Baltic-Adriatic TEN-T Core Network Corridor – Project list, November 2017

Disclaimer: this list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

Member States / Project Project end Project name Project promoter Countries Total costs category date involved Upgrade Nordbahn Wien Süßenbrunn - Bernhardsthal Rail ÖBB-Infrastruktur AG AT 592.0 12/2025 Data networks and mobile radio Wien -Bernhardsthal Rail ÖBB-Infrastruktur AG AT 2.1 12/2018 Train condition checkpoints Wien -Bernhardsthal Rail ÖBB-Infrastruktur AG AT 0.7 12/2018 Integration of interlockings into signalling & dispatching Rail ÖBB-Infrastruktur AG AT 10.5 12/2018 centres Wien - Bernhardsthal Noise protection Wien - Bernhardsthal Rail ÖBB-Infrastruktur AG AT 3.6 12/2020 Upgrade Stadlau-Marchegg Rail ÖBB-Infrastruktur AG AT 550.0 12/2023 Train condition checkpoints Marchegg - Arnoldstein Rail ÖBB-Infrastruktur AG AT 9.5 12/2020 Integration of interlockings into signalling & dispatching Rail ÖBB-Infrastruktur AG AT 98.6 12/2016 centres Marchegg - Arnoldstein Pottendorf line Rail ÖBB-Infrastruktur AG AT 618.2 12/2022 Upgrade Wien Meidling / Altmannsdorf Rail ÖBB-Infrastruktur AG AT 44.6 12/2023 Wien Zvbf Rail Freight Station - Alignment optimization of To be Rail ÖBB-Infrastruktur AG AT 12/2037 exit lines defined Reconfiguration of the accessibility of Himberg Station Rail ÖBB-Infrastruktur AG AT 10.5 12/2020 Link between Airport - Bruck/Leitha (- border To be Rail ÖBB-Infrastruktur AG AT 12/2017 AT/HU) defined Extension Wien Erdberger Lände Rail Bridge (section Wien Rail ÖBB-Infrastruktur AG AT To be 12/2034 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Simmering - Wien Praterkai) defined Integration of interlockings into signalling & dispatching Rail ÖBB-Infrastruktur AG AT 25.7 12/2017 centres (Vienna) Noise protection (Vienna) Rail ÖBB-Infrastruktur AG AT 13.4 12/2020 Train condition checkpoints Wien - Nickelsdorf Rail ÖBB-Infrastruktur AG AT 0.8 12/2017 Noise protection Wien - Nickelsdorf Rail ÖBB-Infrastruktur AG AT 1.7 12/2017 Electronic interlocking: Wr. Neustadt - Rail ÖBB-Infrastruktur AG AT 64.3 12/2022 Data networks and mobile radio Wien - Villach Rail ÖBB-Infrastruktur AG AT 15.7 12/2017 Noise protection Wien - Villach Rail ÖBB-Infrastruktur AG AT 17.9 12/2021 To be Upgrade Wampersdorf - Wiener Neustadt Rail ÖBB-Infrastruktur AG AT 12/2022 defined Upgrade Wiener Neustadt - Gloggnitz Rail ÖBB-Infrastruktur AG AT 81.2 12/2018 Ternitz station reconfiguration Rail ÖBB-Infrastruktur AG AT 41.3 12/2022 Semmering base tunnel Rail ÖBB-Infrastruktur AG AT 3,315.0 12/2026 Station reconfigurations Mürzzuschlag - Bruck a.d.M. Rail ÖBB-Infrastruktur AG AT 116.3 12/2019 Station reconfigurations Bruck a.d.M - Graz Rail ÖBB-Infrastruktur AG AT 204.9 12/2023 Graz Hauptbahnhof Rail ÖBB-Infrastruktur AG AT 150.2 12/2017 Upgrade Graz - Spielfeld-Straß Rail ÖBB-Infrastruktur AG AT 19.1 12/2026 Graz - ; Koralm line Rail ÖBB-Infrastruktur AG AT 5,539.3 12/2024 ETCS deployment Wien - Süßenbrunn Rail ERTMS ÖBB-Infrastruktur AG AT 16.4 12/2017 ETCS deployment in ETCS gap between Westbahn and Rail ERTMS ÖBB-Infrastruktur AG AT 9.8 12/2019 Ostbahn To be ERTMS deployment Wien – Marchegg Rail ERTMS ÖBB-Infrastruktur AG AT 12/2030 defined To be ERTMS deployment Wien – Parndorf Rail ERTMS ÖBB-Infrastruktur AG AT 12/2022 defined ERTMS deployment Parndorf – Kittsee / Petrzalka (border To be Rail ERTMS ÖBB-Infrastruktur AG AT 12/2030 AT/SK) defined ERTMS deployment Wampersdorf – Gramatneusiedl Rail ERTMS ÖBB-Infrastruktur AG AT To be 12/2023 Member States / Project Project end Project name Project promoter Countries Total costs category date involved defined To be ERTMS deployment Wampersdorf – Wien Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 defined To be ERTMS deployment Wr. Neustadt – Wampersdorf Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 defined To be ERTMS deployment Graz – Wr. Neustadt Rail ERTMS ÖBB-Infrastruktur AG AT 12/2030 defined To be ERTMS deployment Werndorf – Graz Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 defined ERTMS deployment Sentilj / Spielfeld-Strass (border To be Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 AT/SLO) – Werndorf defined To be ERTMS deployment Klagenfurt – Werndorf Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 defined To be ERTMS deployment Border AT/IT – Klagenfurt Rail ERTMS ÖBB-Infrastruktur AG AT 12/2030 defined Bundesministerium für Upgrade Austrian locomotives to ERTMS Baseline 3 Rail ERTMS Verkehr, Innovation und AT 9.0 12/2019 Technologie Planning and construction of the A5 North motorway. ASFINAG (Austrian Road Road AT 283.0 12/2017 Schrick-Poysbrunn section Infrastructure Manager) ASFINAG (Austrian Road A5 Construction Poysbrunn - Border AT/CZ 1st Part Road AT 49.6 12/2018 Infrastructure Manager) ASFINAG (Austrian Road A5 Construction Poysbrunn - Border AT/CZ 2nd Part Road AT 91.1 06/2027 Infrastructure Manager) Planning of the A5 North motorway, section between ASFINAG (Austrian Road Road AT 5.0 02/2018 Poysbrunn and the -Czech border Infrastructure Manager) S1 - Vienna Outer Ring Expressway - Schwechat - ASFINAG (Austrian Road Road AT 271.1 12/2020 Süßenbrunn (1st part: Großenzersdorf - Süßenbrunn) Infrastructure Manager) S1 - Vienna Outer Ring Expressway - Schwechat - ASFINAG (Austrian Road Road AT 1,612.1 09/2025 Süßenbrunn (2nd part: Schwechat - Großenzersdorf) Infrastructure Manager) Member States / Project Project end Project name Project promoter Countries Total costs category date involved A4 - Fischamend – Bruck a. d. Leitha 6-lane expansion and ASFINAG (Austrian Road Road AT 151.7 11/2020 rehabilitation Infrastructure Manager) A2 motorway: northern by-pass Klagenfurt, general ASFINAG (Austrian Road Road AT 14.6 06/2018 overhaul (stage 2) Infrastructure Manager) ASFINAG (Austrian Road Roadside network information system Road AT 4.1 11/2018 Infrastructure Manager) Bundesministerium für eCall.at Road Verkehr, Innovation und AT 8.0 12/2017 Technologie Bundesministerium fur C-Roads Austria Road Verkehr, Innovation und AT 19.1 12/2020 Technologie Planning and construction of the expansion of the trimodal Wiener Hafen, Gmbh & Co IWW AT 57.0 12/2025 Port of Freudenau/Vienna KG Improving of the multimodal interconnections at Port of Wiener Hafen, Gmbh & Co IWW AT 9.0 n.a. Freudenau/Vienna KG Wiener Hafen, Gmbh & Co Expansion of the container terminal - construction Stage 1 IWW AT 5.1 12/2017 KG Third runway for the Vienna International Airport Airport Vienna Airport PLC AT 800.0 12/2028 Sustainable airport area - CO2 neutral Airport Airport Flughafen Wien AG AT 80.0 12/2025 Cargo Center Vienna South (Inzersdorf) Multimodal ÖBB-Infrastruktur AG AT 245.5 12/2017 Steiermärkische Terminal Graz Süd Expansion Multimodal Landesbahnen / Cargo- AT 39.8 n.a. Center-Graz AT, BE, BG, CY, I_HeERO - Harmonized eCall European pilot (Partnership CZ, DE, EI, ES, FI, Road ERTICO – ITS Europe 31.0 12/2017 Project) GR, IT, LU, NL, PT, RO, SI, UK AT, BE, CZ, CY, DE, Navigation performance implementation tooklit Airport EUROCONTROL 4.9 12/2019 DK, EE, FI, FR, GR, Member States / Project Project end Project name Project promoter Countries Total costs category date involved HU, HR, IE, IT, LU, LV, LT, NL, MT, PL, PT, RO, SK, SI, ES, SE, SI, UK AT, BE, CZ, DE, DK, EE, FI, FR, GR, Coordinated and harmonised implementation of rail freight HU, HR, IE, IT, LU, Rail RailNetEurope 7.8 12/2017 corridors and freight and passenger telematics applications LV, LT, NL, PL, PT, RO, SK, SI, ES, SE, SI, UK AT, BE, CZ, DE, DK, EE, FI, FR, GR, HU, HR, IE, IT, LU, Support to the implementation of ERTMS Rail ERTMS EEIG ERTMS Users Group 11.5 12/2017 LV, LT, NL, PL, PT, RO, SK, SI, ES, SE, SI, UK AT, BE, CZ, DE, DK, EE, FI, FR, GR, HU, HR, IE, IT, LV, Joint Application for PDP Implementation - Cluster 1 (DP Airport ENAV S.p.A. NL, PL, PT, RO, SK, 643.8 12/2020 Implementation) SI, ES, SE, UK, BH, NO

AT, BE, DE, DK, SESAR Deployment Manager ES, FI, FR, IE, IT, SESAR Deployment Programme implementation 2015- Airport (NATS (En-Route)Pic on MT, NL, PT, SE, SI, 529.1 12/2018 Cluster 1 behalf) UK

ULTRA-E Innovation Allego B.V. AT, BE, DE, NL 13.1 12/2018 Regional and Transport Development in the -Black IWW Regional Government of AT, BG, DE, HR, 2.2 06/2019 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Sea Region towards a Transnational Multiport Gateway Lower Austria HU, MD, RO, RS, Region - DBS Gateway Region SK, UA AT, BG, HR, HU, DAPHNE - Danube Ports Network IWW Pro Danube International MD, RO, RS, SK, 3.0 06/2019 UA CN Administratia Porturilor AT, BG, HU, RO, GETUP Green Danube Ports IWW 2.0 n.a. Dunarii Maritime SA Galati RS, SK, UA Bundesministerium fur AT, CY, CZ, DE, CROCODILE 2 Road Verkehr, Innovation und 41.3 12/2018 GR, IT, PL, RO, SI Technologie Bundesministerium fur Verkehr, AT, CY, CZ, IT, CROCODILE 3 Road 13.8 12/2020 Innovation und SI Technologie (AT) Lokomotion Gesellschaft fur AT, CZ, DE, HU, IT, Retrofitment and upgrade of locomotives Rail ERTMS 5.4 12/2020 Schienentraktion mbH SI AT, CZ, DE, HU, Deployment of ERTMS/ETCS onboard components Rail ERTMS CD Cargo, a.s. 137.5 12/2020 PL, SK AT, CZ, DE, HU, Deployment of ERTMS/ETCS onboard components Rail ERTMS Ceske drahy, a.s. 246.9 04/2020 PL, SK AT, CZ, HR, HU, Linking Danube Innovation AustriaTech 2.9 06/2019 MD, RO, SK, SI Zapadoslovenska energetika, AT, CZ, HR, HU, NEXT-E Innovation 22.2 12/2020 a.s. (SK) RO, SI, SK HungaroControl Air AT, CZ, HR, SK, SI, Free Route Airspace from the Black Forest to the Airport Navigation Services 2.2 06/2017 UK Pte.Ltd.Co. H2 Mobility Deutschland Connecting Hydrogen Refuelling Stations (COHRS) Innovation AT, DE 26.0 06/2019 GmbH & Co. KG CODACASIB Airport Ministere de l’ecologie, du AT, DK, FR, HR, IE, 4.6 06/2018 Member States / Project Project end Project name Project promoter Countries Total costs category date involved developpement durable et SE de I’energie Ministere de l’ecologie, du AT, DK, FR, HR, IE, CODACAS IB Airport developpement durable et 0.8 06/2018 SE de I’energie Speeding up harmonisation and convergence of the ATM Airport AustroControl GmbH AT, DK, HR, IE, SE 24.5 06/2017 EVA+ (Electric Vehicles Arteries in and Austria) Innovation EnelSpA AT, IT 13.6 12/2018 SDAG - SESAR Related AT, IT and other Joint application for PDP implementation - Cluster 2 Airport Deployment Airport 10 Member 125.4 12/2019 Operators Grouping States Landesbetrieb Mobilität Ursa Major 2 Road AT, IT, DE, NL 92.3 12/2018 (project coordinator) AT, IT, PL and Joint Application for PDP Implementation - Cluster 3 Airport ENAV S.p.A. other 16 Member 281.6 12/2018 States ERTMS HIPOPS (ERTMS Harmonised & International Procedures for Placing into Operation of Products & Rail ERTMS RINA Services BE, BG, FR, IT 1.4 09/2017 Subsystems) Deployment of European Surveillance System Airport EUROCONTROL BE, CZ, PT 10.8 12/2020 Deployment of European Surveillance System Airport EUROCONTROL BE, CZ, PT 0.8 12/2020 BE, DE, EE, LT, LV, LNG 2.0 - The C02llaborative S0- 2lution Innovation Furetank Rederi AB 28.4 11/2019 NL, PL BE, DE, ES, FR, LNG motion Innovation Axegaz SAS 60.3 12/2020 HU, IT, NL, PL, RO European Organisation for ATM Data 'as a service' Airport the Safety of Air Navigation BE, DE, LU, NL, SI 4.9 12/2017 (EUROCONTROL) BE, DK, DE, ES, FI, EU ITS Platform (EU EIP) Road SINA S.p.A FR, IE, IT, LT, NL, 12.9 12/2020 PL, PT, RO, SE, UK Member States / Project Project end Project name Project promoter Countries Total costs category date involved Unit-2 Innovation Electricité de France SA BE, FR, IT, UK 3.6 12/2017 SESAR Deployment Manager BG, CZ, EE, EL, HR, SESAR Deployment Programme implementation 2015 - Airport (NATS (En-Route) Pic on HU, NL, PL, PT, 132.6 12/2020 Cluster 3 behalf) RO, SK, UK SESAR Deployment Manager 2016 SESAR Deployment Programme implementation - BG, CZ, HR, HU, Airport (NATS (En-Route) Plc on 10.1 12/2020 Cluster 2: Cohesion SI, SK, UK behalf) (UK) Luka Koper, Port and Logis- Fresh Food Corridors MoS tic System, Public Limited CY, EG, FR, IT,SI 21.4 06/2017 Company Preventing incident and accident by safer ships on the Sociedad de Salvamento y CY, ES, GR, IT, MT, MoS 10.3 11/2018 oceans - PICASSO Seguridad Maritima PT, SE, UK ELEMED-Electrification of the Eastern MEDiterranean area Innovation Hellenic Lloyd’s SA CY, GR, SI 1.5 03/2018 ELEMED-Electrification of the Eastern MEDiterranean area Innovation Hellenic Lloyd’s SA CY, GR, SI 0.2 03/2018 Synchronised PBN Implementation Cohesion Europe Airport EUROCONTROL CY, PT, RO, SK 39.9 12/2020 (SPICE) Track optimisation Český Těšín - Dětmarovice , only Rail SŽDC CZ 108.0 09/2019 Dětmarovice station belongs to BAC Remote traffic control of the section Ostrava, Svinov – Rail SŽDC CZ 10.8 12/2017 Petrovice u Karviné and Dětmarovice - Mosty u Jablunkova Ostrava junction modernisation Rail SŽDC CZ 222.2 12/2021 Reconstruction of Přerov railway station, construction II Rail SŽDC CZ 84.6 10/2021 Modernisation of the railway junction Přerov, 3rd phase Rail SŽDC CZ 26.1 12/2021 Electric traction system change to 25 kV AC, 50 Hz in the Rail SŽDC CZ 55.2 06/2020 section Nedakonice - Říkovice Blažovice - Nezamyslice: railway modernisation to 200 Rail SŽDC CZ 896.8 08/2023 km/h Nezamyslice - Přerov: railway modernisation to 200 km/h Rail SŽDC CZ 453.1 06/2023 - Blažovice: railway modernisation to 200 km/h Rail SŽDC CZ 262.3 12/2024 Railway junction Brno (Study) (also: Brno Rail Node) Rail Railway Infrastructure CZ 11.0 02/2024 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Administration, state organization (SZDC) Railway Infrastructure Railway junction Brno (Works) (also: Brno Rail Node) Rail Administration, state CZ 745.0 02/2030 organization (SZDC) Modernisation of the track Šakvice - Hustopeče Rail SŽDC CZ 40.4 12/2019 To be Upgrade of Brno - Breclav line as a High Speed Rail line Rail SŽDC CZ 12/2030 defined Modernisation of selected sections of the Brno - Prerov Rail SŽDC CZ 45.5 12/2024 railway line Sprava zeleznicni a dopravni Implementation of the TSI TAF and TSI TAP information Rail cesty, statni organizace CZ 3.2 12/2020 systems SZDC - phase 3 (SZDC, s. o.) Advanced World Transport Implementation of TAF TSI in AWT Rail CZ 0.9 12/2020 a.s. ETCS Petrovice u Karvine - Ostrava - Prerov - Breclav Rail ERTMS SŽDC CZ 24.1 07/2018 Ministry of Transport, Road B22 D1 01191 Starý Lískovec – Brno-jih 6,7 km Road and Motorway Directorate CZ 110.7 12/2028 (RSD) D1 01311-3 Brno-jih – Holubice: Upgrade (for increasing Road ŘSD ČR CZ 131.1 12/2035 the absorption capacity) D1 0137 Přerov - Lipník: motorway D1 construction Road ŘSD ČR CZ 177.9 12/2018 D1 0136 Říkovice - Přerov: motorway D1 construction Road ŘSD ČR CZ 275.5 12/2022 D52 Pohořelice - state border Road ŘSD ČR CZ 380.0 12/2030 Introduction and development of ITS for road transport on highways, limited access highways and 1st class roads (incl. Road Ministry of Transport CZ 1,272.0 12/2023 Operation or toll system) CEZ EV TEN-T Fast Charging Network Road CEZ, a. s. CZ 2.9 12/2020 Road and Motorway URSA Road CZ 1.0 12/2020 Directorate of the Czech Member States / Project Project end Project name Project promoter Countries Total costs category date involved Republic Multimodal container terminal Ostrava - Paskov, phase III Advanced World Transport Multimodal CZ 8.9 12/2020 (acc. to CEF) a.s. Rail Cargo Operator - CSKD To be Rail road terminal Přerov Multimodal CZ n.a. s.r.o. defined To be Open multi modal rail road terminal Přerov Multimodal To be specified CZ 01/2030 defined EV fast charging backbone network Central Europe Innovation CEZ, a. s. CZ 2.8 12/2018 Zapadoslovenska energetika, EAST-E Innovation CZ, HR, SK 7.4 12/2018 a.s. Implementation of TAF TSI at the Hungarian private railway Rail OLTIS Group, a. s. (CZ) CZ, HU 1.3 12/2020 undertakings Zapadoslovenska energetika, FAST-E (SK\CZ) Innovation CZ, SK 2.6 09/2017 a.s. Implementation of TAF TSI by private railway operators Rail OLTIS Group CZ, SK, PL 1.1 12/2019 ETCS retrofit Rail ERTMS LEO Express a.s. CZ, SK, PL 3.8 07/2019 Sustainable LNG Operations for Ports and Shipping - ES, FR, HR, IT, PT, Innovation Fundacion Valenciaport 10.3 09/2019 Innovative Pilot Actions (GAINN4MOS) SI Med-Atlantic Ecobonus MoS Puertos del Estado ES, FR, IT, PT 1.5 11/2017 Italian Ministry of Transport ES, GR, HR, IT, RO, DIGITMED-Digital Single Market in the Mediterranean Innovation and Infrastructure and 62.0 12/2020 SI Livorno Port Authority CarEsmatic MoS Luka Koper, d.d. ES, SI 17.1 12/2018 HAM CRIOGÉNICA, ENOS cHAMeleon Innovation ES, SI 2.7 06/2019 d.d. Improving Motorways of the sea Venice Patras (MoS MoS Venice Port Authority GR, IT 9.0 12/2018 Venice-Patras) BUTAN PLIN družba za SiLNGT Small Scale TRANSPORT Innovation HR, SI 2.5 09/2019 distribucijo plina URBAN-E: e-Mobilty, Infrastructure and Innovative Innovation PETROL d.d., Ljubljana (SI) HR, SI, SK 4.5 12/2020 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Intermodal Services in Ljubljana, and Improvement of freight routes and Udine Node Rail RFI spa IT 186.0 12/2025 Completion of the upgrading to two tracks of the Udine- Rail RFI spa IT 170.0 12/2030 Cervignano railway line Upgrading of the railway line -Divača Rail MoT IT 40.0 12/2026 All italian corridor sections: Upgrade of train length to 740 Rail RFI S.p.A. IT 100.0 12/2021 m Speed upgrading works Rail RFI S.p.A. IT 35.0 05/2018 New high speed line Venice-Trieste Rail RFI S.p.A. IT 7,447.0 n.a. Upgrading of Venezia-Trieste railway line (speed up works) Rail RFI S.p.A. IT 1,800.0 12/2031 Venice node: Upgrade of the “Linea dei Bivi” railway line Rail RFI S.p.A. IT 180.0 12/2030 Upgrading of Venezia node Rail RFI S.p.A. IT 80.0 12/2021 Bologna- Padua railway line: upgrading of the traffic Rail RFI S.p.A. IT 160.0 12/2021 management system Bologna High Speed Railway Junction: interconnection to Rail RFI S.p.A. IT 36.2 12/2017 Venezia line Speed increase of the Adriatic Line Bologna-Bari Rail RFI spa IT 350.0 12/2018 Technological upgrading of the Bologna-Castelbolognese Rail RFI S.p.A. IT 30.0 12/2021 railway line Faenza cut off line to link Faenza-Granarolo-Ravenna and Emilia Romagna Region Faenza-Rimini lines, aimed to improvement of freight Rail IT 19.4 n.a. (network RFI) traffic to/from Ravenna Porto Works to allow train length operation to 750 m along the Rail RFI spa IT 80.0 12/2026 corridor Bologna Underground (Servizio Ferroviario Metropolitano Città Metropolitana di Rail IT 372.7 n.a. di Bologna) Bologna Enhancement of signalling system to ERTMS Rail ERTMS RFI S.p.A. IT 57.0 12/2020 Enhancement of signalling system to ERTMS Rail ERTMS RFI S.p.A. IT 48.0 12/2020 Enhancement of signalling system to ERTMS Rail ERTMS RFI S.p.A. IT 112.0 12/2030 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Cross-border Road section between Italy and Road ANAS S.p.A. IT 3.0 12/2019 Improvement of the R.A. 14 motorway Road ANAS S.p.A. IT 8.0 12/2017 R.A.13 Interventions Road ANAS S.p.A. IT 3.0 02/2017 New toll station of Alvisopoli junction with major road SS14 Road Autovie Venete S.p.A. IT 28.7 08/2028 Widening of motorway A4 with a third lane (from 2x2 to Road Autovie Venete S.p.A. IT 162.5 06/2018 3x2 lanes): Sub section N.1 San Donà di Piave - Alvisopoli Widening of motorway A4 with a third lane (from 2x2 to Road Autovie Venete S.p.A. IT 182.9 06/2028 3x2 lanes): Sub section N.2 San Donà di Piave - Alvisopoli Widening of motorway A4 with a third lane (from 2x2 to Road Autovie Venete S.p.A. IT 227.9 06/2029 3x2 lanes): Sub section N.3 San Donà di Piave - Alvisopoli Widening of motorway A4 with a third lane (from 2x2 to Road Autovie Venete S.p.A. IT 65.4 03/2018 3x2 lanes): Sub section N.1 Gonars - Villesse Widening of motorway A4 with a third lane (from 2x2 to Road Autovie Venete S.p.A. IT 48.6 08/2019 3x2 lanes): Sub section N.2 Gonars - Villesse Widening of motorway A4 with a third lane (from 2x2 to Road Autovie Venete S.p.A. IT 91.3 04/2028 3x2 lanes): Sub section N.3 Gonars - Villesse Widening of motorway A4 with a third lane (from 2x2 to 3x2 lanes): Alvisopoli - Gonars, new interchange of Road Autovie Venete S.p.A. IT 442.3 07/2019 Palmanova and by-pass major road SS352 - 1 section Venice-Trieste Motorway section: upgrading works on the Road Autovie Venete S.p.A. IT 4.4 10/2017 tollgate barriers of Portogruaro Venice-Trieste Motorway section: Revamping of existing Road Autovie Venete S.p.A. IT 14.9 04/2018 barriers S. Donà di Piave barracks Road Autovie Venete S.p.A. IT 1.9 06/2027 Further works for modernization and extension service Road Autovie Venete S.p.A. IT 3.9 02/2029 areas Rehabilitation plan acoustic: additional works of acoustic Road Autovie Venete S.p.A. IT 10.2 12/2022 barriers New building service centre of Palmanova Road Autovie Venete S.p.A. IT 13.3 09/2017 Acoustic Rehabilitation plan: acoustic barriers of Road Autovie Venete S.p.A. IT 5.5 06/2017 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Aurisina Third lane upgrading of the A13 Motorway between To be Road Autostrade per l’Italia S.p.A. IT n.a. Monselice and Padova defined Third lane upgrading of the A13 Motorway between To be Road Autostrade per l’Italia S.p.A. IT 12/2020 Bologna and Ferrara defined Upgrading of the Bologna tolled A14 and un-tolled ring To be Road Autostrade per l’Italia S.p.A. IT n.a. roads defined Realisation of the metropolitan expressway road north of Road ANAS S.p.A. IT 37.6 12/2020 the A14 between Ozzano and Bologna Fourth lane upgrading of the A14 Motorway between Road Autostrade per l’Italia S.p.A. IT 600.0 12/2020 Bologna and Castelbolognese ITS Road 3 (Installation of several road telematics systems) Road ANAS S.p.A. IT 3.2 n.a. First phase: construction of a new quay called “Logistic Maritime Triest Port Authority IT 132.4 12/2018 Platform” Second phase: construction of a new quay called “Logistic Platform”, with a wharf of about 600 meters in length and Maritime Triest Port Authority IT 206.5 12/2020 a depth of 12-14 meters Enlargement of the container terminal at quay VII increasing the potential up to a maximum of 1,200,000 TEU Maritime Triest Port Authority IT 187.0 12/2020 (dimension 200m, 18m depth) Realization of a new Ro-Ro terminal in the Noghere valley area with a “working” draught of no less than 12 meters Maritime Triest Port Authority IT 27.0 12/2020 for berthing RO-RO vessels and a total surface of 430.000 sqm (first phase) Realization of a new Ro-Ro terminal in the Noghere valley area with a “working” draught of no less than 12 meters Maritime Triest Port Authority IT 126.0 12/2020 for berthing RO-RO vessels and a total surface of 430.000 sqm (second phase) Second phase of passengers terminal upgrade Maritime Triest Port Authority IT 14.0 12/2020 encompassing the enlargement of the related quay Member States / Project Project end Project name Project promoter Countries Total costs category date involved Upgrading of the port railway system to operate longer trains coherently with the on-going upgrading action of the Maritime Triest Port Authority IT 20.0 12/2020 marshalling yard in Campo Marzio Construction of a new rail connection from the Logistic Platform, the Timber terminal and the steel plant in Maritime Triest Port Authority IT 16.0 12/2020 Servola with the existing national rail system Capital dredging of the port in the area of Noghere Muggia Maritime Triest Port Authority IT 8.0 12/2020 Railway works inside and outside the port area of Trieste Maritime RFI S.p.A. IT 77.0 12/2026 RFI S.p.A. and Venice Port Direct Connection to Venice Port Maritime IT 175.0 12/2030 Authority Definitive Design of the Venice Onshore Offshore Port Maritime Venice Port Authority IT 2,965.0 12/2022 System for large ships Upgrading to 2 tracks railway line in order to support growth in traffic flows due also to the realisation of Fusina Maritime Venice Port Authority IT 7.0 12/2025 Ro-Ro terminal (Adriamos EU project) Upgrade of rail links between the South Industrial Area of Venice Port Authority Marghera and Marghera Scalo Station and redesign of road Maritime IT 32.0 12/2020 (Venezia Municipality) infrastructure New rolling stock vehicle maintenance and repair depot in response to increasing demand for this kind of services by Maritime Venice Port Authority IT 3.5 12/2019 port’s railway operators Realisation of an information system in order to real time monitor maritime traffic and forecast the maritime traffic Maritime Venice Port Authority IT 0.6 12/2019 levels in the last maritime mile Railway telematics systems for shunting operations (SIMA) and its integration with PCS and information systems of Maritime Venice Port Authority IT 1.6 12/2018 other subject involved in developing rail services West Industrial Canal Dredging Maritime Venice Port Authority IT 5.3 12/2018 Broadband connection Maritime Venice Port Authority IT 6.0 12/2018 New access to Passengers Terminal of Marittima Maritime Venice Port Authority IT 139.0 12/2018 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Ravenna Port Hub - 1st phase Maritime Ravenna Port Authority IT 235.0 12/2023 Ravenna Port Hub - 2nd phase Maritime Ravenna Port Authority IT 129.0 12/2027 Ro-Ro terminal upgrading Maritime Ravenna Port Authority IT 31.0 12/2023 ICT services for the port community: interoperability of PCS with the National Maritime Single Window; the National Maritime Ravenna Port Authority IT 3.0 12/2018 Logistics Platform and the Customs ICT platform Dredged material treatment plant Maritime Ravenna Port Authority IT 20.0 12/2020 Improvement of Data connection infrastructure for port Maritime Ravenna Port Authority IT 1.3 12/2019 services Upgrading of the railway link to the port of Ravenna Maritime RFI S.p.A. IT 70.0 12/2026 SS 309DIR: upgrading works by doubling the width of the Maritime ANAS IT 150.0 12/2020 existing road SS 16 Upgrading Maritime ANAS IT 72.0 n.a. Upgrading of the road connection between SS 16 and SS Maritime ANAS IT 25.0 12/2020 309Dir Functional and technical restructuring of Pier VI in the Port MoS Triest Port Authority IT 6.5 12/2018 of Trieste Venezia Marco Polo Airport: Last mile rail connection with Airport RFI S.p.A. IT 425.0 12/2026 conventional Venice - Trieste railway line (SMFR) SS 14 bypass at Campalto and Tessera Airport ANAS S.p.A. IT 35.0 n.a. Venice Airport: new Parking and Bus terminal Airport ENAC S.p.A. / SAVE S.p.A. IT 75.0 12/2025 Venice Airport: new connection between the Underground railway station, the passenger terminal, public transport Airport ENAC S.p.A. / SAVE S.p.A. IT 50.0 12/2022 and car parkings Venice airport: external areas and internal ways (Aree Airport ENAC S.p.A. / SAVE S.p.A. IT 80.0 12/2025 scoperte e viabilità interna) Venice Airport: expansion of the passenger terminal Airport ENAC S.p.A. / SAVE S.p.A. IT 300.0 12/2025 Emilia Romagna Bologna airport: People Mover Airport IT 119.1 12/2018 Region Member States / Project Project end Project name Project promoter Countries Total costs category date involved Bologna airport: People Mover Footbridge Airport Bologna Airport IT 1.7 12/2018 Construction of Turn Pad and taxiway B expansion Airport Bologna Airport IT 4.0 12/2019 Investment to meet regulatory requirements (ex. New Airport Bologna Airport IT 0.3 12/2020 EASA, ICAO) Express car park expansion Airport Bologna Airport IT 2.0 12/2017 Construction of new boarding piers in Bologna Airport Airport Bologna Airport IT 2.6 12/2018 Bologna airport: III site apron Airport Bologna Airport IT 15.2 12/2019 Bologna airport: realisation of a new East multistory Airport Bologna Airport IT 15.4 12/2020 parking Bologna airport: realisation of a new departure lounge and Airport Bologna Airport IT 50.6 12/2020 a new pier Bologna airport: I site apron extension Airport Bologna Airport IT 2.8 12/2018 Bologna airport: de-icing apron and structure Airport Bologna Airport IT 5.8 12/2018 Improvement of the accessibility by railway to the To be Multimodal RFI S.p.A. IT 12/2030 Cervignano Core RRT defined Enhancing the efficiency of the new container terminal of Multimodal Interporto di Padova S.p.A. IT 16.2 12/2019 Interporto di Padova Enhancing Interporto di Padova - Step 2: ancillary measures and ICT solutions for optimising terminal Multimodal Interporto di Padova S.p.A. IT 5.9 12/2020 operations, accessibility and interconnections ICT system application in RRT on the Italian part of the corridor, for operations synchronization and management Multimodal Interporto di Bologna S.p.A. IT 0.4 12/2020 efficiency with other nodes LNG supply facilities implementation at the Port of Venezia Innovation Venice Port Authority IT 100.0 12/2020 LNG supply facilities implementation at the Port of Innovation Ravenna Port Authority IT 77.5 09/2020 Ravenna Ministero delle GAINN4CORE Innovation Infrastrutture e dei Trasporti IT 43.9 09/2019 (project coordinator) EUROSKY - Environmental and safety improvements Innovation BMT GROUP LIMITED IT and other 18.4 12/2017 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Member States IT and other CORE - Safety improvements Innovation BMT GROUP LIMITED 48.8 12/2018 Member States FR ASFA(C) MedTIS II- Overall Project Road IT, ES, FR, PT 53.3 12/2018 MIT (NCP) Administracao do Porto de e-Freight Implementation Action (e-Impact) Innovation IT, PL, PT 3.9 06/2017 Lisboa, S.A. SESAR Deployment Manager SESAR Deployment Programme implementation 2015 - IT, SI and other 18 Airport (NATS (En-Route) Plc on 854.9 12/2020 Cluster 2 Member States behalf) Upgrading of Instrument Flight Procedures to a PBN Airport Transport Systems Catapult IT, UK 4.8 12/2020 standard State Enterprise “Oro Air Traffic Management (ATM) system deployment Airport LT, PL 13.6 11/2018 navigacija” Urząd Marszałkowski Województwa Pomorskiego Development of suburban railway network in Tricity Rail PL 11.7 12/2017 (Pomorska Kolej Metropolitalna S.A.) Elaboration of documentation for construction of collission free passing through railway line E 65 together with access Rail Municipality of Gdansk PL 1.0 06/2020 roads network Works on the Warsaw ring railway (section Warszawa PKP Polskie Linie Kolejowe Rail PL 82.2 12/2018 Golabki\ Warszawa Zachodnia -Warszawa Gdanska) S.A. Works on diametrical line in Warsaw section Warszawa PKP Polskie Linie Kolejowe Rail PL 239.0 12/2024 Wschodnia - Warszawa Zachodnia S.A. Modernisation of railway line Warszawa – Łódź, lot A PKP Polskie Linie Kolejowe section Warszawa Zachodnia – Skierniewice (Miedniewice) Rail PL 306.9 06/2018 S.A. and lot C - other works Works on railway line Warszawa Wlochy - Grodzisk PKP Polskie Linie Kolejowe Rail PL 82.7 06/2019 Mazowiecki (line no. 447) S.A. Member States / Project Project end Project name Project promoter Countries Total costs category date involved PKP Polskie Linie Kolejowe Works on railway line C-E 65 section Bydgoszcz - Tczew Rail PL 167.3 n.a. S.A. Works on railway line C-E 65 section Chorzów Batory - PKP Polskie Linie Kolejowe Tarnowskie Góry - Karsznice - Inowrocław - Bydgoszcz - Rail PL 488.9 10/2022 S.A. Maksymilianowo Elaboration of Pre-design documentation for Modernisation of railway line E65 section Chorzów Batory PKP Polskie Linie Kolejowe Rail PL 1.6 04/2017 – Tarnowskie Góry – Karsznice – Inowrocław – Bydgoszcz – S.A. Tczew Works on main passenger lines (E 30 and E 65) in Śląsk PKP Polskie Linie Kolejowe area, phase I: line E 65 section Będzin – Katowice – Tychy – Rail PL 141.6 12/2023 S.A. Czechowice Dziedzice – Zebrzydowice ; LOT C Works on main passenger lines (E 30 and E 65) in Śląsk PKP Polskie Linie Kolejowe area, phase I: line E 65 section Będzin – Katowice – Tychy – Rail PL 442.2 n.a. S.A. Czechowice Dziedzice – Zebrzydowice, lots A, A1 Works on main passenger lines (E 30 and E 65) in Śląsk PKP Polskie Linie Kolejowe area, phase I: line E 65 section Będzin – Katowice – Tychy – Rail PL 370.5 12/2023 S.A. Czechowice Dziedzice – Zebrzydowice, lots B, D Works on main passenger lines (E 30 and E 65) in Śląsk PKP Polskie Linie Kolejowe area, phase I: line E 65 section Będzin – Katowice – Tychy – Rail PL 9.0 06/2019 S.A. Czechowice Dziedzice – Zebrzydowice - preparatory works Works on railway line no. 139 section Czechowice PKP Polskie Linie Kolejowe Rail PL 47.8 11/2023 Dziedzice - Bielsko Biała - Zwardoń (state border) S.A. Works on railway lines no. 14 and 811 on the section Łódź PKP Polskie Linie Kolejowe Kaliska-Zduńska Wola-Ostrów Wielkopolski, stage I: Łódź Rail PL 113.1 05/2020 S.A. Kaliska-Zduńska Wola Streamlining of Łódź Railway Node (TEN-T), phase I, section PKP Polskie Linie Kolejowe Rail PL 352.6 12/2017 Łódź Widzew - Łódź Fabryczna S.A. Streamlining the Łódź Railway Node (TEN-T), phase II, PKP Polskie Linie Kolejowe Rail PL 459.2 11/2021 section Łódź Fabryczna – Łódź Kaliska/Łódź Żabieniec S.A. Member States / Project Project end Project name Project promoter Countries Total costs category date involved Works on railway lines no. 15, 16 on section Łódź Kaliska – PKP Polskie Linie Kolejowe Rail PL 66.9 09/2021 Zgierz – Kutno S.A. Construction of multimodal integrated nodes together with PKP Polskie Linie Kolejowe construction and reconstruction of railway stops in the Rail PL 9.6 12/2021 S.A. area of Łódzkie Voivodship Completion of construction of the eastern viaduct on Łódź PKP Polskie Linie Kolejowe Rail PL 9.6 12/2021 Kaliska station S.A. Revitalisation of railway line no. 16 Łódź Widzew – Kutno PKP Polskie Linie Kolejowe Rail PL 32.3 09/2021 on section Zgierz – Ozorków S.A. Construction of Nowoweglowa street in Lodz between Wierzbowa and Kopcinskiego streets with the expansion of Rail Urząd Miasta Łodzi PL 8.6 12/2017 the intersection of Kopcinskiego street Stowarzyszenie Development of Szczecin Metropolitan Rail, using the Rail Szczecińskiego Obszaru PL 177.8 12/2022 existing sectors of railway lines No. 406, 273, 351 Metropolitalnego Works on the E 59 railway line, Poznan Glowny -Szczecin PKP Polskie Linie Kolejowe Rail PL 531.6 12/2020 Dabie section S.A. PKP Polskie Linie Kolejowe Works on the E 59 railway line, Wronki - Słonice section Rail PL 349.7 12/2023 S.A. Works on by-passing line in Poznań (section Poznań PKP Polskie Linie Kolejowe Górczyn - Poznań Starołęka - Poznań Franowo - Rail PL 10.5 n.a. S.A. Swarzędz/Zieliniec - Kiekrz) Modernisation of the road infrastructure between Poznań Główny railway station and the network of logistic centres Rail Miasto Poznań PL 220.0 12/2022 in South-East part of Poznań PKP Polskie Linie Kolejowe The modernization of the railway infrastructure within the S.A. (national rail station platforms Poznan Central on the western side with Rail PL 11.3 12/2017 infrastructure manager in adaptation for disabled people ) Modernisation of railway line E59 Wrocław – Poznań, Rail PKP Polskie Linie Kolejowe PL 157.1 12/2017 Member States / Project Project end Project name Project promoter Countries Total costs category date involved phase III, section Czempiń – Poznań S.A. Works on the E 59 railway line on the Wroclaw-Poznan PKP Polskie Linie Kolejowe section, stage IV, border of Dolnoslaskie Voivodeship- Rail PL 364.8 07/2020 S.A. Czempin section Modernisation of railway line E59 Wrocław – Poznań, PKP Polskie Linie Kolejowe phase II, section Wrocław – Dolnosląskie Voivodship Rail PL 232.7 12/2017 S.A. border Works on railway line C-E 30 section Opole Groszowice - PKP Polskie Linie Kolejowe Rail PL 134.6 n.a. Jelcz - Wrocław Brochów S.A. Improvement of transport services through improvement PKP Polskie Linie Kolejowe of technical conditions of railway line 132 section Błotnica Rail PL 45.7 06/2017 S.A. Strzelecka–Opole Groszowice Works on railway line E 30 section Kędzierzyn Koźle - Opole PKP Polskie Linie Kolejowe Rail PL 150.2 03/2022 Zachodnie S.A. Works on railway line E 30 section Kędzierzyn Koźle – PKP Polskie Linie Kolejowe Rail PL 0.2 08/2016 Opole Zachodnie (preparatory works) S.A. Works on railway line E-59 section Kędzierzyn Koźle - PKP Polskie Linie Kolejowe Rail PL 47.0 n.a. Chałupki (state border) S.A. Works on main passenger lines (E 30 and E 65) in Śląsk PKP Polskie Linie Kolejowe area, phase II: line E 30 section Katowice - Chorzów Batory Rail PL 78.0 n.a. S.A. and Gliwice Łabędy Works on main passenger lines (E 30 and E 65) in Śląsk PKP Polskie Linie Kolejowe area, phase III: line E 30 section Chorzów Batory - Gliwice Rail PL 262.9 n.a. S.A. Łabędy Acoustic modernisation of freight cars to adapt them to Rail PKP Cargo S.A. PL 8.9 12/2020 the functional and system requirements PKP Polskie Linie Kolejowe Safety improvement on rail/road crossings Rail PL 95.6 12/2021 S.A. Improvement of technical condition of passengers services PKP Polskie Linie Kolejowe Rail PL 86.0 02/2022 infrastructure (including TSI PRM) S.A. Member States / Project Project end Project name Project promoter Countries Total costs category date involved Modernisation of railway line E30, phase II. PKP Polskie Linie Kolejowe Implementation of ERTMS/ETCS and ERTMS/GSM-R in Rail ERTMS PL 26.5 09/2018 S.A. Poland on section Legnica - Wrocław - Opole Modernisation of railway line E65/C-E65 on section PKP Polskie Linie Kolejowe Warszawa - Gdynia in the scope of supreme layer of LCC, Rail ERTMS PL 142.0 05/2018 S.A. ETRMS/ETCS/GSM-R, DSAT and traction power supply PKP Polskie Linie Kolejowe Construction of ERTMS/ETCS on core TEN-T network lines Rail ERTMS PL 356.8 12/2023 S.A. Construction of GSM-R infrastructure on railway lines PKP Polskie Linie Kolejowe according to the schedule from the ERTMS National Rail ERTMS PL 0.0 08/2016 S.A. Implementation Programme, phase I - preparatory works Construction of GSM-R infrastructure on PKP PLK S.A. PKP Polskie Linie Kolejowe railway lines according to the ERTMS National Rail ERTMS PL 670.2 05/2023 S.A. Implementation Programme Extension of Szadółki junction within national road S6 Road Municipality of Gdansk PL 92.0 12/2023 together with construction of Nowa Jabłoniowa Street Municipality of Gdansk Extension of Kowale junction within the national road S6 Municipality of Pruszcz To be Road PL 12/2023 together with connecting roads Gdański defined Minicipality of Kolbudy Generalna Dyrekcja Dróg S7: section Koszwały – Kazimierzowo Road PL 880.1 10/2018 Krajowych i Autostrad Generalna Dyrekcja Dróg S7: section Miłomłyn – Olsztynek Road PL 628.7 08/2017 Krajowych i Autostrad Generalna Dyrekcja Dróg S7: section Nidzica – Napierki Road PL 150.5 05/2017 Krajowych i Autostrad Generalna Dyrekcja Dróg S7: section Napierki – Płońsk Road PL 632.6 06/2021 Krajowych i Autostrad Generalna Dyrekcja Dróg S7: section Płońsk – Warszawa Road PL 944.1 05/2024 Krajowych i Autostrad Member States / Project Project end Project name Project promoter Countries Total costs category date involved Modernisation of Marsa & Żołnierska streets, section Road Urząd m.st. Warszawy PL 36.0 12/2017 Marsa junction - city limits, phase II Modernisation of Wał Miedzeszyński street, section Trakt Road Urząd m.st. Warszawy PL 19.1 12/2019 Lubelski st - junction with planned S2 expressway Generalna Dyrekcja Dróg A1 motorway: Tuszyn - Piotrków Trybunalski Road PL 161.6 12/2020 Krajowych i Autostrad Generalna Dyrekcja Dróg A1: Pyrzowice-Częstochowa by-pass Road PL 624.9 06/2019 Krajowych i Autostrad Generalna Dyrekcja Dróg A1: Piotrków Trybunalski - Częstochowa Road PL 735.4 12/2020 Krajowych i Autostrad Generalna Dyrekcja Dróg S1: express road section Kosztowy - Bielsko-Biała Road PL 853.0 11/2022 Krajowych i Autostrad S1: Construction of S1 expressway Bielsko Biała – state Generalna Dyrekcja Dróg Road PL 350.7 12/2020 border , section Węgierska Górka bypass Krajowych i Autostrad Generalna Dyrekcja Dróg S3: express road Świnoujście - Szczecin Road PL 348.2 04/2023 Krajowych i Autostrad Development of Western Ring Road of Szczecin, including construction of permanent crossing via the Oder River Road Gmina Miasto Szczecin PL 139.5 12/2023 between the road nodes at towns of Police and Święta S3: Sulechów (Kruszyna junction) – Nowa Sól, II lane of Generalna Dyrekcja Dróg Gorzów Wielkopolski by-pass and II lane of Międzyrzecze Road PL 321.7 07/2019 Krajowych i Autostrad by-pass S3: Nowa Sól (Nowe Miasto junction) – Legnica (A4, Generalna Dyrekcja Dróg Road PL 694.3 07/2019 Legnica II junction) Krajowych i Autostrad A4 motorway: extension of A4 motorway on section Generalna Dyrekcja Dróg Wrocław - Legnica (within section Wrocław-Krzyżowa); Road PL 825.7 n.a. Krajowych i Autostrad construction of third lane National Road Traffic Management System on TEN-T Generalna Dyrekcja Dróg Road PL 145.0 12/2020 network, phase I Krajowych i Autostrad Construction of a pilot docking station, as a part of an LNG Road Remontowa LNG Systems Sp. PL 1.9 12/2020 Member States / Project Project end Project name Project promoter Countries Total costs category date involved distribution system based on cryogenic tank containers z o.o. LEM project – pilot implementation of electromobility Road Lotos Paliwa Sp.z o.o. PL 0.8 12/2020 along the TEN-T base network Improvement of railway connection to Maritime Port in PKP Polskie Linie Kolejowe Maritime PL 190.9 12/2020 Gdynia S.A. Reconstruction of Kwiatkowski viaduct in Gdynia to the full Maritime Urząd Miasta w Gdyni PL 95.6 12/2027 TEN-T requirements Via Maris - Construction of north by-pass of Tricity Generalna Dyrekcja Dróg agglomeration (works partly affecting last mile connection Maritime PL 380.0 12/2024 Krajowych i Autostrad to Gdynia port) Urząd Miasta Gdyni / Zarząd Via Maris - Droga Czerwona road in Gdynia (from Janka Morskiego Portu Gdynia / Maritime PL 200.0 12/2024 Wiśniewskiego Street to Gdynia-Północ junction) Generalna Dyrekcja Dróg Krajowych i Autostrad Urząd Miasta Gdyni / Zarząd Via Maris - Further integration and modernization of Morskiego Portu Gdynia / national roads and motorways links with the port’s road Maritime PL 76.0 12/2027 Generalna Dyrekcja Dróg infrastructure Krajowych i Autostrad Zarząd Morskiego Portu Construction of public ferry terminal in Gdynia Port Maritime PL 37.0 12/2020 Gdynia Deepening the approach fairway and internal waters of Maritime Urząd Morski Gdynia PL 108.8 12/2019 Gdynia Port, phase II Deepening the approach fairway and internal waters of Zarząd Morskiego Portu Gdynia Port Phase I and III. Reconstruction of Quay areas in Maritime PL 133.8 12/2020 Gdynia Gdynia Port, phase II and III Integrated system of navigation marking including e- Maritime Urząd Morski w Gdyni PL 9.6 12/2019 Navigation Construction of GMDSS system for maritime administration Maritime Urząd Morski w Gdyni PL 3.6 12/2019 Reconstruction of railway access to western part of Gdynia Zarząd Morskiego Portu Maritime PL 17.7 06/2020 Port Gdynia Member States / Project Project end Project name Project promoter Countries Total costs category date involved Construction of port infrastructure for sanitary sewerage Zarząd Morskiego Portu Maritime PL 5.2 07/2019 collection Gdynia Creating new infrastructure on the extended port areas Zarząd Morskiego Portu Maritime PL 1,157.7 12/2027 (including the construction of the Outer Port) Gdynia Zarząd Morskiego Portu Reconstruction of Quay areas in Gdynia Port, phase IV Maritime PL 52.6 12/2027 Gdynia Zarząd Morskiego Portu Further adaptation of the maritime access infrastructure to Maritime Gdynia/ Urząd Morski PL 359.2 12/2027 new infrastructure created on the extended port areas Gdynia Increasing the throughput capacity of rail tracks within the Zarząd Morskiego Portu administrative borders of the Port of Gdynia according to Maritime PL 59.8 12/2027 Gdynia TEN-t requirements Integration of port with its hinterland, especially through Under evaluation / Zarząd Maritime PL 70.5 12/2027 intermodal terminals Morskiego Portu Gdynia Implementation of PCS, and integration of IT systems in the Under evaluation / National port, increasing efficiency of serving heavy loads and trucks Maritime Administration / Zarząd PL 4.8 01/2027 in the Port of Gdynia Morskiego Portu Gdynia Zarząd Morskiego Portu Development of Multimodal Platform „Logistics Valley” Maritime PL 104.0 01/2027 Gdynia Reconstruction of southern access to Gdynia Port Maritime Urząd Morski w Gdyni PL 172.1 12/2024 Extension and modernisation of road network in External Maritime Municipality of Gdansk PL 12.3 12/2020 Port of Gdańsk Design and environmental documentation for expansion Zarząd Morskiego Portu and modernization of the road and rail infrastructure at Maritime PL 1.1 03/2018 Gdańsk the Port of Gdańsk Extension and modernisation of road and railway network Zarząd Morskiego Portu Maritime PL 28.8 12/2020 in the Gdańsk outer port Gdańsk Improvement of railway connection to Maritime Port in PKP Polskie Linie Kolejowe Maritime PL 141.5 12/2020 Gdańsk S.A. Project of improvement of railway connection to Gdańsk Maritime PKP Polskie Linie Kolejowe PL 76.2 10/2018 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Port (bridge + double track railway line) S.A. Modernisation of fairway, expansion of the quays and Zarząd Morskiego Portu Maritime PL 110.3 12/2020 improvement of navigation in the Internal Port in Gdańsk Gdańsk Expansion and modernization of core network node in the Zarząd Morskiego Portu Maritime PL 22.0 12/2022 Port of Gdańsk concerning road and rail infrastructure Gdańsk Expansion and modernization of core network node in the Zarząd Morskiego Portu Maritime PL 16.0 12/2022 Port of Gdańsk concerning road and rail infrastructure Gdańsk Studies for the integrated IT system aiding traffic and Zarząd Morskiego Portu Maritime PL 1.2 12/2019 environmental management for freight transport Gdańsk Integrated IT system aiding traffic and environmental Zarząd Morskiego Portu Maritime PL 2.9 06/2021 management for freight transport Gdańsk Zarząd Morskiego Portu Construction of the quay in the external port Maritime PL 50.0 01/2022 Gdańsk Modernisation of entrance to Inner port (in Gdańsk), phase Maritime Urząd Morski w Gdyni PL 40.6 09/2020 IIIa Modernisation of entrance to Inner port (in Gdańsk), phase Maritime Urząd Morski w Gdyni PL 17.5 12/2023 IIIb Modernisation of entrance to Inner port (in Gdańsk), phase Maritime Urząd Morski w Gdyni PL 35.9 12/2030 IV Modernisation of protective breakwaters system in Maritime Urząd Morski w Gdyni PL 179.3 10/2020 Northern Port in Gdańsk Modernisation of seaway into Northern Port in Gdańsk Maritime Urząd Morski w Gdyni PL 28.7 01/2019 Gdańsk Northern Port - construction of port of refuge for ships in distress and threatening ecological disaster along Maritime Urząd Morski w Gdyni PL 179.3 12/2023 with breakwater infrastructure and anti-flood barrage Breakwaters of development areas in the Northern Port of Maritime Urząd Morski w Gdyni PL 191.2 12/2030 Gdańsk Deepwater Container Terminal Gdańsk - Construction of To be Maritime DCT Gdansk S.A. PL 12/2019 new part of the terminal defined Modernisation of road access to Szczecin Port: Maritime Gmina Miasto Szczecin PL 69.1 12/2020 Member States / Project Project end Project name Project promoter Countries Total costs category date involved reconstruction of communication network in the area of Międzyodrze Improvement of Szczecin Port access in the area of Zarząd Morskiego Portu Maritime PL 58.8 06/2022 Kaszubski Basin Szczecin i Świnoujście PKP Polskie Linie Kolejowe Improvement of railway connection to Maritime Ports in Maritime S.A. PL 143.7 12/2020 Szczecin and Świnoujście Port of Szczecin/Świnoujście Modernisation of the fairway Świnoujście-Szczecin to a Maritime Urząd Morski w Szczecinie PL 331.8 12/2022 depth of 12.5m Extension and modernisation of technical infrastructure in Zarząd Morskiego Portu Maritime PL 28.2 02/2022 Szczecin and Świnoujście Ports Szczecin i Świnoujście Functional and environmentally friendly access to Maritime Gmina Miasto Świnoujście PL 22.9 12/2019 Świnoujście Port infrastructure, phase I Functional and environmentally friendly access to Maritime Gmina Miasto Świnoujście PL 12.9 12/2021 Świnoujście Port infrastructure, phase II Construction of deep sea berth at the outer port in Świnoujście Zarząd Morskiego Portu Maritime PL 69.8 12/2021 Construction of deep-water quays in the ports of Szczecin Szczecin i Świnoujście and Świnoujście Construction of port infrastructure on development areas Zarząd Morskiego Portu To be Maritime PL 12/2027 of Ostrow Grabowski Peninsula Szczecin i Świnoujście defined Improvement of Port Szczecin access in the area of Dębicki Zarząd Morskiego Portu Maritime PL 83.8 02/2021 Basin Szczecin i Świnoujście Development of multimodal infrastructure and facilities at Maritime PHŚ PL 11.9 n.a. the Container Terminal Świnoujscie Gdansk Airport - extension of registered and hand luggage Airport Gdansk Airport PL 15.7 12/2020 and passenger control system Gdansk Airport - airside infrastructure including taxiways, Airport Gdansk Airport PL 10.1 12/2023 aprons and de-icing aprons Gdansk Airport - extension of cargo and passenger Airport Gdansk Airport PL 24.7 12/2023 Member States / Project Project end Project name Project promoter Countries Total costs category date involved terminals Gdansk Airport - extension of navigation light system on Airport Gdansk Airport PL 3.4 12/2023 auxiliary direction no 1.1 Modernisation of Marynarska street, section Taśmowa st - Airport Urząd m.st. Warszawy PL 11.5 12/2017 Rzymowskiego st Construction of new cargo handling terminal at the LS Airport Services S.A. & Airport PL 15.1 12/2017 Warsaw Chopin Airport (works) DHL Express Poland Port Lotniczy Warszawa- Modernization of airport infrastructure Airport PL 172.7 06/2016 Okęcie Reconstruction of road system in front of the passenger Port Lotniczy Warszawa- Airport PL 19.5 12/2020 terminal of the Warsaw Chopin Airport Okęcie Extension of the north pier of the passenger terminal of Port Lotniczy Warszawa- Airport PL 62.8 12/2019 Warsaw Chopin Airport Okęcie Alternation of safety and documents check points and Port Lotniczy Warszawa- increase of capacity of Terminal A at the Warsaw Chopin Airport PL 8.0 12/2017 Okęcie Airport Construction of a new cargo terminal at the Warsaw Port Lotniczy Warszawa- Airport PL 15.6 12/2019 Chopin Airport Okęcie Katowice Airport -Redevelopment of the runway into the Airport Port Lotniczy Katowice PL 8.0 01/2018 taxiway Katowice Airport - Redevelopment of passenger terminals Airport Port Lotniczy Katowice PL 6.2 06/2018 A and B Katowice Airport - Construction of the new air traffic To be Airport PAŻP PL n.a. control tower defined Katowice Airport - Adaptation of the movement area to Airport Port Lotniczy Katowice PL 2.6 01/2018 CAT II Katowice Airport - Construction of the base of the technical Airport Port Lotniczy Katowice PL 4.5 12/2020 support Katowice Airport - Installation for storing the aviation fuel Airport Port Lotniczy Katowice PL 0.6 12/2019 Katowice Airport - expansion of Cargo apron - stage IIa and Airport Port Lotniczy Katowice PL 9.6 09/2020 Member States / Project Project end Project name Project promoter Countries Total costs category date involved IIb Katowice Airport - extension of Terminal Cargo Airport Port Lotniczy Katowice PL 11.6 12/2027 Katowice Airport - Multi-stage parking extension Airport Port Lotniczy Katowice PL 8.1 08/2020 Katowice Airport - Construction of the second, parallel Airport Port Lotniczy Katowice PL 65.7 12/2033 runway Katowice Airport - Extension of aprons Airport Port Lotniczy Katowice PL 23.9 12/2029 Katowice Airport - Construction of the position of the Airport Port Lotniczy Katowice PL 7.2 12/2025 insulated plane with the de/anti-icing stand. Katowice Airport - Construction of the new passenger Airport Port Lotniczy Katowice PL 87.2 09/2027 terminal D Reconstruction of partially closed railway line no. 182 PKP Polskie Linie Kolejowe Airport PL 131.0 09/2021 Tarnowskie Góry – Zawiercie S.A. Generalna Dyrekcja Dróg S1 express road section Pyrzowice-Podwarpie Airport PL 41.3 03/2020 Krajowych i Autostrad Generalna Dyrekcja Dróg S1 express road section Podwarpie - Dąbrowa Górnicza Airport PL 56.6 07/2021 Krajowych i Autostrad To be Łódź Airport - Extension of parallel taxiway with RET Airport Port Lotniczy Łódź PL n.a. defined Łódź Airport - Implementation of Constant Noise Airport Port Lotniczy Łódź PL 0.1 08/2017 Monitoring System Łódź Airport - Extension of radar - camera security system Airport Port Lotniczy Łódź PL 0.3 n.a. Extention of Rokicinska Street in Lodz from Malownicza Airport Urząd Miasta Łodzi PL 9.7 12/2019 street to the city border Szczecin Airport - Works on airport's infrastructure on Port Lotniczy Szczecin - Airport PL 9.9 12/2020 airside / landside Goleniów Sp. z o.o. Szczecin Airport - Replacement security control units at Port Lotniczy Szczecin - Airport PL 0.9 12/2016 passenger security control zone Goleniów Sp. z o.o. Port Lotniczy Szczecin - Szczecin Airport - Rebuild CCTV system at airport Airport PL 0.5 12/2017 Goleniów Sp. z o.o. Szczecin Airport - Building a new entrance to airport airside Airport Port Lotniczy Szczecin - PL 1.2 12/2018 Member States / Project Project end Project name Project promoter Countries Total costs category date involved zone Goleniów Sp. z o.o. Szczecin Airport - Building a new airport lighting approach Port Lotniczy Szczecin - Airport PL 7.3 12/2020 system cat.II Goleniów Sp. z o.o. Poznań Airport - Modernization Road taxiing Airport Port Lotniczy Poznań-Ławica PL 1.0 12/2019 Poznań Airport - Terminal Modernization Airport Port Lotniczy Poznań-Ławica PL 1.7 12/2019 Poznań Airport - Security Airport Port Lotniczy Poznań-Ławica PL 2.1 12/2019 Poznań Airport - Construction of parking with the Airport Port Lotniczy Poznań-Ławica PL 0.7 12/2018 communication system Poznań Airport - Modernization of aircraft parking aprons Airport Port Lotniczy Poznań-Ławica PL 0.2 12/2016 Poznań Airport - Modernization of Buildings and Structures Airport Port Lotniczy Poznań-Ławica PL 0.4 12/2019 Poznań Airport - Network elements Informatics Airport Port Lotniczy Poznań-Ławica PL 1.9 12/2019 Poznań Airport - Station pre-treatment with rainwater Airport Port Lotniczy Poznań-Ławica PL 7.1 12/2019 distribution system Poznań Airport - Modernization and extension of Runway Airport Port Lotniczy Poznań-Ławica PL 21.9 12/2019 Poznań Airport - Technical Base Airport Port Lotniczy Poznań-Ławica PL 4.8 12/2019 Wrocław Airport - preparation of documentation and construction of the plane de-icing aircraft with a possible Airport Port Lotniczy Wrocław PL 18.1 12/2020 extension of an existing one Wrocław Airport - Construction of the fuel storage Airport Port Lotniczy Wrocław PL 3.5 12/2018 Wrocław Airport - development of internal infrastructure Airport Port Lotniczy Wrocław PL 16.0 12/2020 Wrocław Airport - Extension of parking and kerb Airport Port Lotniczy Wrocław PL 1.0 12/2020 Wrocław Airport - Expressway Airport Port Lotniczy Wrocław PL 20.0 12/2020 Wrocław Airport - decarbonization Airport Port Lotniczy Wrocław PL 5.0 12/2020 Wrocław Airport - adapt to climate change Airport Port Lotniczy Wrocław PL 2.0 12/2020 Development of national infrastructure of air traffic Polska Agencja Żeglugi Airport PL 34.6 01/2020 management Powietrznej Modernisation of Marywilska, Czołowa, Polnych Kwiatów Multimodal Urząd m.st. Warszawy PL 30.5 12/2023 streets, section Trasa Toruńska - Mehoffera st, stage I Link to the junction "Romanów" on the A1 motorway - 3rd Multimodal Urząd Miasta Łodzi PL 19.1 12/2020 Member States / Project Project end Project name Project promoter Countries Total costs category date involved phase of the "Trasa Górna" Schavemaker Invest Sp. z Expansion of Intermodal Terminal in Katy Wrocławskie Multimodal PL 3.0 06/2020 o.o. Study optimizing the functioning and deployment of Przemyslowy Instytut Innovation PL 1.8 06/2018 alternative fuel stations of the TENT-T core network Motoryzacji Deployment of alternative fuels facility infrastructure - LNG Zarząd Morskiego Portu Innovation PL 9.6 12/2027 bunkering and vessel's electric power supply Gdynia Construction of vessel's stand for LNG export in External Zarząd Morskiego Portu Innovation PL 16.3 02/2022 Port of Świnoujście Szczecin i Świnoujście Development of LNG infrastructure in Poland - the pilot Innovation Gaspol Spolka Akcyjna PL 0.0 08/2016 project Multimodal node by Łódź Fabryczna Station Other Urząd Miasta Łodzi PL 100.4 12/2017 Comprehensive integration program for the low-emission Other Urząd Miasta Łodzi PL 161.5 12/2021 public transport system in Lodz Metropolitan Area Construction and reconstruction of tram lines in Łódź Other Urząd Miasta Łodzi PL 27.0 09/2020 Lodz metropolitan tram Other Urząd Miasta Łodzi PL 244.3 12/2020 Studies and activities regarding enhancement of Baltic- PKP Polskie Linie Kolejowe PL, CZ, SK, AT, IT, Rail 2.9 12/2020 Adriatic Rail Freight Corridor 5 offer Spoka Akcyjna SI Port of Trelleborg, Port of "Sweden-Poland Sustainable Sea-Hinterland Services" MoS Swinoujscie, Trelleborg PL, SE 5.4 12/2019 Municipality Sweden-Poland Sustainable Sea-Hinterland Services III MoS Trelleborgs Hamn AB (SE) PL, SE 3.2 12/2020 The study corridor lines: the identification of measures to ensure the TEN-T standards and the elimination of Rail Ministry of infrastructure SI 1.1 12/2017 bottlenecks in the corridor lines Rehabilitation of existing line Maribor-Šentilj-state border Rail Ministry of infrastructure SI 247.0 12/2022 (new tunnel and viaduct) Construction of the 2nd track (new line) on the section Rail Ministry of infrastructure SI 170.0 12/2030 Maribor-Šentilj-state border Railway station Pragersko - Upgrading of the railway hub to Rail Ministry of infrastructure SI 78.1 12/2020 Member States / Project Project end Project name Project promoter Countries Total costs category date involved meet the required TEN-T standards regarding interoperability (first phase) Upgrading of railway line on the section Poljčane - Slovenska Bistrica and railway stations Poljčane and Rail Ministry of infrastructure SI 58.7 12/2019 Slovenska Bistrica Assuring D4 down the whole section Zidani Most - Celje Rail Ministry of infrastructure SI 239.7 12/2020 Upgrading and reconstruction of the section Ljubljana - To be Rail Ministry of infrastructure SI 12/2030 Zidani Most defined Introduction of traffic remote control on a section of Rail Ministry of infrastructure SI 73.5 08/2023 railway line Zidani Most-Ljubljana Creation of siding, pax tracks, extra tracks - Tivoli Arch in Rail Ministry of infrastructure SI 0.5 03/2018 Ljubljana New section assuring direct connection and increase abilities of train station in Ljubljana (project called Tivoli Rail Ministry of infrastructure SI 80.0 12/2022 Arch) Upgrading of station Ljubljana and ensure intermodal hub Rail Ministry of infrastructure SI 180.0 12/2030 with regional lines and new stops Verification of reconstruction or upgrading of the track To be Rail Ministry of infrastructure SI 12/2023 Ljubljana - Divača defined Upgrading the railway line between Ljubljana and Divača Rail Ministry of infrastructure SI 72.8 12/2023 Identification of additional measures for upgrading Rail Ministry of infrastructure SI 0.1 03/2017 (increase abilities) of the existing line Divača-Koper Construction of the 2nd track Divača-Koper Rail Ministry of infrastructure SI 960.0 10/2025 Elimination of bottleneck Bivje on the railway section Rail Ministry of infrastructure SI 21.4 12/2020 Divača-Koper Upgrading of the section Trieste-Divača (Divača-state Rail Ministry of infrastructure SI 61.9 12/2030 border) Signalling enhancement (ERTMS/ETCS…) and implementation of the ETCS level 1 - Pragersko-Šentilj- Rail ERTMS Ministry of infrastructure SI 7.5 04/2022 state border Member States / Project Project end Project name Project promoter Countries Total costs category date involved Implementation of the ITS system on Motorway and Road DARS SI 6.5 10/2019 Highway - Maribor - Celje Connection Brezovica/Dragomer Road DARS SI 33.3 12/2018 Expansion of Ljubljana Motorway ring with connecting legs Road DARS SI 3.3 12/2020 Extension of the motorway section Koseze - Kozarje to 6- Road DARS SI 34.1 12/2020 lanes Implementation of the ITS system on Motorway and Road DARS SI 12.0 10/2020 Highway - Ljubljana ring Implementation of the ITS system on Motorway and Road DARS SI 1.8 10/2017 Highway - Koper Traffic Management Integration in the National Traffic Road Ministry of infrastructure SI 5.6 01/2020 Management Centre 2 Traffic management integration in the National Traffic Road Ministry of Infrastructure SI 4.9 11/2019 Management Centre Implementation of the C-ITS system on Motorway and Road DARS SI 2.0 12/2020 Highway - pilot project Koper - Ljubljana C-Roads Slovenia Road Ministry of Infrastructure SI 2.3 12/2020 Republika Slovenija, Ministrstvo za infrastrukturo C-Roads Slovenia 2 Road SI 3.1 12/2020 (Republic of Slovenia, Ministry of Infrastructure) Implementation of the ITS system on Motorway and Road DARS SI 6.0 10/2020 Highway - resting place Safety Management on HW and MW Road DARS SI 6.0 12/2020 Examination of the number of required parking spaces Road DARS SI 0.5 12/2018 Arrangements for MW and HW in the context of land on Road DARS SI 16.1 12/2030 the former MMP Noise barrier Road DARS SI 50.0 12/2022 Port of Koper - Extension of Pier I Southern side and Maritime Luka Koper d.d. SI 80.0 12/2020 capacity upgrading in order to support the growing Member States / Project Project end Project name Project promoter Countries Total costs category date involved volumes of container business Port of Koper - New berthing facilities in Basin I, II and III Maritime Luka Koper d.d. SI 40.0 12/2020 Port of Koper - New port entry and supporting road Maritime Luka Koper d.d. SI 20.0 12/2020 infrastructure Port of Koper -Construction of additional rail connecting Maritime Luka Koper d.d. SI 20.0 12/2018 infrastructure network within the port Port of Koper - Passenger terminal infrastructure Maritime Luka Koper d.d. SI 3.0 12/2018 Port of Koper - Deepening of the navigational channel in Maritime Ministry of Infrastructure SI 15.0 12/2020 basin II (outside the concession area) Port of Koper - Arrangement of ports back areas Maritime Luka Koper d.d. SI 12.0 12/2020 Port of Koper - Dredging works in port’s basins according Maritime Luka Koper d.d. SI 10.0 12/2020 needs (within the concession area of the port) Port of Koper -Extension of Pier I -Northern side Maritime Luka Koper d.d. SI 60.0 12/2025 Port of Koper - New berthing facilities in Basin I, II and III Maritime Luka Koper d.d. SI 20.0 12/2030 Port of Koper - New port entry and supporting road Maritime Luka Koper d.d. SI 10.0 12/2030 infrastructure Port of Koper -Construction of additional rail connecting Maritime Luka Koper d.d. SI 20.0 12/2030 infrastructure network within the port Port of Koper - Arrangement of ports back areas Maritime Luka Koper d.d. SI 10.0 12/2030 Port of Koper - Dredging works in port’s basins according Maritime Luka Koper d.d. SI 10.0 12/2030 needs (within the concession area of the port) Port of Koper - Extension of Pier II Maritime Luka Koper d.d. SI 100.0 12/2030 Port of Koper - Construction of Pier III Maritime Luka Koper d.d. SI 50.0 12/2030 Connection of Port of Koper to motorway Maritime DARS SI 23.1 12/2023 Airport Ljubljana - Development of airport infrastructure (In the context of the National Spatial Plan will set area for Airport Ministry of Infrastructure SI 1.4 12/2021 the location of the airport and other infrastructure) Slovenian infrastructure Reallocation of the main road Airport SI 5.3 12/2017 agency (DRSI), Aerodrom Member States / Project Project end Project name Project promoter Countries Total costs category date involved Ljubljana, Občina Cerklje na Gorenjskem Renovation and modernization of air navigation services at Air Traffic Control, Ministry Airport SI 0.1 12/2020 the airport - "New pens" of Infrastructure Renovation and modernization of the infrastructure of air Airport Air Traffic Control SI 1.1 12/2018 navigation services Infrastructure manager, Logistic centre (optimization of logistic processes) Airport SI 9.2 12/2022 Aerodrom Ljubljana, d.o.o. FAB CE - Free Route Airspace from the Black Forest to the Airport Air Traffic Control SI 0.3 04/2017 Black Sea (Partnership Project) Air Traffic Management, Partnership Project Airport Air Traffic Control SI 1.7 12/2017 FAB CE - DAM and STAM (Partnership Project) Airport Air Traffic Control SI 0.4 12/2018 Gate One - Free Route Airspace project (Partnership Airport Air Traffic Control SI 1.7 11/2019 Project) Renovation and modernization of airport infrastructure Airport Aerodrom Ljubljana SI 41.8 12/2025 Initial airport operation plan Airport Aerodrom Ljubljana, d.o.o. SI 0.9 05/2017 Upgrading and modernization of Ljubljana container terminal infrastructure for improvement of intermodal Multimodal Slovenian railways SI 150.0 12/2030 transport services and logistics centre Strategy for deployment of alternative fuels infrastructure Ministry of Innovation SI 0.0 08/2017 in Slovenia (in accordance with the Directive 2014/94) Infrastructure Intermodal passenger hub (increasing mobility) Other Ministry of Infrastructure SI 0.5 12/2018 Modernisation of railway corridor State border CZ/SK – Čadca – Krásno nad Kysucou, section Čadca - Krásno nad Rail ŽSR SK 220.0 12/2023 Kysucou (outside) Modernisation of railway node Žilina (documentation + Rail ŽSR SK 390.0 12/2022 construction) Construction of maintenance centre for passenger railway Rail ZSSK SK 56.8 12/2020 vehicles in Zilina Zlatovce – Trenčianska Teplá: railway modernisation Rail ŽSR SK 245.0 12/2017 Member States / Project Project end Project name Project promoter Countries Total costs category date involved Považská Teplá – Žilina: railway modernisation to 160 km/h Rail ŽSR SK 131.0 11/2017 Púchov - Považská Teplá: railway modernisation to 160 Rail ŽSR SK 374.0 01/2020 km/h Devínska Nová Ves - state border SK/AT: railway Rail ŽSR SK 4.8 12/2020 electrification Rail Node Bratislava - Feasibility Study Rail Slovak railways (ZSR) SK 1.3 02/2018 Rail Node Bratislava - Project Documentation Rail Slovak railways (ZSR) SK 25.0 12/2019 Rail Node Bratislava - Works Rail Slovak railways (ZSR) SK 900.0 12/2030 Construction of terminals integrated passenger transport Rail ŽSR SK 20.6 01/2021 in Bratislava - Devínska Nová Ves, implementation Construction of terminals integrated passenger transport Rail ŽSR SK 16.5 05/2021 in Bratislava - Lamačská brána, implementation Construction of terminals integrated passenger transport Rail ŽSR SK 10.3 03/2021 in Bratislava - Patrónka, implementation Construction of terminals integrated passenger transport Rail ŽSR SK 3.0 n.a. in Bratislava - Mladá garda, implementation Construction of terminals integrated passenger transport Rail ŽSR SK 8.6 05/2021 in Bratislava - Trnávka, implementation Construction of terminals integrated passenger transport Rail ŽSR SK 4.5 12/2020 in Bratislava - Ružinov, implementation Construction of terminals integrated passenger transport Rail ŽSR SK 3.0 03/2020 in Bratislava - Vrakuňa, implementation Construction of maintenance centre for passenger railway Rail ŽSR SK 170.6 12/2023 vehicles in Bratislava Terminals integrated passenger transport in Bratislava - Rail ŽSR SK 1.0 02/2020 project documentation The information system of the integrated transport system Rail ŽSR SK 4.7 12/2020 of Bratislava region Implementation of the technical interoperability for TAF Zeleznicna spolocnost Cargo Rail SK 3.1 12/2019 TSI sub system Slowakia, a.s. Member States / Project Project end Project name Project promoter Countries Total costs category date involved Implementation of the technical interoperability for TAP Zeleznica spolocnost Cargo Rail SK 8.7 12/2019 TSI sub system Slovensko, a.s. Delivery and installation of ETCS into 361 series Zeleznicna spolocnost Rail ERTMS SK 2.3 12/2020 locomotives for ZSSK Slovensko, a.s. Motorway D3 Cadca, Bukov - Svrcinovec Road NDS a.s. SK 229.1 12/2020 Oščadnica – Čadca: motorway D3 construction Road NDS a.s. SK 102.2 11/2023 Kysucké Nové Mesto – Oščadnica: motorway D3 Road NDS a.s. SK 303.6 01/2024 construction Žilina Brodno - Kysucké Nové Mesto: motorway D3 Road NDS a.s. SK 411.0 01/2024 construction Žilina Strážov - Žilina Brodno: motorway D3 construction Road NDS a.s. SK 254.9 11/2017 Triblavina junction construction Road NDS a.s. SK 30.2 12/2018 Bratislava – Senec: motorway D1 widening to 8 lanes Road NDS a.s. SK 79.7 09/2020 (Bratislava - Triblavina) Bratislava – Senec: motorway D1 widening to 8 lanes Road NDS a.s. SK 214.4 05/2023 (Triblavina - Senec) Blatné junction construction Road NDS a.s. SK 29.5 12/2017 Blatné – : motorway D1 widening to 6 lanes Road NDS a.s. SK 478.8 02/2027 Construction of Motorway D4 section Rača Junction – Road MDV (MoT) SK 740.8 12/2023 Záhorská Bystrica Construction of Motorway D4 section Bratislava – Road MDV (MoT) SK 860.0 10/2020 Ivanka pri Dunaji sever - Rača Study on Motorway D4 Bratislava Ring Road MDV (MoT) SK 22.5 12/2020 Motorway ITS Bratislava Node Road NDS a.s. SK 24.5 12/2017 Slovensky plynarensky fuelCNG Road SK 18.5 12/2020 priemysel, a.s. GreenWay Infrastructure NCE - AdvancedEvNet Road SK 7.3 12/2020 s.r.o. LNG: Fuelling Renewable Transport in the Visegrad Road ST Logistic s.r.o SK 32.4 12/2020 Member States / Project Project end Project name Project promoter Countries Total costs category date involved countries Feasibility study for the Modernization of public port of Verejné prístavy, a.s. (Public IWW SK 2.5 12/2020 Bratislava ports, jsc) Modernization of infrastructure in cargo port BA and Verejné prístavy, a.s. (Public IWW SK 63.2 12/2024 completion of bollards in cargo port ports, jsc) Modernization and completion of the port quays and hard Verejné prístavy, a.s. (Public IWW SK 40.4 12/2024 standings ports, jsc) Verejné prístavy, a.s. (Public Passenger port - waterfront Eurovea in IWW SK 7.0 12/2023 ports, jsc) Verejné prístavy, a.s. (Public Port Safety Protection IWW SK 22.6 12/2021 ports, jsc) Verejné prístavy, a.s. (Public Waterway public transport - feasibility study IWW SK 1.0 12/2019 ports, jsc) Verejné prístavy, a.s. (Public Waterway public transport - works IWW SK 30.0 06/2020 ports, jsc) ZSR Intermodal Terminal Bratislava - 1st construction Multimodal Slovak railways (ZSR) SK 50.0 02/2020 phase Construction of the LNG Terminal in public port of Verejné prístavy, a.s. (Public Innovation SK 12.0 12/2023 Bratislava ports, jsc) GreenWay Infrastructure, NCE - FastEvNet Innovation SK, PL 4.8 03/2019 s.r.o.