48Th OCC Meeting Minutes
Total Page:16
File Type:pdf, Size:1020Kb
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/4204 Jabalpur, dated: 07.12.2015 To As per distribution list Sub: Minutes of 48th meeting of Operation and Coordination Committee of MP. The Minutes of 48th meeting of the Operation and Coordination Committee of MP scheduled at 10.30 AM on 28th October, 2015 at SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. ( K.K.Parbhakar) Memebr Secretary OCC SLDC, MPPTCL, Jabalpur Distribution List The Chief Engineer (T&C), The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, MP Power Transmission Co. Limited, Jabalpur. Jabalpur Fax No- 0761-2665593, 2702710 Fax No- 0761-2660908 Email- [email protected] Email- [email protected] The Chief Engineer (Procurement.), The Executive Director (O & M:Gen), MP Power Transmission Co. Limited, MP Power Generating Company Limited, Jabalpur. Jabalpur. Fax No- 0761-2664749 Fax No- 0761-2660908 Email- [email protected] Email – [email protected] Email- [email protected] The Chief Engineer (O & M:Hydel), The General Manager( PM), MP Power Generating Company Limited, MPPMCL, Jabalpur Jabalpur. Fax No- 0761-2664749 Email – [email protected] [email protected] The Superintending Engineer (GCC), The General Manger (DCC-EZ), MPPGCL, Jabalpur DISCOM Control Centre, MP Poorva Kshetra Vidyut Email – [email protected] Vitaran Co. Limited, Jabalpur. [email protected] Fax No- 0761-2668503 Email – [email protected] The Dy. General Manager (DCC –CZ) The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Madhya Kshetra DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Bhopal. Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Fax No-0755-2580611 Road, Indore, Fax No- 0731-2421554. Email- [email protected] Email- [email protected] The Executive Engineer, The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore Sub Load Despatch Centre, MPPTCL, Bhopal Fax No- 0731-2874515, Fax No- 0755-2885220 Email – [email protected] Email – [email protected] The General Manger(RO), MPPMCL, The Chief Engineer (PM&C), In front of Bhojpur Club Narmada Hydroelectric Development Corpn. Ltd, E-4, Arera Colony,Bhopal NHDC Parisar, Shamla Hills, Fax No-0755-2423046 Bhopal – 462013., Fax No- 0755-4030130 [email protected] Email – [email protected] The General Manager, The General Manager, Indira Sagar Power Station, NHDC Office complex, Omkareshwar Power Station, Prashsnik Bhawan, PO : Narmada Nagar, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 119. Distt : Khandwa (MP) – 450 554. Fax No- 07323-284080 FaxNo-07280-271703 Email – [email protected] Email- [email protected] The Director (Projects), The Sr. Vice President BLA Power Limited, Jaiprakash Power Ventures Ltd., At : Niwari, PO: Khorsipan, Village Sirchopi Subpost Office-Agasod, Tah : Gadarwara, Post Office-Bina- 470113 Distt- Sagar Distt ; Narsinghpur 487 551 Fax No. 07580-277200 Fax No. 07791-243667 / 243669 Email – [email protected] Email – [email protected] The Vice President, The Deputy General Manager, Welspun Solar MP Pvt. Ltd. Kalpataru Satpura Transco Pvt. Ltd. C-11, Sector-65, Noida-201301 Satpura Colony, Betul Road, Old Itarsi, Fax no. 0120-6757000 Distt. Hoshangabad. Email – [email protected] Email – [email protected] [email protected] Shri Atulya Kumar Naik, Addl. General Shri Naushad Saifi (Manager), M/s Waneep Solar Manager(PS), Solar Energy Corpoartaion of India, Pvt. Ltd.,602, Western Edge-I, Western Express D-3, 1st floor, Wing-A, Relgare building, Distrcit Highway, Borivali (E) , Mumbai-400066,India, e- centrer Saket, New Delhi – 110017 Fax no. 011- email : [email protected] 71989244, Email id :- [email protected] / aknaik@ seci.gov.in Shri Keshav Prasad (Chief Operating Officer-Solar), Shri Anchit Gupta (Director-Business Development), M/s IL&FS Energy Development Company Ltd., M/s Focal Renewable Energy (One & Two) India 1st Floor, Corporate Officer Tower, Ambience Mall Pvt. Ltd., 403-404, 4th Floor, Southern Park, D-2, Complex, Ambience Island, NH-8,Gurgaon-122001, Saket, New Delhi-110017 e- Haryana, e-mail: [email protected] mail: anchit@focal_energy.com MINUTES OF 48TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 28TH OCTOBER 2015 AT 10.30 AM AT SLDC, MPPTCL, JABALPUR The 48th meeting of Operation & Coordination Committee was held on 28th October at SLDC, MPPTCL, Jabalpur. The list of participants is enclosed at Annexure-1.0. Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC welcomed all the participants attending 48th Operation & Coordination Committee. He high-lighted the various issues to be discussed in the OCCM. Chairman OCC stated that last 47th OCCM was held at SGTPS, Birsingpur and meeting was continued upto post lunch session also and number of Operational / Energy Accounting issues which were pending have been resolved. Today’s meeting was proposed to be held at Omkareshwar but due to some unavoidable circumstances, meeting was arranged at SLDC, Jabalpur. The Chairman informed that during the month of August & September 2015, frequency remained 70.00% and 59.83% respectively between 49.9 to 50.05Hz. He further informed that during the month of August & September 2015, frequency remained below 49.9Hz for 15.03% and 29.39% time. Though the frequency control is a collective effort of all the constituents of National Grid, the entities of State Grid also follow the grid discipline to maintain the frequency within operational limits. This would save the additional DSM charges which are to be paid when MP, being surplus state, under draw from the grid at high frequency. The Chairman further elaborated about CERC’s Draft Procedure on Ancillary Services Operation Regulation-2015 issued on 13th August 2015 and requested State Grid entities for offering comments on the Procedure before due date. He further requested State Grid entities to offer comments/suggestions to Hon’ble CERC on Draft of CERC (Deviation Settlement Mechanism and Related Matters) (Third Amendment) Regulations, 2015. He informed the Committee that the Madhya Pradesh Electricity Balancing & Settlement Code 2015 has been notified by the MPERC on 18.09.2015 which will become effective from 1st November 2015. Some of the key amendments incorporated in the BSC-2015 were deliberated. He stated that 315 MVA ICTs at 765 KV Satna (PGCIL) were getting over loaded due to increased irrigational demand in Satna, Panna, Singrauli, Rewa and Chhatarpur districts. To keep the ICT loadings within safe limits and also to avoid any interruption to round the clock supply in that particular areas, the load of Rewa & Sidhi area has been shifted from Satna to Birsinghpur and Amarkantak. For this purpose, 220 KV Birsinghpur-Satna and 220 kV Satna-Rewa bunched at certain location to make new circuit as 220 kV Birsinghpur-Rewa Ckt. bypassing 220 KV Satna. Now the load of Satna, Panna & Chhatarpur Districts are being fed through Satna ICTs. He informed that this arrangement helped to relieve lverloading the ICTs at Satna (PG) substation. He further informed that grid disturbance of Category-GD1 was occurred at 220 KV S/s Satna on dated 20.08.2015 and resulted in interruption of supply at about 11 substations of Satna, Chhatarpur and Panna districts, with load loss of 366 MW. Satna substation neither contacted SLDC nor attended telephonic calls for about 45 minutes. This communication gap had delayed the restoration of the system. He requested all the constituents of State Grid to be in contact with SLDC during the emergencies in the grid and one person should always be available in the Control Room for attending the telephonic calls. SLDC should be informed about the details and extent of tripping of the grid elements within minimum possible time so that normalization could be started at the earliest. It has been observed that 132 KV S/s Satna and 220 KV S/s Chattarpur had started normalizing the supply by their own without informing and obtaining code from SLDC. This is not desirable for safe & secure operation of the Grid and is a serious violation of Grid Code. He also informed the Committee that two nos. 315 MVA ICTs have been failed at 400 kV S/s Bina and the loading on one ICT at Bina is being maintained by shifting some of the load on adjoining ICTs of Damoh, Bhopal, Gwalior & Minutes of 48th OCC of M.P 1 Shujalpur. One 315 MVA ICT at 400 kV S/s Indore is also failed in the month of July 2015. All these have reduced the reliability of system. The Chairman deliberated that scheduling of some of the Solar Power Generators located within the geographical area of MP have Long Term PPA with other States could not be commenced so far due to non- availability of any regulation for their deviation settlement. The matter has been taken up with the SECI trading power on behalf of Solar Generators for treating REGs as conventional Power Generator for computing their deviation and SECI has agreed to this proposal. Thereafter Shri P.A.R. Bende, Chairman OCC requested Shri K.K. Prabhakar Secretary (OCC) to take up the agenda items for discussion. ITEM NO. 1 : CONFIRMATION OF MINUTES: Minutes of 47th meeting of Operation & Coordination Committee of MP held on 25th August 2015 at SGTPS ,MPPGCL, Birsinghpur was forwarded to the Committee members vide No.07-05/SG-9B-II/3270 dated 21.09.2015. MPPGCL has sought amendment in Item No. 10.5 (i) of the MoM of 47th OCCM requesting to amend the date of settlement of energy of 40 MVA transformer w.e.f.