42 Flights To

Total Page:16

File Type:pdf, Size:1020Kb

42 Flights To 4242 FlightsFlights toto ISSISS -- 11/98-8/04 11/98-8/04 1616 shuttleshuttle flightsflights 2626 RussianRussian flightsflights STSSTS 8888 2A2A U.S.U.S. NodeNode 22 Proton,Proton, (FGB,(FGB, ServiceService Module)Module) STSSTS 9696 2A.12A.1 LogisticsLogistics 1515 ProgressProgress re-supplyre-supply shipsships STS101STS101 2a.2a2a.2a LogisticsLogistics 88 MannedManned SoyuzSoyuz STS106/STS106/ 2B.2B2B.2B LogisticsLogistics 11 UnmannedUnmanned Soyuz,Soyuz, (Docking(Docking Compartment)Compartment) STSSTS 92/3A92/3A Z-1Z-1 TrussTruss STSSTS 9797 P6P6 SolarSolar ArrayArray STSSTS 98/5A98/5A (Destiny(Destiny Lab)Lab) STSSTS 102/5A.1102/5A.1 (MPLM,(MPLM, ExpeditionExpedition 2)2) STSSTS 100/6A100/6A (CanadArm2)(CanadArm2) STSSTS 104/7A104/7A (U.S.(U.S. Airlock)Airlock) STSSTS 105/7A.1105/7A.1 (MPLM,(MPLM, ExpeditionExpedition 3)3) STSSTS 108/UF1108/UF1 (Expedition(Expedition 4)4) STS110STS110 8A8A (S0(S0 Truss)Truss) STSSTS 111/111/ UF2UF2 (Science(Science andand ExpeditionExpedition 5)5) STS112STS112 /9A/9A (( S1S1 StarboardStarboard Truss)Truss) STSSTS 113/113/ 11A11A (P1(P1 PortPort Truss)Truss) ISSISS AssemblyAssembly HistoryHistory 2A2A 3A3A 4A4A Zarya/FGBZarya/FGB ZvezdaZvezda Service Service ModuleModule P6P6 TrussTruss UnityUnity NodeNode 11 Z-1Z-1 TrussTruss w/Earlyw/Early CommComm w/Solarw/Solar ArrayArray 7A7A 11A 9A9A 11A DestinyDestiny LabLab P-1 truss PirsPirs Airlock Airlock P-1 truss CanadArm2CanadArm2 CurrentCurrent ConfigurationConfiguration S-0S-0 TrussTruss S-1S-1 TrussTruss QuestQuest AirlockAirlock ISSISS LaunchLaunch VehiclesVehicles nownow andand inin thethe futurefuture Ariane&Ariane& Shuttle Proton Soyuz HIIA & HTV Shuttle Proton Soyuz ATVATV HIIA & HTV 1515 MajorMajor ElementsElements AssembledAssembled •• FGBFGB ZaryaZarya •• UnityUnity •• 33 PressurizedPressurized MatingMating AdaptersAdapters •• ServiceService ModuleModule ZvezdaZvezda •• Z1Z1 TrussTruss •• P6P6 SolarSolar ArrayArray •• DestinyDestiny LabLab •• CanadarmCanadarm 2 2 && MobileMobile BaseBase SystemSystem •• QuestQuest U.S.U.S. AirlockAirlock 400,000400,000 lbslbs toto orbitorbit •• PirsPirs Russia Russia DockingDocking CompartmentCompartment •• S0S0 CentralCentral PowerPower DataData TrussTruss •• S1S1 RightRight TrussTruss •• P1P1 LeftLeft TrussTruss InIn 20012001 andand 2002,2002, 160,000160,000 lbslbs ofof hardwarehardware waswas liftedlifted toto thethe InternationalInternational SpaceSpace Station,Station, buildingbuilding mainlymainly thethe backbonebackbone TrussTruss structure.structure. OnceOnce ISSISS assemblyassembly resumesresumes afterafter ShuttleShuttle returnreturn toto flight,flight, NASANASA willwill focusfocus onon completingcompleting thethe massivemassive U.S.U.S. SolarSolar ArraysArrays thatthat provideprovide thethe electricityelectricity neededneeded toto operateoperate thethe ISSISS ISSISS ElementsElements atat KennedyKennedy SpaceSpace CenterCenter SpaceSpace StationStation ProcessingProcessing FacilityFacility (SSPF)(SSPF) OperationsOperations andand CheckoutCheckout FacilityFacility (O&C)(O&C) NodeNode 22 andand “Kibo”“Kibo” atat KSCKSC ProcessingProcessing FacilityFacility EVAEVA ChallengeChallenge 160160 120120 8080 spacewalks performed spacewalks spacewalks performed spacewalks 4040 00 GeminiGemini Apollo/SkylabApollo/Skylab ISSISS toto datedate (56) (56) ISSISS completecomplete.
Recommended publications
  • ARC-OVER April
    April Upcoming Events Next Board Meeting: May 6 Next General Meeting: May 12 Field Day: June 27 & 28 Pacificon: October 16 - 18 Dayton Hamvention May 15 TARC Meeting April 14, 2015 Turlock, War Memorial 7:00 p.m. Ron Roos, KJ6KNL, Our honorable President, called the meeting to order Pledge of Allegiance, All members and guests introduced themselves. Dylan Low, KK6SYD, was a first time guest. All were welcomed. Dick Decker, Vice President, K6SUU, gave an interesting presentation on Hams In Space. This was the topic members showed the most interest in. Fox 1 will launch on August 27th, 2015. To contact Space Stations in the past the Uplink was on VHF and the Downlink on UHF. This is now reversed, the Uplink will be UHF and the Downlink will be VHF. For a full copy of the Powerpoint Presentation, Dick announced that those interested could send an email to him and he would send it to those requesting it. Included in the Powerpoint will be the links for further information. Dick explained that Space stations were easier to use than Satellites. A variety of antennas were shown and discussed. They included; The Yagi, Two Elk Antennas (mounted on PVC) and one that really measured up; The Tape Measure Antenna. Dick informed all that he has a radio that members could use to hit the Space Station. Please contact him if you are interested. The process is pretty simple and it is rewarding when you get your card back in the mail! Dick’s email is; [email protected] 1 Ron Roos, asked members if they had read the minutes from our March 10th Meeting.
    [Show full text]
  • IAF-01-T.1.O1 Progress on the International Space Station
    https://ntrs.nasa.gov/search.jsp?R=20150020985 2019-08-31T05:38:38+00:00Z IAF-01-T.1.O1 Progress on the International Space Station - We're Part Way up the Mountain John-David F. Bartoe and Thomas Holloway NASA Johnson Space Center, Houston, Texas, USA The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, ard Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kg of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes.
    [Show full text]
  • The International Space Station and the Space Shuttle
    Order Code RL33568 The International Space Station and the Space Shuttle Updated November 9, 2007 Carl E. Behrens Specialist in Energy Policy Resources, Science, and Industry Division The International Space Station and the Space Shuttle Summary The International Space Station (ISS) program began in 1993, with Russia joining the United States, Europe, Japan, and Canada. Crews have occupied ISS on a 4-6 month rotating basis since November 2000. The U.S. Space Shuttle, which first flew in April 1981, has been the major vehicle taking crews and cargo back and forth to ISS, but the shuttle system has encountered difficulties since the Columbia disaster in 2003. Russian Soyuz spacecraft are also used to take crews to and from ISS, and Russian Progress spacecraft deliver cargo, but cannot return anything to Earth, since they are not designed to survive reentry into the Earth’s atmosphere. A Soyuz is always attached to the station as a lifeboat in case of an emergency. President Bush, prompted in part by the Columbia tragedy, made a major space policy address on January 14, 2004, directing NASA to focus its activities on returning humans to the Moon and someday sending them to Mars. Included in this “Vision for Space Exploration” is a plan to retire the space shuttle in 2010. The President said the United States would fulfill its commitments to its space station partners, but the details of how to accomplish that without the shuttle were not announced. The shuttle Discovery was launched on July 4, 2006, and returned safely to Earth on July 17.
    [Show full text]
  • Post Increment Evaluation Report Increment 11 International Space
    SSP 54311 Baseline WWW.NASAWATCH.COM Post Increment Evaluation Report Increment 11 International Space Station Program Baseline June 2006 National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas Contract Number: NNJ04AA02C WWW.NASAWATCH.COM SSP 54311 Baseline - WWW.NASAWATCH.COM REVISION AND HISTORY PAGE REV. DESCRIPTION PUB. DATE - Initial Release (Reference per SSCD XXXXXX, EFF. XX-XX-XX) XX-XX-XX WWW.NASAWATCH.COM SSP 54311 Baseline - WWW.NASAWATCH.COM INTERNATIONAL SPACE STATION PROGRAM POST INCREMENT EVALUATION REPORT INCREMENT 11 CHANGE SHEET Month XX, XXXX Baseline Space Station Control Board Directive XXXXXX/(X-X), dated XX-XX-XX. (X) CHANGE INSTRUCTIONS SSP 54311, Post Increment Evaluation Report Increment 11, has been baselined by the authority of SSCD XXXXXX. All future updates to this document will be identified on this change sheet. WWW.NASAWATCH.COM SSP 54311 Baseline - WWW.NASAWATCH.COM INTERNATIONAL SPACE STATION PROGRAM POST INCREMENT EVALUATION REPORT INCREMENT 11 Baseline (Reference SSCD XXXXXX, dated XX-XX-XX) LIST OF EFFECTIVE PAGES Month XX, XXXX The current status of all pages in this document is as shown below: Page Change No. SSCD No. Date i - ix Baseline XXXXXX Month XX, XXXX 1-1 Baseline XXXXXX Month XX, XXXX 2-1 - 2-2 Baseline XXXXXX Month XX, XXXX 3-1 - 3-3 Baseline XXXXXX Month XX, XXXX 4-1 - 4-15 Baseline XXXXXX Month XX, XXXX 5-1 - 5-10 Baseline XXXXXX Month XX, XXXX 6-1 - 6-4 Baseline XXXXXX Month XX, XXXX 7-1 - 7-61 Baseline XXXXXX Month XX, XXXX A-1 - A-9 Baseline XXXXXX Month XX, XXXX B-1 - B-3 Baseline XXXXXX Month XX, XXXX C-1 - C-2 Baseline XXXXXX Month XX, XXXX D-1 - D-92 Baseline XXXXXX Month XX, XXXX WWW.NASAWATCH.COM SSP 54311 Baseline - WWW.NASAWATCH.COM INTERNATIONAL SPACE STATION PROGRAM POST INCREMENT EVALUATION REPORT INCREMENT 11 JUNE 2006 i SSP 54311 Baseline - WWW.NASAWATCH.COM SSCB APPROVAL NOTICE INTERNATIONAL SPACE STATION PROGRAM POST INCREMENT EVALUATION REPORT INCREMENT 11 JUNE 2006 Michael T.
    [Show full text]
  • Spaceport News Pioneering the Future America's Gateway to the Universe
    May 14, 1999 Vol. 38, No. 10 Fortieth Anniversary Spaceport News Pioneering the Future America's gateway to the universe. Leading the world in preparing and launching missions to Earth and beyond. John F. Kennedy Space Center Preparing GOES to go Packing up for a trip to the space station Packing li ght isn't an option for the seven-member crew of STS-96, scheduled to lift off to the Inter­ national Space Station (ISS) on May 20 from Kennedy Space Center's Launch Pad 39B. The 10-day flight will take about two tons of supplies - including laptop computers, a printer, cameras, maintenance tools, spare parts and clothing- to the orbiting space station in the SPACEHAB double module. Discovery will be the first orbiter to dock with the fledgling station since the crew of Endeavour departed the outpost in December 1998. At Astrotech in Titusville, STS-96 will also be the first Fla., the GOES-L weather logistics flight to the new station. satellite was encapsulated in Discovery will spend five days its fairing before transfer to linked to the ISS, transferring and Launch Pad 36B at Cape installing gear that could not be Canaveral Air Station. The fourth of a new (See STS-96, Page 5) advanced series of geo­ At left, In the payload changeout room at stationary weather satellites Launch Pad 39B, technicians moved the for the National Oceanic and SPACEHAB double module from the payload canister on April 28 and placed it Atmospheric Administration in Space Shuttle Discovery's payload bay (NOAA), GOES-Lis a three­ for STS-96.
    [Show full text]
  • Observations of the Performance of the U.S. Laboratory Architecture
    ---------------~ Source of Acqui sition NAS A Johnson Space Center Observations of the performance of the U.S. Laboratory Architecture Rod Jones National Aeronautics and Space Adm inistration , Lyndon B. Johnson Space Center ABSTRACT Station " 2000-01-2329 described the requirements selection process used to define the quadrant or The United States Laboratory Module "Destiny" was four post architecture of the Space Station the product of many architectural, technology, pressurized elements. The key features where the manufacturing, schedule and cost constraints pressure vessel envelope, standoffs, racks and which spanned 15 years. Requirements for the hatch shape and size. Space Station pressurized elements were developed and baselined in the mid to late '80's. Although the station program went through several design changes the fundamental requirements that drove the architecture did not change. Manufacturing of the U.S. Laboratory began in the early 90's. Final assembly and checkout testing completed in December of 2000. Destiny was launched, mated to the International Space Station and successfully activated on the STS-98 mission in February of 2001. The purpose of this paper is to identify key requirements, which directly or indirectly established the architecture of the U.S. Laboratory. Provide an overview of how that architecture affected the manufacture, assembly, test, and activation of the module on-orbit. And finally, through observations made during the last year of operation, provide considerations in the development of future requirements and mission integration controls for space habitats. ARCHITECTURE AND REQUIREMENTS In normal building construction the product of "architecture" are the drawings and specifications, which identify hardware requ irements and depict the integrated design.
    [Show full text]
  • Building and Maintaining the International Space Station (ISS)
    / Building and maintaining the International Space Station (ISS) is a very complex task. An international fleet of space vehicles launches ISS components; rotates crews; provides logistical support; and replenishes propellant, items for science experi- ments, and other necessary supplies and equipment. The Space Shuttle must be used to deliver most ISS modules and major components. All of these important deliveries sustain a constant supply line that is crucial to the development and maintenance of the International Space Station. The fleet is also responsible for returning experiment results to Earth and for removing trash and waste from the ISS. Currently, transport vehicles are launched from two sites on transportation logistics Earth. In the future, the number of launch sites will increase to four or more. Future plans also include new commercial trans- ports that will take over the role of U.S. ISS logistical support. INTERNATIONAL SPACE STATION GUIDE TRANSPORTATION/LOGISTICS 39 LAUNCH VEHICLES Soyuz Proton H-II Ariane Shuttle Roscosmos JAXA ESA NASA Russia Japan Europe United States Russia Japan EuRopE u.s. soyuz sL-4 proton sL-12 H-ii ariane 5 space shuttle First launch 1957 1965 1996 1996 1981 1963 (Soyuz variant) Launch site(s) Baikonur Baikonur Tanegashima Guiana Kennedy Space Center Cosmodrome Cosmodrome Space Center Space Center Launch performance 7,150 kg 20,000 kg 16,500 kg 18,000 kg 18,600 kg payload capacity (15,750 lb) (44,000 lb) (36,400 lb) (39,700 lb) (41,000 lb) 105,000 kg (230,000 lb), orbiter only Return performance
    [Show full text]
  • International Space Station Basics Components of The
    National Aeronautics and Space Administration International Space Station Basics The International Space Station (ISS) is the largest orbiting can see 16 sunrises and 16 sunsets each day! During the laboratory ever built. It is an international, technological, daylight periods, temperatures reach 200 ºC, while and political achievement. The five international partners temperatures during the night periods drop to -200 ºC. include the space agencies of the United States, Canada, The view of Earth from the ISS reveals part of the planet, Russia, Europe, and Japan. not the whole planet. In fact, astronauts can see much of the North American continent when they pass over the The first parts of the ISS were sent and assembled in orbit United States. To see pictures of Earth from the ISS, visit in 1998. Since the year 2000, the ISS has had crews living http://eol.jsc.nasa.gov/sseop/clickmap/. continuously on board. Building the ISS is like living in a house while constructing it at the same time. Building and sustaining the ISS requires 80 launches on several kinds of rockets over a 12-year period. The assembly of the ISS Components of the ISS will continue through 2010, when the Space Shuttle is retired from service. The components of the ISS include shapes like canisters, spheres, triangles, beams, and wide, flat panels. The When fully complete, the ISS will weigh about 420,000 modules are shaped like canisters and spheres. These are kilograms (925,000 pounds). This is equivalent to more areas where the astronauts live and work. On Earth, car- than 330 automobiles.
    [Show full text]
  • STS-129 Stocking the Station PRESS KIT/November 2009
    National Aeronautics and Space Administration SPACE SHUTTLE MISSION STS-129 Stocking the Station www.nasa.gov www.nasa.gov PRESS KIT/November 2009 CONTENTS Section Page STS-129/ULF-3 MISSION OVERVIEW .................................................................................... 1 STS-129 TIMELINE OVERVIEW ............................................................................................... 9 MISSION PROFILE ................................................................................................................... 11 MISSION OBJECTIVES ............................................................................................................ 13 MISSION PERSONNEL ............................................................................................................. 15 STS-129 CREW ....................................................................................................................... 17 PAYLOAD OVERVIEW .............................................................................................................. 27 S-BAND ANTENNA SUPPORT ASSEMBLY (SASA) AND RADIO FREQUENCY GROUP (RFG) ..................... 29 EXPRESS LOGISTICS CARRIER 1 AND 2 ............................................................................................... 31 RENDEZVOUS & DOCKING ....................................................................................................... 47 UNDOCKING, SEPARATION, AND DEPARTURE ...................................................................................... 48 SPACEWALKS
    [Show full text]
  • A Call for a New Human Missions Cost Model
    A Call For A New Human Missions Cost Model NASA 2019 Cost and Schedule Analysis Symposium NASA Johnson Space Center, August 13-15, 2019 Joseph Hamaker, PhD Christian Smart, PhD Galorath Human Missions Cost Model Advocates Dr. Joseph Hamaker Dr. Christian Smart Director, NASA and DoD Programs Chief Scientist • Former Director for Cost Analytics • Founding Director of the Cost and Parametric Estimating for the Analysis Division at NASA U.S. Missile Defense Agency Headquarters • Oversaw development of the • Originator of NASA’s NAFCOM NASA/Air Force Cost Model cost model, the NASA QuickCost (NAFCOM) Model, the NASA Cost Analysis • Provides subject matter expertise to Data Requirement and the NASA NASA Headquarters, DARPA, and ONCE database Space Development Agency • Recognized expert on parametrics 2 Agenda Historical human space projects Why consider a new Human Missions Cost Model Database for a Human Missions Cost Model • NASA has over 50 years of Human Space Missions experience • NASA’s International Partners have accomplished additional projects . • There are around 70 projects that can provide cost and schedule data • This talk will explore how that data might be assembled to form the basis for a Human Missions Cost Model WHY A NEW HUMAN MISSIONS COST MODEL? NASA’s Artemis Program plans to Artemis needs cost and schedule land humans on the moon by 2024 estimates Lots of projects: Lunar Gateway, Existing tools have some Orion, landers, SLS, commercially applicability but it seems obvious provided elements (which we may (to us) that a dedicated HMCM is want to independently estimate) needed Some of these elements have And this can be done—all we ongoing cost trajectories (e.g.
    [Show full text]
  • Aeronautics and Space Report of the President
    Aeronautics and Space Report of the President Fiscal Year 2009 Activities Aeronautics and Space Report of the President Fiscal Year 2009 Activities The National Aeronautics and Space Act of 1958 directed the annual Aeronautics and Space Report to include a “comprehensive description of the programmed activities and the accomplishments of all agencies of the United States in the field of aeronautics and space activities during the preceding calendar year.” In recent years, the reports have been prepared on a fiscal-year basis, consistent with the budgetary period now used in programs of the Federal Government. This year’s report covers Aeronautics and SpaceAeronautics Report of the President activities that took place from October 1, 2008, through September 30, 2009. TABLE OF CONTENTS National Aeronautics and Space Administration . 1. Fiscal Year 2009 Activities Year Fiscal • Exploration Systems Mission Directorate 1 • Space Operations Mission Directorate 10 • Science Mission Directorate 18 • Aeronautics Research Mission Directorate 25 Department of Defense . 41 Federal Aviation Administration . 45 . Department of Commerce . 51. Department of the Interior . 81. Federal Communications Commission . 103 U.S. Department of Agriculture. 107 National Science Foundation . 115 . Department of State. 125 Department of Energy. 129 Smithsonian Institution . 137. Appendices . 149 . • A-1 U S Government Spacecraft Record 150 • A-2 World Record of Space Launches Successful in Attaining Earth Orbit or Beyond 151 • B Successful Launches to Orbit on U S Vehicles 152 • C Human Spaceflights 155 • D-1A Space Activities of the U S Government—Historical Table of Budget Authority in Millions of Real-Year Dollars 156 • D-1B Space Activities of the U S Government—Historical Table of Budget Authority in Millions of Inflation-Adjusted FY 09 Dollars 157 • D-2 Federal Space Activities Budget 158 • D-3 Federal Aeronautics Activities Budget 159 Acronyms .
    [Show full text]
  • ESA's ISS External Payloads
    number 8, march 2002 on station The Newsletter of the Directorate of Manned Spaceflight and Microgravity http://www.esa.int/spaceflight in this issue A Promising Start to 2002 aurora Jörg Feustel-Büechl Aurora: A European Roadmap 4 ESA Director of Manned Spaceflight and Microgravity for Solar System Exploration Rolf Schulze I want to highlight two very important milestones for this year. Firstly, the final integration and test of our Columbus virtual campus laboratory for the International Space Station began at The Erasmus Virtual Campus 6 Astrium GmbH in Bremen (D) following the arrival in Dieter Isakeit September of the Pre-Integrated Columbus Assembly (PICA) from Alenia Spazio in Turin (I). I believe that we have a payloads masterpiece of European engineering here, and I am ESA’s ISS External Payloads 8 delighted with the progress so far.We should be seeing some Steve Feltham & Giacinto Gianfiglio very real advance on Columbus by the end of 2002 and look forward to its status then. xeus Secondly, I had the opportunity on 15 January to review ISS Assembly of XEUS 10 the course of the Automated Transfer Vehicle (ATV) project at Jens Schiemann Les Mureaux (F), together with our team and the industries involved in the project under prime contractor EADS-LV.The spoe progress is quite remarkable when we remember the SPOE 12 difficulties of last year. All in all, I think that the technical Rolf-Dieter Andresen, Maurizio Nati achievements so far are satisfactory. One important & Chris Taylor demonstration of this progress is the arrival of the ATV Structural Test Model in ESTEC’s Test Centre, where it will research undergo testing during the whole of this year.
    [Show full text]