A Tour of Codelco's Santiago Operations Center

Total Page:16

File Type:pdf, Size:1020Kb

A Tour of Codelco's Santiago Operations Center A Tour of Codelco’s Santiago Operations Center INTRODUCTION Copper supplier to the world Codelco – or the Corporación Nacional del Cobre de Chile – is the world’s largest copper producer, manufacturing 1.8 million tons of fine copper per year, representing 15 percent of global production. The state-owned company controls the world’s largest known copper reserves, deep within the Andes Mountains of Chile. The 118 million tons of copper residing within Codelco mines is sufficient for more than 70 years of production at current production rates. Organizationally, Codelco is split into four areas: research, exploration, acquisition and development. Each of these units support the company’s principal production sites, which are structured into the following Divisions: Andina, Chuquicamata, El Teniente, Gabriela Mistral, Ministro Hales, Radomiro Tomic, Salvador and Ventanas; plus, the El Abra mine, in which Codelco holds a 49% interest. Joint venture with control of its Andes-based mines and production facilities to the cosmopolitan streets Honeywell Drives of Santiago, the Chilean capital. Together with Process Stability and Honeywell, it has built a state-of-the-art, remote 24x7 Operations Center in the heart of the Business Performance city, combining mining operations along with In 2007, Codelco formed a joint venture with concentrator plant, roaster and maintenance Honeywell, through which Honeywell supplies functions for the Ministro Hales Division. Codelco with process automation technology Zamora explains the rationale: “Based on and services to improve the performance of Codelco drivers, we wanted to minimize safety the company’s plants. The joint venture, called risks to workers and improve their quality of life Kairos Mining, was designed to improve process while increasing productivity. The fact is, people stability and business performance at the sites. don’t want to work long-term in the mountains “Kairos Mining is a long-term alliance that anymore, and technical talent is difficult to is helping Codelco achieve greater process retain. So, Codelco decided to migrate plant efficiency through higher automation standards,” functions hundreds of kilometers away, to the explains Claudio Zamora, President and city center.” CEO of Kairos Mining. “Honeywell Connected The Santiago Operations Center uses the latest Plant technologies are enabling Codelco to technologies to foster communication and optimize assets, improve operation continuity, interaction. It incorporates remote operation and and standardize automation processes and remote monitoring centers equipped with video technologies.” transmission equipment, video IP phones and a large-scale display wall; testing, development Innovating through and training laboratories; and meeting, training Connected Operations and video conferencing facilities. Today, Codelco is the midst of an ambitious, forward-thinking project to transfer operational Improving Production making – creating a connected production environment that’s delivering $45 million Efficiencies at Key Sites in incremental revenue annually through Today, the Operations Center is using data improved production quality and productivity analytics, predictive maintenance and for the Ministro Hales Division. The connected Honeywell Connected Plant expertise to deliver operating model was a brave business decision – radically improved production, productivity and and one that’s paying off.” increased revenues at Codelco’s plants. Operators can see production environments Visiting the clearly through cameras and high-resolution Operations Center screens, and are better coordinated since they can work together in the same room. Approved visitors can tour the Santiago Operations Center to better understand how Codelco is also able to achieve the full Codelco is solving production and business automation of its Advanced Process Control challenges through connected technologies, and (APC) systems, and to manage and exploit to see Honeywell advanced solutions at work. large volumes of data to improve production performance. Meanwhile, operations staff are There are eight major Operations Center alerted in real time to potential problems, and functions that visitors can experience: can modify processes to prevent the loss of Remote Support; Ministro Hales Remote continuity. Operations; Competency Management; Connected Assets; Application Development; The Operations Center has helped Codelco fine- Lifecycle Support; Advanced Process tune production, improve the use and availability Control Support; and Process Support. of equipment and systems, reduce costs and increase the productivity of its teams. Over the following pages, we’ll take you on a tour of each of these areas, allowing Zamora says: “Honeywell has helped Codelco you to better understand which functions integrate processes, information and decision are most relevant to your business. REMOTE SUPPORT CENTER For years, Codelco’s far-flung sites were There are three business drivers for Codelco’s constrained by the availability and cost of Remote Support Center function in Santiago, qualified specialists. The Remote Support through which cross-functional specialists Center addresses this challenge by providing support processes, advanced control applications, senior-level support across each plant. DCS and communications at Codelco plants: The Remote Support Center also provides real-time • Sustain automation benefits over time monitoring of open-platform process automation systems, and online access to process data and • Overcome the lack of on-site specialists control application information for different sites. • Reduce downtime and improve This allows Codelco’s process specialists to study operational continuity the impact that one process stage has on the Connected to the plants through a secure private next; the relationship between process variables; network, the Remote Support Center provides the identification of factors that might inhibit centralized access to multi-plant process process performance; and the evaluation of best information and automation resources, plus practices that can be replicated at other sites. services to follow-up processes, support plant operators, identify improvement opportunities KEY OUTCOMES and facilitate changes in operational Increased production yield practices to sustain automation benefits. Reduced operating costs Improved risk and safety profile MINISTRO HALES REMOTE improving the quality of decision making OPERATIONS CENTER through the visualization of productive chain variables; boosting product quality Codelco’s Ministro Hales plant, located in through an advanced control app; and Chile’s northern Antofagasta region, is run reducing water and energy consumption. from a dedicated Remote Operation Center in Santiago managed by Kairos Mining. The remote At the Ministro Hales Remote Operations operating model is having a beneficial impact on Center, you can see various Honeywell solutions process continuity and efficiency at the site. at work, including: the Experion® Process Knowledge System platform; sleek, intuitive The Kairos Mining team is enabling process Experion Orion consoles; an alarm management continuity by improving safety; minimizing system; control operations for SAG, grinding, disruptions to plant access; and using flotation and roasting processes; Digital Video condition monitoring to check the health Manager; and remote radio communications. of the plant’s process equipment. Simultaneously, Kairos Mining specialists have KEY OUTCOMES boosted process efficiency by integrating the Delivering $45 million in incremental annual revenue] management of operations and maintenance; Faster, better access to expertise whenever it’s needed establishing better coordination between Improvement in safety indicators due to less exposure to process operators; and ensuring consistency hazardous areas in operations criteria. Additionally, they are heightening operators’ situational awareness; COMPETENCY MANAGEMENT The training has also facilitated the adoption Through its Competency Management program, of new technologies and operational practices, Codelco is improving the knowledge, aptitude and and helped to standardize the learning of mining efficiency of its employees while adapting them to process behaviors and operational criteria, creating technological change. a strong foundation for operational efficiency and commercial success Nearly 1,400 Codelco employees have completed competency management training to build their KEY OUTCOMES knowledge of control system technology, advanced . Delivering $45 million in incremental annual revenue] control applications and process operations. Faster, better access to expertise whenever it’s needed Training sessions are conducted on-site, in the Improvement in safety indicators due to less exposure to Kairos Mining Remote Operations Center and via hazardous areas the web. The result? Employees are getting more out of Codelco’s installed systems. CONNECTED ASSETS Nearly 1,400 Codelco employees have completed Connected Assets allow operators to competency management training to build their boost operational efficiency, make more knowledge of control system technology, advanced timely decisions, reduce downtime and control applications and process operations. improve information transparency. Training sessions are conducted on-site, in the Kairos Mining Remote Operations Center and Using remote access and monitoring tools, via the web. The result? Employees are getting operators
Recommended publications
  • Carta De Codelco
    Codelco Investor Presentation February 2014 Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. CopyrightsCopyrights © 20112010 by CODELCO--CHILE. All Rights Reserved. 1 Codelco´s Highlights Industry Overview Operating & Financial Review Development Plan Update & Outlook Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. CopyrightsCopyrights © 20112010 by CODELCO--CHILE. All Rights Reserved. 2 Codelco At a Glance World Largest Copper Producer: 10% of Market Share Copper Reserves and Sep 2013 Financial Results Resources (million US$) (million mft) Pre-Tax Profit 2,672 Geological Resources 339.5 EBITDA 4,194 Mineral Resources 131.9 EBITDA Margin 38.5% Reserves 63.6 Sep 2013 Production* Credit Ratings (thousand mft) S&P AA- Stable Copper 1,310 Moody‟s A1 Negative World largest copper producer Fitch A+ Stable Molybdenum 16.2 2nd world largest moly producer DBRS A Stable *: Includes 49% share in El Abra and 20% in Anglo American Sur Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. CopyrightsCopyrights © 20112010 by CODELCO--CHILE. All Rights Reserved. 3 Codelco: Sales Breakdown Sales Breakdown by Product – Sep 2013 Sales Breakdown by Region (mft) – Sep 2013 100% US$ millions 2013 % 1% 1% 13% 10% Copper 10,128 92.9% 90% Molybdenum 378 3.5% 10% 80% 12% Other Products (anodic slimes, 395 3.6% 70% 18% sulfuric acid, etc.) 15% Total 10,901 100% 60% 50% 18% 20% Copper Sales Breakdown (mft) – Sep 2013 40% Refined Copper 80% 30% Concentrate 20% - Cathodes 74% - Anodes/Blister 6% 20% 41% 40% 10% 0% Sep-13 Sep-12 China Asia (exc. China) Europe Source: Codelco North America South America Oceania Copyrights © 2011 CODELCO-CHILE.
    [Show full text]
  • Salvador Allende Rea
    I Chronology: Chile 1962-1975 Sources: Appendix to Church Committee Report reproduced on the Internet by Rdbinson Rojas Research Unit Consultancy <http:// www. soft.net.uk/rrojasdatabank/index.htm> [the "Church Committee," named after its chairman Senator Frank Church, was the U.S. Senate Select Committee to Study Governmental Operations in Respect to Intelligence Activities]; James D. Cockcroft, Latin America: History, Politics, and U.S. Policy, 2"d ed. (Belmont, CA: Wadsworth Publishing/Thomson Learning, 1997), 531-565; Congressional Research Service, Library of Congress, "Chile: A Chronology," Appendix A of United States and Chile During the Allende Years, 1970-1973: Hearings before the Subcommittee on Inter-American Affairs o] the Committee on Foreign Affairs, U.S. House of Representatives (Washington, D.C.: U.S. Government Printing Office, 1975); Hedda Garza, Salvador Allende (New York and Philadelphia: Chelsea House Publishers, 1989); "HI and Chile," Report of the Senate Foreign Relations Subcommittee on Multinational Corporations, June 21,1973; NACLA Report on the Americas, May-June 1999. 1962 Special Group [select U.S. government officials including the CIA approves $50,000 to strengthen Christian Democratic Party (PDC) subsequently approves an additional $180,000 to strengthen PDC anc its leader, Eduardo Frei. Throughout early 1960s, the U.S. Depart ment of the Army and a team of U.S. university professors develop "Project Camelot," which calls for the coordinated buildup of civilian and military forces inside Chile, with U.S. support, into a force capable of overthrowing any elected left-coalition govemment. 1963 Special Group approves $20,000 for a leader of the Radical Party (PR); later approves an additional $30,000 to support PR candidates in April municipal elections.
    [Show full text]
  • The Mineral Industry of Chile in 2014
    2014 Minerals Yearbook CHILE U.S. Department of the Interior October 2017 U.S. Geological Survey THE MINERAL INDUSTRY OF CHILE By Susan Wacaster Chile’s position in the world’s mineral economy was that of a accounted for by the mining sector—4.9% by state-owned leading producer of copper, gold, iodine, lithium, molybdenum, Corporación National del Cobre (CODELCO) and 5.1% by natural nitrates, rhenium, silver, and zinc. In 2014, Chile private mining operations. The mining sector’s contribution to continued to be the world’s leading producer of mined copper, Government revenue between 2003 and 2013 averaged about accounting for 31% of the total; iodine, 66%; and rhenium, 20% annually but had been decreasing since 2008. The decrease 56%. Chile was the world’s second-ranked producer of lithium, was directly related to a downturn in international prices for accounting for 36% of total mine production after Australia copper. Since 2012, the average annual rate of growth of the (with less than a 1% difference), and mined boron (ulexite), price of refined copper on both the London Metal Exchange accounting for 10% of total production after Turkey (which and the New York Metal Exchange decreased by an average accounted for 70% of world production). Chile was the world’s annual rate of 8%. In turn, the average annual rate of growth third-ranked producer of molybdenum, accounting for 17% of of copper mine production in Chile increased by 3% per year. world production after China (37% of world production) and Mining sector activities contributed significantly to other the United States (24%); and the fifth-ranked producer of mined economic sectors in Chile.
    [Show full text]
  • Telfer W with Pr 800,000 Copper Signific Resourc
    4420 Newcrest Cover 04 6pp 16/9/04 9:52 AM Page 2 Telfer will be the largest gold mine in Australia, with projected annual production of more than 800,000 ounces of gold and 30,000 tonnes of copper for 24 years, positioning Newcrest as a significant and profitable Australian-based resources business. Newcrest Mining Limited Newcrest – The Sustainable Section 5 Resource Business 1 Sustainability and People 38 Section 1 Health and Safety 40 Our Results 2 Environment 42 Human Resources 43 Performance in Brief 2 Chairman’s Review 4 Section 6 ABN: 20 005 683 625 ABN: Managing Director and Corporate Governance 44 Chief Executive Officer’s Report 5 Board of Directors 45 Newcrest Senior Management 10 Corporate Governance 46 Financial Report 11 Section 7 Section 2 Concise Annual Report 2004 Financials 49 Operations 12 Directors’ Report 50 Cadia Valley Operations 14 Management Discussion and Analysis Ridgeway Gold/Copper Mine 14 of the Financial Statements 56 Cadia Hill Gold/Copper Mine 16 Statement of Financial Performance 58 Toguraci Gold Mine 19 Statement of Financial Position 59 Section 3 Statement of Cash Flows 60 Projects 22 Notes to the Concise Financial Report 61 Directors’ Declaration 68 Telfer Gold/Copper Project 24 Independent Audit Report 69 Cracow 26 Cadia East 28 Shareholder Information 70 Boddington Expansion Project 29 Five Year Summary 72 Section 4 Corporate Directory IBC Exploration 30 Strategy and Review 32 Mineral Resources and Ore Reserves 34 Newcrest Mining Limited Newcrest ABN: 20 005 683 625 Notice of Meeting Notice is hereby given that the 24th Annual General Newcrest Mining Limited Meeting will be held at the Hyatt Regency Hotel, Concise Annual Report 2004 99 Adelaide Terrace, Perth, Western Australia on Wednesday 27 October 2004 at 9.30am.
    [Show full text]
  • Investor Presentation
    Southern Copper Corporation November, 2018 0 I. Introduction 1 Safe Harbor Statement This presentation contains certain statements that are neither reported financial results nor other historical information. These estimates are forward-looking statements within the meaning of the safe-harbor provisions of the securities laws. These forward-looking estimates are subject to risk and uncertainties that could cause actual results to differ materially from the expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Southern Copper’s (SCC) ability to control or estimate precisely, such as future market conditions, commodity prices, the behavior of other market participants and the actions of governmental regulators. Readers are cautioned not to place undue reliance on these forward- looking statements, which speak only as of the date of this presentation. SCC does not undertake any obligation to publicly release any revision to these forward-looking estimates to reflect events or circumstances after the date of this presentation. 2 Corporate Structure 100.0% (*) AMERICAS MINING CORPORATION 88.9% (*) Public Float 11.1% (*) 99.29 % 99.96 % SCC Peru Branch Minera Mexico (*) As of September 30, 2018 3 Copper – The Best Fundamental Story in Commodities Solid Fundamentals Copper Consumption by Region ► Copper has the best fundamentals in the basic materials space: ― Expect 2.8% copper demand growth. 2018 demand driven by strong U. S. economic growth. ― Expect supply growth of 2% due to lack of projects. About 1/3 of world supply will discuss labor conditions. ― Our basic scenario does not consider an escalation of U.S.
    [Show full text]
  • The United States, Eduardo Frei's Revolution in Liberty and The
    The Gathering Storm: The United States, Eduardo Frei's Revolution in Liberty and the Polarization of Chilean Politics, 1964-1970 A dissertation presented to the faculty of the College of Arts and Sciences of Ohio University In partial fulfillment of the requirements for the degree Doctor of Philosophy Sebastian Hurtado-Torres December 2016 © 2016 Sebastian Hurtado-Torres. All Rights Reserved. 2 This dissertation titled The Gathering Storm: The United States, Eduardo Frei's Revolution in Liberty, and the Polarization of Chilean Politics, 1964-1970 by SEBASTIAN HURTADO-TORRES has been approved for the Department of History and the College of Arts and Sciences by Patrick Barr-Melej Associate Professor of History Robert Frank Dean, College of Arts and Sciences 3 ABSTRACT HURTADO-TORRES, SEBASTIAN, Ph.D., December 2016, History The Gathering Storm: The United States, Eduardo Frei’s Revolution in Liberty, and the Polarization of Chilean Politics, 1964-1970 Director of Dissertation: Patrick Barr-Melej This dissertation explores the involvement of the United States in Chilean politics between the presidential campaign of 1964 and Salvador Allende’s accession to the presidency in 1970. The main argument of this work is that the partnership between the Christian Democratic Party of Chile (PDC) and the United States in this period played a significant role in shaping Chilean politics and thus contributed to its growing polarization. The alliance between the PDC and the United States was based as much on their common views on communism as on their shared ideas about modernization and economic development. Furthermore, the U.S. Embassy in Santiago, headed by men strongly committed to the success of the Christian Democratic project, involved itself heavily in the inner workings of Chilean politics as an informal actor, unable to dictate terms but capable of exerting influence on local actors whose interests converged with those of the United States.
    [Show full text]
  • Peñasquito Site Tour
    Peñasquito Site Tour FEBRUARY 2020 PEÑASQUITO SITE TOUR 2.27.2020 Cautionary Statement CAUTIONARY STATEMENT REGARDING FORWARD LOOKING STATEMENTS: This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other applicable laws. Where a forward-looking statement expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by the forward-looking statements. Forward-looking statements often address our expected future business and financial performance and financial condition; and often contain words such as “anticipate,” “intend,” “plan,” “will,” “would,” “estimate,” “expect,” “believe,” “target,” “indicative,” “preliminary,” or “potential.” Forward-looking statements in this presentation may include, without limitation, (i) estimates of future production and sales, including production outlook, average future production, upside potential and indicative production profiles; (ii) estimates of future costs applicable to sales and all-in sustaining costs; (iii) estimates of project spend, budget estimates, sustaining capital and
    [Show full text]
  • Contents Codelco – 1.7MT Steady – Sum 1.7MT 2020 – GROWTH 1.7MT
    Expected forward production per copper miner Contents Codelco – 1.7MT steady – sum 1.7MT 2020 – GROWTH 1.7MT ....................................... 2 BHP – 1.7MT – 3.4 MT – growth 3.4MT ............................................................................ 4 Rio Tinto – 0.4MT = 3.8MT – growth 3.8MT ...................................................................... 4 Glencore – 1.4MT down to 1.3 MT long term – 2020=5.2MT, 2024=5.1MT ...................... 4 FCX – 1.5MT – growing to 1.9 2022 = 6.7 MT later 7.1 MT ............................................... 4 Anglo American0.8 – +0.45MT by 2023 – 7.5MT – later 8.35MT ...................................... 5 Antofagasta – 0.7MT, going to 1MT 2025 – 8.3MT later 9.35 MT ...................................... 5 Norilsk 0.5 – stable – 8.8 MT – 9.85 MT .............................................................................. 5 First quantum 0.7MT – 0.7MT – 9.5MT later 10.55MT ....................................................... 5 Sourhern copper 1MT – 2025 1 MT – 2027 1.7MT – 10.5MT – 11.55 MT by 2025. 2027 12.35 MT................................................................................................................................ 5 Teck 0.3 MT + 0.3 by 2023 – 10.8MT – 2023 12.15 MT ..................................................... 5 Barrick Gold – 0.15 rest included with Zaldivar for Antofagasta – 0.15 = 10.95/12.3 MT .. 6 Newcrest mining – 0.1 growth Wafi Golpu – 11.05/12.4 MT ............................................... 6 Seabridge gold KSM project .................................................................................................
    [Show full text]
  • RECEIVED ABSTRACTS (73 Abstracts As of November 15, 2019)
    RECEIVED ABSTRACTS (73 abstracts as of November 15, 2019) Represented Countries (10): Argentina, Australia, Brazil, Canada, Colombia, Chile, England, Peru, South Africa and USA Lean Production (7) (A07) Use of Availability (UoA) Improvement in Minera Las Bambas Luis Reynafarge, Pável Oropeza and Juan Herrán, Minera Las Bambas, Peru (A08) Six Sigma to Enhance Operational Performance in a Concentrate Plant Jorge Arana, Rolando Quispe and Marco Gutierrez, Minera Las Bambas, Peru (A09) Hauling Payload Improvement in Minera Las Bambas Luis Reynafarge, Pável Oropeza and Juan Herrán, Minera Las Bambas, Peru (A23) Operational Experience of Autonomous Hauling System at Gabriela Mistral Mine Diego Quezada, Gabriela Mistral Division, Codelco, Chile (A28) Information Flows Impact on Productivity through Lean Initiatives Patricio Gahona, Alberto Lagos and Fabián Retamal, Gestión de la Producción, Chile (A62) Lean Transformation at MolymetNos Operation Oscar Ley and Ricardo Araya, Molymet, Chile; Diego Zamorano and Laura Mottola, Flow Partners, Chile and Canada (A73) Lean Construction Applied to Underground Mine Development Codelco Operational Excellence Team, Chile and McKinsey, USA Process Improvement and Technology Innovation (30) (A01) Improved Refuelling Assignment based on Multiple Fitted Fuel Level Models for Komatsu's 930E EDT's Matías Benavides, Angelo Hermosilla and Diego Cáceres, Komatsu, Chile (A02) Classification of Haul Truck’s Spotting Time on Shovel Double Spot Loading Pattern Sebastián Seria, Daniel González and Diego Cáceres, Komatsu,
    [Show full text]
  • Emerging Players in Global Mining Public Disclosure Authorized Public Disclosure Authorized
    Extractive Industries and Development48882 Series #5 June 2009 Public Disclosure Authorized Emerging Players in Global Mining Public Disclosure Authorized Public Disclosure Authorized Dr. David Humphreys The World Bank 1818 H Street, N.W. Washington, D.C. 20433 USA www.worldbank.org/ogmc (OR /oil OR /gas OR /mining) Public Disclosure Authorized www.ifc.org/ogmc (OR /oil OR /gas OR /mining) World Bank Group’s Oil, Gas, and Mining Policy Division Oil, Gas, Mining, and Chemicals Department A joint service of the World Bank and the International Finance Corporation The Oil, Gas, and Mining Policy Division series publishes reviews and analyses of sector experience from around the world as well as new findings from analytical work. It places particular emphasis on how the experience and knowledge gained relates to developing country policy makers, communities affected by extractive industries, extractive industry enterprises, and civil society organizations. We hope to see this series inform a wide range of interested parties on the opportunities as well as the risks presented by the sector. The findings, interpretations, and conclusions expressed in this paper are entirely those of the authors and should not be attributed in any manner to the World Bank or its affiliated organizations, or to members of its Board of Executive Directors or the countries they represent. The World Bank does not guarantee the accuracy of the data included in this publication and accepts no responsibility whatsoever for any consequence of their use. Extractive Industries
    [Show full text]
  • Keeping the US Hand Well Hidden: the Role of the Church Committee in Rethinking US Covert Intervention in the 1970S
    Keeping the US Hand Well Hidden: The Role of the Church Committee in Rethinking US Covert Intervention in the 1970s Julia Kropa A thesis submitted in partial fulfillment of the requirements for the degree of BACHELOR OF ARTS WITH HONORS DEPARTMENT OF HISTORY UNIVERSITY OF MICHIGAN April 2, 2018 Advised by Professor Victoria Langland TABLE OF CONTENTS Acknowledgments…………………………………………………………………………..ii Timeline……………………………………………………………………………………iii Introduction…………………………………………………………………………………1 Chapter 1: US Covert Involvement and the Death of General Schneider…………………14 The Election of 1970 and Escalation of US Involvement…………………………16 Creating an Atmosphere of Overthrow……………………………………………26 The Aftermath of General Schneider’s Death……………………………………..37 Chapter 2: The Formation of the Church Committee……………………………………..42 The Origins of the Church Committee…………………………………………….45 White House Opposition to the Church Committee……………………………….59 The Committee’s Purpose for Investigating Assassination Plots………………….66 Chapter 3: The Church Committee Investigates Assassination Plots……………………..70 The Church Committee’s Investigation…………………………………………...73 The Investigation Reaches the White House………………………………………81 The Committee’s Interim Report and its Findings………………………………...91 Conclusion…………………………………………………………………………………96 Appendix 1……………………………………………………………………………….102 Appendix 2……………………………………………………………………………….107 Bibliography……………………………………………………………………………...109 i Acknowledgments First and foremost, thank you to my advisor, Professor Victoria Langland, for her guidance and encouragement at every stage of this project from my initial thoughts to the end product. I would like to thank the LSA Honors Program and the History Department for generously providing funding for my research and writing. I am also thankful to my writing group, Maggie and Noah, for reading my many drafts and offering feedback at every step in the process. Many thanks to Emily for listening to me for a year and a half talking and brainstorming out loud, and for forcing me to always keep on working.
    [Show full text]
  • Recent Developments and Perspectives
    BMO CAPITAL MARKETS 25th GLOBAL METALS & MINING CONFERENCE CODELCO: RECENT DEVELOPMENTS AND PERSPECTIVES Oscar Landerretche M. Chairman of the Board February 28 - March 2, 2016 CODELCO HIGHLIGHTS 2 Copyrights© 2015 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights© 2015 by CODELCO-CHILE. All Rights Reserved. 2015 Highlights Safety(P): total global accident frequency and severity rates deceased by 30% and 39%, reaching 0.93* and 140**, respectively. No fatal accident. Copper Own Mine Production: increased by 3.6% in 2015 to 1,732 thousand tons, compared to 2014, especially due to the new production coming from Mina Ministro Hales. Total production achieved a historical record of 1,891 thousand tons. Cost Reduction(P): C1 decreased 7.8% to 138.6 c/lb in 2015 compared to 2014, attributable to lower input prices and the intensification of the control cost program. Financial Performance(P): Adjusted Mining EBITDA Margin reached 41%, despite the 20% drop in the average copper price in 2015 compared to 2014. (S&P A+, Moody’s A1) Financing Program: In addition to the US$2 billion bond issuance in September, Codelco received US$600 million capital injection plus an approval to retain earnings for US$225 million, securing the financing for 2016. Investment Program: During 2015 Codelco reduced its capex program by US$1 billion, without affecting the execution plan for the key projects under construction. (P): All 2015 figures contained in this presentation are preliminary * Lost Time Injuries/ Million Hours worked ** Lost days & days charged / Million Hours worked 3 Copyrights© 2015 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights© 2015 by CODELCO-CHILE.
    [Show full text]