Activity Report 2013
Total Page:16
File Type:pdf, Size:1020Kb
SPAIN - Activity Report 2013 SPAIN ACTIVITY REPORT 2013 AETOS (Asociación Española de Túneles y Obras Subterráneas) C/ Jenner Nº 3-1º Derecha 28010 Madrid (Spain) Web: www.aetos.es Email : [email protected] /[email protected] AETOS is a National Private Association with79 institutional and 235 individual’s members. AETOS working groups are currently working on drafting regulations, technical publications and inventories of tunnels. Some groups organized courses with their members for training. At other times, they focus the work in line with the activities that are developing the ITA working groups, for example doing translations of documents, or similar researches. Active Working Groups are: WG0 – Listing of Tunnels, Recommendations and Technical Publications WG1-5 – Health and safety in works. WG2 – Research WG3-18 – Contractual practices. Education. WG6- 12 – Maintenance, Repair and Shotcrete use. WG9-15 – Underground, Environment and Seismic effects. WG14-17-19 – Mechanisation of excavation, Base tunnels, Conventional tunnelling. WG11-20 – Urban Problems, Underground Solutions. SPAIN - Activity Report 2013 Currently in Spain, the companies’ Olessa of Montserrat - Viladecavalls. members of the Association are working Features: in the following projects: - Length of section: 10.2 km - Tunnels Olessa of 1264 meters Improved Sanitation Network Capacity excavation section 226 m2. Abroñigales Basin. Bending Collector B - Type of excavation: German Method. Abroñigal. Lovat EPB TBM. 3,95 m diameter drill. Tunnel Excavation 2,400 m. Tunnels Inspection Zone 2 (Central - Southern) of Spain from the state highway Reform A-8017 A-2, A-15 motorway network. Provinces of Segovia, Madrid, Medinaceli-Radona and Villanubla. Caceres, Toledo, Cuenca, Guadalajara, Agglomerate extended work in different Murcia, Jaen, Almeria, Granada, Malaga, works: Collaboration with different Seville and Cadiz. The works include the Machinery Parks. inspection of a total of 136 tunnels which together account for more than 87 km. Highway Beasain - Durango. Section: Among them are 20 tunnels over 1.00 Zumárraga East - Link Urretxu / Legazpi. meters and 36 between 500 and 1,000 Features: meters. - Length of section: 2.2 km. - Link Zumarraga Security officials operating under existing - Link Urretxu tunnels on the State Road Network of - Arguisao Tunnel: two tubes of 890 Eastern Andalusia. meters each. The works include the inspection of a total - Viaduct Urola: 266 meters of 41 tunnels totaling more than 35 miles. Safety Responsible for the operational Technical assistance for the construction phase Somport tunnel. This is one of the of C-25 Transversal Arterial. longest road tunnels in Spain, with 8.6 kilometers. Section: Vic - Ruidellots de la Selva. Features: Drafting the study of alternatives to - Length of the trail: 55 km. improve the evacuation and ventilation in - 8 tunnels with lengths between 177 and the underground network of near 1420 meters of excavation sections and Barcelona. The study undertaken by the between 83,27 and 116,89 m2. company includes the tunnels in central - Type of excavation: NMA. Barcelona, Terrassa and Sabadell. In total there are 9 tunnels that together add up Supervision of the construction of the to 31.9 meters, with lengths between motorway Orbital Barcelona. Section: 6,313 and 1,140 meters. SPAIN – Activity Report 2013 ADIF - HIGH SPEED TRAIN TUNNELS IN PROGRESS 2013 REF. SECTION NAME SECTION TUNNEL NAME TUNNEL EXCAV. LENGHT LENGHT METHOD (m) HSL MADRID-BADAJOZ.SECTION:NAVALMORAL DE LA MATA - CÁCERES NAV.-BAD. Grimaldo - Casas de 6.600,00 Santa Marina 3.595,00 NMA Millán HSL MURCIA MONFORT San Isidro - Orihuela 9.600,00 Callosa 2.055,00 NMA E- MURCIA HSL MADRID -GALICIA.SECTION:ZAMORA-ORENSE Zamora-La Hiniesta 8.100,00 Bolón 430,00 NMA Valorio 193,00 NMA Pedralba de la Pradería- 11.000,0 Pedralba de la Pradería 1.700,00 NMA Túnel de Padornelo 0 Requejo (left tube) 2.405,00 NMA Requejo-Túnel de 4.100,00 Requejo (right tube) 2.404,50 TBM Padornelo Túnel de Padornelo- 7.600,00 Padornelo (right 6.407,00 TBM Lubián tube+D24) Lubián-Tunel de la Canda 3.200,00 Hedroso (right tube) 913,00 NMA E S Lubián (right tube) 1.710,00 NMA N E R O - Túnel de la Canda- 3.800,00 Vilavella (right tube) 902,00 NMA A R Vilavella O Vilavella (left tube) 869,00 NMA M A Z Túnel O Cañizo (right 6.600,00 O Cañizo (right tube) 5.372,00 NMA tube) Túnel O Cañizo (left 5.600,00 O Cañizo (right tube) 45,00 NMA tube) O Cañizo (left tube) 5.369,92 NMA Vilariño-Campobecerros 7.900,00 Bolaños (left tube) 6.780,00 TBM Y (left tube) NMA Campobecerros- 4.200,00 Portocamba (right 3.680,00 NMA Portocamba tube) Portocamba (left tube) 3.745,00 NMA Portocamba-Cerdedelo 2.300,00 Cerdedelo (right tube) 1.694,97 NMA SPAIN – Activity Report 2013 Cerdedelo (left tube) 1.699,94 NMA Túnel del Corno 8.800,00 Corno (right tube) 8.535,60 NMA Corno (left tube) 22,50 NMA Cerdedelo-Prado 8.900,00 Corno (right tube) 34,00 NMA Corno (left tube) 8.551,94 NMA Prado-Porto 9.100,00 Prado (right tube) 7.606,40 TBM Prado (left tube 33,45 TBM access) Corga de Vela (right 1.170,62 NMA tube) Corga de Vela (left 1.171,47 NMA tube) HSL VITORIA-BILBAO-SAN SEBASTIÁN Legutiano-Escoriatza. 5.000,00 Albertia I (left tube) 2.589,00 NMA Subsection I Albertia I (right tube) 2.588,00 NMA Legutiano-Escoriatza. 2.400,00 Albertia II (left tube) 2.089,00 NMA Subsection II Albertia II (right tube) 2.080,00 NMA O A B L I Escoriatza-Aramaio 5.600,00 Induspe 2.170,00 NMA B - A I Amorebieta/Etxano- 3.500,00 Ganzelai. 1.260,00 NMA R O Lemoa T I San Román. 625,00 NMA V Lemoa - Galdakao 5.400,00 Galdakao 1.756,00 NMA Bekea 230,00 NMA Galdakao - Basauri 3.600,00 Zarátamo 2.617,00 NMA N Bergara-Antzuola 4.300,00 Kortaxo-Sakon 3.706,00 NMA Ú R I - A Antzuola-Ezkio/Itsaso 3.600,00 Zumárraga East (tube 2.500,00 NMA R A West 2) G R Zumárraga West (tube 2.495,00 NMA E B 1) : N Antzuola-Ezkio/Itsaso 3.400,00 Zumárraga East (tube 2.829,00 NMA O I T East 2) C E S Zumárraga West (tube 2.851,00 NMA N 1) A O C Ezkio/Itsaso-Beasain 2.500,00 Atsusain 555,00 NMA Z U P I Sorozarreta 1.731,00 NMA U G SPAIN – Activity Report 2013 Beasain-West 1.900,00 Arriaran 479,00 NMA Itola 219,00 NMA Loinatz 370,00 NMA Legorreta 3.600,00 Legorreta 1 1.102,00 NMA Legorreta 2 1.756,00 NMA Tolosa 3.800,00 Mine Tunnel 1 1.518,00 NMA Mine Tunnel 2 1.455,00 NMA Tolosa - Hernialde 3.800,00 Aldaba Txiki 650,00 NMA Auzo Txikia 160,00 NMA Arane 206,00 NMA Montezkue 1.424,00 NMA Urnieta - Hernani 5.200,00 Urnieta 2.620,00 NMA HSL LEÓN-ASTURIAS.SECTION:LA ROBLA - POLA DE LENA (PAJARES VARIANT) South Part 9.800,00 East 9.790,00 TBM A N West 9.790,00 TBM E L E D North Part 14.800,0 East 14.790,0 TBM A L 0 0 O P - West 14.790,0 TBM A L 0 B O Sotiello - Campomanes 4.320,00 West 666,00 NMA R A L East 666,00 NMA TOTAL (m) : 176.218.