Derailment of Amtrak Tran No. 12 and Sideswipe of Amtrak Train No. 79

Total Page:16

File Type:pdf, Size:1020Kb

Derailment of Amtrak Tran No. 12 and Sideswipe of Amtrak Train No. 79 PB97-917002 NTSB/SIR-97/01 WASHINGTON, D.C. 20594 RAILROAD SPECIAL INVESTIGATION REPORT DERAILMENT OF AMTRAK TRAIN NO. 12 AND SIDESWIPE OF AMTRAK TRAIN NO. 79 ON PORTAL BRIDGE NEAR SECAUCUS, NEW JERSEY, NOVEMBER 23, 1996 6813B Abstract: On November 23, 1996, the National Railroad Passenger Corporation (Amtrak) train No. 12 derailed while crossing Portal Bridge, a swing bridge spanning the Hackensack River in Secaucus, New Jersey. When the train derailed, it sideswiped Amtrak train No. 79, which was crossing the bridge in the opposite direction on an adjacent track. No fatalities resulted, but 42 passengers and crewmembers aboard train No. 12 were injured, as was 1 passenger aboard train No. 79. Estimated cost of the damaged train, track, and signal equipment and site cleanup exceeded $3.6 million. The safety issues discussed in this report are (1) Amtrak management oversight of the inspection, maintenance, and repair of the miter rail assemblies on Portal Bridge; and (2) the effectiveness of Amtrak’s emergency notification procedures. The report also examines the effectiveness of Amtrak locomotive event recorders in capturing critical operational data. As a result of its investigation, the National Transportation Safety Board issued safety recommendations to Amtrak, the Federal Railroad Administration, the Association of American Railroads, and the American Short Line Railroad Association. The National Transportation Safety Board is an independent Federal agency dedicated to promoting aviation, railroad, highway, marine, pipeline, and hazardous materials safety. Established in 1967, the agency is mandated by Congress through the Independent Safety Board Act of 1974 to investigate transportation accidents, determine the probable causes of the accidents, issue safety recommendations, study transportation safety issues, and evaluate the safety effectiveness of government agencies involved in transportation. The Safety Board makes public its actions and decisions through accident reports, safety studies, special investigation reports, safety recommendations, and statistical reviews. Information about available publications may be obtained by contacting: National Transportation Safety Board Public Inquiries Section, RE-51 490 L’Enfant Plaza, S.W. Washington, D.C. 20594 (202) 314-6551 Safety Board publications may be purchased, by individual copy or by subscription, from: National Technical Information Service 5285 Port Royal Road Springfield, Virginia 22161 (703) 487-4600 RAILROAD SPECIAL INVESTIGATION REPORT Adopted: December 18, 1997 Notation 6813B NATIONAL TRANSPORTATION SAFETY BOARD Washington, D.C. 20594 CONTENTS CONTENTS ..............................................................................................................................iii EXECUTIVE SUMMARY .........................................................................................................v INVESTIGATION......................................................................................................................1 Synopsis......................................................................................................................................1 Preaccident Events ......................................................................................................................1 The Accident ...............................................................................................................................4 Survival Factors...........................................................................................................................6 Emergency Response............................................................................................................6 Emergency Preparedness ......................................................................................................7 Injuries ........................................................................................................................................7 Damages .....................................................................................................................................8 Personnel Information..................................................................................................................8 Traincrews............................................................................................................................8 Portal Bridge Operator .........................................................................................................8 Bridge and Building Electrician.............................................................................................8 Train Information ........................................................................................................................8 Train No. 12.........................................................................................................................8 Train No. 79.........................................................................................................................8 Signal Information.......................................................................................................................8 Site Description...........................................................................................................................9 Portal Bridge........................................................................................................................9 Track and Special Trackwork ...............................................................................................9 Postaccident Inspection .............................................................................................................12 Preaccident Bridge Inspections ..................................................................................................13 Operations Information..............................................................................................................13 Meteorological Information.......................................................................................................15 Toxicological Information..........................................................................................................15 Tests and Research....................................................................................................................15 Bridge Tests .......................................................................................................................15 Signal Tests........................................................................................................................15 Bridge Event Recorder Information....................................................................................16 Signal System Event Recorder Information.........................................................................16 Locomotive Event Recorder Information............................................................................16 Metallurgical Information ...................................................................................................18 Other Information......................................................................................................................20 Portal Bridge Miter Rail Configuration History...................................................................20 Previous Defects In and Problems With the Miter Rail System............................................21 Amtrak Postaccident Actions..............................................................................................23 Amtrak Locomotive Event Recorders.................................................................................25 iii Throttle Position Recording.........................................................................................25 Cab Signal Aspect Recording.......................................................................................26 Event Recorder Tests and Inspections..........................................................................27 Federal Oversight of Special Trackwork .............................................................................28 ANALYSIS...............................................................................................................................29 General......................................................................................................................................29 The Accident .............................................................................................................................29 Design of Portal Bridge Miter Rail System.................................................................................30 Maintenance of the Miter Rail System........................................................................................30 Inspection of the Miter Rail System ...........................................................................................31 Removal of the Miter Rail Position Detection Circuits ...............................................................32 Emergency Response.................................................................................................................33 Locomotive Event Recorders.....................................................................................................34 Using Traction Motor Current to Indicate Throttle Position................................................34
Recommended publications
  • GATEWAY PROGRAM OVERVIEW and UPDATE John D
    January 12, 2017 GATEWAY PROGRAM OVERVIEW AND UPDATE John D. Porcari, Interim Executive Director Gateway Program Development Corporation 1 GATEWAY PROGRAM DEVELOPMENT CORPORATION » Incorporated in the state of New Jersey under Title 15A:2-8 New Jersey Domestic Nonprofit Corporation Act. » For coordinating, developing, operating, financing, managing, owning or otherwise engaging in activities to effectuate the transportation project between Penn Station, Newark, New Jersey, and Penn Station, New York, New York currently referred to as the “Gateway Program.” » Four trustees appointed by US DOT, Amtrak, NJ TRANSIT, and NYS DOT, respectively. Gateway Program Development Corporation 2 HOW IT WILL WORK Federal NJ Other/ Amtrak PANYNJ Grants TRANSIT Private Federal Gateway Program Development Loans Corporation Project Delivery NJ Amtrak TRANSIT PANYNJ Consultants/ Contractors Gateway Program Development Corporation 3 WHAT IS THE GATEWAY PROGRAM? » Hudson Tunnel Project » New Hudson River Tunnel » Rehabilitation of Existing North River Tunnel » Replacement of Portal Bridge » Expansion of Penn Station, New York » Capacity and Renewal Projects in New Jersey » Sawtooth Bridges/ Harrison » Portal South Bridge » Secaucus Station and Loops » Operating Rail Yard in NJ » Newark-Secaucus Improvements Gateway Program Development Corporation 4 WHY DO WE NEED GATEWAY? »Existing North River Tunnel, Completed in 1910 Gateway Program Development Corporation 5 SUPERSTORM SANDY CAUSED IRREPARABLE DAMAGE » Superstorm Sandy forced 4-day closure of the NEC in October 2012. » Ongoing damage to internal components requires complete renewal of inundated tunnels. » Tunnel reconstruction requires closure of each tube for outages of ~1.5 years. » Without new tunnel in place, closure would devastate service. » Rebuilding of the existing North River Tunnel will not begin until the new Hudson Tunnel is built and commissioned.
    [Show full text]
  • “Bicentennial Speeches (2)” of the Ron Nessen Papers at the Gerald R
    The original documents are located in Box 2, folder “Bicentennial Speeches (2)” of the Ron Nessen Papers at the Gerald R. Ford Presidential Library. Copyright Notice The copyright law of the United States (Title 17, United States Code) governs the making of photocopies or other reproductions of copyrighted material. Ron Nessen donated to the United States of America his copyrights in all of his unpublished writings in National Archives collections. Works prepared by U.S. Government employees as part of their official duties are in the public domain. The copyrights to materials written by other individuals or organizations are presumed to remain with them. If you think any of the information displayed in the PDF is subject to a valid copyright claim, please contact the Gerald R. Ford Presidential Library. Digitized from Box 2 of The Ron Nessen Papers at the Gerald R. Ford Presidential Library THE WHITE HOUSE WASHINGTON June 28, 1976 MEMORANDUM FOR ROBERT ORBEN VIA: GWEN ANDERSON FROM: CHARLES MC CALL SUBJECT: PRE-ADVANCE REPORT ON THE PRESIDENT'S ADDRESS AT THE NATIONAL ARCHIVES Attached is some background information regarding the speech the President will make on July 2, 1976 at the National Archives. ***************************************************************** TAB A The Event and the Site TAB B Statement by President Truman dedicating the Shrine for the Delcaration, Constitution, and Bill of Rights, December 15, 1952. r' / ' ' ' • THE WHITE HOUSE WASHINGTON June 28, 1976 MEMORANDUM FOR BOB ORBEN VIA: GWEN ANDERSON FROM: CHARLES MC CALL SUBJECT: NATIONAL ARCHIVES ADDENDUM Since the pre-advance visit to the National Archives, the arrangements have been changed so that the principal speakers will make their addresses inside the building .
    [Show full text]
  • Portal Bridge Fact Sheet Summer 2015V2.Indd
    PORTAL BRIDGE REPLACEMENT PROJECT The Portal Bridge Replacement Project will replace an aging obsolete bridge with a new fi xed-span bridge resulti ng in enhanced capacity and reliability along the Northeast Corridor. PROJECT OVERVIEW The Portal Bridge is a two-track, moveable, swing-span bridge PROJECT SUMMARY that crosses over the Hackensack River in Hudson County, New Timeline Esti mated 5-year constructi on period Jersey connecti ng Newark, New Jersey and Penn Stati on, New York. This secti on of the Northeast Corridor is used solely by Am- Cost $940 million (2013 esti mate) trak and New Jersey Transit commuter rail service. Constructed Partners New Jersey Transit, Amtrak and US DOT Federal Rail- over a century ago, the bridge is one of the oldest pieces of infra- road Administrati on structure along the Northeast Corridor. Due to its age and inten- sity of use, the bridge is costly and diffi cult to maintain in work- ing order. The bridge, which hosts about 450 trains per weekday, was esti mated to cost approximately $940 million in 2013 dol- creates a bott leneck along the busy Northeast Corridor that con- lars and will proceed with the cooperati on of New Jersey Tran- fl icts with marine traffi c, limits operati ng speeds and impedes sit and Amtrak, as soon as funding can be secured. The recently effi cient and reliable passenger rail service. The bridge requires completed design process involved a preliminary design phase replacement in order to meet expected future travel demand. for which costs of $31 million were shared between New Jersey Transit and Amtrak, and fi nal design, funded by a Federal Rail- Amtrak and New Jersey Transit have completed several planning road Administrati on grant of $38.5 million.
    [Show full text]
  • Portal Bridge Capacity Enhancement Project FEIS
    Chapter 4: Transportation Effects A. INTRODUCTION AND METHODOLOGY This chapter assesses the potential impacts of the project alternatives on transportation conditions in the New York-New Jersey metropolitan area and the entire Northeast Corridor. Since the Portal Bridge is a vital link on the Northeast Corridor, the project alternatives could result in effects over a larger area than many of the other environmental resources examined in this FEIS. The effects of the project alternatives on the capacity and reliability of Amtrak and NJ TRANSIT’s crossing of the Hackensack River could have a positive effect on regional and commuter rail travel along the Northeast Corridor. This could lead to changes in travel patterns and modes that are discussed below. Therefore, the transportation impact assessment includes a discussion of regional issues, with a focus on the critical trans-Hudson corridor. The analysis presented in this chapter includes an evaluation of current and future transportation infrastructure within the project study area, including intercity rail, public transportation (including public and private bus service, commuter and light rail, and ferry services), navigable waters, and the roadway system. B. EXISTING CONDITIONS The importance of public transportation (including bus, rail, and ferry) in northern and central New Jersey is reflected in the mode shares for the different types of trips made in the region. As shown in Table 4-1, while intra-New Jersey trips were predominately auto-based, trans-Hudson trips are evenly split between automobiles and public transportation. This illustrates the importance of public transportation in providing access to New York City for employment, entertainment, shopping, education, and other trips.
    [Show full text]
  • Regional Transit Projects Project Sheet | Portal Bridge Replacement (Portal North)
    Appendix B Capital Plan Project Sheets Regional Transit Projects Project Sheet | Portal Bridge Replacement (Portal North) Description The existing Portal Bridge is a ±960-foot long structure which carries the Existing: Portal Bridge Northeast Corridor (NEC) over the Hackensack River between Newark Penn Station and Secaucus Junction. The existing movable, swing span bridge was constructed in 1910, is 110-years old, and has exceeded its originally intended service life. Due to its age and frequency of use, the movable bridge is costly and difficult to maintain and experiences frequent breakdowns. The two-track bridge creates a bottleneck between the four-track territories to the east and west and requires train speed reductions of 30% which contributes to a decrease in rail service reliability. Given its low vertical clearance to the river, frequent bridge openings are required to accommodate marine traffic. Also, mechanical component malfunctions often cause the bridge to be open for extended periods of time, resulting in frequent, lengthy delays of rail service on the NEC. Additionally, the existing bridge does not have enough capacity to accommodate anticipated future demand. If funded, this project would replace the existing bridge with a higher, more reliable, double track fixed bridge on a new alignment to the north of the existing bridge. The increased vertical profile would eliminate interruptions to rail service due to required bridge openings. The new north bridge would also eliminate speed restrictions, thereby improving Proposed: New Bridge rail operation and capacity across the span. A second, two-track southern bridge, Portal South, is contemplated separately as part of the overall Gateway Program, which when complete would substantially increase operational capacity along this critical length of the NEC.
    [Show full text]
  • Notice of Meeting
    Bill Shuster Peter A. DeFazio Chairman Ranking Member Mathew M. Sturges Katherine W. Dedrick Staff Director Democratic Staff Director September 29, 2017 SUMMARY OF SUBJECT MATTER TO: Republican Members, Subcommittee on Railroads, Pipelines, and Hazardous Materials FROM: Majority Staff, Subcommittee on Railroads, Pipelines, and Hazardous Materials RE: Subcommittee Hearing on “Building a 21st Century Infrastructure for America: Rail Stakeholders’ Perspectives” PURPOSE The Subcommittee on Railroads, Pipelines, and Hazardous Materials, will meet on Wednesday, October 4, 2017 at 10:00 a.m., in 2167 Rayburn House Office Building, to receive testimony related to “Building a 21st Century Infrastructure for America: Rail Stakeholders’ Perspectives”. The purpose of this hearing is to receive the views of the railroad industry’s stakeholders regarding infrastructure in the 21st Century. The Subcommittee will hear testimony from the railroad industry, a railroad supplier, and rail labor. BACKGROUND The railroad industry in the United States is largely comprised of private freight carriers and the National Rail Passenger Corporations, or Amtrak, which was created by Congress in 1970 to assume money-losing passenger operations from the freight railroads. Operations began on May 1, 1971. This hearing will gather opinions of rail stakeholders and seek information on infrastructure expansion opportunities, opportunities for public-private partnerships, regulatory reforms, ways to make grant programs more accessible, and ways to enhance safety through the use of performance based regulations. Freight Rail The freight rail industry consists of seven large Class I railroads, line haul freight carriers with operating revenues of $453 million or more in 2016, and approximately 600 much smaller Class II and Class III railroads, which own and operate nearly one-third of the national rail mileage.
    [Show full text]
  • Zenas King and the Bridges of New York City
    Volume 1, Number 2 November 2014 From the Director’s Desk In This Issue: From the Director’s Desk Dear Friends of Historic Bridges, Zenas King and the Bridges of New Welcome to the second issue of the Historic Bridge York City (Part II) Bulletin, the official newsletter of the Historic Bridge Hays Street Bridge Foundation. Case Study: East Delhi Road Bridge As many of you know, the Historic Bridge Foundation advocates nationally for the preservation Sewall’s Bridge of historic bridges. Since its establishment, the Historic Bridge Collector’s Historic Bridge Foundation has become an important Ornaments clearinghouse for the preservation of endangered bridges. We support local efforts to preserve Set in Stone significant bridges by every means possible and we Upcoming Conferences proactively consult with public officials to devise reasonable alternatives to the demolition of historic bridges throughout the United States. We need your help in this endeavor. Along with Zenas King and the Bridges our desire to share information with you about historic bridges in the U.S. through our newsletter, of New York City (Part II) we need support of our mission with your donations to the Historic Bridge Foundation. Your generous King Bridge Company Projects in contributions will help us to publish the Historic New York City Bridge Bulletin, to continue to maintain our website By Allan King Sloan at www.historicbridgefoundation.com, and, most importantly, to continue our mission to actively promote the preservation of bridges. Without your When Zenas King passed away in the fall of 1892, help, the loss of these cultural and engineering his grand plan to build two bridges across the East landmarks threatens to change the face of our nation.
    [Show full text]
  • Construction on Portal North Bridge Project
    FOR IMMEDIATE RELEASE October 13, 2017 Construction on Portal North Bridge Project Gets Underway Local, State and Federal partners celebrate start of first New Jersey project in Gateway Program with Groundbreaking Ceremony Kearny, NJ – Construction of a new, more reliable Portal North Bridge is now underway, as the Gateway Program partners broke ground today on $20 million worth of early work activities. The higher clearance, fixed-span Portal North Bridge will permit faster speeds, allow for an increase in NJ TRANSIT train capacity and eliminate a single point of failure on the busiest section of Amtrak’s Northeast Corridor (NEC). The Portal North Bridge Project is a critical component of the Gateway Program – a comprehensive rail investment program designed to add critical resiliency and create new capacity on the 10-mile stretch of the NEC between Newark, NJ and Penn Station New York. This is the busiest section of railroad in North America, supporting 450 daily and commuter intercity trains and some 200,000 passenger trips. “The Gateway Program is the most urgent infrastructure program in America,” said Gateway Program Development Corporation Chairman Rich Bagger. “Eliminating single points of failure like the Portal Bridge and Hudson River tunnel that put 10% of America’s Gross Domestic Product at increased risk must be one of our highest infrastructure priorities.” “The start of construction on the Portal North Bridge demonstrates the commitment of the Gateway partners to this important project of national significance,” said Amtrak Board Chairman Tony Coscia. “A new Portal Bridge will improve reliability on the Northeast Corridor, benefiting both New York and New Jersey, as well as the region and nation as a whole.” “The replacement of the aging Portal Bridge is the first step toward ensuring a sound and efficient rail transportation system that will serve millions of riders now and well into the future,” said New Jersey Governor Chris Christie.
    [Show full text]
  • Penn Station Table of Contents
    www.PDHcenter.com www.PDHonline.org Penn Station Table of Contents Slide/s Part Description 1N/ATitle 2 N/A Table of Contents 3~88 1 An Absolute Necessity 89~268 2 The Art of Transportation 269~330 3 Eve of Destruction 331~368 4 Lost Cause 369~417 5 View to a Kill 418~457 6 Men’s Room Modern 458~555 7 Greatness to Come Fall From Grace 1 2 Part 1 The Logical Result An Absolute Necessity 3 4 “…The idea of tunneling under the Hudson and East Rivers for an entrance into New York City did not evolve suddenly. It was the logical result of long-studied plans in which Mr. Alexander Johnston Cassatt, the late President of the Company, participated from the beginning, and an entrance into New York City was decided upon only when the Executive Officers and Directors of the Company realized that it had become an absolute necessity…” RE: excerpt from The New York Im- provement and Tunnel Extension of the Pennsylvania Railroad Left: Alexander J. Cassatt (1839-1906), Above: caption: “The empire of the Pennsylvania Railroad, President – Pennsylvania Railroad extending through most of the northeast, but unable to reach Company (1899-1906) 5 Manhattan until 1910” 6 © J.M. Syken 1 www.PDHcenter.com www.PDHonline.org “…After the Company in 1871 leased the United Railroads of New Jersey, which terminate in Jersey City, the Officers of the Railroad looked longingly toward New York City. They wanted a station there, but they were confronted both by the great expense of such an undertaking, as well as the lack of a feasible plan, for at that time the engineering obstacles seemed to be insurmountable.
    [Show full text]
  • Portal North Bridge Project
    NEC.AMTRAK.COM PORTAL NORTH BRIDGE PROJECT A passenger train crosses the Portal Bridge Built in 1910, the existi ng Portal Bridge is a two-track moveable swing-span bridge between the towns of Kearny and Secaucus in Hudson County, New Jersey. A criti cal Northeast Corridor link for New Jersey commuters and intercity rail customers to New York City, the century-old bridge is in need of replacement. Project Need The century-old Portal Bridge is a two-track swing bridge over the Hackensack River in New Jersey that rotates open for mariti me traffi c several ti mes per month. 450 trains cross the bridge as they travel be- tween Newark, N.J., and Penn Stati on New York every day. The bridge is a major bott leneck and source of delay for Amtrak and NJ TRANSIT trains – the aging mechanical & electrical components someti mes malfuncti on while opening and closing, causing a cascade of delays. Infrastructure Background Portal Bridge was constructed by the Pennsylvania Railroad in 1907 and began revenue operati ons in November 1910. The bridge earned the name “Portal,” because it leads the Northeast Corridor (NEC) rail line to the “portal” of the North River Tunnel, located just three miles away. It consists of seven spans and totals 960 feet in length. The mid- dle span is 300 feet long and pivots to open for marine traffi c. The The aging Portal Bridge requires regular swing span and special “miter rail” confi gurati on pose maintenance repairs to address malfuncti ons caused by and operati onal challenges.
    [Show full text]
  • Hudson River Valley Greenway Link Technical Memorandum #4 Task #4 Final Report Research
    NEW YORK METROPOLITAN TRANSPORTATION COUNCIL Hudson River Valley Greenway Link Technical Memorandum #4 Task #4 Final Report Research October 28, 2009 Submitted By: with: Table of Contents INTRODUCTION 1 A. CORRIDORS TO BE ANALYZED IN FURTHER DETAIL 5 1. All Waterfront Corridor 5 a. Manhattan Segments 5 b. Spuyten Duyvil Railroad Bridge 7 c. Bronx Segment 8 d. Yonkers Segments 10 e. Existing Waterfront Uses 18 f. Existing Waterfront Access Points/Trip Attractors 22 g. Potential/Desired Waterfront Access Points 24 h. Related Yonkers Waterfront Development Projects 26 2. Inland Corridors 28 a. Manhattan Corridors 28 b. Inland Harlem River Crossings 30 c. Bronx Corridors 32 d. Yonkers Corridors 38 e. Inland Scenic Points 44 f. Inland Trip Attractors 44 B. CORRIDORS TO BE ELIMINATED FROM FURTHER CONSIDERATION 47 Hudson River Valley Greenway Link Task 4 Research INTRODUCTION The primary goal of the Hudson River Valley Greenway Link project is to align a north/south corridor linking the Old Croton Aqueduct (OCA) Trail in Yonkers with the Hudson River Greenway along the Hudson River at Dyckman Street in Upper Manhattan. In order to begin the process of identifying a preferred corridor, a number of potential alignments have been identified as part of Task 4. These alignments are described herein and will be analyzed in further detail in Task 6. The goals and objectives outlined in the Task 3 deliverable state a desire for a route that provides for both recreational as well as utilitarian trips. The alternatives described for further analysis are defined to emphasize the link’s function as a greenway, connecting to nature and the waterfront.
    [Show full text]
  • Rail & Road to Recovery
    RAIL & ROAD TO RECOVERY April 2020 Tri-State Transportation Campaign BlueWaveNJ Clean Water Action Environment New Jersey New Jersey Policy Perspective New Jersey Sierra Club SUMMARY Transit and environmental advocates strongly oppose the New Jersey Turnpike Authority’s unprecedented 2020 Capital Plan, which will direct $16 billion toward road expansion projects. The $24 billion capital plan calls for more than 50 major projects to be undertaken on the New Jersey Turnpike and Garden State Parkway in rolling, five-year increments. Thirteen of these projects will ultimately widen over 100 miles of roadway on the Turnpike and Parkway, and none of the projects would allow for any transit expansion or incorporate a transit component. This proposed capital program directly contradicts the state’s Energy Master Plan, released in January after a year-long process, which aims to reduce greenhouse gas emissions and transition the state to 100% clean energy sources by 2050, with an emphasis on expanding public transportation options and reducing vehicle miles traveled (VMT). In contrast, Rail and Road to Recovery, our alternative capital plan, highlights 27 unfunded mass transit projects totaling over $25.8 billion that would create 1.28 million jobs that should be funded with the $16 billion currently slated for highway expansion. NJTA’s plan also doesn’t take getting the state’s roads and bridges into a state of good repair seriously --36% of the state’s highways are deficient (rough and/or distressed), 529 bridges are structurally deficient and 2,367 are in need of repair. The price tag for unfunded fix-it-first projects is over $10 billion --at least $8.6 billion for bridges and $679 million for just the top 500 state road projects over the next few years, which doesn’t even include needed repairs to the far larger network of local and county roads.
    [Show full text]