- Activity Report 2013

SPAIN ACTIVITY REPORT 2013

AETOS (Asociación Española de Túneles y Obras Subterráneas) C/ Jenner Nº 3-1º Derecha 28010 Madrid (Spain) Web: www.aetos.es Email : [email protected] /[email protected]

AETOS is a National Private Association with79 institutional and 235 individual’s members.

AETOS working groups are currently working on drafting regulations, technical publications and inventories of tunnels. Some groups organized courses with their members for training. At other times, they focus the work in line with the activities that are developing the ITA working groups, for example doing translations of documents, or similar researches.

Active Working Groups are:

WG0 – Listing of Tunnels, Recommendations and Technical Publications WG1-5 – Health and safety in works. WG2 – Research WG3-18 – Contractual practices. Education. WG6- 12 – Maintenance, Repair and Shotcrete use. WG9-15 – Underground, Environment and Seismic effects. WG14-17-19 – Mechanisation of excavation, Base tunnels, Conventional tunnelling. WG11-20 – Urban Problems, Underground Solutions. SPAIN - Activity Report 2013

Currently in Spain, the companies’ Olessa of Montserrat - Viladecavalls. members of the Association are working Features: in the following projects: - Length of section: 10.2 km - Tunnels Olessa of 1264 meters Improved Sanitation Network Capacity excavation section 226 m2. Abroñigales Basin. Bending Collector B - Type of excavation: German Method. Abroñigal. Lovat EPB TBM. 3,95 m diameter drill. Tunnel Excavation 2,400 m. Tunnels Inspection Zone 2 (Central - Southern) of Spain from the state highway Reform A-8017 A-2, A-15 motorway network. Provinces of Segovia, Madrid, Medinaceli-Radona and Villanubla. Caceres, Toledo, Cuenca, Guadalajara, Agglomerate extended work in different Murcia, Jaen, Almeria, Granada, Malaga, works: Collaboration with different Seville and Cadiz. The works include the Machinery Parks. inspection of a total of 136 tunnels which together account for more than 87 km. Highway - Durango. Section: Among them are 20 tunnels over 1.00 Zumárraga East - Link / Legazpi. meters and 36 between 500 and 1,000 Features: meters. - Length of section: 2.2 km. - Link Zumarraga Security officials operating under existing - Link Urretxu tunnels on the State Road Network of - Arguisao Tunnel: two tubes of 890 Eastern Andalusia. meters each. The works include the inspection of a total - Viaduct Urola: 266 meters of 41 tunnels totaling more than 35 miles. Safety Responsible for the operational Technical assistance for the construction phase Somport tunnel. This is one of the of C-25 Transversal Arterial. longest road tunnels in Spain, with 8.6 kilometers. Section: Vic - Ruidellots de la Selva. Features: Drafting the study of alternatives to - Length of the trail: 55 km. improve the evacuation and ventilation in - 8 tunnels with lengths between 177 and the underground network of near 1420 meters of excavation sections and Barcelona. The study undertaken by the between 83,27 and 116,89 m2. company includes the tunnels in central - Type of excavation: NMA. Barcelona, Terrassa and Sabadell. In total there are 9 tunnels that together add up Supervision of the construction of the to 31.9 meters, with lengths between motorway Orbital Barcelona. Section: 6,313 and 1,140 meters. SPAIN – Activity Report 2013

ADIF - HIGH SPEED TRAIN TUNNELS IN PROGRESS 2013

REF. SECTION NAME SECTION TUNNEL NAME TUNNEL EXCAV. LENGHT LENGHT METHOD (m) HSL MADRID-BADAJOZ.SECTION:NAVALMORAL DE LA MATA - CÁCERES

NAV.-BAD. Grimaldo - Casas de 6.600,00 Santa Marina 3.595,00 NMA Millán HSL MURCIA

MONFORT San Isidro - Orihuela 9.600,00 Callosa 2.055,00 NMA E- MURCIA HSL MADRID -GALICIA.SECTION:ZAMORA-ORENSE Zamora-La Hiniesta 8.100,00 Bolón 430,00 NMA

Valorio 193,00 NMA

Pedralba de la Pradería- 11.000,0 Pedralba de la Pradería 1.700,00 NMA Túnel de Padornelo 0 Requejo (left tube) 2.405,00 NMA

Requejo-Túnel de 4.100,00 Requejo (right tube) 2.404,50 TBM Padornelo Túnel de Padornelo- 7.600,00 Padornelo (right 6.407,00 TBM Lubián tube+D24) Lubián-Tunel de la Canda 3.200,00 Hedroso (right tube) 913,00 NMA E

S Lubián (right tube) 1.710,00 NMA N E R O

- Túnel de la Canda- 3.800,00 Vilavella (right tube) 902,00 NMA A

R Vilavella O Vilavella (left tube) 869,00 NMA M A Z Túnel O Cañizo (right 6.600,00 O Cañizo (right tube) 5.372,00 NMA tube) Túnel O Cañizo (left 5.600,00 O Cañizo (right tube) 45,00 NMA tube) O Cañizo (left tube) 5.369,92 NMA

Vilariño-Campobecerros 7.900,00 Bolaños (left tube) 6.780,00 TBM Y (left tube) NMA Campobecerros- 4.200,00 Portocamba (right 3.680,00 NMA Portocamba tube) Portocamba (left tube) 3.745,00 NMA

Portocamba-Cerdedelo 2.300,00 Cerdedelo (right tube) 1.694,97 NMA SPAIN – Activity Report 2013

Cerdedelo (left tube) 1.699,94 NMA

Túnel del Corno 8.800,00 Corno (right tube) 8.535,60 NMA

Corno (left tube) 22,50 NMA

Cerdedelo-Prado 8.900,00 Corno (right tube) 34,00 NMA

Corno (left tube) 8.551,94 NMA

Prado-Porto 9.100,00 Prado (right tube) 7.606,40 TBM

Prado (left tube 33,45 TBM access) Corga de Vela (right 1.170,62 NMA tube) Corga de Vela (left 1.171,47 NMA tube) HSL VITORIA--SAN SEBASTIÁN

Legutiano-Escoriatza. 5.000,00 Albertia I (left tube) 2.589,00 NMA Subsection I Albertia I (right tube) 2.588,00 NMA

Legutiano-Escoriatza. 2.400,00 Albertia II (left tube) 2.089,00 NMA Subsection II Albertia II (right tube) 2.080,00 NMA O A B L

I Escoriatza-Aramaio 5.600,00 Induspe 2.170,00 NMA B -

A

I Amorebieta/Etxano- 3.500,00 Ganzelai. 1.260,00 NMA R

O T I San Román. 625,00 NMA V

Lemoa - Galdakao 5.400,00 Galdakao 1.756,00 NMA

Bekea 230,00 NMA

Galdakao - 3.600,00 Zarátamo 2.617,00 NMA

N - 4.300,00 Kortaxo-Sakon 3.706,00 NMA Ú R I -

A Antzuola-Ezkio/Itsaso 3.600,00 Zumárraga East (tube 2.500,00 NMA R

A West 2) G

R Zumárraga West (tube 2.495,00 NMA E B 1) :

N Antzuola-Ezkio/Itsaso 3.400,00 Zumárraga East (tube 2.829,00 NMA O I

T East 2) C E

S Zumárraga West (tube 2.851,00 NMA

N 1) A O

C Ezkio/Itsaso-Beasain 2.500,00 Atsusain 555,00 NMA Z U P I Sorozarreta 1.731,00 NMA U G SPAIN – Activity Report 2013

Beasain-West 1.900,00 Arriaran 479,00 NMA

Itola 219,00 NMA

Loinatz 370,00 NMA

Legorreta 3.600,00 Legorreta 1 1.102,00 NMA

Legorreta 2 1.756,00 NMA

Tolosa 3.800,00 Mine Tunnel 1 1.518,00 NMA

Mine Tunnel 2 1.455,00 NMA

Tolosa - 3.800,00 Aldaba Txiki 650,00 NMA

Auzo Txikia 160,00 NMA

Arane 206,00 NMA

Montezkue 1.424,00 NMA

Urnieta - Hernani 5.200,00 2.620,00 NMA

HSL LEÓN-ASTURIAS.SECTION:LA ROBLA - POLA DE LENA (PAJARES VARIANT)

South Part 9.800,00 East 9.790,00 TBM A

N West 9.790,00 TBM E L

E D North Part 14.800,0 East 14.790,0 TBM A L 0 0 O P

- West 14.790,0 TBM

A

L 0 B

O Sotiello - Campomanes 4.320,00 West 666,00 NMA R

A L East 666,00 NMA

TOTAL (m) : 176.218