M25 Junction 28 Improvement Scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering

Total Page:16

File Type:pdf, Size:1020Kb

M25 Junction 28 Improvement Scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering Rule 8(1)(e) Planning Act 2008 Infrastructure Planning (Examination Procedure) Rules 2010 Volume 9 January 2021 M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering Infrastructure Planning Planning Act 2008 The Infrastructure Planning (Examination Procedure) Rules 2010 M25 junction 28 scheme Development Consent Order 202[x ] 9.8 STATEMENT OF COMMON GROUND WITH LONDON BOROUGH OF HAVERING Rule Number: Rule 8(1)(e) Planning Inspectorate Scheme TR010029 Reference Application Document Reference TR010029/EXAM/9.8 Author: M25 junction 28 scheme, Project Team, Highways England Version Date Status of Version 0 21 January 2021 Deadline 1 Planning Inspectorate scheme reference: TR010029 Application document reference: TR010029/EXAM/9.8 Page 2 of 39 M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering STATEMENT OF COMMON GROUND This Statement of Common Ground has been prepared and agreed by (1) Highways England Company Limited and (2) London Borough of Havering Signed……………………………………. Project Manager on behalf of Highways England Date: [DATE] Signed……………………………………. Team Leader Transport Planning on behalf of London Borough of Havering Date: 20/01/2021 Planning Inspectorate scheme reference: TR010029 Application document reference: TR010029/EXAM/9.8 Page 3 of 39 M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering Table of contents Chapter Pages 1. Introduction 5 1.1 Purpose of this document 5 1.2 Parties to this Statement of Common Ground 5 1.3 Terminology 5 2. Record of engagement 7 3. Issues 11 3.1 Introduction and general matters 11 Tables Table 2-1 Record of engagement 7 Table 3-1 Table of issues and matters to be agreed – Version as at 21 January 2020 13 Table 3-2 Examination documents 38 Planning Inspectorate scheme reference: TR010029 Application document reference: TR010029/EXAM/9.8 Page 4 of 39 M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering 1. Introduction 1.1 Purpose of this document 1.1.1 This Statement of Common Ground (“SoCG”) has been prepared in respect of the application (“the Application”) for the M25 junction 28 scheme (“the Scheme”’) submitted by Highways England Company Limited (“Highways England”) to the Secretary of State (“Secretary of State”) for a Development Consent Order (“the Order”) under section 37 of the Planning Act 2008 (“PA 2008). 1.1.2 This SoCG does not seek to replicate information which is available elsewhere within the Application documents. All documents are available on the Planning Inspectorate website. 1.1.3 The SoCG has been produced to confirm to the Examining Authority where agreement has been reached between the parties to it, and where agreement has not (yet) been reached. SoCGs are an established means in the planning process of allowing all parties to identify, and so focus on, specific issues that may need to be addressed during the examination. 1.2 Parties to this Statement of Common Ground 1.2.1 This SoCG has been prepared by (1) Highways England as the Applicant and (2) London Borough of Havering. 1.2.2 Highways England became the Government-owned Strategic Highways Company on 1 April 2015. It is the highway authority in England for the strategic road network and has the necessary powers and duties to operate, manage, maintain and enhance the network. Regulatory powers remain with the Secretary of State. The legislation establishing Highways England made provision for all legal rights and obligations of the Highways Agency, including in respect of the Application, to be conferred upon or assumed by Highways England. 1.2.3 London Borough of Havering is a host authority in respect of the application and as such is a local authority under section 56A of the Planning Act 2008. 1.2.4 This SoCG with the London Borough of Havering also covers heritage and archaeological related issues. A letter to the Examining Authority from Historic England dated 07 December 2020 notes that Historic England do not intend to enter into a SoCG with Highways England and that archaeological and heritage advise is provided through London Borough of Havering. 1.3 Terminology 1.3.1 In Table 3-1 in the Issues section of this SoCG: • “Agreed” indicates area(s) of agreement Planning Inspectorate scheme reference: TR010029 Application document reference: TR010029/EXAM/9.8 Page 5 of 39 M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering • “Under discussion” indicates area(s) of current disagreement where resolution remains possible, and where parties continue discussing the issue to determine whether they can reach agreement by the end of the examination • “Not Agreed” indicates a final position for area(s) of disagreement where the resolution of divergent positions will not be possible, and parties agree on this point. 1.3.2 It can be taken that any matters not specifically referred to in the Issues section of this SoCG are not of material interest or relevance to London Borough of Havering and therefore have not been the subject of any discussions between the parties. As such, those matters can be read as agreed, only to the extent that they are either not of material interest or relevance to London Borough of Havering. Planning Inspectorate scheme reference: TR010029 Application document reference: TR010029/EXAM/9.8 Page 6 of 39 M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering 2. Record of engagement 2.1.1 A summary of the meetings and correspondence that has taken place between Highways England and London Borough of Havering in relation to the Application is outlined in Table 2-1. Table 2-1 Record of engagement Date Form of Key topics discussed and key outcomes correspondance Local authority liaison meetings Greater London Archaeological Advisory Service Stakeholders (GLAAS) accepted invitation but were not 8 June 2016 Meeting subsequently contacted. Minutes were provided in 2017. Atkins set out an approach to baseline data gathering; 29 air photo assessment, geophysical survey, possible November Email consultation trench evaluation near river, borehole information. 2016 GLAAS agree this. 29 March Email of WSI GLAAS comments on WSI for geophysics work. 2017 17 August GLAAS further comments WSI for geophysics work Email of WSI 2017 prepared by AOC. 15 EIA Scoping November GLAAS provide scoping comments to PINS. Notification 2017 7 January GI locations GLAAS agree watching brief on GI locations and 2018 monitoring proposals receive PEIR. 8 January AOC Desk based GLAAS receive DBA. 2019 assessment 11 January Statutory GLAAS comments sent. 2019 Consultation WSI for GI Watching 22 July 2019 GLAAS agree second draft of WSI. brief by AOC Problems with GI monitoring, attendance being 28 October Email missed, further investigative works agreed to 2019 compensate. 6 November Supplementary WSI (second draft) to cover above WSI 2019 agreed. 27 February Supplementary GLAAS comments provided to London Borough of 2020 Consultation Havering. Section 56 22 July 2020 Documents received. consultation 5 August Section 56 GLAAS comments to London Borough of Havering. 2020 Consultation 18 November Email Correspondence with Atkins of protocols for advice. 2020 11 April Meeting Workshop to obtain views and assess the extent to Planning Inspectorate scheme reference: TR010029 Application document reference: TR010029/EXAM/9.8 Page 7 of 39 M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering Date Form of Key topics discussed and key outcomes correspondance 2017 and 12 which the three Scheme options considered at the April 2017 time would give effect to achieving the Scheme objectives and to agree actions to improve the value of the Scheme. Environmental stakeholder meeting with local 22 July 2017 Meeting authorities and statutory environmental bodies. 16 August Preferred Route Announcement and the next stage of Meeting 2017 consultation. 13 A DCO knowledge sharing event for host authorities November Meeting to raise awareness of their role in the DCO process. 2017 Officer briefing meeting to discuss design work to 11 January date, programme, the scoping request for the Meeting 2018 environmental impact assessments and planned statutory consultation. 12 December Meeting Member briefing on the Scheme. 2018 20 March Meeting Response to Statutory Consultation discussion. 2019 11 April Meeting Project update - air quality noise and landscape. 2019 15 April Monthly engagement meeting held jointly with Meeting 2019 Brentwood Borough Council. Monthly engagement meeting held jointly with 29 May 2019 Meeting Brentwood Borough Council. 26 June Monthly engagement meeting held jointly with Meeting 2019 Brentwood Borough Council. 12 July 2019 Meeting Quarterly joint local authority forum. 15 Monthly engagement meeting held jointly with Meeting August2019 Brentwood Borough Council. 20 Monthly engagement meeting held jointly with September Meeting Brentwood Borough Council. 2010 28 October Meeting Statutory consultation Feedback Review meeting. 2019 01 November Meeting Quarterly joint local authority forum. 2019 28 Monthly engagement meeting held jointly with November Meeting Brentwood Borough Council. 2019 02 March DCO joint Local Authority Forum – draft DCO Meeting 2020 documents. 03 July 2020 Meeting Proposed approach to photomontages. 27 July 2020 Meeting Update on application and SoCG. Planning Inspectorate scheme reference: TR010029 Application document reference: TR010029/EXAM/9.8 Page 8 of 39 M25 junction 28 improvement scheme TR010029 9.8 Statement of Common Ground with London Borough of Havering Date Form of Key topics discussed and key outcomes correspondance 16 Meeting Update meeting on traffic modelling. October2020 22 October Update meeting to discuss the burial ground/Putwell Meeting 2020 Bridge caravan park. 28 October Update meeting to discuss SoCG/cumulative Meeting 2020 impacts/Code of construction practice (CoCP).
Recommended publications
  • The London Borough of Havering (Rainham and Beam Park Housing Zone Regeneration Area) Compulsory Purchase Order 2019 No
    The London Borough of Havering (Rainham and Beam park Housing Zone Regeneration Area) Compulsory Purchase Order 2019 No. 1 THE LONDON BOROUGH OF HAVERING (RAINHAM AND BEAM PARK, NEW ROAD, RAINHAM) COMPULSORY PURCHASE ORDER 2019 No. 1 THE TOWN AND COUNTRY PLANNING ACT 1990 THE LOCAL GOVERNMENT (MISCELLANEOUS PROVISIONS) ACT 1976 AND THE ACQUISITION OF LAND ACT 1981 THE LONDON BOROUGH OF HAVERING STATEMENT OF REASONS October 2019 1 The London Borough of Havering (Rainham and Beam park Housing Zone Regeneration Area) Compulsory Purchase Order 2019 No. 1 CONTENTS 1. Introduction 2. Location and Description of the Order Land 3. The Scheme 4. Planning Policy Context 5. The Justification for Compulsory Purchase 6. Human Rights and Equality 7. Consultations and Negotiations 8. Related Orders 9. Known Obstacles to the development 10. Conclusion 11. Additional Information Appendix 2 The London Borough of Havering (Rainham and Beam park Housing Zone Regeneration Area) Compulsory Purchase Order 2019 No. 1 1 Introduction 1.1 The London Borough of Havering (“the Council”) has made The London Borough of Havering (Rainham and Beam Park Housing Zone Regeneration Area) Compulsory Purchase Order 2019 No. 1 (“the Order”) pursuant to the statutory powers contained in s226 (1)(a) of the Town and Country Planning Act 1990 as amended (“the 1990 Act”) and associated provisions within section 13 of the Local Government (Miscellaneous Provisions) Act 1976 (“the 1976 Act”). This Statement of Reasons (“this Statement”) is a non-statutory statement provided in compliance with paragraph 154 of the Department of Communities and Local Government (“the DCLG”) “Guidance on Compulsory Purchase Process and The Critchel Down Rules for the disposal of surplus land acquired by, or under the threat of, compulsion” published 29th October 2015 and last updated on 28th February 2018 (“the CPO Guidance”) and it is made in accordance with Cabinet resolution of 10th October, 2018.
    [Show full text]
  • SEGRO.Com/PARKRAINHAM
    NEW WAREHOUSE / OFFICE / INDUSTRIAL SPACE SEGRO.com/PARKRAINHAM INSPIRATIONAL WELCOME TO THE INSIDE AND OUT ENTERPRISE The Enterprise Quarter is an ideal place to work, with like-minded people QUARTER together in modern business premises with exceptional facilities, and attractive landscaped surroundings. The Enterprise Quarter offers progressive office, warehouse and industrial space from 552 sq ft to 3,738 sq ft, specifically designed for start-ups and small businesses with a desire to grow. FLEXIBLE LEASES STARTING OPPORTUNITY TO UPGRADE FROM 3 YEARS WITH LIMITED TO A LARGER UNIT AS YOUR REPAIR OBLIGATION BUSINESS GROWS ONSITE OFFICE FACILITIES ACCESS TO COLLABORATIVE AVAILABLE, INCLUDING MEETING BUSINESS SUPPORT, ROOMS, BREAKOUT AREAS AND TRAINING AND DEVELOPMENT KITCHEN SPACE OPPORTUNITIES Computer generated image of The Enterprise Quarter 2 3 ASPIRATION PLUS ENTERPRISE EQUALS SEGRO HAS ESTABLISHED A RANGE OF RELATIONSHIPS WITH SUCCESS LOCAL ORGANISATIONS THAT CAN PROVIDE CUSTOMERS WITH A RANGE OF BUSINESS SUPPORT, The Enterprise Quarter offers features with ADVICE AND GUIDANCE. THESE growing businesses in mind. Flexible leases, ORGANISATIONS INCLUDE together with additional support services LONDON RIVERSIDE BUSINESS provide an optimum working environment IMPROVEMENT DISTRICT (BID), for SMEs. HAVERING COUNCIL AND CEME. Easy In / Out Inclusive Leases – Buildings insurance included in rent Flexible leases with service and insurance – Responsibility to maintain the built into the rent – so no additional interior of the property only service charges. – 3 months’ rent deposit Track Record Developer & Landlord Of Choice ABOUT SEGRO – Simple, easy to understand leases SEGRO has a track record of offering With over 95 years experience of Collaboration SEGRO is a UK Real Estate – Enterprise 1: 3 year lease with flexible, affordable properties to creating industrial space to support Investment Trust (REIT), and the Tenant only break at 12 months, Our links with local organisations mean help small businesses to thrive.
    [Show full text]
  • Thames Chase, Beam & Ingrebourne Area Framework
    All Thames Chase, Beam & Ingrebourne London Area framework Green Grid 3 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 9 Strategic Context 12 Vision 14 Objectives 18 Opportunities 20 Project Identification 22 Project update 24 Clusters 26 Projects Map 28 Rolling Projects List 32 Phase Two Delivery 34 Project Details 50 Forward Strategy 52 Gap Analysis 53 Recommendations 55 Appendices 56 Baseline Description 58 ALGG SPG Chapter 5 GG03 Links 60 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA03 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www.london.gov.uk/publication/all-london- green-grid-spg . Cover Image: The river Rom near Collier Row As a key partner, the Thames Chase Trust welcomes the opportunity to continue working with the All Foreword London Green Grid through the Area 3 Framework.
    [Show full text]
  • M25 Junction 28 Local Impact Report
    2021 M25 Junction 28 Local Impact Report LONDON BOROUGH OF HAVERING Guidance for the Development of the Local Impact Report ....................... 2 Executive Summary ................................................................................... 4 M25/28 Capacity Improvement Scheme .................................................. 18 Traffic Issues in the Borough ................................................................... 19 Road Safety ............................................................................................. 20 Borough Constraints Maps ...................................................................... 24 Details of the proposal relevant to the London Borough of Havering ....... 27 Relevant Planning History and Any Issues Arising .................................. 30 Relevant Development Plan Policies ....................................................... 35 Policy Compliance ................................................................................... 42 Topic Specific Issues ............................................................................... 50 Contaminated Land .................................................................................. 57 Built Heritage ........................................................................................... 59 Air Quality in Havering ............................................................................. 63 Noise ........................................................................................................ 67 Flood
    [Show full text]
  • Brochure Are Indicative Only
    LONDON LIVING WITH SPACE AND STYLE Lowen Apartments is a brand new collection of one and two bedroom Shared Ownership homes, ideal for first time buyers - close to leafy nature yet perched on the edge of London. START LIVING YOUR BEST LIFE Lowen Apartments represents the final phase of the Orchard Village development in Rainham, in the London Borough of Havering. It’s a recently revitalised neighbourhood that has blossomed into a thriving community of residents, both existing and new. Thanks to Shared Ownership you have the chance to be a part of this exciting final piece of the puzzle. Whether you’re a couple looking for your first base, a young family needing space to grow, or a long-time local wanting to stay, Lowen Apartments has everything you need to move right in – and simply start living. Computer generated image is indicative only 3 Computer generated image is indicative only FIRST TIME FOR EVERYTHING For those just beginning their adventure in home ownership, Lowen Apartments is a collection of one and two bedroom homes arranged in an elegantly curving contemporary block over five storeys. Every apartment has private outdoor space and comes with a parking space, while each resident has access to a private landscaped communal garden situated in the centre of the block. But best of all it’s yours. No more private renting, goodbye annoying flatmates! Hello privacy, space, and permission to stick things on the wall. You won’t need to get the paintbrushes out either – everything is sparkling new and tip-top. Pick up the keys and move straight in, hassle free.
    [Show full text]
  • 021 Rainham and Beam Park Planning Framework. Statement Of
    SUMMARY OF COMMUNITY INVOLVEMENT Phases 1 and 2 RAINHAM AND BEAM PARK MASTERPLAN CONSULTATION Date: November 2015 Prepared by: Victoria Walker Beattie Communications Ltd Phone: 08448 425270 Fax: 0113 2130 301 www.beattiegroup.com [email protected] TABLE OF CONTENTS 1.0 Introduction ......................................................................................................... 3 2.0 Policy Context ...................................................................................................... 5 3.0 Approach to Consultation .................................................................................... 8 4.0 Engagement with Consultees .............................................................................. 12 5.0 Public Consultation Events .................................................................................. 17 6.0 Consultation Feedback ........................................................................................ 28 7.0 Design Response to Consultation Activities ......................................................... 32 8.0 Conclusion .......................................................................................................... 37 APPENDICES APPENDIX A – Correspondence with stakeholders APPENDIX B – Exhibition boards March 2015 APPENDIX C – Stakeholder Workshop report 2 1. INTRODUCTION 1.1. The purpose of this Summary of Community Involvement (SCI) is to outline the consultation undertaken with various stakeholders in the production of a development masterplan
    [Show full text]
  • LONDON BOROUGH of HAVERING Boundary Commission Review Part
    LONDON BOROUGH OF HAVERING Boundary Commission Review Part 2 Submission The Local Government Boundary Commission for England CONTENTS 1 – Summary 2 – About the Borough 3 – Summary of Proposed Warding Arrangements 4 – Ward by Ward Proposals a. Bedfords b. Berwick Pond c. Beam Park d. Collier Row e. Cranham f. Elm Park g. Emerson Park h. Gidea Park i. Gooshays j. Harold Wood k. Harrow Lodge l. Heaton m. Hylands n. Mawneys o. Pettits p. Rainham & Wennington q. Rush Green r. St Andrew’s s. St George’s t. South Hornchurch u. Squirrels Heath v. Upminster 1. SUMMARY The Local Government Boundary Commission for England (LGBCE) is undertaking a review of the London Borough of Havering’s local government electoral arrangements. The outcome of the review being implemented in readiness for the 2022 Council elections. In September 2019, the Council recommended to the Commission that it retain its existing cohort size of 54 (Part 1 submission). The Commission subsequently informed the Council that it was minded to agree to the proposal. For its Part 2 submission on warding arrangements, the Council proposes a pattern of 22 wards across a total membership of 56 councillors. The proposal gives a councillor / elector ratio of 1:3728 (by 2025). The Council considers that it has drawn up a ward arrangement which the Boundary Commission will find acceptable by meeting the statutory criteria for a successful electoral review. 2. ABOUT THE BOROUGH Havering is an outer London borough and the third largest in London, comprising 43 square miles. It is mainly characterised by suburban development, with almost half of the area dedicated to open green space, particularly to the east of the borough.
    [Show full text]
  • Beam Park, Dagenham and Rainham in the London Boroughs of Barking & Dagenham and Havering Planning Application Nos
    representation hearing report addendum GLA/2933a/04 28 September 2018 Beam Park, Dagenham and Rainham in the London Boroughs of Barking & Dagenham and Havering planning application nos. 17/01307/OUT and P1242.17 This addendum sets out various factual updates, clarifications and corrections which need to be considered in conjunction with the Representation Hearing Report originally published on 13 September 2018 (GLA ref: GLA/2933a/03). Representations to the Mayor Since publication of the report, a representation has been made to the Deputy Mayor from the Environment Agency, confirming that the revisions to the scheme raise no objection to the scheme, reiterating points and suggested conditions, previously raised to Barking & Dagenham and Havering Councils. The additional representation received does not raise any further material considerations that have not already been raised and considered in the Representation Hearing Report. Amendments to the report To clarify: • Paragraphs 4 - 6 should read: “Assistant Director – Planning or the Executive Director of Development, Enterprise and Environment”. • Paragraph 71 should read: “The Mayor and/or GLA officers have received 11 responses (9 in objection, 1 query and 1 letter of support) as a result of the public consultation exercise, including 2 from Havering Councillors and 1 from Havering Council. • Table 4 entitled London Affordable Rent should read “proposed weekly rent (exclusive of service charge)”. To clarify, and in accordance with the Affordable Homes 2016 – 2021 Funding Guidance, London Affordable Rent benchmark levels do not include service charges, which can be charged in addition; however, there is the clear expectation that these are transparently set out and affordable to tenants.
    [Show full text]
  • Dagenham, Essex, RM9 6UQ
    Dagenham, Essex, RM9 6UQ Restaurants available to let in Dagenham’s leading leisure destination Location Description Dagenham is located approximately 11 miles east of Central London A purpose built leisure park with over 600 parking spaces, providing and 7 miles west of Junction 30 (Thurrock) of the M25 and 8 miles of a 9 screen Vue cinema, bingo hall, a drive-thru restaurant and a ten east of London Docklands. pin bowling facility. The leisure park is situated immediately adjoining the Asda superstore Furthermore, there is a newly built gym let to The Gym and planning on a highly visible and accessible location, within close proximity to the permission has been granted for the development of a 77 bed regeneration area Barking Riverside, which will provide 10,800 new Travelodge which incorporates a new ground floor restaurant. residential units. E s s H e e x S Alder Walk Mayesbrook P a t a R U r rs t a lo h d p G e w t Park s A124 n t a A d o a e l v R e e e Pa y n y d e e v S e rk L D A R A n r rs t ve rte Po W Rd ilm Rd d i Ivyhouse n ng A1153 he C to ut e n Church Elm Ln o N c G S il Rd o A d emans r v s Hedg t e Dagenham B h u s r S rd Rd g odwa e t Wo r R e d a s C d in n R R ha R Suf e B s m d fo rd g d R lk A n r r d son Ave i o a S R Daw n ll F Rd d a a or n n d d pto w B L em o K S D Sisley Rd t A406 A123 Goresbrook Rd Beam Valley M A124 o e Country Park R P v v a N Circular Rd G e A i r Blake n a a s A13 Ov h r s al a k c L R m n d A o R i N v g d e n S e R d R d d Alfreds Way k R c i n rs Rd O o e w land v Fred ls F n al R
    [Show full text]
  • Freehold for Sale
    FREEHOLD FOR SALE POTENTIAL REDEVELOPMENT OPPORTUNITY FOR A MIXED-USE SCHEME OF RESIDENTIAL AND COMMERCIAL USES (B1 & B8 USE CLASSES). RAINHAM R O AD NOR TH PLANNING ADVICE HAS BEEN SOUGHT FROM THE LOCAL AUTHORITY FOR A MIXED-USE, RESIDENTIAL-LED DEVELOPMENT TO INCLUDE 455 RESIDENTIAL UNITS AND COMMERCIAL SPACE SITUATED ON A PROMINENT CORNER AT THE JUNCTION OF RAINHAM ROAD SOUTH, OXLOW LANE OXLOW LANE AND DAGENHAM ROAD RAINHAM R CURRENTLY USED AS A DISTRIBUTION CENTRE REXEL AND TRADE COUNTER WITH ASSOCIATED WAREHOUSING AND OFFICES O AD S OUTH SITE COMPRISES 6.13 ACRES (2.48 HECTARES) FREEHOLD FOR SALE WITH VACANT POSSESSION UNCONDITIONAL OFFERS INVITED W AL TZ R O MANCHESTER WAY AD ATE USTRIAL EST STERLING IND Site plan for indicative purposes only and not to scale. 2 REXEL D A O R F H R C I D R A U Y H H C I L D L L D O A RO CHIGWELL NE WOODFORD WELLS OUR A AMB Hainault Forest A A L RODING VALLEY H A L A L AD I I NEW RO N H A A U E E L A T R E T R N CHINGFORD HATCH C O E A H L IN L A G A G D GRANGE HILL L R F N L O K A A R S D R H H O A R L O L A L N M R E F O N O A E R D D E R A R O G A D W D WOODFORD A R A AD A L RO T O OR H F AN A D M M O GRANGE HILL S D T A CHASE CROSS O O HIGHAMS PARK O W W R D L HAINAULT A A L E V HIGHAMS PARK O E R W N G H I U WOODFORD H G E I C H N O R TH C F I E R HAINAULT A C N D U A WALTHAM C L A D O HALE END E B R R A R R OA WOODFORD BRIDGE P S O O DM I S R E E A A O D C D A R ­ R RO C A E E D E S R A FOREST T CH S COLLIER ROW O ROMFORD ROAD E WOODFORD GREEN A H REPTON PARK D D C
    [Show full text]
  • Beam Park Planning Prospectus
    APPENDIX 1 FINAL DRAFT TEXT Beam Park Planning Prospectus London Borough of Barking & Dagenham London Borough of Havering BEAM PARK PLANNING PROSPECTUS Aim of the Prospectus The London Borough of Havering and the London Borough of Barking & Dagenham (“the Boroughs”), are working together in partnership and in close consultation with the Mayor of London to deliver the regeneration of the London Riverside area of East London. The Boroughs are mindful of the existing planning policy situation, but in order to achieve an early and successful development wish to explore a more flexible approach to the potential redevelopment of the Beam Park site. Following recent interest from the market, it is considered that a major leisure- led project could provide the essential catalyst to secure regeneration and deliver growth in the wider South Dagenham and Rainham area within which the site is situated. This Prospectus describes the opportunity, the reasons why the Boroughs wish to consider this form of development, key development objectives and an illustration of the planning benefits the Boroughs expect to see delivered, and a summary of planning and transport requirements including planning policy considerations. This prospectus has been prepared as a joint statement from the two Boroughs. It does not seek to change or replace existing planning policy, but does provide an up-to-date statement of the aspirations and attitude of the authorities to achieve a successful regeneration of Beam Park. Context – London Riverside Opportunity Area The London Plan (July 2011) identifies 33 Opportunity Areas which provide London’s major reservoir of land for new housing, commercial and other development, linked to improvements in public transport accessibility.
    [Show full text]
  • The London Borough of Havering (Electoral Changes) Order 2021
    Draft Order laid before Parliament under section 59(9) of the Local Democracy, Economic Development and Construction Act 2009; draft to lie for forty days pursuant to section 6(1) of the Statutory Instruments Act 1946, during which period either House of Parliament may resolve that the Order be not made. DRAFT STATUTORY INSTRUMENTS 2021 No. 0000 LOCAL GOVERNMENT, ENGLAND The London Borough of Havering (Electoral Changes) Order 2021 Made - - - - *** Coming into force in accordance with article 1(2) and (3) Under section 58(4) of the Local Democracy, Economic Development and Construction Act 2009( a) (“the Act”) the Local Government Boundary Commission for England(b) (“the Commission”) published a report dated May 2021(c) stating its recommendations for changes to the electoral arrangements for the London Borough of Havering. The Commission has decided to give effect to the recommendations. A draft of the instrument has been laid before Parliament and a period of forty days has expired since the day on which it was laid and neither House has resolved that the instrument be not made. The Commission makes the following Order in exercise of the power conferred by section 59(1) of the Act. Citation, commencement, extent and application 1. —(1) This Order may be cited as the London Borough of Havering (Electoral Changes) Order 2021. (2) This article and article 2 come into force on the day after the day on which this Order is made. (3) Article 3 comes into force— (a) for the purpose of proceedings preliminary or relating to the election of councillors, on the day after the day on which this Order is made; (b) for all other purposes, on the ordinary day of election of councillors in England( d) in 2022.
    [Show full text]