<<

Project site

Vestfold site

100 acres (40 Ha) flat site, centrally located, 15 minutes from Torp International airport.

Value proposition in brief Project 59°13'50"N 10°17'40"E 6°C/42,8°F and annual precipitation is 386 inches (980 mm). Power capacity at site is Statkraft Data Center Sites invites large data Vestfold consists of a flat area of 100 acres 80 MW available, with a further 40 MW centers to . We develop shovel-ready (40Ha) situated next to a strong substation expansion possible within 24 month. sites and projects that reduce the investor’s with 5x132kV connections. Other Connectivity can be provided by 2 or more risk. This effort is a continuation of our more infrastructure i.e. dark fibre access, railroad carriers. Dark fibre can be provided from 3 than 120 year legacy as a facilitating partner station, highway and international airport are or more providers. Connections can be with the power intensive industry. Norway has excellent. City centres of and made to Stockholm, , the lowest wholesale electricity price in Europe Tønsberg (county capital), are 20 minutes by and Frankfurt. Water and sanitary are and the lowest energy tax possible as well. Our car. University campus is 30 minutes by car. available on site. Zoning and consent is reliable high voltage grid makes hyperscale The site is facilitated by Statkraft. The site is completed by Q4 2018. datacenters without back-up generators facilitated by Statkraft, and ownership possible, reducing cost significantly. Each consists of one private owner. The site Distances main infrastructure: project consists of well suitable land ready topography is flat. The area is located 207ft Sandefjord Airport: 38 miles (62 km) zoned for light industry and with other relevant (63 m) above sea level, with topography of +/- airport: 114 miles (182 km) permits in place. It also has solutions for power 3.2ft (1 m). The site is zoned for 1.300.000 train station: 5 miles (8 km) supply and connectivity including indicative square feet (120.000 m2) data center Highway E18: 13 miles (21 km) pricing and timeframe. buildings, with a max height of 20 meters. Skien city center: 7 miles (9km) Annual mean temperature is Annual mean city center: 10 miles (16km) temperature Oslo city center: 83 miles (132km) January 2018

CONTACTS Atle Haga Statkraft Data Center Sites Program director P.O. Box 200 Lilleaker, N-0216 Oslo, Norway Phone: +47 91 37 46 19 E-mail: [email protected] www.statkraftdatasentersites.com

0