+

Cleveleys Building, and The Fylde College Building, Blackpool and The Fylde College before

PROJECT SCOPE REFERENCE CONTACT Client Testimonial John Pye “Blackpool and The Fylde College are delighted with the The project comprised design and build Project Director transformational change to the seven-storey landmark of an insulated aluminium rainscreen College Capital Projects Cleveleys Building which was completed on time and and replacement windows to the seven Ashfield Road, Bispham within budget by d+b facades. FY2 0HB The project was delivered around the normal working storey Cleveleys building and adjacent T: 01253 504349 operations of a live College site and we were pleased not boiler room with local repair, restraint M: 07932 605046 to have lost any teaching and learning time throughout and stabilisation of the existing external E: [email protected] the entire construction period thanks to d+b’s approach fabric. Additional works undertaken TYPE OF CONTRACT to careful planning. Design and build contract JCT 2005 We hope to undertake future over-cladding projects at included new aluminium glazed screens the College in forth-coming years and would welcome and doors at ground level and new CONTRACT VALUE £2.46m d+b being part of the project delivery team”. insulated over-roofing to all roofs. PROJECT DURATION 45 weeks John Pye, Project Director - College Capital Projects

Cleveleys Building, Blackpool and The Fylde College after

Cleveleys Building, Blackpool and The Fylde College + Cleveleys Building, Blackpool and The Fylde College before Cleveleys Building, Blackpool and The Fylde College after

Cleveleys Building, Blackpool and The Fylde College before Cleveleys Building, Blackpool and The Fylde College during

Cleveleys Building, Blackpool and The Fylde College + Cleveleys Building, Blackpool and The Fylde College before Cleveleys Building, Blackpool and The Fylde College after

Cleveleys Building, Blackpool and The Fylde College +