1.5m 3.0m 3.0m 2.5m monies Existing 1.3m 1.3m 1.3m 1.3m Capital monies 2.8m 4.3m 4.3m 3.8m

It is anticipated that a certain amount of virement between various budget headings will be necessary during the financial year. This will allow varying priorities and problems to be addressed.

10 Legal Services Comments

10.1 None Alan Evans

11 Human Resources Comments

11.1 None Paul Dernley

12 Risk Assessments

12.1 None

13 IT Implications

13.1 None

14 Property Implications

14.1 None

15 Procurement Implications

15.1 That all works will be carried out either by the Economy, Place and Skills Directorate’s internal Highways Services Operations team or appointed term contractors or by contractors appointed following a tendering process, in accordance with the Council’s contract procedure rules.

Page 13 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010

16 Environmental and Health & Safety Implications

16.1 Transport – Transport of materials, i.e. excavated material and new surfacing materials to and from various sites.

16.2 Pollution – Work will be undertaken under strict conditions to limit disruption and pollution. Many local safety schemes will involve speed reduction, which should in turn lead to reductions in air and noise pollution.

16.3 Consumption and Use of Resources – Use of aggregates and bitumen coated aggregates in new surfacing materials.

16.4 Built Environment – Improved aesthetic appearance of roads and footways.

16.5 Natural Environment – Nil.

16.6 All schemes undertaken, as part of this programme of works will be designed in accordance with the principles of sustainability that form an integral part of the Local Transport Plan.

16.7 Health and Safety – During the implementation of these programmes of works, as outlined in this report, the Health and Safety of the general public and the contractors’ employees, will be safeguarded by the continuing use of safe working practices on the public highway network.

16.8 The Council has a duty to prevent road traffic accidents under the Road Traffic Act 1988. Particular emphasis will be given to vulnerable road users in many schemes.

17 Community Cohesion Implications [including Crime & Disorder Implications in accordance with Section 17 of the Act] and Equalities Implications

17.1 Works will be undertaken throughout the Borough as detailed in the Appendices. Location of works will be based on a needs basis. The proposed works will improve the highway network for the benefit of all highway users, including pedestrians as many of the proposed works involve footway improvements. Many of the schemes will also address safety issues in disadvantaged areas and facilitate movement between communities, especially for pedestrians and including access to public transport thus assisting cohesion.

Page 14 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 18 Forward Plan Reference

18.1 EPS/

19 Key Decision

19.1 Yes . July 2010

20 Background Papers

20.1 The following is a list of background papers on which this report is based in accordance with the requirements of Section 100(1) of the Local Government Act 1972. It does not include documents which would disclose exempt or confidential information as defined by the Act:

File Ref: LRD/investment bid Name of File: Investment bid 2010 Records held in Economy, Place and Skills Department, Highways Services Lees Rd depot, Hamilton St Oldham OL4 1DA Officer Name: Sue Eachus Group Manager Highways Services Contact No: 5243

21 Appendices

21.1 Appendix A: Principal A and Non Principal roads requiring resurfacing (RED)

21.2 Appendix B: Principal A and Non Principal roads requiring resurfacing (AMBER)

21.3 Appendix C: Unclassified network with major defects in alphabetical order

21.4 Appendix D: Maps

Signed Dated ______Cabinet Member

Signed Dated ______Executive Director

Page 15 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 Appendix A

Principal A and Non Principal roads requiring resurfacing (RED)

50% OF CARRIAGEWAYS TO BE RESURFACED AS PART OF £10M PROGRAMME – FOR CONSIDERATION BY LEADERSHIP

ROAD EXTENT TO RESURFACE IDENTIFY YEAR member priority 1-4 Yes /No ASHTON ROAD KING ST TO CHAMBER RD BROADWAY ELK MILL TO A671 WAY CHEW VALLEY RD A635 TO SHAW HALL BANK RD DELPH NEW RD A62 TO WALL HILL RD DOBCROSS NEW RD WOODS LANE TO HIGH ST FEATHERSTALL RD N/B FROM QUEBEC ST R/ABOUT FEATHERSTALL CHADD WAY R/A TO ROAD NORTH. ROCHDALE RD T. FEATHERSTALL RAIL BRIDGE TO ROAD SOUTH. A669 MIDDLETON RD HIGH ST UPPERMILL HIGH ST LEES HIGH ST GREENFIELD HOLLINS RD COPSTER HILL RD TO FREDERICK ST HOLLINWOOD AVE TWEEDALE WAY/SEMPLE WAY HUDDERSFIELD RD STAMFORD RD TO HEY WOOD AVE HUDDERSFIELD RD A62. DELPH LANE -- A670 KINGS ST AROUND METROLINK 3B MANCHESTER RD/B KINGS ST OLDHAM METROLINK 3B LEES RD CROSS ST -- OTHER SECTION BALFOUR ST TO BE RESURFACED IN AUG 2010 MANCHESTER RD M60 TO DRURY LANE MANCHESTER ST EDWARD ST TO DRURY LANE MIDDLETON RD BROADWAY TO MIDDLETON RD MIDDLETON RD BROADWAY TO RD OLDHAM RD OAKLANDS RD -- CHEW VALLEY RD(RLWY BGE)

Page 16 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD EXTENT TO RESURFACE IDENTIFY YEAR member priority 1-4 Yes /No OLDHAM RD GRAFTON ST TO WELLINGTON ST FAILSWORTH TO BOUNDARY

OLDHAM RD SOUND TO CROSS KEYS RIPPONDEN RD VULCAN ST TO GRAINS BAR SHAW RD LAMP R.BT TO BLACKSHAW LANE ST DOMINGO ST ST.WEST ST TO METRO LINK 3B MCR ST NR COURTS.

STANDEDGE RD HUDDERSFIELD RD TO A62 STOCKPORT ROAD. FROM TAMESIDE RETAINING WALL BOUNDARY TO PROJECT QUICKEDGE RD/A669 OLDHAM RD THE SOUND FROM O/M RD TO GRAINS RD WEST ST WEST STREET TO METROLINK 3B END OF ISLAND (ST DOMINGO ST) WOOL RD DOBCROSS NEW ROAD -- SANDY LANE

Page 17 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 Appendix B

Principal A and Non Principal roads requiring resurfacing (AMBER)

50% OF CARRIAGEWAYS TO BE RESURFACED AS PART OF £10M PROGRAMME – FOR CONSIDERATION BY LEADERSHIP

ROAD LIMITS TO RESURFACE ID ENTIFY YEAR member priority 1-4 Yes /No ABBEYHILLS RD GLODWICK RD - WARREN LANE- ROUNDTHORN ROAD ALT LANE GABLE END NO 41 - ABBEY HILLS ROAD- THORN ROAD ASHTON RD WEST OLDHAM RD - DUNKERLEY ST ASHTON RD CHAPEL ENT(RHS) - CUTLER HILL RD. ASHTON ROAD EAST BRIERLEY AVENUE - WESTMINSTER ROAD- POLE LANE- ROMAN RD BLOCK LANE LANE HAMPSHIRE RD - DENTON LANE- OXFORD ST BUCKSTONES ROAD 238M EAST - TOP O'TH SCARR- BLACK LAD BURNLEY LANE GARFORTH STREET - VICTORIA STREET- FERNHURST STREET

BUTLER GREEN COALSHAW GREEN RD - FIELDS NEW RD CHADDERTON HALL RD RD - MILL BROW

CHADDERTON WAY FEATHERSTALL ROAD - ROCHDALE ROAD

CHAMBER ROAD MANCHESTER ROAD - PRETORIA ROAD- HERON STREET COALSHAW GREEN TURF LANE - WINDSOR RD AVE- BUTLER GREEN

COVERHILL ROAD THORNLEY LANE - OLDHAM ROAD CROSS ST LEES RD - HUDDERSFIELD RD

DENTON LANE ARNE ST - FIELDS NEW RD BLOCK LANE DRURY LANE ALBION P.H.- TURF LANE- MAN RD

Page 18 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010

ROAD LIMITS TO RESURFACE IDENTIFY YEAR member priority 1-4 Yes /No EAVES LANE WHITEGATE LANE - BROADWAY EDWARD STREET MANCHESTER ROAD - RAILWAY BRIDGE ELLIOTT ST HIGH ST - ST JOHN ST

FAILSWORTH RD. 210M SOUTH - MEDLOCK ROAD- ASHTON RD EAST LANE BROADWAY - SEWAGE WORKS ENT- SPRINGS ST CANAL BRIDGE.- FREDERICK ST CHAMBER RD - BROOMHURST AVE- CANAL BRIDGE

GARFORTH ST ST BROOK ST - EUSTACE BURNLEY LANE

GLODWICK ROAD GREENGATE - LEES ROAD GRAINS RD A672 HALIFAX RD - 500M EAST OF HALIFAX RD- 300M SOUTH OF COTTAGE GREENGATE END DCN - ENT BRITISH BOTH ENTE GRIMSHAW LANE CANAL BRIDGE - RAILWAY BRIDGE- ROCHDALE BOUNDARY HALE LANE DEAN ST - MANCHESTER BDY HARTSHEAD STREET RHODES AVENUE - CHURCH STREET HERON ST CHAMBER RD - MANCHESTER RD HOLLINS RD. - COLENSO ST HEYSIDE TURF LANE - WATER ST BOUNDARY HIGGINSHAW LANE HIGGINSHAW RD - RUDDING ST JAMMY LANE RLY BRIDGE - LANSDOWN RD. KELVERLOW LANE. TAMESIDE BDY(NTH OF DEAN TERR)-ALT LANE KNOWLES LANE. THORNLEY LANE - LEES NEW ROAD LANE HEAD 150M NORTH - 650M NORTH OF BOUNDARY LANSDOWN ROAD EDWARD STREET - STOCKFIELD ROAD

Page 19 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010

ROAD LIMITS TO RESURFACE IDENTIFY YEAR member priority 1-4 Yes /No MANCHESTER ROAD OLDHAM WAY RDBT TO JOHN STREET. KING ST MEDLOCK ROAD MEADOWCROFT FARM - ASHBRIDGE ROAD VALE LANE - MEADOWCROFT FARM MIDDLETON RD HIGH ST - ROCHDALE RD HINDLE DRIVE MILLS HILL RD BRITISH VINEGARS OFFICE - MIDDLETON RD MANCHESTER BOUNDARY - ROSE HEY LANE MUMPS -- ALL METROLINK PHASE 3B OLD RD OLDHAM RD - HARDMAN LANE OLDHAM ROAD COWLISHAW LANE - MANCHESTER ROAD A633 OXFORD ROAD MANCHESTER ROAD -- TAMWORTH ST BLOCK LANE - WORCESTER STREET PARK ROAD BISMARK ST. - GLODWICK ROAD ROUNDABOUT SIB - KINGS ROAD PARKBRIDGE ROAD

PLATTING RD 250M N - HUDDERSFIELD RD BURNAGE LANE - GROTTON HALL ENTRANCE RHODES HILL LEES NEW ROAD - RHODES AVENUE ROCHDALE RD THORNHAM RD - WHITEHEAD ST SAINT JOHN STREET RAILWAY BRIDGE - DEN LANE

ST.MARYS WAY LORD ST - ROCHDALE ROAD DCW STAMFORD ROAD. DOWRY ROAD - WILLOW BANK STANLEY ROAD DERBY STREET - MANCHESTER ROAD COALSHAW GREEN ROAD. STANNYBROOK ROAD ASHTON ROAD - CRIME TO BE - LANE LUMB RESURFACED LANE(BOUNDARY) AS PART OF RETAINING WALL PROJECT

Page 20 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010

ROAD LIMITS TO RESURFACE IDENTIFY YEAR member priority 1-4 Yes /No STREET BRIDGE CRAGG ROAD - ROAD CINDER HILL LANE

THORNHAM LANE CHERRY HALL DRIVE - ROCHDALE RD TURF LANE OLDHAM RD - SHAW RD UNDER LANE BOUNDARY - QUICK EDGE LANE THORNLEY LANE UNION STREET - MUMPS - WATERLOO METRO LINK PH - STREET GEORGE 3B STREET WASHBROOK BUTLER GREEN - OLD LANE WELL I HOLE ROAD MANCHESTER ROAD - RIVER TAME TAMESIDE BDY - MANCHESTER RD

Page 21 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010

Appendix C Unclassified network with major defects in alphabetical order

(For consideration by District Partnerships)

ROAD/EXTENT COMMENTS LENGTH M ACTON STREET-ACRE LANE TO CROMFORD ST- 1 ADLINGTON ST-HERBERT ST - END-OLDHAM 99 AFGHAN STREET-PRINCE CHARLIE STREET - END- OLD- 198 ALAN AVE-LORD LANE - CAMBRIDGE RD-FAILSWORTH 118 ALAN AVE-WILLOWS DRIVE - LORD LANE-FAILSWORTH 273 ALBERT STREET-STANLEY ROAD - OLD LANE-CHADDERTON 150 ALBERT STREET-WHARFE STREET - STANLEY ROAD CHADDERTON 182 ALBION STREET-ASHTON ROAD WEST - END-FAILSWORTH 171 AMBROSE CRESCENT-HUDDERSFIELD ROAD - END-DIGGLE 165 ANCHOR ST-HENSHAW ST - END-OLDHAM 76 ANCOATS ST-BENYON ST - VICTORIA ST 80 ARKWRIGHT ST-L-C-5(OPP SUB STN) - LANSDOWNE ROAD 205 ARKWRIGHT STREET-FEATHERSTALL RD SOUTH - L-C-5(OPP SUB 161 STN) ARNCLIFFE RISE-OAKWORTH CROFT-F-D NO-40 159 ASHES LANE-STATION STREET - BRIDGE STREET-SPRINGHEAD 170 ASHFIELD CRESCENT-CARR HOUSE DRIVE - GE NO 32-SPRINGHEAD 288 ASHWORTH STREET-DEVONSHIRE STREET EAST - END- 96 FAILSWORTH ASHWORTH STREET-STOTT ST - DEVONSHIRE ST EAST- 243 FAILSWORTH BACK O'TH' LOW RD-LOWBROOK LANE - PASTURES FARM 60 BACK O'TH' LOW ROAD-BACK O'TH' LOW FARM - LOWBROOK LANE 250 BACK O'TH'-LOW RD-BIRKS AVE - BACK O'TH' LOW FARM 245 BACK O'TH'LOW RD-PASTURES FARM - BRIGHTON RD 289 BALFOUR STREET-LEES ROAD-WARCOCK ROAD-OLDHAM 202 BANK HILL STREET-COW LANE - END OLDHAM 175 BARMOUTH WALK-BYRON STREET - END-OLDHAM 69 BATH STREET-OXFORD STREET - TAMWORTH STREET-OLDHAM 120 BEAL LANE-MARKET STREET - RAILWAY CROSSING-SHAW 262 BECKETT STREET-ST-JOHN STREET - TURNER STREET-LEES 250 BEECH AVENUE-TOP STREET-CYPRESS AVENUE-OLDHAM 159 BELGRAVE ROAD-GODDARD ST - BROADWAY ST 182 BELLFIELD AVENUE-ASHTON ROAD - END-OLDHAM 195 BELMONT STREET-FRANKLIN STREET-HENSHAW STREET 179 BELMONT STREET-ROCHDALE ROAD-FRANKLIN STREET 171 BENYON STREET-SAINT JOHN STREET - HIGH STREET-LEES 129 BERESFORD ST-OLDHAM RD - END-FAILSWORTH 102 BERESFORD STREET-REDGRAVE STREET-MARSDALE CLOSE 120 BETHESDA ST-GODDARD ST TO BROADWAY ST 147 BIRCH AVENUE-BURNLEY LANE - ST MATHEWS DRIVE- 265 CHADDERTON BIRCH AVE-SHAW HEAD DRIVE - ALDER RD-FAILSWORTH 270 BIRCHENLEA ST-CHESTNUT ST - TURF LANE-CHADDERTON 128 BLACKSHAW LANE-BALMORAL AVE - BLACKSHAW SCHOOL-ROYTON 266

Page 22 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M BLAND CLOSE-BROWN ST - END-FAILSWORTH 127 BLEASBY STREET-HUDDERSFIELD RD-PERCY ST- 233 BLEASDALE STREET-ROCHDALE ROAD - CHAUCER STREET- 288 ROYTON BLUNN STREET-CRETE STREET - END-OLDHAM 33 BOURNE RD-DUCHESS ST - MEDWAY RD-SHAW 63 BRADSHAW AVE-MIRIAM ST - FARM ST-FAILSWORTH 116 BRIDEOAK ST-HUDDERSFIELD RD - DUNHAM ST 130 BRIDGE STREET-ASHES LANE - OLDHAM ROAD-SPRINGHEAD 166 BROADSTONE AVE -- WHITEHALL LANE -- END 101 BROADWAY STREET ASHTON ROAD - BELGRAVE ROAD-OLDHAM 280 BRONTE CLOSE-LONGFELLOW CRESCENT - END-OLDHAM 103 BROOKDALE ST-BERESFORD ST - END-FAILSWORTH 42 BROOKLANDS AVE -DENTON LANE -END-CHADDERTON 83 BROOKS DRIVE-GREAVES AVE - MARLBOROUGH DRIVE- 166 FAILSWORTH BROOKS DRIVE-MARLBOROUGH DRIVE - REGENTS CRESCENT- 251 FAILS BROOKS DRIVE-REGENT CRES - PROPPS HALL DRIVE-FAILSWORTH 60 BROWN ST-OLDHAM RD - END-FAILSWORTH 150 BRUN LANE-INTAKE HEAD FARM TO 314 M- 314 BRYAN ST-LITTLEMOOR RD - LONGFIELD CRES-OLDHAM 63 BUCKLOW CLOSE-SUNFIELD AVENUE - END-OLDHAM 55 BUNYAN CLOSE-LONGFELLOW CRESCENT - END-OLDHAM 185 BURGESS DRIVE-DUNKERLEY AVE - LORD LANE-FAILSWORTH 190 BURLINGTON AVENUE-HULME STREET - CHAMBER ROAD-OLDHAM 199 BURLINGTON AVENUE-MANLEY ROAD - HULME STREET-OLDHAM 110 BURNEDGE LANE-ENT HILLSIDE BUNGALOW - FPS WADE HILL FARM 220 BURNLEY LANE(U-C SECT)-NO 60-DENMARK ST END-CHADDERTON 63 BURNLEY ST-ANDREW ST - HOLLY GROVE-CHADDERTON 285 BYRON STREET-HIVE STREET - BARMOUTH WALK-OLDHAM 154 BYRON STREET-MANCHESTER ROAD - HIVE STREET-OLDHAM 148 CAMBRIDGE STREET-WARWICK STREET - OXFORD STREET(END) 199 OLD CARDIGAN ROAD-HOLLINS ROAD - IRVING STREET-OLDHAM 212 CARDIGAN ROAD-IRVING STREET - END-OLDHAM 135 CARLISLE STREET-SUFFOLK STREET - CAMBRIDGE STREET OLD 160 CARLTON AVE-COUNTHILL RD - END-OLDHAM 69 CARR LANE-BANK GAP HOUSE - HUDDERSFIELD RD- 263 CARR LANE-STANDEDGE RD - BANK GAP HOUSE- 243 CEDAR RD-SHAWHEAD DRIVE - END-FAILSWORTH 54 CEDAR STREET-MILK STREET - RYEBURNE ROAD-OLDHAM 74 CEMETERY RD-LORD LANE - LAYCOCK CRES-FAILSWORTH 110 CHALLUM DR- CONIVAL WAY-- CAIRNWELL RD. 260 CHAPEL STREET-VICTORIA STREET - HIGH STREET-LEES 84 CHARLESTON STREET-ASHTON ROAD - END-OLDHAM 143 CHATSWORTH STREET-201 ROUNDTHORN ROAD - 189 167 ROUNDTHORN RD-O CHAUCER ST-RADCLIFFE ST - BLEASDALE ST;ROYTON 211 CHELTENHAM STREET-YATES STREET - END-OLDHAM 101 CHESTERTON ROAD-SHAKESPEARE ROAD - KIPLING ROAD- 92 OLDHAM

Page 23 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M CHESTNUT GROVE-CLIVE RD - END-FAILSWORTH 66 CHESTNUT ST-LONG LANE - ASHTON CRES-CHADDERTON 152 CHIEF STREET-HARDY STREET - END-OLDHAM 90 CHRISTINE ST-ALISON ST - ALFRED ST-SHAW 160 CHURCH ST EAST-HUDDERSFIELD RD - WATERWORKS RD 182 CHURCH STREET-SAINT PAUL'S CHURCH - RAINSHAW STREET- 255 ROYTON CLAREMONT ST-MAIN ST - FRANCIS ST-FAILSWORTH 122 CLARKSFIELD ROAD-ERIC STREET-YORKDALE STREET 259 CLEVELAND GROVE-MENDIP CLOSE - CAMBRIAN DRIVE-ROYTON 258 CLIFTON STREET-MABEL ROAD - ROMAN ROAD-FAILSWORTH 247 CLIVE RD-ASHTON RD WEST - CHESTNUT GROVE-FAILSWORTH 284 CLOVER CRESCENT-THORN ROAD - FURNESS AVENUE-OLDHAM 169 CLYDESDALE RISE-SAM RD TO END- 160 COLDHURST ST-GODSON ST - UNSWORTH WAY(SERVICE 194 RD)OLDHAM COLDHURST ST-UNSWORTH WAY(SERVICE RD) - HENSHAW RD- 98 OLDHAM COLENSO STREET-MILLGATE - HERON STREET OLD 149 COLWYN ST-PLATO ST - WESTBOURNE ST-OLDHAM 151 CONISTON AVENUE-HERON STREET - GRANGE AVENUE OLD 177 COP RD-200M EAST - LOWER DINGLE 197 COP RD-LOWER DINGLE - SHOLVER LANE-OLDHAM 227 COPPICE STREET-OSBORNE RD - WELLINGTON ROAD-OLDHAM 146 COPPICE STREET-WELLINGTON RD- - CHAMBER ROAD-OLDHAM 191 CORMALLEN GROVE-ACCESS RD CHANGE OF SURFACE-CDS END 106 INC PK CORMALLEN GROVE-JAMES ST ACCESS RD-CHANGE OF SURFACE 66 CORONA AVE-REPTON AVE - HOLLINS ROAD-OLDHAM 157 CORONATION RD(CUL DE SAC 2)-NO 114 - NO 76-FAILSWORTH 62 CORONATION RD(CUL DE SAC)-NO 68 - NO 50-FAILSWORTH 31 CORONATION ROAD-GE 48 - FARM STREET-FAILSWORTH 180 CORWEN CLOSE-CARDIGAN ROAD - END-OLDHAM 87 COSGROVE CRES(CUL DE SAC)-NO 17 - NO 51-FAILSWORTH 89 COSGROVE CRESCENT-COSGROVE RD - GROVE AVE-FAILSWORTH 246 COSGROVE RD-FARM ST - GROVE AVE-FAILSWORTH 147 COTSWOLD AVENUE-MARFIELD AVENUE - FIELDS NEW ROAD-CHAD 268 COUNTY STREET-HOLLINS ROAD - END-OLDHAM 161 COVERDALE AVENUE-HAREWOOD DRIVE - END-ROYTON 81 COVERT ROAD-CUL-DE-SAC(NOS-52-38) - END-HOLTS 73 CRETE STREET-ESTATE STREET - MELDRUM STREET-OLDHAM 208 CRIMBLE STREET-BRIDEOAK ST - GREENACRES RD 50 CROMFORD STREET-YATES STREET-DERKER STREET 271 CULVERT ST-HUDDERSFIELD RD- WATERWORKS RD OLDHAM 221 CYPRESS ROAD-BEECH AVENUE-NEWBREAK STREET-OLDHAM 104 DALTON STREET-TEMPLE STREET - HUDDERSFIELD ROAD- OLD- 47 DAME ST-ELLEN RD - BUSK RD-OLDHAM 94 DANIEL STREET-MILES STREET-DERKER STREET 188 DARWIN STREET-BREWERTON ROAD - END-OLDHAM 65 DEAN HEAD LANE-DEAN HEAD - HUDDERSFIELD ROAD(DIGGLE) 300 (300M)

Page 24 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M DENMARK ST-BURNLEY LANE - BAMFORD ST-CHADDERTON 113 DENSMORE ST-DUNKERLEY AVE - COW LANE-FAILSWORTH 83 DERBY COURT-DERBY ST--END 47 DERBY STREET-OXFORD ST - END(CARLISLE ST)-OLDHAM 295 DERKER ST OLD-ACRE LANE - ARGYLE ST 270 DERKER STREET-ARGYLE STREET - RIPPONDEN ROAD- OLD- 300 DERKER STREET-SHAW ROAD - ACRE LANE- OLD- 278 DEVON DRIVE-CORNWALL CRESCENT - END 216 DEVONSHIRE STREET EAST-MIRIAM STREET - FARM STREET-FAILS 161 DICKINSON STREET-TERRACE STREET - END- OLD- 178 DIRTY LANE-THORPE LANE - WHITEGATE LANE-STRINESDALE 250 DIXON STREET-WILLOW BANK - DUNHAM STREET-LEES 101 DOCTOR LANE-150M NORTH - DOCTOR HOUSE FARM-SPRINGHEAD 176 DOCTOR LANE-DOCTOR HOUSE FARM - THORPE LANE- 170 SPRINGHEAD DORSET AVENUE-CORNWALL CRES TO NOS 17-19- 275 DOUGLAS STREET-HIGGINSHAW ROAD - END- OLD- 57 DOVE STREET-LEES ROAD-LYDGATE DRIVE 175 DOVECOTE LANE-GE NO 51 - BELMONT AVE-LEES 168 DOVER STREET-PORTER STREET - ST JOHN'S ST-OLDHAM 60 DOWRY ROAD-TURNER STREET - STAMFORD STREET-LEES 200 DOWRY ST-LICHENS CRES-SPORTSMANS DRI. 185 DOWRY STREET-ASHTON ROAD - CARDWELL STREET-OLDHAM 227 DOWRY STREET-CARDWELL STREET - LICHENS CRESCENT- 170 OLDHAM DUCHESS ST-BOURNE RD - TRENT RD-SHAW 257 DUCHESS ST-DERWENT DRIVE - BOURNE RD SHAW 266 DUCHESS ST-TRENT RD - BROOK AVE-SHAW 299 DUNHAM ST-HUDDERSFIELD RD - TURNER ST 220 DUNHAM ST--TURNER ST--GREENACRES RD- 97 DURHAM CRESCENT-ALDER ROAD - END-FAILSWORTH 140 DURHAM STREET-SUFFOLK STREET - LYNN STREET OLD 44 EDEN STREET-BARKER STREET - BELMONT STREET-OLDHAM 158 EDGEMOOR CLOSE-COUNTHILL ROAD - END- 150 ELDON STREET-HAVELOCK STREET - END-OLDHAM 107 ELI ST-TURF LANE - END-CHADDERTON 95 ELIZABETH AVE-HINDLE DRIVE - END 68 ELM ROAD-BOUNDARY NO 89 ELM ROAD - BOUNDARY NO 107 ELM 90 ROAD EQUITABLE STREET-LONGFIELD CRESENT - HUDDERSFIELD RD 231 OLDHAM ESKDALE AVE-CHEW VALLEY RD - (BEND) KINDERS CRES- 155 GREENFIELD EVELYN STREET-WESTMINSTER STREET - YATES STREET-OLDHAM 127 EVERTON ROAD-CHAMBER ROAD - COLLEGE AVENUE OLD 89 FALCON STREET-ASHTON ROAD - HAVELOCK STREET-OLDHAM 171 FALMOUTH STREET-CHARLESTON STREET - END-OLDHAM 122 FARM ST-GE 45 - COSGROVE RD-FAILSWORTH 244 FARM ST-STOTT ST - GE 45-FAILSWORTH 239 FARRAND ROAD-BYRON STREET - HIVE STREET-OLDHAM 143 FERNEYFIELD RD-MIDDLETON RD WEST - SOUTH FENCE NO 25 184

Page 25 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M FERNEYFIELD RD-SOUTH FENCE NO 25 - ENTRANCE NO 41 205 FILBERT ST-WAVERLEY ST - ROTHESAY RD 50 FITTON HILL ROAD-HONEYWELL LANE - END-OLDHAM 183 FLAKE LANE-ALBERT STREET - ROCHDALE LANE-ROYTON 160 FLORA ST-BELMONT ST - END-OLDHAM 75 FOXHILL-ACRE BARN - WOOD ST-SHAW 181 FOXHILL-MARLFIELD RD - ACRE BARN-SHAW 152 FRANCES ST- LONDON ROAD TO END. 122 FRANKLIN ST BELMONT ST -END 139 FRENCH AVENUE-ROTHSAY RD - PRINCE CHARLIE AVENUE- 60 OLDHAM FRIARMERE ROAD-DENSHAW ROAD - LODGE LANE- 145 FROST STREET-WINDSOR ROAD - BURLINGTON AVENUE-OLDHAM 95 FULHAM STREET-BREWERTON ROAD - NEW EARTH STREET- 144 OLDHAM FURTHERWOOD RD-BOUNDARY PARK RD-SHEEPFOOT LN 229 FURZE LANE - CROWLEY LANE- PEACH LANE.OLDHAM 205 GAME STREET-ROUNDTHORN ROAD-LOWSIDE DRIVE 92 GARNET STREET-AFGHAN STREET - END- OLD- 135 GARTSIDE STREET-KING STREET - HOLLAND CLOSE-DELPH 108 GATEWAY CRESCENT-BROADGATE-LC-B26- 188 GATEWAY CRESCENT-LC-B26 162M SOUTH JET ON LEFT- 162 GIBRALTAR ST-LEES RD - END-OLDHAM 270 GLADSTONE STREET-LEICESTER STREET - ROUNDTHORN ROAD- 159 OLDHAM GLADSTONE TERRACE RD -MANCHESTER RD - END 251 GLAZEDALE AVENUE-WESTERLAND DRIVE - END-ROYTON 54 GLEBE STREET-ROCHDALE ROAD - SALTS STREET-SHAW 261 GLEBE ST-SALTS ST - END-SHAW 114 GLEN GROVE-BROOKLANDS STREET - END-ROYTON 118 GLOUCESTER DRIVE-DORSET AVENUE - END-DIGGLE 207 GODDARD STREET-ASHTON ROAD - BELGRAVE STREET-OLDHAM 277 GODSON STREET-COLDHURST STREET - CROMPTON STREET- 198 OLDHAM GODSON STREET-CROMPTON STREET - LILY STREET-OLDHAM 221 GODSON STREET-LILY STREET - BOOTH HILL LANE-OLDHAM 108 GOLDSMITH AVENUE-COLERIDGE ROAD - STEVENSON DRIVE- 137 OLDHAM GORSE AVENUE-2 CHERRY AVENUE - 40 CHERRY AVENUE-OLDHAM 145 GOULD ST-BOWER ST - DERKER ST-OLDHAM 244 GOYO RISE-WILKES STREET - END-OLDHAM 57 GRAINS ROA-BEAL LANE - FOOTPATH AT SIDE NO 76-SHAW- 238 GRAINS ROAD-FOOTPATH AT SIDE NO 76 - HILLSIDE AVENUE-SHAW- 210 GRAINS ROAD-FOOTPATH SIDE NO 241 - DET HOUSE ROSES-SHAW- 190 GRAINS ROAD-HILLSIDE AVENUE - FOOTPATH AT SIDE NO 241- 228 SHAW- GRAMMER SCHOOL RD--BYRON ST-HIVES ST- 194 GRAVEL WALKS-CROSS STREET - HONDURAS STREET 136 GREAT MEADOW-RISHWORTH RISE - GREENWAY-SHAW 210 GREAVES AVE-PROPPS HALL DRIVE - END-FAILSWORTH 216 GREEN BRIDGE LANE -CHEW VALLEY RD - LADHILL LANE- 279 GREENFIELD

Page 26 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M GREENACRES RD--HEYWOOD ST--DUNHAM ST- 169 GREENACRES ROAD-ESTHER STREET - TOP STREET-OLDHAM 249 GREENACRES ROAD-HANSON STREET - ESTHER STREET-OLDHAM 199 GREENACRES ROAD-HEAP STREET - HANSON STREET-OLDHAM 235 GREENACRES ROAD-LINDEN AVENUE - HEYWOOD STREET OLDHAM 241 GREENACRES ROAD-TOP STREET - LINDEN AVENUE OLDHAM 233 GREENGATE STREET -- WATERLOO ST TO MINTON ST. 160 GREENGATE STREET-PED AREA - GLODWICK RD 158 GREENGATE STREET-WATERLOO STREET - PEDESTRIANISED AREA 226 GREENWOOD ST SPRING ST TO END(GATES) 131 GREGORY ST-HAWKSLEY ST - END-OLDHAM 61 GROBY STREET-URMSON ST - END(WORKS)-OLDHAM 173 HAGUE ST-HAYWOOD ST - END-OLDHAM 106 HANGING CHADDER LANE-HANGING CHADD - END-ROYTON 183 HANGING CHADDER LANE-SPRINGFIELD LANE - HANGING CHADD- 200 ROY- HARDMAN ST-OLDHAM ROAD - END- 127 HARDY STREET-PARK ROAD-PITT STREET 213 HARGREAVES STREET-ARKWRIGHT STREET - CDS END 173 HARRY ST-EDWARD ST-SUTHERS ST. 145 HATHERSAGE STREET-PEAK STREET - HARRY STREET-OLDHAM 124 HAUGHHILL RD-HAVEN LANE - END 188 HAVELOCK STREET-SCOTT STREET - ELDON STREET-OLDHAM 251 HAVEN LANE-TURF PIT LANE --RUSHTON GROVE 220 HAWKSLEY STREET-FOWLER STREET - CHAMBER ROAD OLD- 248 HAWKSLEY STREET-HERON STREET - FOWLER STREET OLD- 102 HAWTHORN CRESCENT-LABURNUM AVENUE - QUEEN STREET- 140 SHAW HEATHFIELDS ROAD-SPRINGMEADOW LANE - CHURCH ROAD- 200 HEDGES STREET-ROMAN ROAD - ASHTON ROAD EAST- 112 FAILSWORTH HEIGHTS LANE-DARK LANE - SPRING HEAD (300M)-DELPH 300 HERBERT ST-PEACH RD-RIPPONDEN RD OLDHAM 298 HEREFORD ST-MILNE ST - LINCOLN ST-OLDHAM 157 HEY CRESCENT-STAMFORD ROAD - STAMFORD ROAD-LEES 194 HEYWOOD AVE-HUDDERSFIELD RD (WEST) - 849 HUDDERSFIELD 300 ROAD HEYWOOD AVE-SERVICE ROAD-837HUDDSFLD RD - 847HUDDSFLD 84 RD HEYWOOD LANE-BROWN HILL DRIVE - HUDDERSFIELD ROAD- 259 SPRINGH'D HEYWOOD ST-HUDDERSFIELD RD - GREENACRES RD 156 HEYWOOD STREET-OLDHAM ROAD - END-FAILSWORTH 59 HIGH BARN ROAD-PARK LANE - SHAW ROAD-ROYTON 277 HIGH BARN STREET-EDGE LANE STREET - PENNINE VIEW 129 HIGH BARN STREET-OLDHAM ROAD - EGDE LANE STREET 222 HIGH BARN STREET-PENNINE VIEW - PARK LANE-ROYTON 290 HIGH LEE LANE - ENT HIGH LEE - 150M NORTH 150 HIGH LEE LANE-GATE L H S - ENT HIGH LEE 250 HIGH LEE LANE-GATE R-H-S - HILL TOP LANE 180 HIGHER FULLWOOD-LOWER DINGLE-PEARLY BANK-OLDHAM 229 HIGHER LIME ROAD-BDRY NOS 50-52 - LIME GREEN ROAD-OLDHAM 282

Page 27 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M HIGHER LIME ROAD-LOWER LIME ROAD - BOUNDARY NOS 50-52-OL 280 HIGHER TURF LANE-HUDDERSFIELD RD - WRIGLEY ST-SCOUTHEAD 166 HIGHLANDS RD-COTSWOLD AVE - GRAMPIAN WAY-SHAW 257 HILLSIDE AVE-HUDDERSFIELD ROAD - END-DIGGLE 87 HILLTOP LANE-250M E - ENT TO HILL TOP 215 HILLTOP LANE-400M E - 2ND JUNC BADGER EDGE LANE 238 HILLTOP LANE-BADGER EDGE LANE - 200M E- 250 HILLTOP LANE-HIGH LEE LANE 200 HILLTOP LANE-ZOOM E - 400M E 200 HINTON STREET-BROOKFIELD STREET-PARK ROAD 44 HODGE CLOUGH RD-G-E-NO27 - WILKES ST-OLDHAM 182 HODGE CLOUGH ROAD-200M SOUTH OF COP ROAD - GE 27- 290 OLDHAM HOLBORN AVENUE-KENSINGTON ROAD - END-FAILSWORTH 50 HOLLIN HALL STREET-CEDRIC STREET - CLARKSFIELD ROAD 109 OLDHAM HOLLIN HALL STREET-GREENACRES ROAD - CEDRIC STREET- 193 OLDHAM HOLLINS AVE-HOLLINS ROAD - END-LEES 200 HOLLINS LANE-HOLMFIRTH RD - TUNSTEAD LANE 270 HOLLINS ROAD-HUDDERSFIELD ROAD - BACK O TH LOW ROAD- 275 LEES HOLLY LANE-G-E-6 (ROUNDABOUT) - MOORCROFT ST-OLDHAM 42 HOLLY LANE-OAK ROAD - GABLE END NO 12-OLDHAM 50 HOLLY LANE-ROUNDABOUT (GE 12)-OLDHAM 78 HOLLYMOUNT DRIVE-SUNFIELD AVENUE - END-OLDHAM 87 HONEYWELL LANE-ASHTON ROAD-CARDWELL STREET 200 HONEYWELL LANE-CARDWELL STREET-KINLOCH STREET 214 HONEYWELL LANE-KINLOCK STREET-KINGS ROAD 287 HOPKIN AVE OLD-HARCOURT ST - CRABTREE RD 128 HUDDERSFIELD RD-200M EAST OF DRY BRIDGE - 400M EAST- 200 DIGGLE HUDDERSFIELD RD-250M NORTH - DRY BRIDGE(BEND)DIGGLE 154 HUDDERSFIELD RD-600M NORTH - NO8 THURSTONS-DIGGLE 300 HUDDERSFIELD RD-MOORDALE - NO165-DIGGLE 294 HUDDERSFIELD RD-NO165 - POST OFFICE-DIGGLE 280 HUDDERSFIELD RD-NO327 - HARROP GREEN LANE-DIGGLE 276 HUDDERSFIELD RD-POST OFFICE - NO327-DIGGLE 300 HUDDERSFIELD RD-STANEDGE RD(A670) - MOORDALE-DIGGLE 290 HUDDERSFIELD ROAD-300M NORTH - 600M NORTH OF HARROP GRN 300 LNE HUDDERSFIELD ROAD-DRY BRIDGE(BEND) - 200M EAST-DIGGLE 200 HUDDERSFIELD ROAD-NO8 THURSTONS - 250M NORTH-DIGGLE 250 HULME STREET-WINDSOR ROAD - LANGHAM ROAD-OLDHAM 149 HULMES RD LORD LANE MANCHESTERBDY 196 HULTON ST-OLDHAM RD - END-FAILSWORTH 134 HUNT LANE-FERNEYFIELD SCH ENT - HSE GABLE 191 HUNT LANE 216 HUNT LANE-HSE GABLE 191 HUNT LN - BROADWAY 235 HUNT LANE-MIDDLETON RD WEST - FERNEYFIELD SCHOOL ENT 208 HUNT LANE-TAYLOR ST - STOCKFIELD ROAD 126 HURSTEADS LANE-STREET HOUSE LANE - RESEVOIR-DOBCROSS 254 HUXLEY STREET-DARWIN STREET - FULHAM STREET-OLDHAM 138

Page 28 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M HUXLEY STREET-FULHAM STREET - LEES ROAD-OLDHAM 140 INCLINE ROAD-CHAPEL ROAD - BYRON STREET-OLDHAM 247 INTAKE LANE-300M EAST - FERN LEE FARM-GREENFIELD 300 INTAKE LANE-FRIEZLAND LANE - WHITE LEE (200M)-GREENFIELD 200 INTAKE LANE-WHITE LEE(200M) - 300M EAST-GREENFIELD 300 IVY GREEN DRIVE-OLDHAM ROAD TO F-D NO 28- 158 JAMES RD-SALTS ST TO CHERTSEY CLOSE- 171 JAMES STREET-ASHTON ROAD EAST - END-FAILSWORTH 162 JAMES ST-RIPPONDEN RD - COUNTHILL ROAD-OLDHAM 71 JOHN KNOTT STREET-GREAVES STREET - END 96 KEB LANE-ASHTON ROAD - MIDDLEFIELD 240 KEB LANE-MIDDLEFIELD - BOLLARDS 282 KELSO CLOSE-ASHTON ROAD - END-OLDHAM 145 KENSINGTON AVENUE-ROCHDALE ROAD - NEWARK PARK WAY- 154 ROYTON KENSINGTON ROAD-FREDERICK STREET - WINDSOR ROAD OLD- 203 KENT CLOSE-DORSET AVE - END 83 KENT STREET-ASHTON ROAD - END-OLDHAM 64 KENWOOD RD-FURTHERWOOD RD - END-OLDHAM 98 KINGS ROAD-250 METRES - 500 METRES-OLDHAM 250 KINGS ROAD-500 METRES - 750 METRES-OLDHAM 250 KINGS ROAD-PARK ROAD - 250 METRES-OLDHAM 250 KINGSTON ROAD-HAMPTON ROAD - WESTMINSTER ROAD- 263 FAILSWORTH KINGSWAY CLOSE-CHAMBER RD TO END- 133 KNARR BARN LANE-ENT TO KNARR BARN - THURSTON CLOUGH RD 217 KNOTT HILL LANE-300M WEST - 600M WEST-DELPH 300 KNOTT HILL LANE-600M - HILL TOP LANE-DELPH 100 KNOTT HILL LANE-STONESWOOD ROAD - 300M WEST-DELPH 300 KNOTT LANES-ENT TO STABLES - FAR SIDE OF BRIDGE 208M- 208 KNOWL TOP LANE-200M SOUTH - S-GABLE KNOWL TOP FARM-U'MILL 209 KNOWL TOP LANE-ENT INTAKE FARM - HIGHER CROSS LANE U'MILL 200 KNOWL TOP LANE-HIGHER CROSS LANE - S-BDY MOORLAND 190 BUNGALOW KNOWL TOP LANE-S-BDY MOORLAND BUNGALOW - 200M SOUTH- 200 U'MILL KNOWL TOP LANE-STREAM AT GELFIELD LANE - ENT INTAKE FARM- 156 U LABURNUM AVENUE-QUEEN STREET - END-SHAW 160 LABURNUM ROAD-HIGHER LIME ROAD - FARM ROAD-OLDHAM 229 LADCASTLE ROAD-250 M-N - LH BEND-UPPERMILL- RETAINING 240 WALL PRO LADCASTLE ROAD-BEND FROM RAILWAY - 250 MN-UPPERMILL- RETAINING 250 WALL PRO LADCASTLE ROAD-L H BEND - MOW HALL LANE-UPPERMILL- RETAINING 245 WALL PRO LADCASTLE ROAD-LADBROOK HOUSE - 250 MN-UPPERMILL- 250 LADCASTLE ROAD-OLDHAM ROAD - BEND FROM RAILWAY- 213 UPPERMILL- LADHILL LANE -CHEW VALLEY RD - GREEN BRIDGE LANE 187 GREENFIELD LARK HILL LANE-HUDDERSFIELD RD - 300M-DELPH 300 LAURELS AVE-BAYTREE AVE - MILLS HILL RD-CHADDERTON 284

Page 29 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M LAWTON SQUARE-KING ST - END-DELPH 40 LEASIDE AVENUE-ST MATTHEWS DRIVE - BIRCH AVENUE- 268 CHADDERTON LEE STREET-CHAMBER ROAD R -- END. 261 LEE STREET-SPRING STREET - STATION ROAD-UPPERMILL- 151 LEWISHAM CLOSE-KINGSTON DRIVE - END-ROYTON 235 LIBRARY LANE-KIRKBANK ST - WEST END ST-OLDHAM 145 LINKS AVE-NEWTON RD - END-FAILSWORTH 87 LINNEY LANE- RD - RAILWAY BRIDGE 117 LINNEY LANE-RAILWAY BRIDGE - BRIDGE OVER STREAM 188 LITTLE OAK CLOSE-MEDLOCK WAY TO END- 92 LITTLEMOOR LANE CUL DE SAC-OPP PRIMARY SCHOOL - END(W)- 53 OLD LITTLEMOOR LANE-BRYAN ST - OS 49-OLDHAM 162 LITTLEMOOR LANE-HERBERT ST - BRYAN ST-OLDHAM 240 LITTLEMOOR LANE-SPURN LANE - END RETAINING 140 WALL PROJ LIVESEY STREET-DANIEL STREET - HUDDERSFIELD ROAD-OLDHAM 79 LOMBARD ST-HENSHAW STREET - C-D-S-OLDHAM 104 LONDON ROAD-DERKER STREET - HARCOURT STREET-OLDHAM 260 LONDON ROAD-HARCOURT STREET - SYDENHAM STREET-OLDHAM 180 LONG LANE OLD-WILLIAMS CRESCENT - BROADWAY-CHADDERTON 276 LONG LANE-CHESTNUT ST - TURF LANE-CHADDERTON 195 LONGFIELD CRES-SHARPLES HALL ST - END-OLDHAM 282 LONGFIELD PARK-SCOWCROFT LANE - END-SHAW 174 LONSDALE ROAD-FARRAND ROAD - END-OLDHAM 57 LOUGHRIGG AVENUE-DEEPDALE AVE - MARDALE AVE-ROYTON 209 LOVERS LANE -BURNEDGE FOLD RD - OLDHAM RD- 192 LOVERS LANE -BURNEDGE LANE - BURNEDGE FOLD RD 205 LOWER HOUSE STREET-HUDDERSFIELD ROAD-PENNANT STREET 75 LOWER LIME ROAD-HIGHER LIME ROAD - BOUNDARY NOS 107-109- 270 OL LYNDHURST AVE-FOXDENTON LANE - END-CHADDERTON 89 MALLARD CLOSE-SWALLOW STREET - END(SWALLOW STREET) 124 OLD- MALVERN CLOSE-HIGHLANDS RD - END-SHAW 121 MANLEY ROAD-MIRFIELD AVENUE-LEE STREET 225 MANLEY ROAD-WINDSOR ROAD-MIRFIELD AVENUE 276 MAPLE GROVE-NEWTON RD - END-FAILSWORTH 57 MARGARET STREET-SCHOOL ROAD - END-OLDHAM 74 MARLBOROUGH DRIVE-RIDGEFIELD ST - ALBION ST-FAILSWORTH 281 MARLFIELD ROAD-ROCHDALE ROAD - FOXHILL-SHAW 293 MARS ST ASHLEY ST TO END 49 MARS ST OSBOURNE ST TO END 31M 31 MARS STREET-PROSPECT ROAD - ASHLEY ST 162 MARTIN AVENUE-QUAIL STREET - DOVE STREET-OLDHAM 68 MASSEY AVENUE-ROMAN ROAD - END-FAILSWORTH 81 MAYFIELD AVE FROM NO 1 COOPER ST END NO 19 115 MAYFIELD ROAD-STONELEIGH ROAD - VULCAN STREET-OLDHAM 224 MCDONOUGH CLOSE-EAST END TO WEST. 107 MCKIE CLOSE-MCDONOUGH CL-END 77

Page 30 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M MEDLOCK WAY-BECKETT STREET - ROWLAND WAY-LEES 139 MEDLOCK WAY-ROWLAND WAY-END-LEES 215 MELDRUM STREET-HONEYWELL LANE - VILLA ROAD-OLDHAM 203 MELDRUM STREET-VILLA ROAD - BROADWAY STREET-OLDHAM 171 MELROSE STREET-YATES STREET - SYDENHAM STREET-OLDHAM 88 MERSEY ROAD NORTH-MABEL ROAD - ROMAN ROAD-FAILSWORTH 207 MERSEY ROAD NORTH-OLDHAM ROAD - MABEL ROAD-FAILSWORTH 255 MIDDLETON AVE-DUNKERLEY AVE - END-FAILSWORTH 37 MIDGROVE LANE-HUDDERSFIELD RD - GATE HEAD BROW-DELPH 247 MILES ST-DERKER ST - HUDDERSFIELD RD 287 MILK ST -CEDAR ST - END-OLDHAM 62 MILLGATE-COLENSO STREET - HOLLINS ROAD OLD- 209 MILNE STREET-TAMWORTH STREET-END 143 MINOR STREET-DUKE STREET - CLIFTON STREET-FAILSWORTH 195 MINTON STREET-LANDSEER STREET-HARDY STREET 206 MIRIAM STREET-DEVONSHIRE STREET - BRADSHAW AVENUE-FAILS 260 MIRIAM STREET-STOTT STREET - DEVONSHIRE STREET- 173 FAILSWORTH MITCHELL ST-FEATHERSTALL RD NORTH - ROCHDALE RD-OLDHAM 201 MOOR CRESCENT-HILLSIDE AVE - END-DIGGLE 100 MOOR STREET-TEMPLE STREET - HUDDERSFIELD ROAD- OLD- 43 MOORCROFT STREET-HAZEL LANE - END-OLDHAM 145 MOORFIELD MEWS-ROCHDALE RD - KERSHAW STREET-SHAW 41 MOORHEY ST-LAUREL ST - ROUNDTHORNE RD OLD 235 MOORHEY ST-LEES RD - LAUREL ST OLD 195 MOORHEY STREET-CRANBERRY STREET - ROUNDTHORN ROAD- 96 OLDHAM MORTAR ST -MILK ST - END-OLDHAM 76 MORTAR ST-GREENWOOD ST - PERCY ST 64 MOUNT PLEASANT ST-OLD-LEES RD - END 300 MYRTLE CLOSE-CHAMBER ROAD - END-OLDHAM 51 NEALE AVE-CENTRAL AVE - NORTH AVE-GREENFIELD 37 NEVILLE ST-MIDDLETON RD - PROSPECT RD-OLDHAM 174 NEW EARTH STREET-ROOK STREET - LEES ROAD-OLDHAM 185 NEW EARTH ST-ROUNDTHORN ROAD - ROOK STREET-OLDHAM 191 NEW ROYD AVE-HOLLINS ROAD - END-WATERHEAD 126 NEW STREET-HIGH STREET - CHURCH ROAD-UPPERMILL 117 NEWARK PARK WAY-KENSINGTON AVENUE - CASTLERIGG DRIVE- 209 ROYTON NEWBREAK CLOSE-REDGRAVE ST - REDGRAVE PASSAGE 122 NEWLANDS-HULMES RD - END 30 NEWTON RD-HULMES ROAD - PADDOCK LANE-FAILSWORTH 331 NIELD STREET-COPSTERHILL ROAD - ASHTON ROAD-OLDHAM 189 NINTH AVENUE-LIMESIDE ROAD - SECOND AVENUE-OLDHAM 288 NORDENS ROAD-MIDDLETON ROAD - END (NORWEB GATES)- 57 NORFOLK CRESCENT-SOMERSET RD(OS 122) - GE NO 52- 298 FAILSWORTH NUGGETT STREET-RETFORD STREET-GLODWICK ROAD 219 OAK ROAD-OGDEN ROAD - LABURNUM AVE. 139 OAK VIEW RD -MANCHESTER RD -GREEN BRIDGE LANE 249 GREENFIELD

Page 31 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M OAKWORTH CROFT SERVICE ROAD F-D NO 14 TO BDY WALL NO 32 127 OLD LANE-BLOCK LANE - SPENCER STREET-CHADDERTON 187 OLD LANE-HARDMAN LANE - SAMUEL STREET-FAILSWORTH- 267 OLD MILL LANE-OLDHAM ROAD - END-SPRINGHEAD 120 OSBOURNE STREET-BUSK ROAD - FEATHERSTALL ROAD 296 OSWALD ST - ELLEN RD - CHADDERTON WAY-OLDHAM 95 OTMOOR WAY-OLDHAM RD TO STUDLEY CLOSE- 175 OVERENS STREET-GREENACRES ROAD - END- OLD- 160 OXFORD ST-KERSHAW ST - END-SHAW 115 PADDOCK LANE-LORD LANE(CHURCH) - SOMERSET LANE- 274 FAILSWORTH PADDOCK LANE-SOMERSET LANE - LORD LANE(THE WINDMILL)- 135 FAILS PARKSIDE AVE- LORD LANE-FAILSWORTH-END. 95 PEAK STREET-EDWARD STREET - END-OLDHAM 95 PEARLY BANK-SHOLVER LANE - 250 M NORTH-OLDHAM 250 PEARSON GROVE-CHAPEL STREET - END-LEES 55 PEEL ST-MIDDLETON RD -STOCKFIELD RD-CHADDERTON 243 PEEL STREET-STOCKFIELD ROAD - STOCK LANE-CHADDERTON 173 PEELS AVENUE-DEN LANE - END-SPRINGHEAD 156 PENDLE GROVE-HIGHLANDS - END-ROYTON 128 PENNANT STREET-BARRY STREET-LOWER HOUSE STREET 100 PENNINE VIEW-HIGH BARN ROAD - F D-60 ROYTON 149 PERCY STREET-BLEASBY STREET - DUNKERLEY STREET OLDHAM 127 PETWORTH ROAD-WALSH STREET - END CHADDERTON 223 PIERCY ST-DUNKERLEY AVE - COW LANE-FAILSWORTH 74 PIKE AVENUE-STAMFORD DRIVE - END-FAILSWORTH 65 PLANE ST-GREENACRES RD - HUDDERSFIELD RD-OLDHAM 201 PLATT LANE-275M NW - LARK HILL ROAD-DOBCROSS RETAINING 299 WALL PROJECT PLYMOUTH STREET-CHARLESTON STREET - VILLA ROAD-OLDHAM 136 POLE LANE-OLDHAM RD - ASHTON RD WEST-FAILSWORTH 205 POPLAR ST-CANAL BRIDGE - PROPPS HALL DRIVE-FAILSWORTH 83 POPLAR STREET-OLDHAM ROAD - CANAL BRIDGE-FAILSWORTH 231 PORT STREET-KENT STREET - END-OLDHAM 45 PORTER STREET-DOVER STREET - SAINT JOHNS STREET -OLDHAM 91 PORTER STREET-MANCHESTER STREET - DOVER STREET-OLDHAM 55 PRESTON STREET-GREENGATE STREET - END-OLDHAM 107 PRINCE CHARLIE ST-DERKER ST - FLINT ST 193 PRINCE CHARLIE ST-FLINT ST - ST AMBROSE RD 269 PRINCE GEORGE ST-PRINCE CHARLIE ST - RIPPONDEN RD-OLDHAM 116 PRINCESS ST-OLDHAM RD - NIXON ST-FAILSWORTH 82 PRIORY CLOSE-COLLEGE AVENUE - END OLD- 108 PRIORY GROVE-EAVES LANE - END-CHADDERTON 90 PROSPECT RD-FEATHERSTALL RD NORTH - MAIN RD-OLDHAM 125 PROSPECT RD-MAIN RD - MAYOR ST-OLDHAM 257 QUAIL ST-WREN ST - ROOK ST-OLDHAM 139 QUEBEC ST-FEATHERSTALL RD NORTH - WADDINGTON ST-OLDHAM 165 QUEEN STREET-CHARLES STREET - END-ROYTON 88 QUEEN STREET-WROE STREET - ATHERTON STREET-SPRINGHEAD 66

Page 32 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M QUEENSWAY -CARR LANE SOUTH PART OF OVAL - GREENFIELD 182 QUEENSWAY -WELLINGTON RD - NORTH PART OVAL TO BOUNDARY 210 9-11 RAILWAY ROAD-FEATHERSTALL ROAD-TATTERSTALL STREET 255 RALEIGH CLOSE-HENSHAW ST - CUNNINGHAM WAY-OLDHAM 96 RAMSAY STREET-LONDON ROAD - END- OLD- 60 REDGRAVE PASSAGE-REDGRAVE STREET - HUDDERSFIELD ROAD- 96 OLDHAM REDGRAVE STREET-SPRING STREET - TOP STREET OLDHAM 186 REDGRAVE STREET-TOP STREET - CYPRESS ROAD OLDHAM 141 REDWOOD LANE-STAMFORD ROAD - TURNER STREET-LEES 180 RETFORD STREET-GLODWICK ROAD - WATERLOO STREET-OLDHAM 262 RETFORD STREET-WATERLOO STREET - PARK ROAD-OLDHAM 119 RICHMOND AVE-G-E-53-51 - END-CHADDERTON 264 RICHMOND AVENUE-FLAKE LANE - END-ROYTON 177 RIDGEFIELD ST-MARLBOROUGH DRIVE - END-FAILSWORTH 76 RIPON STREET-WARD STREET-MITCHELL STREET 73 ROBERT STREET-OLDHAM ROAD - MINOR STREET-FAILSWORTH 92 ROCHE ROAD-FRIARMERE - END 70 ROOK STREET-QUAIL STREET-NEW EARTH STREET 49 ROSARY RD-WESTERHILL RD - 109 ROSARY RD-OLDHAM 142 ROSARY ROAD-CROSSWAYS - WESTERHILL ROAD-OLDHAM 299 ROSEHEY LANE-LORD LANE - GREEN LANE-FAILSWORTH 253 ROTHESAY RD-ST AMBROSE ST - FILBERT ST 144 RUMBLES LANE-HUDDERSFIELD ROAD - HILL END ROAD RETAINING 214 WALL PROJECT RUTHIN CLOSE-CARDIGAN ROAD - END-OLDHAM 63 SAINT MARK'S AVENUE-WATER ST - SAINT MARK'S CLOSE-ROYTON 178 SAINT AMBROSE RD-WAVERLY ST - PRINCE CHARLIE ST 122 SAINT ANNES SQUARE-KING ST - END 61 SAINT JOHNS ST-EDWARD ST - DOVER STREET 132 SAINT MARYS DR-CHEW VALLEY RD - PARK LANE 265 SALTS ST-CROMPTON WAY - BELGRAVIA MEWS 259 SALTS ST-GLEBE ST - FRAZER ST 223 SALTS ST-NEVILLE ST - GLEBE ST 133 SANDBED LANE-DALE LANE - DELPH LANE-DELPH 240 SANDS AVE-SAXON DRIVE - END-CHAD 204 SANDY LANE-CROFT HEAD-ROCHDALE LANE. 152 SANDY LANE-ROCHDALE LANE - CROFT HEAD-ROYTON 257 SANDYS AVENUE-HERON STREET - WOLVERTON AVENUE-OLDHAM 80 SAXON DRIVE-MIDDLETON RD WEST - PARTRIDGE WAY-CHAD 136 SCHOOL ROAD-HOLLINS ROAD - BARMOUTH WALK-OLDHAM 135 SCOTFIELD-ASHTON ROAD-HAVELOCK STREET 96 SCOTT STREET-SCOTTFIELD - END-OLDHAM 66 SCOTTFIELD ROAD-SCOTTFIELD - GODDARD STREET-OLDHAM 300 SHARPLES HALL STREET-HUDDERSFIELD ROAD - ADDLINGTON 254 STREET SHAWCROFT LANE-SCOWCROFT LANE - END-SHAW 106 SHAWHEAD DRIVE-LARCH CLOSE - BIRCH AVE-FAILSWORTH 217 SHAWHEAD DRIVE-LORD LN - LARCH CLOSE-FAILSWORTH 217

Page 33 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M SHAWS LANE-SPRING MEADOW LANE - SIGN (UNSUITABLE FOR 265 VEH) U SHEPLEY STREET-OLDHAM ROAD - STANSFIELD ROAD- 97 FAILSWORTH SHIP LANE-250 M EAST - 500 M EAST-DELPH 250 SHIP LANE-500 M EAST - HIGH LEE LANE-DELPH 228 SHIP LANE-GRAINS ROAD - 250 M EAST-DELPH 250 SHREWSBURY STREET-LITTLEMOOR LANE - RIPONDEN ROAD 105 OLDHAM SIDEBOTTOM ST-BRIDEOAK ST - END-OLDHAM 119 SLACK LANE-BEND SWAINSCROFT FARM - TRACK RT HAND SIDE- 257 DELPH SLACK LANE-LEFT HAND BEND - REAR NO 6 WEST VIEW-DELPH 222 SLACK LANE-REAR NO 6 WEST VIEW - TAME LANE-DELPH 299 SLACK LANE-TRACK RT HAND SIDE - LEFT HAND BEND-DELPH 150 SMITH STREET-DUNHAM STREET - WILLOW BANK-LEES 113 SOLWAY CLOSE- ASHTON ROAD--END. 92 SOMERSET RD-GE 72 NORFOLK CRES - THORN AVE-FAILSWORTH 226 SOMERSET RD-THORN AVE - PADDOCK LANE-FAILSWORTH 186 SOUTH HILL STREET-GREENGATE ST - CHURCHILL ST EAST- 47 OLDHAM SOUTH HILL STREET-GREENGATE STREET-HARDY STREET 146 SOUTHLINK GLODWICK ROAD TO HAMILTON ST. 187 SPENCER ST--MANCHESTER RD--BDY- 34&36 SPENCER 158 SPORTSMANS DRIVE CUL-DE-SAC-GE NO 8-GE NO 44-OLDHAM 149 SPRING STREET-GREENACRES ROAD - REDGRAVE STREET- 259 OLDHAM SPRING STREET-REDGRAVE STREET - HUDDERSFIELD ROAD 98 OLDHAM SPRINGMEADOW LANE-SPRINGMEADOW HOUSE - SHAWS LANE- 252 UPPERMILL SPRINGWOOD CDS OPP NO 14 TO END 36 SPRINGWOOD CDS OPP NO 30 TO END 32 SPRINGWOOD OPP 31 LODGE LANE TO END 60 SPRINGWOOD OPP 39 LODGE LANE TO N END 169 SPURN LANE-STANDEDGE ROAD - LITTLEMOOR LANE-DIGGLE RETAINING 130 WALL PROJ STAFFORD ROAD-WARWICK ROAD - END-FAILSWORTH 97 STAINDALE-YORKDALE ROAD - END-OLDHAM 71 STAMPSTONE STREET-SHAW ROAD - GOULD STREET- OLD- 108 STANDEDGE FOOT ROAD-HUDDERSFIELD ROAD - DIRTY LANE 137 STATION RD-SMITHY LANE TO SPRING MEADOW LANE. 141 STOCKFIELD RD-HUNT LA - COBDEN ST-CHADDERTON 208 STOCKFIELD RD-PEEL ST - LANSDOWNE RD-CHADDERTON 245 STOCKFIELD ROAD-COBDEN STREET - PEEL STREET-CHADDERTON 150 STONEBREAKS ROAD-WOODBROOK ROAD - 141 METRES- 141 SPRINGHEAD STONELEIGH ROAD-COOPER STREET - G-E- HOUSE 26- 245 SPRINGHEAD STONELEIGH STREET-DERKER STREET - WESTMINSTER STREET- 261 OLDHAM STONESWOOD ROAD-KING STREET-KNOTT HILL LANE-DELPH- 247 STOTT STREET-POPLAR STREET - BOUNDARY CABLE END NO 2- 155

Page 34 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M FAILS STREET HOUSE LANE-DELPH NEW ROAD - HURSTEADS LANE- 103 DOBCROSS SUNFIELD AVENUE-TURF PIT LANE - BUCKLOW DRIVE-OLDHAM 270 SUNFIELD CRESCENT-211 TURF LANE - 249 TURF LANE-ROYTON 168 SUNFIELD LANE-DORSET AVE - END 165 SUNFIELD LANE-HUDDERSFIELD RD - DORSET AVE 122 SUTHERLAND CLOSE-ASHTON ROAD - END-OLDHAM 67 SWALLOW STREET-MILLGATE - HERON STREET OLD 229 SYCAMORE AVE-YEW CRESCENT - GREENACRES ROAD-OLDHAM 144 SYDENHAM STREET-BARTLEMORE STREET - MELROSE STREET 124 OLDHAM SYDNEY ST-HULTON ST - END-FAILSWORTH 48 SYLVAN AVENUE-NEWTON ROAD - END-FAILSWORTH 72 TALBOT CLOSE-LITTLEMOOR LANE - END OLDHAM 113 TAME LANE-250 METRES EAST - MARLED EARTH FARM-DELPH 140 TAME LANE-FOOTPATH RIGHT HAND SIDE-250 METRES EAST-DELPH 250 TAME LANE-MARLEY EARTH FARM - SLACK GATE LANE-DELPH- 114 TAMWORTH STREET-OXFORD STREET-EDWARD STREET 260 TANDLE HILL ROAD-NEWARK PARK WAY - ROCHDALE ROAD- 167 ROYTON TANDLEWOOD PARK-TANDLE HILL ROAD - 285M-OS 25-ROYTON 285 TATCHBURY RD-KERSHAW ST - JAMES ST-FAILSWORTH 114 TATTERSALL STREET-RAILWAY ROAD - VALE DRIVE-OLDHAM 90 TAURUS STREET-GREENWOOD STREET - END OLDHAM 153 TAYLOR GREEN WAY-SW END - NW END-SPRINGHEAD 162 TAYLOR STREET-HUDDERSFIELD ROAD - DANIEL ST 76 TEESDALE CLO--G-E- HSE- NO-50 - BOUNDARY FENCE 10-12-CHAD- 137 TEMPLE CLOSE-SLOANE AVENUE - END-SPRINGHEAD 72 TEMPLE STREET-DALTON STREET - MOOR STREET- OLD- 41 TENBY ROAD-HOLLINS ROAD - END-OLDHAM 71 TENNYSON ST-WHETSTONE HILL LA - IVANHOE ST-OLDHAM 232 TERRACE STREET-GREENACRES ROAD - MOUNT PLEASANT 138 STREET- OLD TETLEY BYE RD-165M STH OF SPRING FARM - DRY BRIDGE-DIGGLE 165 THAMES STREET-HIGGINSHAW ROAD - END-OLDHAM 142 THATCH LEACH-BROADWAY - BDRY 37-39 (CLOCKWISE)- 197 CHADDERTON THE SYCAMORES HOLLY GROVE TO END 175 THORLEY ST-POLE LANE - CHURCH ST-FAILSWORTH 120 THORNCLIFFE AVENUE-ROCHDALE ROAD - END-ROYTON 102 THORNCLIFFE PARK-ROCHDALE ROAD - END-ROYTON 182 THORPE VIEW-KINGSTON DRIVE - END-ROYTON 73 THURSTON CLOUGH RD-600MW - KNARR BARN LANE-DELPH 204 THURSTON CLOUGH ROAD-250M SOUTH - ENTRANCE TO HEIGHTS 225 FARM THURSTON CLOUGH ROAD-HEIGHTS FARM - E GE BUILDING 340M E- 340 THURSTON CLOUGH ROAD-N GABLE HIGHER HOUSE - 250M SOUTH- 250 DELP TILBURY ST-MITCHELL ST - RUSKIN ST-OLDHAM 154 TIMPSON ST-KERSHAW RD - JAMES ST-FAILSWORTH 119 TOP O'TH'MEADOWS LANE-LOWBROOK - BACK O'TH'LOW ROAD 245

Page 35 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M (EAST) TOP STREET-REDGRAVE STREET - GREENACRES ROAD OLDHAM 220 TRAFALGAR ST-MITCHELL ST - NORTHMOOR MEWS-OLDHAM 299 TRAFFORD STREET-CROSSBANK STREET - END-OLDHAM 21 TRENT RD-CHEVIOTS RD - HAWKSHEAD RD-SHAW 290 TRENT RD-HAWKSHEAD RD - DERWENT DRIVE-SHAW 299 TRENT RD-VALLEY RISE - DUCHESS ST-SHAW 244 TURF LANE-LONG LANE - HOUSELEY AVENUE-CHADDERTON 236 TURF PIT LANE-RIPPONDEN RD - SUNFIELD AVE 193 TURNER STREET-BOUNDARY BETWEEN NOS 51 AND53 - REDWOOD 97 LANE TURNER STREET-DUNHAM STREET - BOUNDARY 51-53-LEES 230 TURNER STREET-REDWOOD LANE - BECKETT STREET-LEES 200 TYNDALL STREET-NEW EARTH STREET - BREWERTON ROAD- 146 OLDHAM URMSON STREET-ASHTON ROAD - GROBY STREET-OLDHAM 291 VAUGHAN GROVE-CHAPEL STREET - END-LEES 50 VESPER STREET-ROMAN ROAD - ECCLESTON ROAD-FAILSWORTH 106 VICARAGE CLOSE-CROSSBANK AVENUE - END-SPRINGHEAD 96 VICARAGE STREET-CHAPEL ROAD - END OLD 119 VICTORIA STREET-SAINT JOHN STREET - CHAPEL STREET-LEES 129 VIGO ST GIBRALTAR ST TO BREEZEHILL 135 VILLA ROAD-ASHTON ROAD - ESTATES ROAD-OLDHAM 141 VULCAN STREET-KEATS ROAD - WHETSTONE HILL ROAD-OLDHAM 277 VULCAN STREET-MAYFIELD ROAD - KEATS ROAD-OLDHAM 179 VULCAN STREET-PRINCE CHARLES ST - MAYFIELD ST-OLDHAM 223 WADDINGTON ST ELLEN ST TO OSBORDNE ST 197 WADE HILL LANE COLT HILL LN - F-P-STH SIDE WADE HILL FARM 106 WADE ROW-HIGH ST - END HOPKINSON CLOSE 97 WAINWRIGHT ST-CROSSBANK ST - ASHTON RD-OLDHAM 48 WALKER AVENUE-STAMFORD DRIVE - END-FAILSWORTH 44 WALLACE STREET-BROADWAY STREET - VILLA ROAD-OLDHAM 138 WALSH STREET-STOCK LANE - DENTON LANE-CHADDERTON 194 WALTHAM STREET-ABBEYHILLS ROAD - MANOR ROAD-OLDHAM 93 WARLOW DR -GLADSTONE TERRACE - END- 115 WARLOW DR -MANCHESTER RD - END- 100 WARWICK RD-ALDER RD - END-FAILSWORTH 300 WASHINGTON ST--MAIN RD--END 83 WATER STREET-BLACKSHAW LANE - HEYSIDE-ROYTON 106 WATERLOO STREET-250 METRES - 500 METRES-OLDHAM 250 WATERLOO STREET-500 METRES - BISMARCK STREET-OLDHAM 260 WATERLOO STREET-BISMARCK STREET - RETFORD STREET- 174 OLDHAM WATERLOO STREET-RETFORD STREET - GLODWICK ROAD-OLDHAM 124 WATERWORKS ROAD-HOWARD STREET - CULVERT STREET- 179 OLDHAM WATSON STREET-HUDDERSFIELD ROAD - END-OLDHAM-SIDE C- 52 CROW PUB WATTERSHEDDINGS WAY. WATTERSHEDDINGS RD- END. 149 WAVERLEY ST-STONLEIGH ST - VULCAN ST-OLDHAM 248 WAVERLEY ST-VULCAN ST - WHETSTONE HILL LANE-OLDHAM 297

Page 36 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 ROAD/EXTENT COMMENTS LENGTH M WELLINGTON RD -CHEW VALLEY RD - QUEENSWAY-GREENFIELD 238 WESLEY ST-TURF LANE - BEARD ST-ROYTON 117 WESTWAY-SHAW 80 WEST END STREET-MIDDLETON RD - MARK ST-OLDHAM 244 WESTMINSTER ROAD-GORE AVENUE - ASHTON ROAD EAST- 100 FAILSWORTH WESTMINSTER ROAD-RICHMOND ROAD - GORE AVENUE- 279 FAILSWORTH WESTMINSTER ROAD-ROMAN ROAD - RICHMOND ROAD- 259 FAILSWORTH WHEATFIELD CRESCENT-HINDLE DRIVE - END-ROYTON 72 WHETSTONE HILL LANE-WAVERLY ST - WHETSTONW HILL RD 240 WHITEBANK ROAD-STAG PASTURE ROAD - 275 M-OLDHAM 275 WHITEBROOK LANE SPRINGMEADOW LANE TO END 84 WHITSTABLE CLOSE-WALSH STREET - END CHADDERTON 53 WILDBROOK CRESCENT-THE SPUR-FIRTREE AVENUE-OLDHAM 238 WILKES ST-HODGE CLOUGH RD - HODGE RD-OLDHAM 227 WILKES ST-HODGE RD-RIPPONDEN RD-OLDHAM 150 WILKES ST-SHOLVER LANE - HODGE CLOUGH RD-OLDHAM 181 WILLOW BANK-TURNER STREET - STAMFORD ROAD-LEES 175 WINDSOR AVE-SCOLES ST - COALSHAW GREEN RD-CHADDERTON 160 WINDSOR RD-HULME ST - CHAMBER RD-OLDHAM 194 WINDSOR ROAD-COPSTERHILL RD - MANLEY RD-OLDHAM 186 WINDSOR ROAD-MANLEY RD - HULME ST-OLDHAM 174 WINTERBOTTOM ST-MIDDLETON ROAD - END-OLDHAM 86 WOLVERTON AVENUE-COLLEGE AVENUE - G-E- 106 OLD 124 WOODBROOK LANE -300M FROM END OF SURFACE - FORD- 205 SPRINGHEAD WOODBROOK LANE -END OF SURFACE - 300M-SPRINGHEAD 300 WOODBROOK LANE -PLATTING RD -END OF SURFACE-SPRINGHEAD 137 WOODBROOK RD - COOPER ST - WOODBROOK AVE 114 WOODBROOK RD-WOODBROOK AVE - STREAM 200 WOODHEAD CLOSE BECKETT ST TO END 70 WOODLANDS-HULMES ROAD - END-FAILSWORTH 76 WORCESTER ST-OXFORD ST - BLOCK LANE-OLDHAM 201 WREN STREET-NEW EARTH STREET - DOVE STREET-OLDHAM 112 WREXHAM CLOSE-BYRON STREET - CARDIGAN ROAD-OLDHAM 138 WRIGLEY HEAD CRES-WRIGLEY HEAD - END-FAILSWORTH 144 WRIGLEY STREET-TERRACE STREET - HEAP STREET- OLD- 240 WYE AVE-ASHTON RD WEST - END-FAILSWORTH 72 WYNDALE DRIVE-LORD LANE - ALAN AVE-FAILSWORTH 229 WYNDALE DRIVE-WYNDALE DRIVE - CUL DE SAC(END)FAILSWORTH 60 YATES ST--SHAW RD--ACRE LANE 250 YORK AVE-CHAMBER RD - KENSINGTON DRIVE-OLDHAM 135

Page 37 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010 Appendix D (Hard copy Maps presented at Leadership 12/07/10)

1. Chadderton (N,S and Central) 2. Royton/Shaw.(Crompton) 3. Saddleworth North 4. Saddleworth South/Lees. 5. St James/St Marys/Waterhead. 6. Coldhurst/Alexandra/Werneth/Medlock vale 7. Hollinwood/Failsworth.(W/E)

Page 38 of 38 2403 4 YEAR HIGHWAY INVESTMENT PROGRAMME July 2010