Scheme Assessment Report

Total Page:16

File Type:pdf, Size:1020Kb

Scheme Assessment Report A585 Windy Harbour to Skippool improvement scheme Stage 2 – Scheme Assessment Report October 2017 A585 Windy Harbour to Skippool Stage 2 - Scheme Assessment Report CONTENTS 1 EXECUTIVE SUMMARY ........................................................................................ 1 1.1 Introduction ....................................................................................................................................... 1 1.2 Format of report ................................................................................................................................ 1 1.3 Options considered ........................................................................................................................... 2 1.4 Non-statutory public consultation ................................................................................................... 3 1.5 Traffic and Economics ...................................................................................................................... 3 1.6 Environmental Assessment ............................................................................................................. 4 1.7 Chosen Option and Recommendations (In confidence) ............................................................... 4 2 INTRODUCTION ..................................................................................................... 5 2.1 Purpose of the Scheme Assessment Report ................................................................................. 5 2.2 Project objectives .............................................................................................................................. 5 3 SUMMARY OF EXISTING CONDITIONS .............................................................. 6 3.1 Scheme history and background .................................................................................................... 6 3.2 Existing route description ................................................................................................................ 8 3.3 Traffic Surveys ................................................................................................................................ 11 3.4 Accident Analysis ........................................................................................................................... 13 3.5 Topography ...................................................................................................................................... 17 3.6 Land use, property and industry ................................................................................................... 17 3.7 Climate ............................................................................................................................................. 18 3.8 Drainage ........................................................................................................................................... 19 3.9 Geology ............................................................................................................................................ 20 3.10 Mining ............................................................................................................................................... 22 3.11 Physical constraints ....................................................................................................................... 22 3.12 Statutory undertakers’ equipment ................................................................................................. 22 4 ENVIRONMENTAL STATUS ................................................................................ 24 4.1 Introduction ..................................................................................................................................... 24 4.2 Noise ................................................................................................................................................. 24 4.3 Air quality ......................................................................................................................................... 25 4.4 Landscape and townscape ............................................................................................................ 25 4.5 Historic environment ...................................................................................................................... 26 4.6 Biodiversity ...................................................................................................................................... 28 4.7 Water environment .......................................................................................................................... 29 4.8 Flood risk ......................................................................................................................................... 30 A585 Windy Harbour to Skippool Stage 2 - Scheme Assessment Report 5 PLANNING FACTORS ......................................................................................... 31 5.1 Planning Constraints ...................................................................................................................... 31 5.2 Wyre Council Local Plan ................................................................................................................ 31 5.3 Fylde Council Local Plan ................................................................................................................ 33 5.4 Fylde Coast Highways and Transportation Masterplan .............................................................. 34 5.5 Lancashire County Council - Mineral Safeguarding .................................................................... 34 6 DO NOTHING CONSEQUENCES ........................................................................ 36 7 SUMMARY OF ALTERNATIVE SCHEME OPTIONS .......................................... 37 7.1 Introduction ..................................................................................................................................... 37 7.2 Options developed further ............................................................................................................. 38 7.3 Option 1A ......................................................................................................................................... 38 7.4 Option 1B ......................................................................................................................................... 40 7.5 Option 2 ............................................................................................................................................ 41 7.6 Network operational resilience ...................................................................................................... 42 7.7 Works to de-trunk the existing A585 road .................................................................................... 43 8 DESIGN INFORMATION ...................................................................................... 46 8.1 Introduction ..................................................................................................................................... 46 8.2 Road Layout and Standards Used ................................................................................................. 46 8.3 Design speed ................................................................................................................................... 46 8.4 Cross section ................................................................................................................................... 47 8.5 Junction options ............................................................................................................................. 47 8.6 Traffic signal junction design ........................................................................................................ 48 8.7 Roundabout junction design ......................................................................................................... 48 8.8 Drainage design .............................................................................................................................. 48 8.9 Earthworks ....................................................................................................................................... 50 8.10 Other highway design issues ........................................................................................................ 50 8.11 Structures design ............................................................................................................................ 51 8.12 Relaxations and Departures from Standards ............................................................................... 52 9 LAND ISSUES ...................................................................................................... 54 9.1 Overview .......................................................................................................................................... 54 9.2 Land referencing ............................................................................................................................. 54 9.3 Further required land referencing work ........................................................................................ 54 10 STRATEGIC TRAFFIC MODELLING ................................................................... 55 10.1 Overview .........................................................................................................................................
Recommended publications
  • Wyre Settlement Study
    Wyre Council Wyre Local Plan Evidence Base Settlement Study August 2016 1 Wyre Council Local Plan Evidence Base - Settlement Study. August 2016 Contents 1. Introduction 2. What is a Settlement? 3. What is a Settlement Hierarchy? 4. The Geography of Wyre – A Summary 5. Methodology 6. Results Appendices Appendix 1 – Population Ranking by Settlement Appendix 2 – Service and Facility Ranking by Settlement Appendix 3 – Transport Accessibility and Connectivity Ranking by Settlement Appendix 4 – Employment Ranking by Settlement Appendix 5 – Overall Settlement Ranking Date: August 2016 2 Wyre Council Local Plan Evidence Base - Settlement Study. August 2016 1. Introduction This study forms part of the evidence base for the Wyre Local Plan. It details research undertaken by the Wyre council planning policy team into the role and function of the borough’s settlements, describing why this work has been undertaken, the methodology used and the results. Understanding the nature of different settlements and the relative roles they can play is critical to developing and delivering local plan strategy and individual policies. With this in mind, the aim of this Settlement Study is two-fold. First, to establish a baseline position in terms of understanding the level of economic and social infrastructure present in each settlement and how this might influence the appropriate nature and scale of development. It will provide evidence for discussions with stakeholders and developers about the nature of supporting infrastructure needed to ensure that future development is sustainable. Second, to identify, analyse and rank the borough’s settlements according to a range of indicators, and by doing so to inform the definition of the local plan settlement hierarchy (see Section 3 below).
    [Show full text]
  • Wyre Dance Directory
    Wyre Dance Directory Type Area Name Contact Email Phone Notes Where Day Time Salsa, Merengue, Martine 07967 For adults Frank Townend Centre, Latin Cleveleys Mambo, [email protected] Carole 970847 and children Kensington Road Latin & Freestyle 01253 Line Cleveleys no email St Theresa's Church Hall 594043 01253 RBL Club, Rough Lea Line Cleveleys no email 595790 Road Jorge’s [email protected] Salsa 07879 Cleveleys Salsa Jorge Ulloa www.jorgessalsalessons.yolasit Verona Hall Fri 6-7pm (Peruvian) 413649 Lessons e.com Martine 07967 Frank Townend Centre, Salsa Cleveleys [email protected] Carole 970847 Kensington Road Cleveleys Community Noches-de- 01253 (Frank Townend) 7.30- Salsa Cleveleys Al [email protected] Wed Salsa 401941 Centre, Kensington Road, 9.30pm Cleveleys FY5 1ER Thornton Cleveleys & District 01253 Cleveleys Park Methodist Scottish Cleveleys Scottish Mrs. Marmo no email 886014 Church, West Drive Country Dancing Society Senior Citizens Hall, 01253 Victoria Road, Sequence Cleveleys no email 852462 Anchorsholme Friendly Club Phil Kelsall 01253 Ballroom Fleetwood [email protected] Organists Marine Hall Chris Hopkins 771141 Christine 01253 Ballroom Fleetwood [email protected] Victoria Street Cheeseman 779746 07874 Farmer Parrs, Fleetwood Ballroom / Latin Fleetwood Alison Slinger [email protected] Improvers Fri 7-8pm 922223 Road 07874 Practise Farmer Parrs, Fleetwood Ballroom / Latin Fleetwood Alison Slinger [email protected] Fri 8-9.30 922223 session Road 07874 Social Farmer
    [Show full text]
  • 15 Lower Dolphinholme | Lancaster | LA2 9AX Cobble Cottage
    Fine & Country Tel: +44 (0)1524 380560 Cobble Cottage sales@fi neandcountry-lakes.co.uk 15 Lower Dolphinholme | Lancaster | LA2 9AX 8384344-print-Covers.indd 1-3 08/05/2019 18:28:06 FINE & COUNTRY Fine & Country is a global network of estate agencies This unique approach to luxury homes marketing specialising in the marketing, sale and rental of delivers high quality, intelligent and creative concepts luxury residential property. With offices in the UK, for property promotion combined with the latest COBBLE COTTAGE Ireland, The Channel Islands, France, Spain, Hungary, technology and marketing techniques. Portugal, Russia, Dubai, Egypt, South Africa, West Africa and Namibia we combine the widespread We understand moving home is one of the most exposure of the international marketplace with the important decisions you make; your home is both local expertise and knowledge of carefully selected a financial and emotional investment. With Fine & independent property professionals. Country you benefit from the local knowledge, experience, expertise and contacts of Fine & Country appreciates the most exclusive a well trained, educated and courteous team of properties require a more compelling, sophisticated professionals, working to make the sale or purchase and intelligent presentation - leading to a common, of your property as stress free as possible. yet uniquely exercised and successful strategy emphasising the lifestyle qualities of the property. 8384344-print-Covers.indd 4-6 08/05/2019 18:28:07 8384344-print-Pages.indd 1 08/05/2019 18:27:40 8384344-print-Pages.indd 2 08/05/2019 18:27:41 Located in the picturesque village of Lower Dolphinholme, Cobble Cottage is a Grade II listed stone built semi-detached property that is believed to date back to 1790.
    [Show full text]
  • Wyre Flood and Coastal Defence Strategy Review
    Wyre Flood and Coastal Defence Strategy Review Coastal Processes Report Wyre Borough Council July 2012 Wyre Flood and Coastal Defence Strategy Review Coastal Processes Report Wyre Borough Council July 2012 Halcrow Group Limited 2nd Floor Suite, Building 304, Bridgewater Place Birchwood Park, Warrington, Cheshire WA3 6XG tel 01925 867 500 fax 01925 867 600 halcrow.com Halcrow Group Limited has prepared this report in accordance with the instructions of client Wyre Borough Council for the client’s sole and specific use. Any other persons who use any information contained herein do so at their own risk. © Halcrow Group Limited 2012 Wyre Flood and Coastal Defence Strategy – Coastal Processes Report Document history Wyre Flood and Coastal Defence Strategy review Coastal Processes report Wyre Borough Council This document has been issued and amended as follows: Version Date Description Created by Verified by Approved by 1 19.10.2011 Draft for comment S Box A Parsons A Parsons 2 06.07.2012 Updated draft for comment S Box D Price A Parsons Wyre Flood and Coastal Defence Strategy – Coastal Processes Report Contents 1 Introduction 1 2 Review of previous studies 3 3 Physical Processes 5 3.1 Wave climate 5 3.2 Extreme wave conditions 5 3.3 Water levels 6 3.4 Tide levels 7 3.5 Extreme water levels 7 3.6 Joint Probability of waves and water levels 9 3.7 Previous flood events 12 3.8 Sediments 12 3.9 Sea level rise allowances 15 4 Coastal change 18 4.1 Historical change 18 4.2 Analysis of beach profile data 19 4.3 Sediment transport modelling 21 4.4
    [Show full text]
  • Summary of Fisheries Statistics 1985
    DIRECTORATE OF PLANNING & ENGINEERING. SUMMARY OF FISHERIES STATISTICS 1985. ISSN 0144-9141 SUMMARY OF FISHERIES STATISTICS, 1985 CONTENTS 1. Catch Statistics 1.1 Rod and line catches (from licence returns) 1.1.1 Salmon 1.1.2 Migratory Trout 1.2 Commercial catches 1.2.1 Salmon 1.2.2 Migratory Trout 2. Fish Culture and Hatchery Operations 2.1 Brood fish collection 2.2 Hatchery operations and salmon and sea trout stocking 2.2.1 Holmwrangle Hatchery 2.2.1.1 Numbers of ova laid down 2.2.1.2 Salmon and sea trout planting 2.2.2 Middleton Hatchery 2.2.2.1 Numbers of ova laid down 2.2.2.2 Salmon, and sea trout planting 2.2.3 Langcliffe Hatchery 2.2.3.1 Numbers of ova laid down 2.2.3.2 Salmon and sea trout planting - 1 - 3. Restocking with Trout and Freshwater Fish 3.1 Non-migratory trout 3.1.1 Stocking by Angling Associations etc., and Fish Farms 3.1.2 Stocking by NWWA 3.1.2.1 North Cumbria 3.1.2.2 South Cumbria/North Lancashire 3.1.2.3 South Lancashire 3.1.2.4 Mersey and Weaver 3.2 Freshwater Fish 3.2.1 Stocking by Angling Associations, etc 3.2.2 Fish transfers carried out by N.W.W.A. 3.2.2.1 Northern Area 3.2.2.2 Southern Area - South Lancashire 3.2.2.3 Southern Area - Mersey and Weaver 4. Fish Movement Recorded at Authority Fish Counters 4.1 River Lune 4.2 River Kent 4.3 River Leven 4.4 River Duddon 4.5 River Ribble Catchment 4.6 River Wyre 4.7 River Derwent 5.
    [Show full text]
  • Lancashire Bird Report 2003
    Lancashire & Cheshire Fauna Society Publication No. 106 Lancashire Bird Report 2003 The Birds of Lancashire and North Merseyside S. J. White (Editor) W. C. Aspin, D. A. Bickerton, A. Bunting, S. Dunstan, C. Liggett, B. McCarthy, P. J. Marsh, D. J. Rigby, J. F. Wright 2 Lancashire Bird Report 2003 CONTENTS Introduction ........................................... Dave Bickerton & Steve White ........ 3 Review of the Year ............................................................. John Wright ...... 10 Systematic List Swans & Geese ........................................................ Charlie Liggett ...... 14 Ducks ....................................................................... Dominic Rigby ...... 22 Gamebirds ........................................................................ Bill Aspin ...... 37 Divers to Cormorants ................................................... Steve White ...... 40 Herons ................................................................. Stephen Dunstan ...... 46 Birds of Prey ........................................................ Stephen Dunstan ...... 49 Rails ................................................................................. Bill Aspin ...... 55 Oystercatcher to Plovers ............................................ Andy Bunting ...... 58 Knot to Woodcock .................................................... Charlie Liggett ...... 64 Godwits to Curlew ........................................................ Steve White ...... 70 Spotted Redshank to Phalaropes .......................
    [Show full text]
  • Agenda DEVELOPMENT MANAGEMENT COMMITTEE
    Agenda DEVELOPMENT MANAGEMENT COMMITTEE Date: Wednesday, 7 October 2015 at 1:00pm Venue: Town Hall, St Annes, FY8 1LW Committee members: Councillor Trevor Fiddler (Chairman) Councillor Richard Redcliffe (Vice-Chairman) Councillors Christine Akeroyd, Peter Collins, Michael Cornah, Tony Ford JP, Neil Harvey, Kiran Mulholland, Barbara Nash, Linda Nulty, Liz Oades, Albert Pounder. Public Speaking at the Development Management Committee Members of the public may register to speak on individual planning applications, listed on the schedule at item 4: see Public Speaking at Council Meetings. PROCEDURAL ITEMS: PAGE Declarations of Interest: Declarations of interest, and the responsibility for 1 1 declaring the same, are matters for elected members. Members are able to obtain advice, in writing, in advance of meetings. This should only be sought via the Council’s Monitoring Officer. However, it should be noted that no advice on interests sought less than one working day prior to any meeting will be provided. Confirmation of Minutes: To confirm the minutes, as previously circulated, of 2 1 the meetings held on 9 September and 16 September 2015 as correct records. Substitute Members: Details of any substitute members notified in accordance 3 1 with council procedure rule 25. DECISION ITEMS: 4 Development Management Matters 3 - 139 5 List of Appeals Decided 140 6 Infrastructure Delivery Plan (The IDP) 141 - 216 The Lancashire Advanced Engineering and Manufacturing Enterprise Zone 7 217 - 269 (Warton) Local Development Order No 1 (2015) Page 1 of 269 Contact: Lyndsey Lacey - Telephone: (01253) 658504 – Email: [email protected] The code of conduct for members can be found in the council’s constitution at http://fylde.cmis.uk.com/fylde/DocumentsandInformation/PublicDocumentsandInformation.aspx © Fylde Borough Council copyright 2015 You may re-use this document/publication (not including logos) free of charge in any format or medium.
    [Show full text]
  • Wyre Local Plan – A585(T) Corridor Evidence Base
    STUDY REPORT Wyre Local Plan – A585(T) corridor evidence base Prepared for Highways England April 2016 Building 304 Bridgewater Place Birchwood Park Warrington WA3 6XG CH2M Contents Section Page Introduction ................................................................................................................................ 1 1.1 Introduction .................................................................................................................. 1 1.2 Purpose of this report ................................................................................................... 1 1.3 Structure of this report ................................................................................................. 1 Study context .............................................................................................................................. 2 2.1 Local Plan context ......................................................................................................... 2 2.2 Study area and the SRN ................................................................................................ 2 Study methodology ..................................................................................................................... 4 3.1 Method overview .......................................................................................................... 4 3.2 Segmented approach .................................................................................................... 4 3.3 Model platforms (and base data) ................................................................................
    [Show full text]
  • Walney Extension Scoping Report
    Walney Extension offshore wind farm – EIA Scoping Report September 2010 Walney Extension offshore wind farm rights, 2010. All rights reserved. For other chart data copyright see Appendix C. Environmental Impact Assessment Scoping Report Co-ordinated by: Ferdinando Giammichele and Trine Hoffman Sørensen. Prepared by: Ferdinando Giammichele, Stuart Livesey, Nicola Barberis-Negra, Trine Hoffman Sørensen, Jennifer Brack, Joanne Myers, Thomas Walsh, Emily Marshall, Aja Brodal, and Shiu-Yeung Hui. Checked by: Ferdinando Giammichele, Trine Hoffman Sørensen, Jesper Krarup Holst, and Hans Lyhne Borg. Approved by: Jesper Krarup Holst. DONG Energy Power (UK) Ltd. 33 Grosvenor Place, Belgravia, London, SW1X 7HY Additional contributions and review by: Project Management Support Services Ltd., Brown & May Marine Ltd. and Bond Pearce LLP. Version: Final. Date: September 27th 2010. Submitted to the Infrastructure Planning Commission (IPC) on September 27th 2010. © DONG Energy Power (UK) Ltd, 2010. All rights reserved. This report is also downloadable from the Walney offshore wind farm website at: www.walneyextension.co.uk or a paper copy can be requested by writing to: [email protected] . Pictures: © Walney (UK) Offshore Windfarms Ltd., 2010. Front cover picture: Horns Rev 2 offshore wind farm off the western Danish coast at Esbjerg, September 2009 © DONG Energy Power (UK) Ltd., 2010. Charts: © DONG Energy Power (UK) Ltd., 2010. United Kingdom Hydrographic Office admiralty charts: © SeaZone Solutions Ltd. Licence no. 092008.004 to DONG Energy Power (UK) Ltd. United Kingdom coastline and background raster tiles (1:250,000 and 1:10,000) contain OS OpenData: Ordnance Survey © Crown Copyright and database DONG Energy Page 2 of 151 Walney Extension offshore wind farm – EIA Scoping Report September 2010 Table of Contents Summary ...............................................................................................................................................
    [Show full text]
  • Hillhouse-Technology-Enterprise
    Lancashire Advanced Manufacturing and Energy Cluster HILLHOUSE TECHNOLOGY ENTERPRISE ZONE Clear financial benefits from day 1 Business Rates Relief, Enhanced Capital Allowances and more Co-locate with your customers The easiest way to grow your business, increase your sales and reduce distribution costs. Enterprise Zones are establishing themselves as the driving force of local economies as they unlock key development sites, consolidate infrastructure, attract business and create jobs. A straightforward planning process Need a new building to meet your business needs? Simplified planning rules could save you time and money Business-ready infrastructure Superfast broadband, easy access to transport links, and a local highly skilled labour pool. What benefits does the Enterprise Zone offer? Businesses that locate on the Enterprise What are the Timescales to qualify? 138 hectare site Zone can access a number of benefits: Businesses that locate on Hillhouse Technology occupied by over • Up to 100% business rate discount worth up to Enterprise Zone before March 2022 qualify for £275,000 per business over a 5-year period Business Rates Relief. 40 companies, • Or 100% Enhanced Capital Allowances (tax relief) Where Enhanced Capital Allowances are available, including world- to businesses making large investments in plant businesses now have up to eight years from and machinery. the launch of the Enterprise Zone to make their leading chemical and investment, to November 2023. • Superfast broadband will be available on site. polymer production companies ATTRACTING INWARD INVESTMENT TO CLEVELEYS, BLACKPOOL & Nationally, Enterprise Zones are helping toM55 attract more investment into the country, bringing jobs and businesses, delivering long-term, sustainable growth based on cutting-edge technology and enterprise.
    [Show full text]
  • Minutes – 7 October 2015
    Development Management Committee Minutes – 7 October 2015 Minutes Development Management Committee Date: Wednesday, 7 October 2015 Venue: Town Hall, St Annes Committee members: Councillor Trevor Fiddler (Chairman) Councillor Richard Redcliffe (Vice-Chairman) Councillors Christine Akeroyd, Peter Collins, Michael Cornah, Tony Ford JP, Neil Harvey, Kiran Mulholland, Barbara Nash, Linda Nulty, Liz Oades Other Council members: Councillors Maxine Chew, Paul Hayhurst, Sandra Pitman Officers: Ian Curtis, Mark Evans, Andrew Stell, Kieran Birch, Michael Eastham, Lyndsey Lacey, Stephen Smith, Matthew Taylor Members of the public: Approximately 22 members of the public were in attendance during the course of the day. Procedural Items Public Speaking at the Development Management Committee In accordance with the public speaking arrangements for the Development Management Committee, 9 members of the public addressed the committee on various applications detailed on the agenda. 1. Declarations of interest Members were reminded that any disclosable pecuniary interests should be declared as required by the Localism Act 2011 and any personal or prejudicial interests should be declared as required by the Council’s Code of Conduct for Members. Councillor Linda Nulty declared a personal and prejudicial interest in planning application no: 15/0309 relating to Mill Farm Ventures, Fleetwood Road, Medlar with Wesham and withdrew from the meeting during the consideration and voting of this item. 2. Confirmation of Minutes RESOLVED: To approve the minutes of the Development Management Committee held on 9 and 16 September 2015 as a correct record for signature by the Chairman. Development Management Committee Minutes – 7 October 2015 3. Substitute members There were no substitute members in attendance at the meeting.
    [Show full text]
  • Meeting Agenda
    Meeting Agenda Development Control Committee Town Hall, St Annes Wednesday 21 October 2009, 10:00a.m. The maximum capacity for this meeting room is 60 persons – once this limit is reached no other person can be admitted. Membership Development Control Committee CHAIRMAN - John Bennett VICE-CHAIRMAN - Janine Owen Councillors Ben Aitken Councillors George Caldwell Christine Akeroyd Barbara Douglas Michael Cornah Albert Pounder Richard Fulford-Brown Trevor Fiddler Kevin Eastham Howard Henshaw Peter Hardy Linda Nulty Maxine Chew Heather Speak Contact: Lyndsey Lacey, St. Annes (01253) 658504, Email: [email protected] 2 Our Vision To establish Fylde Borough Council as a high performing local authority Our Corporate Objectives To improve the economic, social and environmental well-being of our communities through: • The promotion and enhancement of the natural built environment • Increasing the availability and access to good quality housing for all • Maintaining healthy and safe communities to reduce the fear of crime • Supporting and sustaining a strong and diverse Fylde coast economy to further enhance employment prospects We will achieve this by: Focusing on customer requirements Clear community and organisational leadership Delivering high quality, cost-effective services Partnership working 3 A G E N D A PART I - MATTERS DELEGATED TO COMMITTEE ITEM PAGE 1. DECLARATIONS OF INTEREST: If a member requires advice on 4 Declarations of Interest he/she is advised to contact the Monitoring Officer in advance of the meeting. (For the assistance of Members an extract from the Councils Code of Conduct is attached). 2. CONFIRMATION OF MINUTES: To confirm as a correct record 4 the minutes of the Development Control Committee meeting held on 7 October 2009 (previously circulated).
    [Show full text]