A Rail Vision for the West Midlands
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
HS2 Unlocking the Benefits
i HS2 Unlocking the benefits West Midlands Connectivity Package ii 2.7 million people live in the West Midlands metropolitan area, the largest urban area outside of London 1 The Connectivity Package will improve regional and local links The High Speed to High Speed Rail Two (HS2) and encourage sustainable Rail Network will growth using the released rail capacity from the West Coast Main Line. Economic benefits will therefore be maximised provide much- across the West Midlands region with capacity constraints on needed additional rail the already congested local transport networks being relieved. capacity connecting Based on international experience of High Speed Rail, the main urban areas implementation of the Connectivity Package to transform the proposed HS2 interchanges into integrated regional of the UK along a transport hubs is fundamental if our businesses are to expand new North-South fast their markets, access a wider workforce and develop local economic networks. Improved connectivity will undoubtedly connection. To capture attract new business and promote innovation across our and maximise the manufacturing and service sectors. distribution of HS2’s The Package will have a positive impact across a range of economic challenges facing Local Enterprise Partnerships potential benefits, (LEPs) in the West Midlands such as slow business cluster authorities across formation, urban youth unemployment and limited access to international gateways. The arrival of HS2 also underpins the West Midlands development plans for Birmingham city centre and UK region have prepared a Central, stimulating further job creation from high-value economic activity in the West Midlands. Delivery of the Transport Connectivity Package will ensure that key locations are effectively linked Package, which will up to HS2 stations overcoming any potential consequences of building HS2 without connections to these places. -
Solent to the Midlands Multimodal Freight Strategy – Phase 1
OFFICIAL SOLENT TO THE MIDLANDS MULTIMODAL FREIGHT STRATEGY – PHASE 1 JUNE 2021 OFFICIAL TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................................................................................... 4 1. INTRODUCTION TO THE STUDY .......................................................................................................................................................... 9 2. STRATEGIC AND POLICY CONTEXT ................................................................................................................................................... 11 3. THE IMPORTANCE OF THE SOLENT TO THE MIDLANDS ROUTE ........................................................................................................ 28 4. THE ROAD ROUTE ............................................................................................................................................................................. 35 5. THE RAIL ROUTE ............................................................................................................................................................................... 40 6. KEY SECTORS .................................................................................................................................................................................... 50 7. FREIGHT BETWEEN THE SOLENT AND THE MIDLANDS .................................................................................................................... -
Framework Capacity Statement
Framework Capacity Statement Network Rail December 2016 Network Rail Framework Capacity Statement December 2016 1 Contents 1. Purpose 1.1 Purpose 4 2. National overview 2.1 Infrastructure covered by this statement 6 2.2 Framework agreements in Great Britain 7 2.3 Capacity allocation in Great Britain 9 2.4 National capacity overview – who operates where 10 2.5 National capacity overview – who operates when 16 3. Network Rail’s Routes 3.1 Anglia Route 19 3.2 London North East & East Midlands Route 20 3.3 London North Western Route 22 3.4 Scotland Route 24 3.5 South East Route 25 3.6 Wales Routes 27 3.7 Wessex Route 28 3.8 Western Route 29 4. Sub-route and cross-route data 4.1 Strategic Routes / Strategic Route Sections 31 4.2 Constant Traffic Sections 36 Annex: consultation on alternative approaches A.1 Questions of interpretation of the requirement 39 A.2 Potential solutions 40 A.3 Questions for stakeholders 40 Network Rail Framework Capacity Statement December 2016 2 1. Purpose Network Rail Framework Capacity Statement December 2016 3 1.1 Purpose the form in which data may be presented. The contracts containing the access rights are publicly available elsewhere, and links are provided in This statement is published alongside Network Rail’s Network Statement section 2.2. However, the way in which the rights are described when in order to meet the requirements of European Commission Implementing combined on the geography of the railway network, and over time, to meet Regulation (EU) 2016/545 of 7 April 2016 on procedures and criteria the requirements of the regulation, is open to some interpretation. -
The Future Climate of North West England
The University of Manchester Research The future climate of North West England Link to publication record in Manchester Research Explorer Citation for published version (APA): Cavan, G., Carter, J. G., & Kazmierczak, A. (2010). The future climate of North West England. EcoCities project, University of Manchester. Citing this paper Please note that where the full-text provided on Manchester Research Explorer is the Author Accepted Manuscript or Proof version this may differ from the final Published version. If citing, it is advised that you check and use the publisher's definitive version. General rights Copyright and moral rights for the publications made accessible in the Research Explorer are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. Takedown policy If you believe that this document breaches copyright please refer to the University of Manchester’s Takedown Procedures [http://man.ac.uk/04Y6Bo] or contact [email protected] providing relevant details, so we can investigate your claim. Download date:08. Oct. 2021 The future climate of North West England Cavan, G. Carter, J. and Kazmierczak, A. 1 Introduction........................................................................................................ 3 1.1 Background to climate change................................................................... 3 1.2 Emissions scenarios ................................................................................. -
The Changing Epidemiology of Cryptosporidiosis in North West England
Epidemiol. Infect. (2005), 133, 785–793. f 2005 Cambridge University Press doi:10.1017/S0950268805004772 Printed in the United Kingdom The changing epidemiology of cryptosporidiosis in North West England W. SOPWITH 1*, K. OSBORN 2,R.CHALMERS3 AND M. REGAN 1 1 Health Protection Agency, North West Regional Office, Liverpool, UK 2 United Utilities, Warrington, UK 3 Cryptosporidium Reference Unit, National Public Health Service for Wales, Swansea, UK (Accepted 24 May 2005) SUMMARY Between 1996 and 2000, rates of cryptosporidiosis in North West England were significantly higher than overall in England and Wales, particularly during the first half of each year. In addition, during the second quarter of each year in this period, up to 40% of all cases recorded in England and Wales were from the North West Region. In 2001, cryptosporidiosis dramatically decreased throughout the United Kingdom and the springtime excess of cases formerly seen in the North West was no longer apparent. This changed epidemiology was due to a decline in cases of Cryptosporidium parvum (formerly genotype 2), associated with zoonotic transmission. Although the initial loss of a spring peak of infection corresponded with the outbreak of foot-and-mouth disease throughout the United Kingdom, its continued absence relates to major structural changes in the North West public water supply. This study highlights the far-reaching public health benefit of local working relationships in addressing re-occurring disease issues. INTRODUCTION In the past 10 years, there have been several springtime clusters of cryptosporidiosis in the United Transmission of the protozoan parasite Crypto- Kingdom relating to various sources of drinking sporidium to humans has been documented by direct water [4–7]. -
West Midlands European Regional Development Fund Operational Programme
Regional Competitiveness and Employment Objective 2007 – 2013 West Midlands European Regional Development Fund Operational Programme Version 3 July 2012 CONTENTS 1 EXECUTIVE SUMMARY 1 – 5 2a SOCIO-ECONOMIC ANALYSIS - ORIGINAL 2.1 Summary of Eligible Area - Strengths and Challenges 6 – 14 2.2 Employment 15 – 19 2.3 Competition 20 – 27 2.4 Enterprise 28 – 32 2.5 Innovation 33 – 37 2.6 Investment 38 – 42 2.7 Skills 43 – 47 2.8 Environment and Attractiveness 48 – 50 2.9 Rural 51 – 54 2.10 Urban 55 – 58 2.11 Lessons Learnt 59 – 64 2.12 SWOT Analysis 65 – 70 2b SOCIO-ECONOMIC ANALYSIS – UPDATED 2010 2.1 Summary of Eligible Area - Strengths and Challenges 71 – 83 2.2 Employment 83 – 87 2.3 Competition 88 – 95 2.4 Enterprise 96 – 100 2.5 Innovation 101 – 105 2.6 Investment 106 – 111 2.7 Skills 112 – 119 2.8 Environment and Attractiveness 120 – 122 2.9 Rural 123 – 126 2.10 Urban 127 – 130 2.11 Lessons Learnt 131 – 136 2.12 SWOT Analysis 137 - 142 3 STRATEGY 3.1 Challenges 143 - 145 3.2 Policy Context 145 - 149 3.3 Priorities for Action 150 - 164 3.4 Process for Chosen Strategy 165 3.5 Alignment with the Main Strategies of the West 165 - 166 Midlands 3.6 Development of the West Midlands Economic 166 Strategy 3.7 Strategic Environmental Assessment 166 - 167 3.8 Lisbon Earmarking 167 3.9 Lisbon Agenda and the Lisbon National Reform 167 Programme 3.10 Partnership Involvement 167 3.11 Additionality 167 - 168 4 PRIORITY AXES Priority 1 – Promoting Innovation and Research and Development 4.1 Rationale and Objective 169 - 170 4.2 Description of Activities -
Midland Lodge, Sutton Park
MIDLAND LODGE, SUTTON PARK A history of the building with details of its architecture, its association with two well-known tenants and the establishment of Sutton Coldfield’s Vesey Club in 1888. Roy Billingham Midland Lodge is a residential property situated within Sutton Park, designed by William Jenkins, a Birmingham architect, and built in 1880 for the Warden and Society of Sutton Coldfield. Following the Town’s incorporation in 1886, ownership passed to the new Corporation of Sutton Coldfield, and to Birmingham City Council in 1974 after Government reorganisation of local authority boundaries. The site of Midland Lodge (O.S. Grid Ref. SP 1121 9715) is adjacent to the Midland Gate entrance to Sutton Park at the western end of Midland Road which was constructed as a private road by the Midland Railway Company in 1879 to provide direct access for train passengers to and from the Park for their Sutton Park railway station. “New Lodge”, as the cottage was originally called, had several tenants prior to 1886 when Benjamin Stone, Sutton Coldfield’s first Mayor, took over the tenancy in order to meet the necessary residential qualifications to become a burgess of the Town. During his four years as Mayor, 1886-90, the lodge was known as “The Mayor’s Cottage” which he treated as his pied- à-terre, his own home being in Grange Lane, Erdington. After Stone terminated his tenancy in 1891 the cottage was referred to ever afterwards as “Midland Lodge”. Fig. 1(a) – Midland Lodge in c. 1910 Fig. 1(b) – Midland Lodge in February, 2014 Photograph by Benjamin Stone [Ref. -
West Midlands & Chilterns Route Study Technical Appendices
Long Term Planning Process West Midlands & Chilterns Route Study Technical Appendices August 2017 Contents August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 02 Technical Appendices 03 A1 - Midlands Rail Hub: Central Birmingham 04 elements A2 - Midlands Rail Hub: Birmingham to 11 Nottingham/Leicester elements A3 - Midlands Rail Hub: Birmingham to 17 Worcester/Hereford via Bromsgrove elements A4 - Chiltern Route 24 A5 - Birmingham to Leamington Spa via 27 Coventry A6 - Passenger capacity at stations 30 A7 - Business Case analysis 50 Technical Appendicies August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 03 Introduction to Technical Appendices Cost estimation These Technical Appendices provide the technical evidence to Cost estimates have been prepared for interventions or packages of support the conclusions and choices for funders presented in the interventions proposed in the Route Study. The estimates are based main Route Study document. The areas of technical analysis on the pre-GRIP data available, concept drawings and high level outlined in these appendices are capability analysis, concept specification of the intervention scope. To reflect the level of development (at pre-GRIP level), cost estimation, business case information available to support the estimate production, a analysis and passenger capacity analysis at stations. contingency sum of 60% has been added. The estimates do not include inflation. Indicative cost ranges have been provided based The appendices are presented by geographical area with the on this assessment. exception of the business case analysis and passenger capacity analysis. Business case analysis The areas of technical analysis are summarised below. Business case analysis has been undertaken to demonstrate to funders whether a potential investment option is affordable and Capability Analysis offers value for money. -
West Midlands Railway Urges Snow Hill Customers to Check Journeys Ahead of Timetable Changes
West Midlands Railway urges Snow Hill customers to check journeys ahead of timetable changes October 19, 2020 Passengers using West Midlands Railway (WMR) services via Birmingham Snow Hill are being urged to check their journeys ahead of a new timetable coming into effect next week (w/c Oct 26). The new timetable formalises temporary arrangements announced last month as the impact of COVID-19 continues to make it difficult for the operator to provide the normal train schedule. The timetable has been brought in to provide a reliable service to passengers on the route, which serves destinations including Stratford-upon-Avon, Worcester and Kidderminster. Peak-time travel and school trains have been prioritised in the new schedule. WMR customer experience director Jonny Wiseman said: “We are committed to providing as many trains as we can with the resources available to meet demand. This new timetable has been designed to provide a simple, straightforward service our customers can rely on. “In recent weeks the impact of COVID-19 has meant we have had to cancel a number of trains on the Snow Hill lines, which we know is frustrating for our customers. “That’s why we have created a new timetable which will reduce the need for short-notice cancellations while still providing a service to match the level of demand on the route. “We will continue to run trains with the maximum possible number of carriages in order to help our customers socially distance while on board.” With cases of COVID-19 increasing and restrictions tightening in some places, WMR is monitoring passenger numbers across the network to provide an appropriate level of service which matches customer demand and takes account of train crew availability. -
Delivering High Speed 2 Major Project Report
DELIVERING HIGH SPEED 2 MAJOR PROJECT REPORT New rail reality Developing a £33bn rail network to transform Uk’s north-soUth 03|2012 CONNECTIONS Special report | High Speed 2 03 | 2012 Foreword 04 infrastructure specialists who supply the rail Introduction industry. Many of them are already helping HS2 Ltd chief executive Alison Munro us deliver Crossrail, Thameslink, electrifica- updates on the project’s progress tion, and upgrades to major stations like Reading and Birmingham. But even the 08 largest of these schemes will be dwarfed in Technical challenge size by HS2. So the challenge is for British Why the current London to West firms to develop the expertise to compete Midlands route is the best for key high speed contracts, and help deliver Britain’s Victorian engineering HS2 on time and on budget. 12 pioneers built a railway that was the The government’s National Infrastructure Euston envy of the world. Such was their Plan makes clear the importance of a predict- vision and singular focus that able and transparent pipeline of infrastruc- Expanding the station presents a ❝ following the opening of the first intercity line regeneration opportunity ture projects that will help the private sector between Manchester and Liverpool in 1830, it invest and plan for the future. HS2 will form 14 took just a little over two decades to construct a a key element of that long-term pipeline, Euston masterplan national rail network which linked all our major providing certainty about future contracting cities, and transformed our economy. Designs for Euston station opportunities following the Yet the modern reality is that since the terminus are vital to the project completion of Crossrail in 2017. -
Prologis Park Birmingham Interchange Goes Above and Beyond What You’Ve Come to Expect from Traditional Industrial & Distribution Property
THE OPPORTUNITY DESIGNED TO REDEFINE Redefining the everyday, Prologis Park Birmingham Interchange goes above and beyond what you’ve come to expect from traditional industrial & distribution property. In addition to stunning, sophisticated working environments with carefully considered and highly crafted details, these landmark buildings take effortless to the next level, providing added excellent local amenities and outstanding connectivity to both UK and international locations. Pushing boundaries and exceeding expectations, this is where form and function works. FEATURES & BENEFITS ALL THINGS CONSIDERED Prologis Park Birmingham Interchange is a speculative development of 310,000 sq ft on 16 acres in an established commercial location, providing the very best industrial & distribution opportunities in the West Midlands. New Grade ‘A’ industrial & An established location, Flexible space available from distribution space with with local occupiers that include 76,975 sq ft – 233,025 sq ft headquarters style specification. Jaguar Land Rover and Rolls-Royce. (7,151 sq m – 21,648 sq m). Rare availability in a Only a 3 minute drive to Outstanding, modern highly sought after east Birmingham Airport. headquarters style office Birmingham location. accommodation. A superb work / life balance Innovation brought to you by the Fully funded with buildings with an abundance of amenities UK’s leading developer and owner of available autumn 2018. available on your doorstep. logistics property – Prologis. Up to 15m Major catchment area with In close proximity -
Delivering a Rail Revolution for Communities
Delivering a Rail Revolution for Communities Malcolm Holmes, Executive Director West Midlands Rail Executive is a movement for change, driving a revolution in rail services for West Midlanders • Increasing local influence over our rail network through: • A strong role in the specification and procurement of the 2017 West Midlands franchise • Leading the local management of the franchise • A role in specification of other franchises that operate in the region • A fully devolved West Midlands rail franchise WMRE Strategic Focus Single Network Vision West Midlands Rail Investment Strategy West Midlands West Midlands Rail Franchising Rail Programme Stations Alliance & Partnerships WMRE Strategic Focus Single Network Vision West Midlands Rail Investment Strategy West Midlands West Midlands Rail Franchising Rail Programme Stations Alliance & Partnerships Franchises in WMRE Area Crewe Stoke-on-Trent West Midlands Franchise - WMSBU West Midlands Franchise - WCSBU Derby Cross Country Nottingham Stafford Chiltern Railways Rugeley Trent Valley Wales & Borders (Arriva Trains Wales) Burton-on- Rugeley Town Trent Inter City West Coast (Virgin Trains) Cannock Lichfield Trent Lichfield City Valley Great Western (First Great Western) East Midlands Walsall Tamworth Shrewsbury Sutton Coldfield Tame Bridge Pky Wolverhampton Nuneaton Birmingham Aston Snow Hill Hinckley Leicester Telford Telford Central Smethwick Galton Bridge New St Rowley Regis Birmingham International Cradley Heath Birmingham Moor St University Coventry Rugby Stourbridge Solihull Long Buckby