47100-004: Madhya Pradesh Power Transmission and Distribution System Improvement Project

Total Page:16

File Type:pdf, Size:1020Kb

47100-004: Madhya Pradesh Power Transmission and Distribution System Improvement Project Initial Environment Examination Project Number: 47100-004 November 2019 Part B: Main Report (Pages 90 - 308) and Annexures IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Submitted by Madhya Pradesh Power Transmission Company Ltd., Jabalpur This initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. This is an updated version of IEE posted in October 2018 available on https://www.adb.org/projects/documents/ind-47100-004-iee-2. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Figure 3.68: LILO of one circuit of Malanpur-Mehgaon line at 400 kvS/s (CWRTL Adani) Morena 107. The line LILO of one circuit of Malanpur- Mehgaon line at 400 KV S/s (CWRTL Adani) Morena was proposed with a route length of 20 kms. There are a number of reserve and protected forest patches in the region and so to avoid them, the revised length was 8 kms (as per IEE report of May, 2017) and has now been revised to 7.396 kms. This final route alignment avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 90 Figure 3.69: 2nd circuit of Shivpuri 220- Kolaras 132kV DCSS line 108. The line 2nd circuit of Shivpuri 220- Kolaras 132kV DCSS was proposed with a route length of 35 kms (as per IEE report of May, 2017) and has now been revised to 34.686 kms as it avoids avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 91 Figure 3.70: 2nd ckt of Malanpur- Morar 132kV line 109. The line 2nd ckt of Malanpur- Morar 132kV line was proposed with a route length of 29 kms. The revised route length is 28.708 kms21. This final alignment avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. 21 Earlier reported as 29 because of rounding off. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 92 Figure 3.71: Khurai- Khimlasa 132kV DCSS line 110. The line Khurai- Khimlasa 132kV DCSS line was proposed with a route length of 20 kms later revised to 20.937 in order to maintain buffer distance from large settlements and reserve forest. This final alignment avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 93 Figure 3.72: LILO of Mungaoli Traction Feeder to Mungaoli (D/C) 111. The line LILO of Mungaoli Traction Feeder to Mungaoli was proposed with a route length of 10 kms later revised to 8.32 kms in order to avoid large settlements. This final alignment avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 94 Figure 3.73: Ashoknagar 220-Kothiya 132kV DCSS Line 112. The line Ashoknagar 220-Kothiya 132kV DCSS was proposed with a route length of 35 kms later revised to 30 kms in order to avoid large settlements. This final alignment avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 95 Figure 3.74: Sagar220- Rehli 132kV DCSS line 113. The line Sagar220- Rehli 132kV DCSS was proposed with three alternatives with route lengths 38.475, 39.722, and 46.260 with forest involvement of 7.89%, 8.38%, and 7.84%. The route length was revised to 40 kms (as per IEE report of May, 2017) which was revised to 38.458 kms (as per IEE report of August, 2018). The length has now been revised to 38.583 kms. The final length has now reduced forest involvement to 7.59%. A total of 8.3889 hectares of forest land (in place of earlier 8.2026)22 will be involved and total number of 470 trees will be felled. Forest clearance has been received. 22 The earlier forest involvement of 8.2026 involved a lot of deforestation and a slightly diverted route was suggested which resulted in an increase in forest area involvement of 8.3889 ha. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 96 Figure 3.75: 2nd ckt of Sagar 220-Sagar 132kV (I/C) 114. The line 2nd ckt of Sagar 220-Sagar 132kV (I/C) was proposed with a route length of 9 kms further revised to 8.77 kms23 which is selected as it avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. 23 Earlier reported as 9 because of rounding off. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 97 Figure 3.76: Stringing of 3rd conductor from Bina220 to Mungaoli 115. The line stringing of 3rd conductor from Bina220 to Mungaoli was proposed with a route length of 35 kms. The revised route length is 31.3 kms as it avoids large settlements. The final route length also avoids reserve forests altogether and other critical sensitive environmental areas. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 98 Figure 3.77: LILO of both ckt of Badod- Kota/Modak 220kV line at Suwasra 220kV S/s (2XD/C) 116. The line LILO of both ckt of Badod- Kota/Modak 220kV line at Suwasra 220kV S/s (2XD/C) was proposed with three alternatives of route lengths 4.103, 4.544 and 4.586. The route length was further revised to 4.382 kms24 in order to maintain sufficient buffer distance from large settelements and reserse forests. This final route alignment avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. 24 Line length had been reported incorrectly instead of route length earlier. This has been corrected now. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 99 Figure 3.78: LILO of one ckt of Neemuch 220-Mandsaur 132kV line at Budha 132kvS/s 117. The line LILO of one ckt of Neemuch 220-Mandsaur 132kV line at Budha 132kvS/s was proposed with three alternatives of route lengths 22.1, 22.976 and 24.041. The revised alternative was finalized with a route length of 24 kms (as per IEE report of May, 2017) and has now been revised to 22.077 kms as it avoids reserve forests altogether and large settlements and other critical sensitive environmental areas. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 100 Figure 3.79: LILO of both ckt of 132kV Gandhisagar-Suwasra / Garoth line at Suwasra 220kV S/s 118. The line LILO of both ckt of Gandhisagar-Suwasra / Garoth 132kV line at Suwasra 220kV S/s was proposed with three alternatives of route lengths 1.2, 1.381 and 1.719 kms. The route length was further revised to 3 kms (as per IEE report of May, 2017) in order to maintain sufficient buffer distance from rserved forest and to avoid large settlements. The new and revised route length of 3 kms avoided reserve forests altogether and large settlements and other critical sensitive environmental areas. However, the alignment was changed because of power evacuation requirement in Gandhisagar resulting a revised route length of 1.423 kms. Name has also been changed as Gandhisagar is a better landmark. Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 101 Figure 3.80: Substation Locations 119. Substation name: Balaghat/Kirnapur 132kV The substation Balaghat/Kirnapur 132kV is located entirely on government wasteland. The substation does not lie near any critical and sensitive environmental locations such as reserve forest, wildlife sanctuary, estuary, important bird area etc. No religious, historical or ASI recognised sites lie in the proposed substation location. No trees will be cut during substation construction as the land is wasteland. No crop will be destroyed as there is hardly any vegetation in the substation location as it comprises of wasteland. 120. Substation name: Waraseoni 132kV The substation Waraseoni 132kV is located entirely on government wasteland. The substation does not lie near any critical and sensitive environmental locations such as reserve forest, wildlife sanctuary, estuary, important bird area etc. No religious, historical or ASI recognised sites lie in the proposed substation location. No trees will be cut during substation construction as the land is wasteland. No crop will be Loan No. 3066 IND IEE Madhya Pradesh Power Transmission Project Implementing Agency – Madhya Pradesh Power Transmission Corporation Limited 102 destroyed as there is hardly any vegetation in the substation location as it comprises of wasteland. 121. Substation name: Bada Malehra 132/33kV The substation Bada Malehra 132/33kV is located entirely on government wasteland.
Recommended publications
  • List of 6038 Schools Selected for Establishment of Atal Tinkering
    LIST OF 6038 SCHOOLS SELECTED FOR ESTABLISHMENT OF ATAL TINKERING LABS (SCHOOLS ARE KINDLY REQUESTED TO WAIT FOR FURTHER INSTRUCTIONS FROM ATAL INNOVATION MISSION, NITI AAYOG ON THEIR REGISTERED EMAIL IDs) PLEASE NOTE:- 1. LAST DATE FOR COMPLETING THE COMPLIANCE PROCESS : 31st JANUARY 2020 2. THESE SELECTED SCHOOLS MUST OPEN A NEW BANK ACCOUNT IN A PUBLIC SECTOR BANK FOR THE PURPOSE OF ATL GRANT. 3. THESE SELECTED SCHOOLS MUST NOT SHARE THEIR INFORMATION WITH ANY THIRD PARTY/ VENDOR/ AGENT/ AND MUST COMPLETE THE COMPLIANCE PROCESS ON THEIR OWN. 4. THIS LIST IS ARRANGED IN ALPHABETICAL ORDER OF STATE, DISTRICT AND FINALLY SCHOOL NAME. S.N. ATL UID CODE UDISE CODE SCHOOL NAME STATE DISTRICT 1 2760806 28222800515 ANDHRA PRADESH MODEL SCHOOL PUTLURU ANDHRA PRADESH ANANTAPUR 2 132314217 28224201013 AP MODEL SCHOOL ANDHRA PRADESH ANANTAPUR 3 574614473 28223600320 AP MODEL SCHOOL AND JUNIOR COLLEGE ANDHRA PRADESH ANANTAPUR 4 278814373 28223200124 AP MODEL SCHOOL RAPTHADU ANDHRA PRADESH ANANTAPUR 5 2995459 28222500704 AP SOCIAL WELFARE RESIDENTIAL SCHOOL JUNIOR COLLEGE FOR GIRLS KURUGUNTA ANDHRA PRADESH ANANTAPUR 6 13701194 28220601919 AVR EM HIGH SCHOOL ANDHRA PRADESH ANANTAPUR 7 15712075 28221890982 AVR EM HIGH SCHOOL ANDHRA PRADESH ANANTAPUR 8 56051196 28222301035 AVR EM HIGH SCHOOL ANDHRA PRADESH ANANTAPUR 9 385c1160 28221591153 AVR EM HIGH SCHOOL ANDHRA PRADESH ANANTAPUR 10 102112978 28220902023 GOOD SHEPHERD ENGLISH MEDIUM SCHOOL ANDHRA PRADESH ANANTAPUR 11 243715046 28220590484 K C NARAYANA E M SCHOOL ANDHRA PRADESH ANANTAPUR LIST OF 6038 SCHOOLS SELECTED FOR ESTABLISHMENT OF ATAL TINKERING LABS (SCHOOLS ARE KINDLY REQUESTED TO WAIT FOR FURTHER INSTRUCTIONS FROM ATAL INNOVATION MISSION, NITI AAYOG ON THEIR REGISTERED EMAIL IDs) PLEASE NOTE:- 1.
    [Show full text]
  • English Advt 8.Indd
    Hindustan Petroleum Corporation Limited proposes to appoint Retail Outlet Dealers in Madhya Pradesh, as per following details: Fixed 1 2 3 4 5 6 7 8 9a 9b 10 11 12 ESTIMATED Fee / MIN Finance to be Security Within 1.5 Km BPC Petrol Pump MONTHLY TYPE Minimum SR REVENUE TYPE DIMENSION OF arranged by the Mode of Deposit 79 in Chadangaon, on Kanad Agar Regular 105 ST CC-2 CFS 35 35 NA NA Draw of Lots NA 5 LOCATION SALES CATEGORY OF Bid Shajapur Road NO DISTRICT OF RO SITE applicant Selection (` in POTENTIAL SITE amount Within 3 Km from Chhaoni Tiraha (In Metres)* (` in Lakhs) Lakhs) 80 Agar Regular 180 Open CC 25 20 25 NA Bidding 30 5 (KL P.M)# (` in towards Ujjain Lakhs) Within 3 Km from BPC Petrol Pump 81 in Susner Near Amlanankar, Susner- Agar Regular 105 Open DC 35 35 25 45 Draw of Lots 15 5 1 2 3 4 5 6 7 8 9a 9b 10 11 12 Agar Road, Susner Regular/ MS+HSD SC CC / Frontage Depth For Estimated Draw of Lots / Tanodiya, Between Km Stone 82 Agar Regular 110 OBC DC 35 35 25 45 Draw of Lots 15 5 Rural in Kls SC CC-1 DC / eligibility fund Bidding Agar "16" to Agar "18" SC CC-2 CL / required for Within 2 Km from Mungawali Bus ST CFS development 83 Stand on Mungaoli Ashoknagar Ashoknagar Regular 105 Open DC 35 35 25 45 Draw of Lots 15 5 ST CC-1 of Road ST CC-2 infrastructure Within 3 Km from IOC Petrol OBC for RO 84 Pump in Isagarh, on Isagarh Ashoknagar Regular 110 Open DC 35 35 25 45 Draw of Lots 15 5 OBC CC-1 Chanderi Road, OH SH-10 OBC CC-2 Village- Saraskhedi, on OPEN 85 Ashoknagar Isagarh Road on Ashoknagar Regular 110 ST CFS 35 35 NA NA
    [Show full text]
  • 33Kv & 11Kv Tripping Information.Xlsx
    33KV FEEDERS HAVING MORE THAN 5 TRIPPINGS IN LAST 3 MONTHS IN WEST DISCOM No. of 33KV Feeders No. of 33KV Feeders No. of 33KV Feeders Total No. Of 33KV S.No. Circle having more than 5 having more than 5 having more than 5 Feeders Trippings in Apr-2019 Trippings in May-2019 Trippings in June-2019 1 Indore City 75 0 2 9 2 Indore O&M 122 0 0 11 3 Khandwa 46 0 0 3 4 Burhanpur 21 0 0 0 5 Khargone 71 1 0 7 6 Barwani 33 2 0 0 7 Dhar 65 1 0 7 8 Jhabua 30 0 0 4 Indore Region 463 4 2 41 9 Ujjain 110 0 0 3 10 Dewas 102 1 2 11 11 Shajapur 59 6 0 2 12 Agar 44 0 0 2 13 Ratlam 55 0 0 8 14 Mandsaur 52 1 0 4 15 Neemuch 28 0 0 2 Ujjain Region 450 8 2 32 West Discom 913 12 4 73 11KV FEEDERS HAVING MORE THAN 8 TRIPPINGS IN LAST 3 MONTHS IN WEST DISCOM No. of 11KV Feeders having No. of 11KV Feeders having No. of 11KV Feeders having Total No. Of 11KV more than 8 Trippings in more than 8 Trippings in more than 8 Trippings in June- Feeders S.No. Circle Apr-2019 May-2019 2019 Non- Non- Non- Non- Irrigation Irrigation Irrigation Irrigation Irrigation Irrigation Total Irrigation Total Irrigation Total Feeders Feeders Feeders Feeders Feeders Feeders Feeders Feeders 1 Indore City 451 2 4 0 4 2 0 2 31 0 31 2 Indore O&M 303 304 0 0 0 0 0 0 35 12 47 3 Khandwa 168 184 2 4 6 0 2 2 25 22 47 4 Burhanpur 73 102 1 2 3 0 0 0 2 4 6 5 Khargone 218 284 0 0 0 0 0 0 2 4 6 6 Barwani 137 142 13 3 16 0 0 0 30 14 44 7 Dhar 196 347 0 2 2 1 1 2 63 37 100 8 Jhabua 182 9 0 1 1 1 0 1 45 0 45 Indore Region 1728 1374 20 12 32 4 3 7 233 93 326 9 Ujjain 314 465 3 0 3 2 0 2 28 1 29 10 Dewas 240 334 33 9 42 2 0 2 49 53 102 11 Shajapur 129 215 18 6 24 3 1 4 25 23 48 12 Agar 63 98 7 1 8 5 1 6 15 3 18 13 Ratlam 198 291 15 2 17 2 2 4 46 24 70 14 Mandsaur 226 325 21 6 27 8 3 11 61 43 104 15 Neemuch 138 196 28 14 42 10 0 10 46 46 92 Ujjain Region 1308 1924 125 38 163 32 7 39 270 193 463 West Discom 3036 3298 145 50 195 36 10 46 503 286 789 33KV Feeder wise Trippings Of MPWZ in June-2019 Total Outage Total No.
    [Show full text]
  • Answered On:15.12.2004 B.S.N.L
    GOVERNMENT OF INDIA COMMUNICATIONS AND INFORMATION TECHNOLOGY LOK SABHA UNSTARRED QUESTION NO:2483 ANSWERED ON:15.12.2004 B.S.N.L. TENDERS Paswan Shri Sukdeo Will the Minister of COMMUNICATIONS AND INFORMATION TECHNOLOGY be pleased to state: (a) the number of telephone exchanges alongwith the number of tenders invited by the civil wing of B.S.N.L. i n different circles in Madhya Pradesh since 2001 till date; (b) the number of tenders disposed off alongwith the names of contractors/firms to which these tenders have been awarded; (c) whether the Government has received any complaints regarding these tenders; and (d) if so, the details thereof? Answer THE MINISTER OF STATE IN THE MINISTRY OF COMMUNICATIONS AND INFORMATION TECHNOLOGY (DR. SHAKEEL AHMAD) (a) There are 2788 Telephone Exchanges in Madhya Pradesh and 149 numbers of tenders were invited under various Civil Circles of Madhya Pradesh relating to construction of telephone exchanges since 2001 till date. (b) Out of these 149 tenders, 142 number were disposed off and the details of contractors/firms to whom these tenders were awarded are given in Annexure-I. (c) Yes, Sir. (d) Three complaints have been received. Details are given in Annexure-II. Annexure-I DETAILS OF CONTRACTORS/FIRMS TO WHOM TENDERS WERE AWARDED SL.NO NAME OF WORK NAME OF AGENCY & ADDRESS (A) (B) (C) 1 Construction of Q-Rex at Shri J.K. Badkul, Gorjhamar (Dsistt. Sagar) Nanak ward Khurai, Distt Sagar. 2 Construction of SBM T.E. Multai M/S Karolia Constructions. E-2/242 Arera Colony Bhopal. 3 Construction of T.E.
    [Show full text]
  • Industrial Land Bank 2016
    22 - 23 2016 22 - 23 2016 INDUSTRIAL LAND BANK 2016 22 - 23 2016 INDUSTRIAL LAND BANK 2016 22 - 23 2016 22 - 23 2016 Publisher: MP Trade and Investment Facilitation Corporation Limited “CEDMAP BHAWAN” 16-A, Arera Hills Bhopal - 462001, M.P(India) Tel. :(91) 755-2575618, 2571830 Fax : (91) 755-2559973 E-mail : [email protected] http://www.mptrifac.gov.in http://www.invest.mp.gov.in/ INDUSTRIAL LAND BANK 2016 CONTENT 1. Preface 2 2. Introduction 3 3. Industrial land bank available with Government of Madhya Pradesh 5 4. Industrial land bank with Audyogik Kendra Vikas Nigam (AKVN) 6 4a. Developed/Developing land bank available with AKVNs 9 • Bhopal AKVN 9 • IIDC Gwalior 22 • Indore AKVN 36 • Jabalpur AKVN 70 • Rewa AKVN 81 • Sagar AKVN 89 • Ujjain AKVN 99 4b. Undeveloped land bank available with AKVNs 113 4c. Undeveloped land allotment guidelines 131 5. Developed Industrial land bank with department of Micro Small and Medium Enterprises (MSME) 137 6. Industrial land bank available with Madhya Pradesh State Electronic Development Corporation (MPSEDC) 143 1 INDUSTRIAL LAND BANK 2016 1 2 INDUSTRIAL LAND BANK 2016 2 INTRODUCTION Madhya Pradesh has emerged as a Growth Centre of the country in the last decade. Madhya Pradesh has witnessed a radical transformation in terms of economic and social development. Madhya Pradesh’s central location makes it an ideal destination as a manufacturing and sourcing hub to tap the constantly growing Indian market. Owing to its rich soil, several rivers and large irrigation projects, Madhya Pradesh is a thriving destination for agriculture and food processing business.
    [Show full text]
  • 11KV Feeder Wise Trippings of MPWZ in July-2019
    11KV FEEDERS HAVING MORE THAN 8 TRIPPINGS IN LAST 3 MONTHS IN WEST DISCOM Total No. Of 11KV Feeders No. of 11KV Feeders having more than 8 Trippings in MAY-2019 No. of 11KV Feeders having No. of 11KV Feeders Non Non S.No. Circle Non Irrigation Irrigation Irrigation Non Irrigation Feeders Non Irrigation Feeders Irrigation Feeders Total Irrigation Total Irrigation Total Feeders Feeders Feeders Feeders Feeders 1 INDORE CITY 451 2 2 0 2 31 0 31 0 7 7 2 INDORE O&M 303 304 0 0 0 35 12 47 5 18 23 3 KHANDWA 168 184 0 2 2 25 22 47 15 25 40 4 BURHANPUR 73 102 0 0 0 2 4 6 11 4 15 5 KHARGONE 218 284 0 0 0 2 4 6 0 0 0 6 BARWANI 137 142 0 0 0 30 14 44 26 21 47 7 DHAR 196 347 1 1 2 63 37 100 37 26 63 8 JHABUA 182 9 1 0 1 45 0 45 0 39 39 Indore Region 1728 1374 4 3 7 233 93 326 94 140 234 9 UJJAIN 314 465 2 0 2 28 1 29 5 25 30 10 DEWAS 240 334 2 0 2 49 53 102 21 40 61 11 SHAJAPUR 129 215 3 1 4 25 23 48 35 39 74 12 AGAR 63 98 5 1 6 15 3 18 1 32 33 13 RATLAM 198 291 2 2 4 46 24 70 15 28 43 14 MANDSAUR 226 325 8 3 11 61 43 104 27 49 76 15 NEEMUCH 138 196 10 0 10 46 46 92 27 41 68 Ujjain Region 1308 1924 32 7 39 270 193 463 131 254 385 West Discom 3036 3298 36 10 46 503 286 789 225 394 619 11KV Feeder wise Trippings Of MPWZ in July-2019 S.No Circle Division 33KV Feeder Name 33/11KV s/s Name 11 kV Feeder Name Category Total Tripping Total Duration 1 INDORE CITY INDORE-NORTH ZONAL-II SANWER RD.
    [Show full text]
  • Bhopal Is a Big Gift of Vanvasis Chouhan Said That Forest Produce
    & * 9: +! & ; ; ; RNI Regn. No. MPENG/2004/13703, Regd. No. L-2/BPLON/41/2006-2008 +,+'/234 +, + - .+/0 ,+#) ! > ,*%## :1$%*:* "!%1:*:#"@#"% /"*-%*!,$*-%+/, +*,-,/$?#1 0-1!,0-/0#*% 1%,+1>!*$* /#%#1>A1,*#$* >1%-"*+0+:*: %#$-%!/% $-#+ %- +*-%+/# -@+*%0+A.@+ <, $ !-1(6++ 24 < * %" $ $ /2"565/7 /5/186 O! # # ) P R #*+*,- of vaccine to come to the open market,” Dr Guleria said. #*+*,- ays after Union Health Sharing his experience of $ +8 DMinister Harsh Vardhan his past 28 days (a time dura- eclaring that the right of said that no clear-cut or final tion for the second dose), Dr Dreputation cannot be pro- decision has been taken on the Guleria, said, “Today I took the tected at the cost of right of life rollout of Covid-19 vaccines in second dose of Covaxin vaccine and dignity, a Delhi court on the private market yet, All and I haven’t found any side Wednesday threw out former India Institute of Medical effect from the first dose. Union Minister and editor MJ Sciences (AIIMS) Director Dr “I didn’t face any difficul- Akbar’s criminal defamation Randeep Guleria on ty. I would urge people not to 1 69 suit against journalist Priya Wednesday said that the jabs fear the vaccine and it is total- Ramani, who has accused him might be available for masses ly safe. People should come out of sexual harassment. by this year’s end after the and take the vaccine. This is & Delivering the landmark prime targeted people are cov- essential if we want to come out #*+*,- judgment being hailed as a ered and there is an equivalence of the pandemic.” watershed moment for the of supply and demand in the He highlighted that pan- he Ministry of Civil #MeToo movement against market.
    [Show full text]
  • Master Data of Phase 2 IP Segmentation 6-Apr-2021
    POP Details Bandwidth Sr.No. District Tehsil/Block PoP Name Site Address Latitude Longitude Allocation Mode of connectivity New collectorate Aagar Malwa office , Agar 1 Agar Malwa Agar PoP Dist Agar. 23.719 76.024 45 -80 Mbps MPLS/ILL without router Swan pop room, tehsil parisar dug Agar-Malwa road badod, 2 Agar Malwa Badod Badod PoP dist agar malwa 23.793 75.807 45 -80 Mbps MPLS/ILL without router Tehsil Office, Agar Malwa Nalkheda Agar 3 Agar Malwa Nalkheda Nalkheda PoP Malwar 465445 23.841 76.246 45 -80 Mbps MPLS/ILL without router Tehsil Office, Agar Malwa Susner Agar 4 Agar Malwa Susner Susner PoP Malwa 465447 23.942 76.095 45 -80 Mbps MPLS/ILL without router Collectorate, Alirajpur 5 Alirajpur Alirajpur Alirajpur PoP 457887 22.318 74.357 45 -80 Mbps MPLS/ILL without router Tehsil Office, Alirajpur Bhavra Alirajpur 6 Alirajpur Bhavra Bhabhra PoP 457887 22.539 74.334 45 -80 Mbps MPLS/ILL without router Tehsil Office, Alirajpur Jobat Jobat Alirajpur 7 Alirajpur Jobat PoP 457990 22.418 74.561 45 -80 Mbps MPLS/ILL without router Janpad Panchayat, New Hall, Katthiwada Alirajpur Alirajpur 8 Alirajpur KATTHIWADA Katthiwada PoP 457887 22.486 74.143 45 -80 Mbps MPLS/ILL without router Alirajpur Tehsil, Sondwa 9 Alirajpur SONDWA Sondwa PoP Alirajpur 22.116 74.374 45 -80 Mbps MPLS/ILL without router Janpad Panchayat, Hall, Udaigarh Alirajpur Alirajpur 10 Alirajpur Udaigarh Udaigarh PoP 457887 22.529 74.54 45 -80 Mbps MPLS/ILL without router Collectorate, Anuppur 11 Anuppur Anuppur Anuppur PoP 484224 23.115 81.702 45 -80 Mbps MPLS/ILL without
    [Show full text]
  • 48Th OCC Meeting Minutes
    MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/4204 Jabalpur, dated: 07.12.2015 To As per distribution list Sub: Minutes of 48th meeting of Operation and Coordination Committee of MP. The Minutes of 48th meeting of the Operation and Coordination Committee of MP scheduled at 10.30 AM on 28th October, 2015 at SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. ( K.K.Parbhakar) Memebr Secretary OCC SLDC, MPPTCL, Jabalpur Distribution List The Chief Engineer (T&C), The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, MP Power Transmission Co. Limited, Jabalpur. Jabalpur Fax No- 0761-2665593, 2702710 Fax No- 0761-2660908 Email- [email protected] Email- [email protected] The Chief Engineer (Procurement.), The Executive Director (O & M:Gen), MP Power Transmission Co. Limited, MP Power Generating Company Limited, Jabalpur. Jabalpur. Fax No- 0761-2664749 Fax No- 0761-2660908 Email- [email protected] Email – [email protected] Email- [email protected] The Chief Engineer (O & M:Hydel), The General Manager( PM), MP Power Generating Company Limited, MPPMCL, Jabalpur Jabalpur. Fax No- 0761-2664749 Email – [email protected] [email protected] The Superintending Engineer (GCC), The General Manger (DCC-EZ), MPPGCL, Jabalpur DISCOM Control Centre, MP Poorva Kshetra Vidyut Email – [email protected] Vitaran Co.
    [Show full text]
  • Madhya Pradesh.Xlsx
    Estimated Fixed Fee / Minimum Dimension (in Finance to be Revenue monthly Type of Minimum Security Sl. No Name of location Type of RO Category M.)/Area of the site (in Sq. arranged by the Mode of Selection District Sales Site* Bid Deposit M.). * applicant Potential # amount 1 2 3 4 5 6 7 8 9a 9b 10 11 12 SC SC CC 1 SC CC-2 SC PH Estimated ST Estimated fund ST CC-1 working required ST CC-2 capital MS+HSD in ST PH CC / DC / for Draw of Lots / Regular / Rural Frontage Depth Area requireme Kls OBC CFS developm Bidding nt for OBC CC 1 ent of operation OBC CC 2 infrastruct of RO OBC PH ure at RO OPEN OPEN CC 1 OPEN CC 2 OPEN PH WITHIN 4 KM FROM DB CITY MAIN GATE ON ANY FOUR 1 GWALIOR REGULAR 150 SC CFS 25 25 625 0 0 DRAW OF LOTS 0 3 LANE ROAD AT OR NEAR BINEKA VILLAGE BETWEEN KM MILE STONE 2 RAISEN REGULAR 200 ST CFS 45 45 2025 0 0 DRAW OF LOTS 0 3 253 TO 255 ON NH-12 FROM 1100 QUARTERS UPTO AKRITI ECO CITY (E8 3 BHOPAL REGULAR 150 ST CFS 25 25 625 0 0 DRAW OF LOTS 0 3 EXTENSION) VIA AURA MALL WITH IN 4 KM FROM BPC PETROL PUMP IN MAKSI ,ON NH- 4 SHAJAPUR REGULAR 150 SC CFS 45 45 2025 0 0 DRAW OF LOTS 0 3 52 5 BORDEHI ON MALEGAON- BORDEHI MAIN ROAD BETUL RURAL 50 ST CFS 30 30 900 0 0 DRAW OF LOTS 0 2 TUMDA (NEAR PHANDA) UPTO 2 KM TOWARDS SEHORE 6 BHOPAL RURAL 50 ST CFS 30 30 900 0 0 DRAW OF LOTS 0 2 ROAD JUNCTION AT OR NEAR BAGDONA-WITHIN 1 KM EITHER SIDE FROM 7 BANK OF MAHARASHTRA (BAGDONA BRACH) ON BETUL REGULAR 100 SC CFS 25 25 625 0 0 DRAW OF LOTS 0 3 BARETHA-SAMI MAIN ROAD FROM BETUL OVER BRIDGE END UPTO 3 KM TOWARDS 8 BETUL REGULAR 150
    [Show full text]
  • M.P.P.K.V.V.C.L.(UR) UJJAIN Regional Office
    M.P.P.K.V.V.C.L.(UR) UJJAIN Regional office STD TELEPHONE S.No. OFFICER NAME DESIGNATION PLACE MOBILE NO. CODE OFF RES. E-Mail [email protected] 1 SHRI Punit Dube C.E. (UR) (UR) UJJAIN O734 2530140 2530117 8989983784 2 SHRI R.C. Jain S.E.(O) UJJAIN O734 2531154 8989984415 3 Shri Goutam Kochar DGM (IT) CE(UR) Ujjain O734 2531154 8989983751 4 SHRI K.K. SHARMA EE(WORKS) (UR) UJJAIN O734 2552254 8989984304 5 SHRI Sandeep Kalra C C EE -OPRERATION) (UR) UJJAIN O734 2530134 8989990221 6 Shri Ravindra Bhavsar EE cc UJJAIN O734 2559576 8989984130 7 Shri Hunaid Bohra SR. L.O. CE(UR) Ujjain O734 2530376 8989984113 8 Shri Anant Choure L.O. © (UR) UJJAIN O734 2530376 8989983728 9 SHRI R.K. SURYAWANSHI Sr. S.O. (UR) UJJAIN O734 2530125 8989984114 10 SHRI P.K. THAKKAR AE (UR) UJJAIN 0734 2530125 8989983814 11 Shri Anshul Karpenter JE (UR) UJJAIN O734 2530134 8989993162 12 SHRI Dr. D.S.RANA MEDICAL OFFICER (UR) UJJAIN O734 2530120 2530120 8989984109 13 SHRI PRIYANKA CHAREGAONKAR ASS-MANAGER (HR) (UR) UJJAIN O734 2530376 8989984115 14 SHRI P.K.DEO Sr.STENO (UR) UJJAIN O734 2530140 8989993196 15 SHRI G.S.PATEL STENO (UR) UJJAIN O734 2530140 8989993197 M.P.P.K.V.V.Co.Ltd., Ujjain Circle Updataed contact list as on 26 Feb..2020 Name of Office Name of Officers Office Telephone S. No. Designation (Full form) (Region/Circle/Division/Sub- STD Code Mobile Number Email - ID S/Shri Number Division/DC/Zone Circle Office Ujjain 1 Shri Bhupendra Singh S.E.
    [Show full text]
  • Interview List for Selection of Appointment of Notaries in the State of Madhya Pradesh
    Interview List For Selection Of Appointment Of Notaries In The State Of Madhya Pradesh Area Of S.No. Name Category Appl.Date Practice File No. Father Name Address Enrollment No. Applied For Balaji Ward, Hatta, Mukesh N-11013/3918/2018- 1777/1992 1 Gen 16.04.12 Hatta Lt.Sh.M.L.Jain Dist. Damoh, M.P.- Kumar Jain NC Dt.06.11.92 470775 9, Vip Road, Syed Faizan N-11013/3919/2018- Lt.Sh.Muqrrab 3171/1998 2 Gen 12.06.12 Bhopal Khanugaon, Bhopal, Husain NC Husain Dt.06.12.98 M.P.-462001 Pushpraj Vill. Kanchanpur, N-11013/3920/2018- 416/1999 3 Singh Gen 18.06.12 Satna Brijendra Singh P.O. Kothi, Distt. NC Dt.07.02.99 Baghel Satna, M.P.485666 New Colony, Vijay N-11013/3921/2018- Bhainsakhedi, 558/1999 4 Obc 31.05.12 Bhopal Tulsiram Patel Kumar Patel NC Bairagarh, Bhopal- Dt.28.02.99 462030, M.P. New Colony, Anil Kumar 05.03.12/ N-11013/3922/2018- Shiv Charan Bhainsakhedi, 1500-A/2000 5 Gen Bhopal Distt. Mishra 26.07.12 NC Mishra Bairagarh, Bhopal- Dt.17.05.2000 462030, M.P. Durga A-1/19, Old C.R.P. N-11013/3923/2018- 2404/1996 6 Prasad Obc 30.05.12 Bhopal Ratan Lal Pawar Bairagarh, Bhopal- NC Dt.07.09.96 Pawar 462030, M.P. Hospital Road, Ward No.6, Deeken, Teh. Mohan Lal N-11013/3924/2018- Banshi Lal Ji 3703/2003 7 Obc 14.09.12 J.M.F.C. Jawad Jawad, Dist.
    [Show full text]