World Bank Document Annex 4 PROCUREMENT PLAN General Public Disclosure Authorized 1. Project Information: Nigeria: Transforming Irrigation Management in Nigeria 2. Bank’s approval Date of the Procurement Plan: May 2014 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement Public Disclosure Authorized Method Threshold Prior Review Procurement Method US$ Threshold ICB (Goods and Non-consulting Equal to and above 1. services) 5,000,000 All NCB (Goods and Non- Equal to or above 2. Consulting Services) Below 5,000,000 US$ 1,000,000 Equal to or above 3 ICB (Works) 20,000,000 All Equal to or above Public Disclosure Authorized 4. NCB (Works) Below 20,000,000 10,000,000 Shopping (Goods) Below US$ 100,000 None Shopping (Vehicles) - From 1st line distributors Below US$ 500,000 None 5. Shopping (Works) Below US$ 200,000 None Public Disclosure Authorized 2. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 3. Procurement Packages with Methods 1 2 3 4 5 6 7 Ref Description Estimated Procureme Domestic Review Comments . Cost nt Preferen by Bank No. US$ Method ce (Prior / million (yes/no) Post) 01 Rehabilitation of 115 ICB No Prior Bakalori Dam and Rehabilitation/Impr ovement of Bakalori Irrigation Scheme 02 Rehabilitation and 85 ICB No Prior Improvement of Kano Irrigation Scheme 03 Rehabilitation and 60 ICB No Prior Extension of Hadejia Valley Irrigation Scheme 04 Rehabilitation of 6 40 ICB No Prior No. Dams 05 Supply and 0.6 NCB No Post Installation of Hydrometric Equipment for Sokoto Rima Basin 06 Flood Plain 1.35 NCB No Prior Mapping for EPP (BIP & MRVIP) 07 Bathymetric Survey 0.20 NCB No Post of Goronyo, Zobe and Bakolori Dams 08 Procurement of 0.3 Shopping No Post Field and Operational Vehicles 09 Procurement of 0.1 Shopping No Post Computers 10 Procurement of 0.1 Shopping No Post Office Equipment III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Method Threshold Prior Review (USD) Threshold (USD) 1. Competitive Methods (Firms); Equal to or above All QCBS, QBS, LCS, FCS 300,000 2. Consultant Qualification Below 300,000 None 3. Single Source Selection (Firms & N/A All Individuals) 4. Individuals N/A Above 100,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods 1 2 3 4 5 6 Ref. No. Description of Assignment Estimated Selection Review Comments Cost Method by Bank US$ (Prior / Post) Million 01 Engineering Supervision 2.7 QCBS Prior of the Rehabilitation of Bakalori Dam and Irrigation Scheme 02 Technical Assistance for 2.0 QCBS Prior Dam Safety Assurance & Training for Dam & Reservoir Dept. and RBDA Staff 03 Dam Safety Panel of 1.0 IC Prior Series of Experts individual consultant contracts on specific aspects of dam 04 Technical Feasibility and 2.0 QCBS Prior detailed Design of Dadin Kowa Irrigation Scheme 05 Engineering Supervision 1.5 QCBS Prior of Rehabilitation and Extension of Kano Rima Irrigation Scheme 06 Engineering Supervision 0.65 QCBS Prior of Rehabilitation and Extension of Hadejia Valley Irrigation Scheme 07 Elaboration of 1.0 QCBS Prior Resettlement Action Plan for Kano River and Hadejia Valley Irrigation Schemes 08 Technical Assistance for 1.5 QCBS Prior WUA in Bakalori and Middle Rima Valley Irrigation Schemes 09 Technical Assistance for 1.0 QCBS Prior WUA in Kano River and Hadejia Valley Irrigation Schemes. 10 Technical Assistance on 4.0 QCBS Prior Farmers-Market Linkages and for the Establishment of FMCs 11 Support to RBDAs; 1.5 QCBS Prior Assessment, capacity Building and Strategic Planning 12 Development of 1.0 QCBS Prior Information Database and information System 13 Development of an 1.0 QCBS Prior Electronic and Document Management System 14 ESIA for Kano River and 0.6 QCBS Prior Hadejia Valley Irrigation Schemes 15 ESIA for Dadin Kowa 0.5 QCBS Prior Irrigation Scheme 16 ESIA for Middle Rima 0.1 IC Prior Valley Irrigation Scheme 17 Development of M&E 0.06 IC Post Manual 18 Development of Financial 0.06 IC Post Management Manual 19 Applied Research Grant 2.3 N/A Prior Grantees will on Irrigated Agriculture be selected competitively on the bases of Call for Research Proposals PROCUREMENT Nigeria : Transforming Irrigation Management in Nigeria PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2017-04-05 Revised Plan Date(s): (comma delineated, leave blank if none)2019-09-05 Project ID: P123112 GPN Date: Project Name: Transforming Irrigation Management in Nigeria Loan / Credit No: IDA / 55060 Executing Agency(ies):Transforming Irrigation Management In Nigeria Federal Coordinating Office WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-TRIMING NCO-12728- CW-RFB / River Training Component 1: Water Works in the Hadejia- Resources Management and Single Stage - One IDA / 55060 Prior Request for Bids Open - National 5,100,000.00 3,663,272.09 Signed 2017-02-09 2017-02-09 2017-05-04 2017-06-19 2017-07-31 2020-06-29 Jama’are River Basin Dam Operation Envelope Located in Jigawa State, Improvement. Nigeria NG-TRIMING NCO-12726- Component 1: Water CW-RFB / Works for Resources Management and Open - Single Stage - One Rehabilitation and IDA / 55060 Prior Request for Bids 125,000,000.00 0.00 Canceled 2017-03-23 2017-03-23 2017-05-18 2017-07-17 2017-09-13 2021-09-06 Dam Operation International Envelope Expansion of Irrigation Improvement. Scheme in KRIS and HVIS NG-TRIMING NCO-14084- CW-RFB / Works for Component 2: Irrigation Open - Single Stage - One Rehabilitation and IDA / 55060 Development and Prior Request for Bids 79,920,874.00 73,941,076.47 Signed 2016-02-01 2016-02-23 2016-05-03 2016-08-06 2017-03-29 2021-03-08 International Envelope Conversion of Bakolori Management. Irrigation Scheme NG-TRIMING NCO-19039- CW-RFB / Rehabilitation of Component 4: Institutional Pending Single Stage - One 4Nos Houses for TRIMING IDA / 55060 Development and Project Post Request for Bids Open - National 239,862.00 0.00 Implementati 2015-11-11 2015-11-11 2015-12-15 2016-01-08 2016-01-18 2016-07-16 Envelope field officers at Bunkure Management. on under KRIP in Kano State FMWR/TRIMING/2018/ICB/ Component 1: Water W/01 / Dam Safety Pending Resources Management and Open - Single Stage - One improvement works of IDA / 55060 Prior Request for Bids 96,000,000.00 0.00 Implementati 2018-06-29 2018-07-27 2018-10-05 2018-11-02 2019-01-25 2022-02-25 Dam Operation International Envelope Bakolori, Zobe and Goronyo on Improvement. dams in two lots FMWR/TRIMING/2018/SH/W/ 01 / Rehabilitation of additional 3 Nos House for Housing of community radio Component 2: Irrigation Under at Hadejia Valley Irrigation Request for Single Stage - One IDA / 55060 Development and Post Open - National 200,000.00 0.00 Implementati 2018-03-31 2018-05-04 2018-10-15 Scheme, Dadinkkowa and Quotations Envelope Management. on Goronyo Irrigation Schemes and Remodeling of Studio rooms at Bakolori and Kano Scheme FMWR/TRIMING/2018/SH/W/ 02 / Upgrading and Securing of 4nos Component 3: Enhancing Pending Agricultural Development Agricultural Productivity Request for Single Stage - One IDA / 55060 Post Open - National 70,000.00 0.00 Implementati 2018-04-25 2018-05-28 2018-09-12 Projects offices allocated for and Support to Value Quotations Envelope on TRIMING project Farmers Chains. Field and Business School activities FMWR/TRIMING/2018/NCB/ Component 3: Enhancing W/01 / Construction of Pending Agricultural Productivity Single Stage - One Farmers Management and IDA / 55060 Post Request for Bids Open - National 4,000,000.00 0.00 Implementati 2018-03-23 2018-04-13 2018-05-25 2018-06-13 2018-07-18 2019-02-22 and Support to Value Envelope Service Delivery Center in on Chains. 4 TRIMING project schemes Page 1 FMWR/TRIMING/2018/NCB/ W/02 / Construction of Tomato Collection Centers in Kano River Irrigation Component 3: Enhancing Pending Scheme to support tomato Agricultural Productivity Single Stage - One IDA / 55060 Post Request for Bids Open - National 700,000.00 0.00 Implementati 2018-03-21 2018-03-26 2018-05-02 2018-05-23 2018-07-20 2018-11-17 farmers in their productive and Support to Value Envelope on alliances with Dangote Chains. tomato processing company and other offtakers in Nigeria FMWR/TRIMING/2018/SH/W/ 04 / Additional works at Kano River Irrigation Scheme, Hadejia Valley Component 2: Irrigation Pending Request for Single Stage - One Irrigation Scheme and IDA / 55060 Development and Post Open - National 200,000.00 0.00 Implementati 2018-03-24 2018-05-03 2018-09-24 Quotations Envelope Bakolori Irrigation Scheme Management. on including one block, fence, gate houses, landscaping and BTC security wire FMWR/TRIMING/2016/ICB/ W/002 / Rehabilitation & Expansion of Kano River Component 1: Water Under Irrigation Scheme (KRIS) Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 125,000,000.00 0.00 Implementati 2017-03-17 2017-03-23 2017-06-29 2017-12-18 2018-05-16 2022-04-29 and Hadejia Valley Irigation Dam Operation International Envelope on Scheme (HVIS) and Dam Improvement.
Recommended publications
  • List of Dams and Reservoirs 1 List of Dams and Reservoirs
    List of dams and reservoirs 1 List of dams and reservoirs The following is a list of reservoirs and dams, arranged by continent and country. Africa Cameroon • Edea Dam • Lagdo Dam • Song Loulou Dam Democratic Republic of Congo • Inga Dam Ethiopia Gaborone Dam in Botswana. • Gilgel Gibe I Dam • Gilgel Gibe III Dam • Kessem Dam • Tendaho Irrigation Dam • Tekeze Hydroelectric Dam Egypt • Aswan Dam and Lake Nasser • Aswan Low Dam Inga Dam in DR Congo. Ghana • Akosombo Dam - Lake Volta • Kpong Dam Kenya • Gitaru Reservoir • Kiambere Reservoir • Kindaruma Reservoir Aswan Dam in Egypt. • Masinga Reservoir • Nairobi Dam Lesotho • Katse Dam • Mohale Dam List of dams and reservoirs 2 Mauritius • Eau Bleue Reservoir • La Ferme Reservoir • La Nicolière Reservoir • Mare aux Vacoas • Mare Longue Reservoir • Midlands Dam • Piton du Milieu Reservoir Akosombo Dam in Ghana. • Tamarind Falls Reservoir • Valetta Reservoir Morocco • Aït Ouarda Dam • Allal al Fassi Dam • Al Massira Dam • Al Wahda Dam • Bin el Ouidane Dam • Daourat Dam • Hassan I Dam Katse Dam in Lesotho. • Hassan II Dam • Idriss I Dam • Imfout Dam • Mohamed V Dam • Tanafnit El Borj Dam • Youssef Ibn Tachfin Dam Mozambique • Cahora Bassa Dam • Massingir Dam Bin el Ouidane Dam in Morocco. Nigeria • Asejire Dam, Oyo State • Bakolori Dam, Sokoto State • Challawa Gorge Dam, Kano State • Cham Dam, Gombe State • Dadin Kowa Dam, Gombe State • Goronyo Dam, Sokoto State • Gusau Dam, Zamfara State • Ikere Gorge Dam, Oyo State Gariep Dam in South Africa. • Jibiya Dam, Katsina State • Jebba Dam, Kwara State • Kafin Zaki Dam, Bauchi State • Kainji Dam, Niger State • Kiri Dam, Adamawa State List of dams and reservoirs 3 • Obudu Dam, Cross River State • Oyan Dam, Ogun State • Shiroro Dam, Niger State • Swashi Dam, Niger State • Tiga Dam, Kano State • Zobe Dam, Katsina State Tanzania • Kidatu Kihansi Dam in Tanzania.
    [Show full text]
  • The Spacio-Temporal Changes of Kiri Dam and Its Implications” in Adamawa State, Nigeria
    International Journal of Scientific and Research Publications, Volume 8, Issue 8, August 2018 469 ISSN 2250-3153 “The Spacio-Temporal Changes of Kiri Dam and Its Implications” In Adamawa State, Nigeria. B. L. Gadiga and I. D. Garandi Department of Geography, Adamawa State University, Mubi, Adamawa State, Nigeria [email protected]/[email protected] +2348064306660 [email protected] +2348030790726 DOI: 10.29322/IJSRP.8.8.2018.p8058 http://dx.doi.org/10.29322/IJSRP.8.8.2018.p8058 ABSTRACT This study focuses on the assessment of the spatial and temporal changes of Kiri lake between 1984 and 2016. The study used both geo-information techniques and field survey to carry out analysis on the spatial as well as the changes in the depth of the lake. Landsat TM and OLI of 1984 and 2016 respectively were digitized in order to determine the extent of surface area changes that has occurred. Field method was used in determining changes in the depth of the lake. The results revealed that the lake has reduced in both surface area and depth. The surface area of the lake in 1984 was 100.3 m2 which reduced to 57.0 m2 in 2016. This means that the surface area of the lake has reduced by 43% within the period of 32 years whereas the depth has reduced by more than half of its original depth. The original depth of which was 20 m has reduced to an average depth of 8.48 m. This revealed that an average siltation of 11.52 m has occurred within the period under study.
    [Show full text]
  • Regional Development Needs and Large-Scale Irrigation Projects in Nigeria: a Case Study
    DOI: 10.36108/ssan/5991.07.0150 5 REGIONAL DEVELOPMENT NEEDS AND LARGE-SCALE IRRIGATION PROJECTS IN NIGERIA: A CASE STUDY Femi Olokesusi and Olusegun Aredta ABSTRACT This paper takes a critical look at the main human problems and issues involved in high technology irrigation farming communities in the Sudano-Sahelian zone of Nigeria. Findings of the study provide ample evidence of rural neglect and low level of satisfaction with the irrigation experience. The harsh eco climatic conditions and degradation of the environment account largely for the weight attached to environmental problems. The results of the study also show that water development projects need to consider issues broader in scope than as conceived at the moment. Finally, water resources projects should be subjected to environmental and socio-economic impact assessment. This and other suggestions made should eliminate observed community problems and non-satisfaction with irrigation projects. INTRODUCTION Since the 1966-73 Sudano-sahelian drought in Nigeria, measures have been taken to mitigate and, if possible, neutralize the adverse consequences of this recurrent climatic 74 Annals of The Social Science Council of Nigeria, No. 7. January-December. 1995 hazard. Prominent among such measures have been the development of irrigation and water resources on a large scale (see Table l).Three major River Basin Development Authorities (RBDAs) have been operating in the region since 1973, namely: Chad, Sokoto-Rima and Hadejia-Jama'are RBDAs. The RBDAs were conceived as agents of rural development: they were set up to plan, formulate and implement comprehensive and integrated rural development programmes, with water resources development serving as the pivot or catalyst.
    [Show full text]
  • Environmental Challenges and the Quest for Social Justice in Dam Communities of Nigeria
    Bangladesh e-Journal of Sociology. Volume 10, Number 2. July 2013 80 Environmental Challenges and the Quest for Social Justice in Dam Communities of Nigeria Ali Arazeem Abdullahi1, Usman A. Raheem2, Saliman Tunde Saliman3. Abstract: While the Nigerian government is focusing its attention on building new dams, the problems and challenges posed by the existing dams to the people and environment across dam communities of Nigeria seem to have been neglected or glossed over. This paper examines the environmental challenges posed by existing dams and how these problems have aggravated grassroots activism and the quest for social justice in dam communities of Nigeria. The paper also examines the institutional arrangement that has been put in place by the government of Nigeria to address these agitations and how effective this might be. On the whole, the paper draws on the concept of community participation to interrogate the socio-cultural and ecologic chasm that certain large dam projects appear to have created between the state and local communities. Keywords: environment, environmental degradation, Dams; HYPADEC; Community participation, Nigeria. Background Dams, especially large ones, function to provide water and energy; they are therefore indispensable mechanisms for economic growth. Large dams4 are also centres of attraction for travelers and tourists. They provide employment for the unemployed and are rich sources of fresh fishes. Following the importance attached to large dams, reports have shown that between 30% and 40% of irrigated land worldwide depend on dams while 19% of world electricity is generated from them (World Commission on Dams [WCD], 2000). By the end of the 20th century, as many as 45,000 large dams have been built across the world (WCD, 2000) with a staggering $2 trillion spent on them (International Rivers Network, [IRN], 2003).
    [Show full text]
  • Effects of Some Physicochemical Parameters on Oreochromis Niloticus in Dadin Kowa Reservoir Gombe State Nigeria
    Int’l Journal of Advances in Chemical Engg., & Biological Sciences (IJACEBS) Vol. 2, Issue 2 (2015) ISSN 2349-1507 EISSN 2349-1515 Effects of Some Physicochemical Parameters on Oreochromis Niloticus in Dadin Kowa Reservoir Gombe State Nigeria *Abubakar U.M., D. M. Umar and Zainab M. Z with possible effects on growth and reproduction are important Abstract—The physicochemical study of Dadin Kowa reservoir considerations of fish farmers (Lamai, et al., 1999). Gombe State Nigeria has been carried out fortnightly over a period of The physico-chemical study of water could also help in six months (May to October, 2014). Water samples were collected understanding of the structure and function of a particular using 250ml sampling bottles and brought to the laboratory for water body in relation to its inhabitant. The chemical elements analysis. Only temperature and transparency were determined insitu. found in water have an effect on biological processes which There were no significant difference (P>0.05) in all the parameters lead to interconversion of energy, production of organic within various months and all the parameters were almost within the tolerable limit for supporting aquatic life. Oreochromis niloticus materials and ultimately to production of aquatic resources were sampled by the local fishermen at the landing sites using such as fisheries and other biological components found in various mesh sizes of gillnet (2.0, 2.5, 3.0cm). Laboratory water ecosystem (Mustapha, 2003). The proper balance of measurements were conducted to determine the length and weight of physical, chemical and biological properties of water in lakes, the fish and this information were used to determine the condition ponds, reservoirs, and rivers is an essential ingredient for factor of the fish.
    [Show full text]
  • The Role of Earth Observation Satellite During the International Collaboration on the 2012 Nigeria Flood Disaster
    IAC-13, B1.5, 10x16566 64th International Astronautical Congress 2013 EARTH OBSERVATION SYMPOSIUM (B1) Earth Observation Applications and Economic Benefits (5) THE ROLE OF EARTH OBSERVATION SATELLITE DURING THE INTERNATIONAL COLLABORATION ON THE 2012 NIGERIA FLOOD DISASTER Olojo Olabamiji Oluwaseun, National Space Research and Development Agency, PMB 437, Garki post office, Abuja, [email protected] Asma T Ibrahim, National Space Research and Development Agency, PMB 437, Garki post office, Abuja,[email protected], Isah Abdulkareem Ahmed, National Space Research and Development Agency, PMB 437, Garki post office, Abuja, [email protected], Oyewumi Ademuyiwa Samsudeen, National Space Research and Development Agency PMB 437, Garki post office, Abuja, [email protected] Adepero Oladeinde, National Emergency Management Agency, Plot 439, Adetokunbo Ademola Crescent, Maitama, Abuja, P.M.B 357 Garki, Abuja, [email protected] Keywords: Disaster; Flood; Collaboration; Economic; PDNA; Earth Observation; Charter; Dam Although the year 2012 flood in Nigeria is the worst ever to have devastated the country in the last fifty years it wasn’t the only flood disaster, notable ones are also the 2010 and 2011 floods. The 2012 flood displaced tens of thousands of people and affected over half of the thirty six states destroying properties running into billions of naira. Farmlands and fertilizers were destroyed, settlements were totally submerged and cultural artifacts were lost. The flood was the result of many underlying factors of which the main ones were the release of water from the Lagdo Dam a reservoir located in Cameroon, and the persistent rain fall due to a changing global climate.
    [Show full text]
  • Appropriation Bill
    Federal Government of Nigeria APPROPRIATION BILL FEDERAL MINISTRY OF WATER RESOURCES 2017 FGN BUDGET PROPOSAL TOTAL TOTAL TOTAL TOTAL NO CODE MDA TOTAL CAPITAL PERSONNEL OVERHEAD RECURRENT ALLOCATION FEDERAL MINISTRY OF WATER 1. 0252001001 1,291,677,344 273,665,578 1,565,342,922 51,153,246,901 52,718,589,824 RESOURCES - HQTRS NIGERIA HYDROLOGICAL SERVICES 2. 0252002001 215,688,828 38,935,101 254,623,929 817,700,000 1,072,323,929 AGENCY 3. 0252037001 ANAMBRA/IMO RBDA 383,777,823 38,935,100 422,712,923 2,619,045,426 3,041,758,349 4. 0252038001 BENIN/OWENA RBDA 308,405,540 30,605,254 339,010,794 755,000,000 1,094,010,794 5. 0252039001 CHAD BASIN RBDA 340,647,380 35,576,963 376,224,343 1,672,545,395 2,048,769,738 6. 0252040001 CROSS RIVER RBDA 338,376,690 38,388,662 376,765,352 4,589,999,067 4,966,764,419 7. 0252041001 HADEJIA-JAMA'ARE RBDA 332,564,227 42,285,000 374,849,227 3,066,340,349 3,441,189,576 8. 0252042001 LOWER BENUE RBDA 347,775,559 27,233,559 375,009,118 1,400,800,000 1,775,809,118 9. 0252043001 LOWER NIGER RBDA 492,627,244 37,127,743 529,754,987 4,991,667,925 5,521,422,913 10. 0252044001 NIGER DELTA RBDA 517,412,412 43,441,662 560,854,074 1,003,000,000 1,563,854,074 11. 0252045001 OGUN/OSUN RBDA 338,994,481 44,471,584 383,466,065 860,259,350 1,243,725,415 12.
    [Show full text]
  • Appropriation Bill
    Federal Government of Nigeria APPROPRIATION BILL SUMMARY BY MDAs 2016 FGN BUDGET PROPOSAL NO CODE MDA TOTAL PERSONNEL TOTAL OVERHEAD TOTAL RECURRENT TOTAL CAPITAL TOTAL ALLOCATION FEDERAL MINISTRY OF 1 0252 6,332,795,809 873,622,924 7,206,418,733 37,000,000,000 44,206,418,733 WATER RESOURCES 6,332,795,809 873,622,924 7,206,418,733 37,000,000,000 44,206,418,733 SUMMARY BY FUNDS 2016 FGN BUDGET PROPOSAL NO CODE FUND TOTAL ALLOCATION 1 021 MAIN ENVELOP - PERSONNEL 6,332,795,809 2 022 MAIN ENVELOP - OVERHEAD 873,622,924 3 031 CAPITAL DEVELOPMENT FUND MAIN 37,000,000,000 44,206,418,733 Budget Office of the Federation Page 1 / 51 2016 FGN BUDGET PROPOSAL Federal Ministry of Finance Federal Government of Nigeria APPROPRIATION BILL FEDERAL MINISTRY OF WATER RESOURCES 2016 FGN BUDGET PROPOSAL NO CODE MDA TOTAL PERSONNEL TOTAL OVERHEAD TOTAL RECURRENT TOTAL CAPITAL TOTAL ALLOCATION FEDERAL MINISTRY OF 1 0252001001 WATER RESOURCES - 1,267,112,688 273,665,579 1,540,778,267 22,296,609,745 23,837,388,012 HQTRS NIGERIA HYDROLOGICAL 2 0252002001 201,669,054 38,935,101 240,604,155 786,127,100 1,026,731,255 SERVICE AGENCY 3 0252037001 ANAMBRA/ IMO RBDA 383,532,543 38,935,100 422,467,643 1,434,869,300 1,857,336,943 4 0252038001 BENIN/ OWENA RBDA 301,729,810 30,605,254 332,335,064 646,000,000 978,335,064 5 0252039001 CHAD BASIN RBDA 369,997,029 35,576,963 405,573,992 1,477,500,000 1,883,073,992 6 0252040001 CROSS RIVER RBDA 326,008,128 38,388,662 364,396,790 1,827,576,837 2,191,973,627 HADEJIA-JAMAĻARE 7 0252041001 335,596,689 29,647,313 365,244,002 865,000,000
    [Show full text]
  • An Assessment of the Impact of Livestock Grazing on Riparian Ecosystem Along Gongola River, Dadin Kowa Yamaltu/Deba Local Government Area, Gombe State, Nigeria
    Jalingo Journal of Social And Management Sciences Volume 1, issue 2 April , 2019 An Assessment of the Impact of Livestock Grazing on Riparian Ecosystem along Gongola River, Dadin Kowa Yamaltu/Deba Local Government Area, Gombe State, Nigeria Lazarus A. Mbaya and Oruonye E. D. Department of Geography, Gombe State University, Gombe, Nigeria Department of Geography, Taraba State University, Jalingo, Nigeria E-mail Address: [email protected] [email protected] Abstract Grazing of livestock is the most widespread land-use practice in Northern part of Nigeria, occupying about 60% of the land surface. These activities are usually carried out along river channels and therefore, impact to a considerable extent on the riparian ecosystem. This study assesses the effects of livestock grazing on riparian ecosystem along Gongola River at Dadin Kowa, Yamaltu Deba LGA, Gombe State, Nigeria. Water samples and laboratory test, field measurements and observation of vegetation species were employed in the study. Descriptive and inferential statistics i.e. T-test was used to analyze the data. The findings revealed that, shrubs are the dominant plant species with 23.17%, followed by neem (Azadiractha indica) 18.30%, Herbs dominating 17.07%, and Mango (magnifera indica) 13.41%. A t-test analysis reveals that there is significant difference in the height and diameter of trees with t-value of 9.087. Plant species that are palatable to animals have witnessed degradation through looping and trampling hence their survivals are at risks. While the largest livestock composition are mainly cows constituting about 52.72%, followed by sheep 40%. Apart from polluting the water, the livestock routes and riparian corridors are characterized by erosion thereby increasing to the siltation/sedimentation of the Gongola River valley.
    [Show full text]
  • Growth Pattern, Diet and Tropical Niche Breadth of the Nile Silver Catfish, Schilbe Mystus (Linne 1758) in Asejire Lake, Southwestern, Nigeria
    Egyptian Journal of Aquatic Biology & Fisheries Zoology Department, Faculty of Science, Ain Shams University, Cairo, Egypt. ISSN 1110 – 6131 Vol. 25(2): 677 – 687 (2021) www.ejabf.journals.ekb.eg Growth Pattern, Diet and Tropical Niche Breadth of the Nile Silver Catfish, Schilbe mystus (Linne 1758) in Asejire Lake, Southwestern, Nigeria Kazeem Kareem1, Nurudeen Olanrewaju2,*, and Bunmi Igbaro1 1Department of Aquaculture and Fisheries Management, University of Ibadan, Nigeria 2Federal College of Freshwater Fisheries Technology, P.M.B 1060, Maiduguri, Nigeria *Corresponding Author: [email protected] ARTICLE INFO ABSTRACT Article History: Schilbe mystus is a valued endemic fish species in the Nigerian Received: Oct. 14, 2020 freshwater, with great potential for culture. Nevertheless, controlled rearing is Accepted: March 22, 2021 currently rare due to the lack of knowledge on its food and feeding habits Online: April 26, 2021 besides other factors. Therefore, growth, food and feeding habits of S. mystus in _______________ Asejire Lake were investigated for six months (July to December, 2018). A Keywords: total of 105 specimens (86.00±14.30 g) were collected from fishers. Samples Nile Silver Catfish, were sexed and grouped according to sizes. Length-weight relationships (LWR) Schilbe mystus, and condition factor were assessed using standard procedures. Gut contents and Growth, niche breadth (Bi) were analyzed and quantified using a standard approach. In Feeding habit, addition, qualitative and quantitative variations in diet were determined Niche breadth, according to sex, size and seasons. Data were analyzed using descriptive Asejire Lake. statistics, chi-square and multiple linear regressions. The LWR indicated negative allometry growth with ‘b’ value of 2.87 and coefficient of determination (R2) of 0.85.
    [Show full text]
  • Some Aspects of Fisheries Ecology in Thomas Dam, Kano Nigeria
    Special Conference Edition, November, 2017 http://dx.doi.org/10.4314/bajopas.v10i1.39S Bayero Journal of Pure and Applied Sciences, 10(1):192 - 197 ISSN 2006 – 6996 SOME ASPECTS OF FISHERIES ECOLOGY IN THOMAS DAM, KANO NIGERIA 1*Nafiu, S. A., 1Badamasi, I., 2Ahmad, M. K., 1Abdullahi, M. T., 3Yelwa, S. I. and 1Ibrahim, B.A. 1Department of Science Laboratory Technology, Kano State Polytechnic, Kano 2Department of Biological Sciences, Bayero University Kano 3College of Art, Science and Remedial Studies, Tudunwada, Kano State *Correspondence author: [email protected] , +23407030918094 ABSTRACT The diversity, length-weight relationship and condition factor of fish species of Thomas Dam, Dambatta Kano were studied fortnightly between November, 2016 and February, 2017. Fish species were collected using line nets, cast nets, hooks and traps; weighted to the nearest gram and standard length measured to the nearest centimeter. A total 313 fishes comprising of 7 families and 11 species were identified. Family cichlidae was predominant(36.7%) represented by T. zilli (21.7%) and Oreochromis niloticus (15.0%). Family Claridae was the second highest in abundance with 24.7% represented by C. garipienus (8.9%), Clarias anguillaris (8.9%) and Heterobranchus sp. (6.7) while Protopteridae represented by Protopterus sp. was the least with 2.8%. Species diversity determined by Shannon Weiner index of diversity, Evenness index and Margalef’s index which revealed the highest value at site A of 1.45, 0.78 and 2.66 while site D had the least with 1.1, 0.64 and 1.72 respectively. Growth coefficient b of the length weight relationship ranged from 0.9 to 2.7 inHeterobranchussp.
    [Show full text]
  • Supporting Report 6 Water Resources Management Plan
    SUPPORTING REPORT 6 WATER RESOURCES MANAGEMENT PLAN WATER RESOURCES MANAGEMENT PLAN Water Resources Management Plan SR6.1 Operation and Maintenance of Existing Dams SR6.1.1 Enhancement of Dam Management SR6.1.2 Dam Safety Management SR6.1.3 Basic Concept for Dam Modification/Rehabilitation SR6.2 Hydrological Monitoring SR6.2.1 Nigeria Hydrological Service Agency (NIHSA) SR6.2.2 Hydrological Monitoring for Surface Water SR6.3 Consideration of Risk Associated with Climate Change and Trans‐boundary Waters SR6.3.1 Climate Change SR6.3.2 Trans‐boundary Water SR6.3.3 Coping Strategy on Risk associate with Climate Change and Trans‐boundary Water SR6.4 Water Environment Management SR6.4.1 Water Environment Conservation SR6.4.2 Water Quality Management SR6.4.3 Problems and Issues on Water Environment Management SR6.4.4 Proposed Plans for Water Environment Management Improvement SR6.5 Water Allocation and Regulation SR6.5.1 Current Condition and Issues on Water Allocation and Regulation SR6.5.2 Proposed Framework on Water Allocation and Regulation SR6.5.3 Proposed Projects The Project for Review and Update of Nigeria National Water Resources Master Plan Contents Page SR 6.1 Operation and Maintenance of Existing Dams ................................................................. SR6-1 SR6.1.1 Enhancement of Dam Management .................................................................................... SR6-1 SR6.1.2 Dam Safety Management.................................................................................................... SR6-4
    [Show full text]